Loading...
HomeMy WebLinkAboutDA MU21.22-7 Water & Wastewater Infrastructure for Commercial Connector Road Return to: /(j T21/22-7 Clay County Utility Authority l�l� 3176 Old Jennings Road Middleburg,Florida 32068-3907 WATER&WASTEWATER INFRASTRUCTURE FOR COMMERCIAL CONNECTOR ROAD (Mid-Clay System) Name of Project Parcel Number: 21-05-25-010094-002-06 Clay County DEVELOPER AGREEMENT This DEVELOPER AGREEMENT("Agreement"), made and entered into thisc(l4 day of Gti,Nt/...0", ,2022,by and between BENTOD,INC.,a Florida corporation,hereafter referred to as "Developer", d CLAY COUNTY UTILITY AUTHORITY, an independent special district established under Chapter 94-491, Laws of Florida, Special Acts of 1994, hereinafter referred to as "Utility". WHEREAS, Developer owns or controls lands located in Clay County, Florida, and described in Exhibit"A",and has a contractual obligation to develop the water,wastewater infrastructure within the lands described in Exhibit "A",attached hereto and incorporated herein by reference(hereinafter"Property"); WHEREAS,Developer desires that the Utility provide central potable water,pumping,treatment and distribution service; central wastewater collection,treatment and disposal service; for the Property; WHEREAS, the Utility is willing to provide, in accordance with the provisions of this Agreement 7D central potable water, wastewater to the Property and thereafter operate applicable facilities so that the occupants of the improvements on the Property will receive adequate potable water,wastewater,from the Utility; and WHEREAS,the parties wish to enter into this Agreement setting forth their mutual understandings and undertakings regarding the furnishing of potable water, wastewater, service by the Utility to the Developer's Property. NOW, THEREFORE, for and in consideration of the premises, the mutual undertakings and agreements herein contained and assumed,Developer and Utility hereby covenant and agree as follows: 1. The foregoing statements are true and correct. 2. The following definitions and references are given for the purpose of interpreting the terms as used in this Agreement and apply unless the context indicates a different meaning: (a) "Consumer Installation"-All facilities ordinarily on the consumer's side of the point of delivery. (b) "Contribution-in-Aid-of-Construction(CIAC)'-The sum of money and/or the value of Property represented by the cost of the wastewater collection system,potable water distribution system, and reclaimed water distribution system constructed or to be constructed which Developer or owner transfers,or agrees to transfer,to Utility,if so designated by the Utility,at no cost to Utility to provide utility service to the Property. RECEIVED JAN 2 6 2022 -2- (c) "Equivalent Residential Connection(ERC)"-A factor expressed in gallons per day (GPD)which is used to convert a given average daily flow(ADF)to the equivalent number of residential connections. For this purpose the average daily flow of one potable water ERC is (450) GPD, one wastewater ERC is(311) GPD. (d) "Point of Delivery"-The point where the pipes or meter of Utility are connected with the pipes of the consumer. Point of delivery for potable water service and reclaimed water service shall be at the consumer's side of the meter and for wastewater service at the lot or property line. Utility shall, according to the terms and conditions hereof,own all pipes and appurtenances to the point of delivery unless otherwise agreed. The pipes and appurtenances inside the point of delivery shall belong to others. (e) "Service" - The readiness and ability on the part of Utility to furnish and maintain potable water,reclaimed water,and wastewater service to the point of delivery for each lot or tract pursuant to rules and regulations of applicable regulatory agencies. 3. Assurance of Title- Developer represents and warrants that Developer is the owner of the Property and has the legal right to grant the exclusive rights of service contained in this Agreement. Upon request, Developer agrees to deliver to Utility evidence of such ownership including any outstanding mortgages, taxes, liens and covenants. 4. Connection Charges-In addition to the contribution of any wastewater collection systems, potable water distribution systems, and reclaimed water systems where applicable, and further to induce Utility to provide potable water,reclaimed water,and wastewater service,Developer hereby agrees to pay to Utility the following fees and charges, as defined in the Rate Resolution (including Service Availability Policy), upon execution of this Agreement in order to reserve capacity in the System: to (a) Potable Water Capacity Charge: ($360.00 x 0.00 ERCs) $ N/A Alternative Water Supply Surcharge: ($365.74 x 0.00 ERCs) $ N/A SJWMD Black Creek Water Resource Charge: ($100.25 x 0.00 ERCs) $ N/A Wastewater Capacity Charge: ($3,200.00 x 0.00 ERCs) $ N/A Environmental Impact Charge: ($410.00 x 0.00 ERCs) $ N/A Debt Service Charge: ($167.00 x 0.00 ERCs) $ N/A (b) Customer Connection Charge(Tap-in) -Potable Water $ N/A Customer Connection Charge(Tap-in)-Wastewater $ N/A (c) Main Extension Charge-Potable Water $ N/A Main Extension Charge- Wastewater $ N/A (d) Fire Protection Capacity Charge $ N/A (e) Meter Installation Charge $ N/A (f) Plan Review Fee $ 463.08 * (g) Inspection Fee $ 693.00 * (h) Recording Fee $ 125.00 Total $ 1,281.08/ - The "Plan Review Fee" and "Inspection Fee" are assessed specifically for the utility infrastructure for the project,in accordance with the plans shown on Exhibit "B", attached hereto. Note: Items(f) and (g)are estimates and are subject to adjustment based on actual cost incurred. -3- Payment of the above charges does not and will not result in Utility waiving any of its rates or rules and regulations and their enforcement shall not be affected in any manner whatsoever by Developer making payment of same. Except as specifically stated, Utility shall not be obligated to refund to Developer any portion of the value of the above charges for any reason whatsoever nor shall Utility pay any interest upon the above charges paid. Except as otherwise stated in this Agreement, neither Developer nor any person or other entity holding any of the Property by,through or under Developer,or otherwise, shall have any present or future right,title,claim or interest in and to the charges paid or to any of the potable water,wastewater facilities and properties of Utility, and all prohibitions applicable to Developer with respect to no refund of such charges,no interest payment on said charges and otherwise, are applicable to all persons or entities. Paid capacity or connection charges may not be applied to offset any service bill or other claims of Utility. 5. On-Site Installations - On-site facilities are those located within the Property for which Developer is requesting service. Developer shall convey to Utility,if so designated by Utility,all on-site water and wastewater lines, laterals, mains, lift stations, pump stations and appurtenant facilities (collectively referred to as "Components" or "On-Site System") on the Property with all contractual guarantees relating thereto. Conveyance shall take place within a reasonable time after installation of the On-Site System but prior to Utility's obligation to provide service. Until such time as the On-Site System is to conveyed, the same shall be operated and maintained by Developer. In its sole discretion, Utility may decline to accept the On-Site System,may lease the On-Site System from Developer,or agree to such other arrangement as it deems appropriate. Utility shall have the right and obligation,at the Developer's expense,to construct and/or approve the construction of the on-site installations which shall be owned and maintained by Utility,if so designated by Utility. The Utility shall also have the right to review all plans and specifications,connections to its system and the Developer shall pay a fee equal to the Utility's actual cost to review such plans and specifications. The Utility shall have the right to inspect all phases of construction undertaken by outside contractors for facilities which are to be owned by the Utility,if so designated by Utility. The Developer will reimburse the Utility for its costs for such inspection, including all overhead associated with same. Where on-site temporary pump stations or backflow prevention devices are required,they shall be paid for one hundred percent (100%) by the Developer without any provision for refund. Utility reserves the right to require backflow prevention devices on all potable water service connections. The On-Site System shall be constructed in compliance with all regulatory requirements and the specifications and requirements of Utility. No construction shall commence until Utility has reviewed and approved Developer's contractor and the plans and specifications for construction of the potable water, reclaimed water,and wastewater systems for the project. The proposed electrical transformer layout of the electric utility providing service must be provided to the Utility prior to commencement of construction. -4- Developer shall guarantee Utility against defects in material and workmanship for the portion of the On-Site System to be owned by the Utility or County, if so designated by Utility. Developer shall secure from its contractor a written and fully assignable warranty that the system installed will be and remain free from all defects,latent or otherwise,with respect to workmanship,materials and installation in accordance with Utility-approved plans and specifications, for a period of two (2) years from the date of the system acceptance by the Utility,and immediately assign the same and the right to enforce the same to the Utility on or before such date. The Developer shall also provide to the Utility, at Developer's sole expense, such maintenance bond and other form of security acceptable to Utility in such amounts approved by Utility, which by its or their express terms