Change Order No.: I Date: August 11,2023
Project: Governor's Park Supply Well Drilling
CCUA Bid No.: 21/22-A26
CCUA Project No.: 1127-003
Vendor: Complete Services Well Drilling,Inc. Owner: Clay County Utility Authority
9785 Well Water Road 3176 Old Jennings Road
Jacksonville,FL 32220 Middleburg.El. 32068
(912)659-9087
Engineer of Record: Dewberry Engineers,Inc.
800 North Magnolia Ave.,Suite 1000
Orlando,FL 32803-3251
(404)843-5120
ORIGINAL CONTRACT TIMES ORIGINAL PREVIOUS CO CURRENT CO
NTP 1/3/2023
DAYS ADD 0 30
SUB.COMP. 240 8/31/2023 9/30/2023
FINAL COMP. 270 9/30/2023 10/30/2023
d
tap INCREASE OR
O DECREASE IN
r
III l DESCRIPTION OF CHANGE(S) QTY. UNIT PRIC1 CONTRACT PRICF
('on traetIncrease
O
Contract Decrease
TOTAL INCREASE S0.00
TOTAL DECREASE S0.00
NET CHANGE RESULTING FROM THIS CHANGE ORDER S0.00
ORIGINAL CONTRACT PRICE S 1.087.490.00
Net Increases by Change Orders(prior to this change order) $0.00
Net Decreases by Change Orders(prior to this change order) $0.00
Total Net Change by Change Orders(prior to this change order) $0.00
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $1.087.490.00
NET CHANGE RI SULTING FROM THIS CHANGE ORDER $0.00
CONfRAC I PRI( I INCLUDING TIIIS CHANGE ORDER 5E087.490.00
This document shall become an amendment to the contract and all pros isions at the contract will apply hereto
-1•
14
4.
4111.
^t 8/14/2023
Accepted by: Date:
Engineer of Re ire
Accepted by: Date: Sb4 124
Vendor
Accepted hv: Date2 a 2 3"'toll.—it
t .n
Project: Governor's Park Supply Well Drilling
CCUA Bid No.: 21/22-A26 CCUA Project No.: 1127-003
Summary of Change Orders
Date Description Contract Net Increase Net Decrease Revised Contract
1/3/2023 Original Contract Price: $1,087,490.00
8/11/2023 $0.00 $0.00 S1,087,490.00
Change Order No. 1:
Summary of Totals: S1,087,490.00 $0.00 $0.00 $1,087,490.00
to
Dewberry Engineers Inc. 407 843.5120
Dewberry. 800 North Magnolia Ave,Suite 1000 407.649 8664 fax
Orlando,FL 32803-3251 www,dewberry.com
August 10. 2023
Linda S. Ortiz, MBA
Construction and Inspection Services Coordinator
Clay County Utility Authority
3176 Old Jennings Rd
Middleburg. FL 32068
SUBJECT: Change Order Request Entitlement Recommendation
Clay County Utility Authority
Governor's Park Water Production Facility Supply Wells
CCUA Project No.: 1127-003
Dewberry Engineers, Inc. Project No.: 50154364
Dear Ms. Ortiz:
Complete Services Well Drilling, Inc. (CWDS) provides construction services for the Governor's Park
Water Treatment Plant Supply Wells. Change Order Request No. 1 is proposed to extend the contract
time by 30 days due to delays associated with increased hydrogen sulfide concentrations encountered
during the construction of Well No. 2. After drilling the well to total depth. decisions between Clay County
and the Dewberry Team were necessary to determine if these concentrations were acceptable and
required further water quality testing to document background concentrations. Additional water quality
sampling was performed during step-drawdown testing, causing delays in final geophysical logging. After
to a review of the additional data, Clay County indicated that the increased hydrogen sulfide concentrations
were within the range of values acceptable for the design of the water treatment facility.
CWDS submitted a change order request on August 8, 2023, for a 30-day contract extension.
Schedule
The Substantial Completion contract time was 240 days by August 31. 2023. Now the Substantial
Completion contract time is 270 days by September 30. 2023. and a Final Completion date of October 30.