protect and indemnify Utility against any loss, damage, costs, claims, debts or demands by reason of defects,latent or otherwise,in the system to be and remain in effect for two (2)years from the date of the system acceptance by Utility. In addition to any other promises,guarantees or warranties to be provided by Developer to the Utility hereunder,Developer agrees to protect and indemnify Utility against any loss,damage,costs,claims,debts or demands by reason of defects, latent or otherwise,in the system which could not have been reasonably discovered upon normal engineering inspection,to be and remain in effect for a period oftwo(2)years from the date of the system's acceptance by Utility. Developer agrees to transfer to Utility,if so designated by Utility,title to all water distribution and wastewater collection systems installed by Developer or Developer's contractor,which the Utility has agreed shall be owned and maintained by it pursuant to the provisions of this Agreement and shall: (a) Deliver a Bill of Sale and No Lien Affidavit in a form acceptable to Utility for such potable water distribution,reclaimed water distribution, and wastewater collection systems. to (b) Provide copies of invoices and Release of Liens from contractor for installation of the utility systems as well as for any repairs to the Systems which may have been caused by other subcontractors during construction. (c) Assign any and all warranties and/or maintenance bonds as set forth herein. (d) Provide all operations, maintenance and parts manuals, as-built plans complying with Utility's specifications, and other documents required for operation of the utility system. (e) Convey to Utility, if so designated by Utility, easements and/or rights-of-way covering all areas in which potable water, reclaimed water, and wastewater systems are installed, with adequate legal access to same,by recordable document satisfactory to Utility. (f) Convey to Utility,if so designated by Utility,by recordable document in form satisfactory to Utility,fee simple title to lift station and pump station sites,along with recordable ingress/egress easement documents. (g) Provide a copy of the Project Engineer's final certification of completion to the Florida Department of Environmental Protection certifying installation of all potable water and wastewater facilities in accordance with approved plans. 6. Off-Site Installations - Developer shall further construct all transmission mains, pump stations and appurtenant facilities necessary to connect the On-Site System to the nearest appropriate point in Utility's transmission system,as determined by Utility. Utility may require Developer to oversize off-site transmission mains and appurtenant facilities in a manner consistent with Utility's Wastewater System Master Plan. -5- The costs associated with construction of over-sized facilities which provide Utility with excess capacity for the benefit of other properties may be subject to refundable advance treatment pursuant to Utility's Service Availability Policy. The same construction standards,warranty requirements,maintenance bond requirements, transfer of title by Bill of Sale, and indemnification requirements, as provided under paragraph 5 of this Agreement, shall also apply to the Off-Site installations. 7. Agreement to Serve - Upon the completion of construction of the On-Site and Off-Site Facilities by Developer,or an appropriate phase thereof, and compliance with the terms and conditions of this Agreement and Utility's Service Availability Policy, Utility will allow connection or oversee the connection of the wastewater collection facility,potable water distribution facility,and/or reclaimed water facility installed by Developer to the central facilities of Utility in accordance with all rules,regulations and orders of the applicable governmental authorities. Utility agrees that once it provides potable water, reclaimed water, and/or wastewater service to the customers within the Property that it will continuously provide such service,at its cost and expense,but in accordance with the other provisions of this Agreement, the then current Rate Resolution in effect for Utility,and the requirements of the governmental authorities having jurisdiction over the operations of Utility. Utility shall not be liable for any temporary interruptions in service as a result of equipment failure, emergencies or Act of God. The covenants and agreements of Developer contained in Paragraphs 5,6,and 7,hereof shall survive Utility's acceptance of any On-site and Off-site Facilities and Utility's commencement of service to the Property. Should any such covenant or agreement of Developer in fact be outstanding following either or both of such dates,then,notwithstanding any contrary provision contained herein,Utility may, upon thirty to (30)days advance written notice and demand for cure mailed to Developer,temporarily interrupt service to the Property until such outstanding covenant or agreement of Developer is satisfied in full. Utility shall not be liable for any temporary interruptions in service as a result of any action authorized or permitted by this paragraph. 8. Application for Service - Developer, or any owner of any parcel of the Property, or any occupant of any residence,building or unit located thereon shall not have the right to and shall not connect any consumer installation to the facilities of Utility until formal written application has been made to Utility by the prospective user of service, or either of them, in accordance with the then effective rules and regulations of Utility and approval for such connection has been granted. 9. Easements - Developer hereby grants and gives to Utility, its successors and assigns, but subject to the terms of this Agreement, the exclusive right or privilege to construct, own, maintain and operate the potable water,reclaimed water,and wastewater facilities to serve the Property in,under,upon, over and across the present and future streets, roads, alleys, utility easements, reserved utility strips and utility sites. Mortgagees,if any,holding prior liens on the Property shall be required to release such liens, subordinate their position or join in the grant or dedication of the easements or rights-of-way, or give to Utility assurance by way of a "non-disturbance agreement", that in the event of foreclosure, mortgagee would continue to recognize the easement rights of Utility. All potable water, reclaimed water, and wastewater collection facilities, save and except installations owned by Developer, or its successors or assigns, shall be covered by easements or rights-of-way if not located within platted or dedicated roads or rights-of-way for utility purposes and there shall be adequate legal access to same. The use of easements granted by Developer to Utility shall not preclude the use by other utilities of these easements,such as for cable television,telephone,electric,or gas utilities. However,the use of such non-exclusive easements by third parties shall not interfere with Utility's utilization of same. -6- Utility hereby agrees that all easement grants will be utilized in accordance with the established and generally accepted practices of the potable water,reclaimed water,and wastewater industry with respect to the installation of all its facilities in any of the easement areas. 10. Utility's Exclusive Right to Utility Facilities-Developer agrees with Utility that all potable water,reclaimed water,and wastewater facilities accepted by Utility in connection with providing potable water, reclaimed water and wastewater services to the Property, shall at all times remain in the sole, complete and exclusive ownership of Utility, and any person or entity owning any part of the Property or any residence,building or unit constructed or located thereon,shall not have any right,title,claim or interest in and to such facilities or any part of them, for any purpose, including the furnishing of potable water, reclaimed water,and wastewater services to other persons or entities located within or beyond the limits of the Property. 11. Exclusive Right to Provide Service-Developer shall not engage in the business of providing potable water services or sanitary wastewater services to the Property during the period of time Utility provides water and wastewater services to the Property. Utility shall have the sole and exclusive right and privilege to provide water and wastewater services to the Property and to the occupants of such residence, building or unit constructed thereon. 12. Rates-Utility agrees that the rates to be charged to Developer and individual consumers of water and wastewater services shall be those set forth in the then current Rate Resolution most recently adopted by the Board Supervisors of the Clay County Utility Authority as may be amended from time to to time. However,notwithstanding any provision in this Agreement,Utility,its successors and assigns,may establish,amend or revise,from time to time in the future,and enforce in a reasonable manner,rates or rate schedules so established. Notwithstanding any provision in this Agreement,Utility may establish,amend or revise,from time to time, in the future, and enforce rules and regulations covering water and wastewater services to the Property. However, all such rules and regulations so established by Utility shall at all times be reasonable and subject to such regulations as may be provided by law or contract. 