2023,
Budget:
This Change Order Request No. 1 does not affect the contract amount of S1,087,490.
Mike Simmons, P.G.
Senior Hydrogeologist
Dewberry Engineers, Inc.
Page 1 of 1
SECTION 00660
Change Order Request Form
Project: Governor's Park Supply Well Drilling Project No.: 1127-003 Change Order No.: I
Change in Contract Times (Days) (Days)
Original Contract time: Substantial Completion: 240 Ready for Final Payment: 270
Increased from previous C.O.: Substantial Completion: Ready for Final Payment:
Decreased from previous C.O.: Substantial Completion: Ready for Final Payment:
Contract time prior to this C.O.: Substantial Completion: Ready for Final Payment:
Increase in time on this C.O.: Substantial Completion: 30 Ready for Final Payment: 30
Decrease in time on this C.O.: Substantial Completion: Ready for Final Payment:
Contract time with all approved C.O.s: Substantial Completion: Ready for Final Payment:
Change in Contract Price
Original Contract Price:
Increased from previously approved C.O.:
Decreased from previously approved C.O.:
Increase in Contract price this C.O.:
Decrease in Contract price this C.O.:
Contract price with all approved C.O.s:
l he undersigned Contractor certifies to the best of my knowledge and belief: (1) all items and amounts shown above are correct; (2)
all Work performed and Reimbursable Expenses fully comply with the terms and conditions of the Contract Documents; (3) all
previous progress payments received from Clay County Utility Authority (CCUA) , on account of Work done under the Contract
referred to above have been applied to discharge in full all obligations of Contractor incurred in connection with Work covered by
prior Applications for Payment; (4) title to all materials and deliverables incorporated in said Work or otherwise listed in or covered
by this Application for Payment will pass to the CCUA at the time of payment clear of all liens, claims, security interests and
encumbrances; (5) payment is due and has not been previously requested for these amounts; (6) no markup has been applied to
reimbursable expenses.
Complete Services Well Drilling, Inc.
Contractor Name and Title
00660-1
CCUA Project No. 1127-003
FOR PROJECT No. CHANGE ORDER REQUEST FORM
PROJECT NAME Governor's Park Supple Well Drilling February 2020
SECTION 00660
Change Order Request Form
Cost Break Down Form: (instructions: use a se arate form for each indiN idual w ork item)
Labor $
Materials _ $
Equipment
Maintenance of Traffic $
Bonding
General Conditions _ $
Overhead and Profit
-— Total firm fixed cost not to exceed amount: ---
Note: attached supporting documentation
RFI No. initiating the change:
Description: Time Extension Request
Justification for the request: Recover time lost while sulfide results were reviewed and a decision was made about
back plugging Well #2.
State the firm fixed cost not to exceed amount in words:
Contractor Signature: _ _ Date: 8/8/23 _
Printed Name: L. Blake .r. Title: Project Manager
00660-2
CCUA Project No. 1127-003
[OR PROJECT No. CHANGE ORDER REQUEST FORM
PROJECT NAME Governor's Park Supply Well Drilling February 2020
NOTICE TO PROCEED
Dated: December y. 2 1)22
TO: Complete Set-%ices W'ellDriiling,Inc..
;11)I)RI 9785 Well Water Rd
Jacksonville, Fl 32220
PROJF:( 1: Governor's Park WTP Suppler Well Drilling_
Clad Counts Utility Authority Project No. 1127-003,Bid No 20121 A26
You are notified that the Contract Times under the aho+L contract %sill commence to run on
Januar\ 3'. 2023. 13) that date. you arc to start performing our obligations under the Contract
Documents In accordance ssith the executed Agreement. substantial and final completion shall
he met 240 and 270 days. respectiscl). from the Notice to Proceed date. The dates of Substantial
Completion and completion and readiness for final pa)ment arc August 31',2023 and September
30'1', 2023.
Clas CQunts l_'tilits Authority
In++nerl •
By: �rk ..4
szna)
Jerem) D. Johnston, PE. \IBA
(Printed Name)
Executive Director