13. Quality of Wastewater-All commercial facilities which discharge non-domestic type wastes into the Utility's collection system are required to meet the requirements of Resolution 19/20-06 (Pretreatment Resolution) with regard to waste quality. In addition, facilities with photographic development operations may be required to install and maintain a silver recovery unit in order to meet the requirements of this resolution. Discharge of floor finish stripper products and waste to the collection system requires an Industrial Pretreatment Permit issued by Utility. Developer, tenant or the Property/project owner must inform Utility of its intent to discharge any floor finish stripper product and waste. Upon notification, a permit application will be sent to Developer, tenant or the Property/project owner to be completed and submitted to Utility for processing. A permit fee is not required by Utility for an Industrial Pretreatment Permit. Failure to follow these procedures may result in termination of water and wastewater service. y -7- 14. Binding Effect of Agreement-This Agreement shall be binding upon and shall inure to the benefit of Developer, Utility and their respective assigns and successors by merger, consolidation, conveyance or otherwise. Prior to Developer's acquisition of title to the Property, any assignment or transfer by Developer shall be subject to Utility approval which shall not be unreasonably withheld provided the assignee or transferee shall acknowledge in writing that it assumes the duties and responsibilities of Developer as set forth in this Agreement. Subsequent to Developer's acquisition oftitle to the Property,this Agreement shall be binding upon and shall inure to the benefit of Developer and the Property and shall run with title to the Property without the requirement of any formal assignment agreement and without obtaining any consent from Utility. 15. Notice - Until further written notice by either party to the other, all notices provided for herein shall be in writing and transmitted by messenger, by mail or by email,and if to Developer, shall be mailed or delivered to Developer at: Bentod,Inc. Attn.:Necdet Senhart 2809 Ocean Drive South Jacksonville Beach, Florida 32250 and if to the Utility at: Clay County Utility Authority 3176 Old Jennings Road Middleburg, Florida 32068-3907 to or such other address as specified in writing by either party to the other. 16. Laws of Florida-This Agreement shall be governed by the laws of the State of Florida and it shall be and become effective immediately upon execution by both parties hereto,subject to any approvals which must be obtained from governmental authority, if applicable. 17. Costs and Attorney's Fees-In the event the Utility or Developer is required to enforce this Agreement by court proceedings, by instituting suit or otherwise, then venue shall lie in Clay County, Florida,and the prevailing party shall be entitled to recover from the other party all cost incurred,including reasonable attorney's fees. 18. Force Majeure - In the event that the performance of this Agreement by either party is prevented or interrupted in consequence of any cause beyond the control of either party,including,but not limited to acts of God or of the public enemy,war,national emergency,allocation or of other governmental restrictions upon the use or availability of labor or materials,civil disorder,strike,embargo,natural disaster or catastrophe, unforeseeable failure or breakdown of transmission, treatment or other facilities, governmental rule, act, order, restriction, regulation, statute, ordinance, or order, decree, judgment, restraining order or inj unction of any court, said party shall not be liable for such non-performance. 19. Indemnification -Developer agrees to indemnify and hold the Utility harmless from and against any and all liabilities,claims,damages,costs and expenses(including reasonable attorney's fees)to which it may become subject by reason of or arising out of Developer's performance of this Agreement. This indemnification provision shall survive the actual connection to Utility's potable water, reclaimed water,and wastewater systems. -8- MISCELLANEOUS PROVISIONS 20. The rights,privileges, obligations and covenants of Developer and Utility shall survive the completion of the work of Developer with respect to completing the facilities and services to any development phase and to the Property as a whole. 21. This Agreement supersedes all previous agreements or representations, either verbal or written, heretofore in effect between Developer and Utility, made with respect to the matters herein contained,and when duly executed,constitutes the agreement between Developer and Utility. No additions, alterations or variations of the terms of this Agreement shall be valid,nor can provisions of this Agreement be waived by either party,unless such additions,alterations,variations or waivers are expressed in writing and duly signed by both parties. 22. Whenever the singular number is used in this Agreement and when required by the context, the same shall include the plural, and the masculine, feminine and neuter genders shall each include the others. 23. Whenever approvals of any nature are required by either party to this Agreement,it is agreed that same shall not be unreasonably withheld or delayed. 24. The submission of this Developer Agreement for examination by Developer does not constitute an offer but becomes effective only upon execution thereof by Utility and Developer. to 25. Failure to insist upon strict compliance.of any of the terms,covenants,or conditions herein shall not be deemed a waiver of such terms,covenants,or conditions,nor shall any waiver or relinquishment of any right or power hereunder at any one time or times be deemed a waiver or relinquishment of such right or power at any other time or times. 26. It is because of inducements offered by Developer to Utility that Utility has agreed to provide potable water and wastewater services to Developer's project.Capacity reserved hereunder cannot and shall not be assigned by Developer to Third Parties without the written consent of Utility,except in the case of a bona-fide sale of Developer's Property. 27. Utility shall,as aforesaid,at all reasonable times and hours,have the right of inspection of Developer's internal lines and facilities. This provision shall be binding on the successors and assigns of the Developer. 28. The parties hereto recognize that prior to the time Utility may actually commence upon a program to carry out the terms and conditions of this Agreement,Utility may be required to obtain approval from various state and local governmental authorities having jurisdiction and regulatory power over the construction,maintenance,and operation of Utility. The Utility agrees that it will diligently and earnestly make the necessary proper applications to all governmental authorities and will pursue the same to the end that it will use its best efforts to obtain such approval. Developer agrees to provide necessary assistance to Utility in obtaining the approvals provided for herein. Upon execution of this Agreement, Utility may require the payment of a reasonable fee to defray Utility's legal,engineering,accounting and administrative and contingent expense. -9- 29. It shall be Developer's responsibility or Developer's customers'responsibility, utilizing the project's potable water, and wastewater service within Developer's project,to apply to Utility for service after the installation of the potable water and wastewater utilities have been completed and accepted by Utility. Upon completion of application for potable water, and wastewater service and payment of the appropriate charges set forth in Utility's then current applicable Rate Resolution, including any security deposits required, service will be initiated to customers within Developer's Property. 30. It shall be Developer's responsibility to provide acceptable as-built drawings of the potable water, wastewater systems installed byDeveloper, in accordance with Utility'sstandard specifications,, details and notes, which are to be accepted by Utility for ownership and maintenance, as set forth in paragraph 5(d)herein;and it is understood and agreed that Utility's charges associated with the review and quality assurance of the CAD as-built survey drawings will be paid directly by Developer's licensed underground utility contractor and shall be provided in accordance with CCUA's"As-built Specifications Standards Manual", which can be obtained from the Utility's website (www.clayutility.org). It shall be Developer's responsibility to properly instruct his contractor to contact Utility for an estimate of such charges and clarification of the required as-built drawing procedures. 31. Developer shall not place any conservation easements over any of the easement lands that contain Utility's water, wastewater or reclaimed facilities for the project covered by this Agreement. 32. Developer shall grant an easement to Utility covering any portion of the potable water,and wastewater facilities that Utility agrees to own and maintain, and Developer shall be responsible for to providing the legal description for such easement to Utility.In addition,this Agreement is contingent upon the execution of the Grant of Easement document. 33. It shall be Developer's specific responsibility to provide all close out documents,easements, etc.,that are necessary to legally convey title or property rights to the water and wastewater utilities installed within the parcel described.in Exhibit "A",for which Utility agrees to assume ownership or requires that Utility assumes ownership. This includes any documents required to be signed by the owner of this portion of the Property. 34. The landscaping for this project(new or existing)shall not include the planting of any trees within seven and one-half feet(7 ft.6 in.)of any of the water and wastewater mains to be owned by Utility. 35. The charges shown in paragraph 4 of this Agreement cover only the infrastructure for water and wastewater water service to Commercial Connector Road, in accordance with the plans shown on Exhibit "B", attached hereto and by reference made a part hereof, and do not include any future developments(buildings,additions,etc.)that are planned for this Property. A separate Agreement will be prepared for the additional requirements of each future development on the Property when such development is initiated. 36. Developer shall connect to Utility's existing water and wastewater mains, at the location shown on the final approved plans prepared by J. Lucas & Associates, Inc., Project No. 2016, entitled Commercial Connector Road, which are acceptable to Utility. All facilities shall be installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all of the requirements of Utility prior to Utility's acceptance for ownership and maintenance. • -10- 37. This Agreement does not include any other developments(future additions)that are planned for this Property. A separate agreement will be prepared for the additional requirements of each future development on the Property when such development is initiated. 38. The construction of this project will not commence until receipt of all permits and easements, if necessary, and this Agreement is executed and the charges stated herein are paid. 39. This Agreement will need to be executed by Developer,the charges paid(shown on page 2, of Agreement),prior to October 1,2022, and the construction of the utilities shall be commenced prior to October 1,2022, or this Agreement will be subject to any Service Availability charge increases currently approved,which may be applicable or which may be approved by Utility's Board of Supervisors for the next fiscal year beginning October 1,2022; and this Agreement is subject to any material cost increases which Utility may experience after October 1,2022. [Signatures Begin Next Page] to -1 1- IN WITNESS WHEREOF, Developer and Utility have executed or have caused this Agreement, with the named Exhibits attached,to be duly executed in several counterparts, each of which counterpart shall be considered an original executed copy of this Agreement. WITNESSES: DEVELOPER: BENTOD, INC.,A FLORIDA CORPORATION Witness: 61-2' 0.•••••••• Print Name: 1 ifs S By: Necdet Senhart,Preside Secretary Witness: (Corporate Seal) Print Name: Rdt-- LIS' 1 " STATE OF T45x: COUNTY OF ADom-�- The foregoing instrument was acknowledged before me by means of©physical presence or❑online notarization this Q 5 day ,a ,2022,by NECDET SENHART,as to PRESIDENT/SEC Y of BENTOD,INC.,a laorida corporation,who is personally known to me or who has produced ,as identification. • Pr' Name: n •Notary PublicYee Florida. Jennifer Notary Public My Commission HH 078258 State of Florida at Large or Expires 01/22/2025 My Commission Expires: -12- WITNESSES: UTILITY: CLAY COUNTY UTILITY jAUTHORITY Witness: el By: Print Name: IVIA y j ; ,1 ► , .► er v . John on, P.E., M.B.A. Dire or Witness: Print Name: iM. n (Corporate Seal) STATE OF FLORIDA COUNTY OF CLAY The foregoing instrument was acknowledged before me by means of❑x physical presence or❑online notarization this day of 7040 , 2022, by JEREMY D. JOHNSTON, as EXECUTIVE DIRECTOR of the CLAY COUNTY U'1'IEITY AUTHORITY, who is personally known to me. Notarysh Publica th te o Florida r ■ ON1 f � Ashley Elizabeth MacDonald 1 � M My Commission HH 136724 Print Name: #p#o /' Expires 06/01/2025 Notary Public to State of Florida at Large My Commission Expires: WATER& WASTEWATER INFRASTRUCTURE FOR COMMERCIAL CONNECTOR ROAD Parcel Number: 21-05-25-010094-002-06 EXHIBIT "A" L .011-DI clatxtiun 211 Ta4ti`ttshipS Snnt[l_R*0 ',F s't.C.Iay.poiniy;FSu iki.-b"e i j p iittciti olr:tlii latsil'ail^si ibLd ac d r'iCi rtitwi it OiIit.i tl PLCc id1.Boos :t162 lrtl;L 11 SD;.,at thL P.ab3ia; ltccprds�rrf`5a cl�cttutily..be nr rrtprest}milli L laitydescrltteci 'Lillowi For;a I'aitrt ut Rc,ILr u e rr1IUt.IK. li tlK. 5irut[Lcrly Lar'Lr lit'till. V',L 4LI1Y;;3crirutrt►S'UI` 'l3rnn.sooi lb ti acl L fi.0l`Oul ri tht;0l:�it�al:' tiapictcd o t rure,_P at jilt ,t i l LILL1 Hi lat 13c ,k42,; WON'and 3,aL aiit 'ttlilrt,lterarL tiatLi garnet Ycngpt�tlte zast ly-rrgltl ai4" v Srn cal 1I010 Road`(Ctuunh4 Itoad No C+'T39)'(i'crru40r +Smtc R ir::(1e S-T 9 si>iattirltl wr i rich[ ist way i�ii etli1 est bIis11eti� ltcnc Sautll UO°17 i'r71.4 t,atU sntci Ln erly 1 tg,:o1 way;. lictfe"tiIIIattleyIRodI • 1f1203freticiOiOaiepowlinsatdrightcfnoj�It -61i6oe Sautltif?Ztl07 `4. 't;-;r crntittrt";atctctSt'.nil L�sll rF rtkFtt ul s�u>Im. 3#9 C4 tau 1t tllL NariItwe ter y eorn r o1 [1itt�e:tairtlq L1l a'ei3ltir r3 tttttt rL Lded trt>4�I3tt l Li £ Lbrd I3ot�6 1t�3�x Ia.4c tt�19!Lit,stud 0 • *`agdw;#ll ai a Sufflil S9440'S.I Eact;;dLiiat 11 'ilia Liuti:r1 r ri ,ill of tivay line and dILl 3 tILL Nariiierly 11130'#fsaacl O Lial R eNstii3t�ris.I disc 93,pa e;i 4;.a .nLL of"�243�19- 'P fps t ttF tlioaint of t4%ltstrlii renu d',Poin'not I#c alit n =13 cf;Nortft 0g720,tt*T.teparIlt i aid Ntiiillei I} lilt :of i7t ie�aI Reeoi 1S Bbort?F192 pa 6d4 4-•.—s uxe•-oi�30 fiett;to ilia paint of CUt tit of.t utrt'G corteayo orttln*al u1.y It fling a rniliuk ut_16111u i L tit ac 151'ortitwt cer1V atoi g the 0ta ot strirt ciuve�ltrt►urIt i�astralrtlif ltHof r 436�3 ynu:trc=l itgt t of 21 11 €mot ttj# paint,ott said curve;�ai:4 ark l>i to lifttcctded l}y a dtarLi krisariisg.,nd tlistivtce cif North ,:I'28'E2"»}l st 1 G )eiit,titenL�t:hltt alt I11°3b t7�'"1'i L'.t.-l1'33 fret-t[tetlLL iylSrtti tlG°2Q t); i s t, 15.[7 TCt 1 to 1wlnF;ot t urt+lziurc til:I(Ut%L tiro°l.'rt'1 k.vk4f:4rIL lllaia�,u.tzLLItLa ut 3U I!D fL.L,t17etLCL Trpt�lycr[a' trtoki `.tILL�r`c"at part[curt*a,tlu�tiitltlr u ceiiu [.lii 'i 4:447!!'ti"I fit,fsll L ;teIt't[t of 3'1.i(3:ILet:to polntl}+tna oft ilte Soutitezlyxiglat af•ivav;Itae oI s'urd Br4114c,p th Road slid.ire lii i.g sLtlt'Lided, by a.lilord bLal t.autl th tatteaot Noit�t;l9°45t02 W sL2QSl #fit.rh0;'LL LL.lu`ly kriu;c.utl; 5hi.d1:i right of vay--true acid M lnj�the arm of Lut4 tiva�4 Sputite,(y cldS rarlrtt of 2 r0 Oil.fet �11.1)g lt a;ssattal t tii c'0109°-_4{{I`I`'..ti$re ittt liL of'.30 feet trt#I001*-41 aiil', curve,saad ac I ain Rubtetkiul by a LllaltI b(.acui,ailtl dlcinnct.ofNoiik S0 i2 2 `;E©st, Ti. he lhr uce Spit sarty dL7r tainn -tint s3r ld.•Sa it'&rlrr it•4l W.cy•lint_;anti AO-t�+tbe�tuld.pf tt Cpt ; ctrncavL,•LDStaijy hat.tir Atti [e at23453.19e4,111 Onz']eit ttr: of'I1,22.51;.teet to d e 1?o&t Ql',ian,{,;L1icy 1s' aid Ltt s gid pre ltett� ;uhun7ded by lton�Ill.rFrrn :- .Ind c turlr a at Srsutlt I2 I6' tS"'} L,1' 2 I Lt"tl 100: ;111 111°20 07'\ st; l7lert ttr:tlic 7uL,iif�eai Wl�utu rill!�ttfi'e Luat"tt�C F t.ckiIV 19a iti a rartltl9 fit 1 11 01) L'L'ty t L.I2S:tt L Sci..J�l1 a[aiitg-eitt,.Ltro.-0.,,o L1.cuivttt 4fitiugh a e&ttl1jt an ft k'.of 1570'g0;alt:.ro i�rtt•C[t of 26 treed to dit g. gat44.44444.afsal fiucv a t ati bG18 iLL rLd !'by tt; lia l+t grin aatl clis t ee of utlt • Sig 437 fi,t,tl1euee Saudi I-I° 9 git 6 9$.fcet:cu tilt point of iui atute ett`a.• CLIIt�L COIL,C.V.'WL'-ILfI4.IL IUlU r;fLiiJILLS t f99.04 reef,Uterieu Sriutlkrl,IL[ati¢th a alt.L)fssrltl L.U I'rC. tltiuuhli.1 teritrdl ta.gk ill 1.S°410 00'f atr;atL turrtls,or2 9 f.LL lLr;tIn.p02121 tall u'bu3c of Itl tiU!Vt3,tau all.hbrnu:3tilrtctrdt.d b5� i i iti bLdI L1 and,cil5lat1L LirSuutir'g7°fl 53'fa,t;?j.R4 fCL.[irenca South ll[i',20�GT ' 'est,533 911.fuet.rn,;atoit,lyIn.aci,nttd i4orilterly ltne at'C1[[ietal RC ciei.I1I3aak 4l'92 past frl9i t1 etrt e l lO-th W-*d i I"West.tr[utt Ledtifrr1JILIi v bilL,22 0tl 1et,t F#i Th i.Pi iuit cii l Il ifillinZ. • Chinlaitihi ;14'29 gtitre fcif'ut ire r less::. EXHIBIT "B" DESCRIPTION OF APPROVED CONSTRUCTION PLANS (Less and except plans to be replaced due to minor changes required) Project: Commercial Connector Road Engineer: James M. Lucas,P.E. J. Lucas&Associates. Inc. 1305 Cedar Street Jacksonville,FL 32207 Project No.: 2016 Project Date: June 2021 Engineer Description Latest Engineer Drawing Approved Plan Date Number 1 Cover Sheet 1/10/2022 2 General Notes &Details 1/10/2022 3 Geometry &Utility Plan 1/10/2022 4 Paving, Drainage& Erosion Control Plan 1/10/2022 5 Roadway& Utility Profiles 1/10/2022 6 M.O.T. Details 1/10/2022 to 1/10/2022 7 Storm Water Pollution Prevention Plan 8 Erosion& Sediment Control Notes and Details 1/10/2022 9 Standard Water& Sewer Technical Specifications 1/10/2022 10 Standard SCH80&Polyethylene Water Service Details 1/10/2022 11 Standard Water Misc. Details 1 1/10/2022 12 Standard Water Misc.Details 2 1/10/2022 13A Standard Locator Wiring Installations 1/10/2022 13B Standard Sewer System Details 1/10/2022 z'''-f,Va loiki.11 11 M N\ 7 � •r r M ha&ill ii tn lAt'falk t�� i. •_• • + 8. • S ak_ • If E�RANSCOME RD -- ._ {�P4,'.. 0c, • .'.,,4)1111, — II-4. 1 4.1).4,,I11 M O • I1 I I ro izl c, - -----„s„.. t 1• ,.%ii tM 11' �v�) M1 M• aI Q: 0E l . •. V • ffO l.'\ • w� LM • 0C, latitlatir ~bil ri Z� ©4li.J w� .,1.:74m la p ft. I • .. 14, ■ I M ■ ■ ~I M ' _ I1 Ai ,....,,.? i N=�:1 • M I M I _ � • i �_ 'i' — �, • — / / / / / / / / / I • SA VDRIDGE RD • I►411 .,,Lit 1r`C Fig B 'C.OPBL Disclaimer:The information displayed on this drawing or sheet is for a general visual representation purposes only.The drawing is based upon numerous sources of public information which include but are not limited to Clay County Property Appraisers, FDOT, SJRWMD, and the Clay County Utility Authority's (CCUA)own records.All information included in the drawing is general in nature and not site specific.Any cimensions or other information is approximate and needs to be field verified.CCUA does not offer any guarantees,certifications,or warranties,either expressed or implied,in regards to the accuracy of the information represented on these drawings.The drawing is not a survey and should not be construed in any manner as such.By receiving this drawing,the recipient is agreeing to hold CCUA harmless for any errors or omissions which may be present in this&awing.All interested parties are strongly encouraged to engage a Professional Surveyor and Mapper licensed in the State of Florida to field verify all site,property,infrastructure,and utility information prior to any decisions or actions. tUNCOT Title: \` Clay County Utility Authority CCUA Web Map 3176 Old Jennings Road i Info: /�� Middleburg, Florida 32068-3907 Prepared by CCUAGIS Portal - Water Features 'a Phone 904 272-5999 ill■ Gravity Sewer Features � �'` c 1/26/2022,2:33:49 PM - Forced Sewer Features Conservation.Commitment.Commundy. �TYAUTN� 1 inch = 250 feet m Reclaimed Features