HomeMy WebLinkAboutEDB Vortex TO #8 for FY21-22 Manhole Rehabilitation EXECUTIVE SUMMARY AGENDA ITEM: Request approval of Task Order No. 8 with Vortex Services (Vortex) for the Fiscal Year 2021- 2022 Manhole Rehabilitation CCUA Bid No. 18/19-A7(b) Date:February 10,2022 BACKGROUND: The Board of Supervisors awarded Part B of the Sewer, Wetwell and Manhole Rehabilitation Services continuing contract to Vortex at the June 4,2019,meeting. Clay County Utility Authority (CCUA) continues to prioritize repair and rehabilitation work throughout the gravity sanitary sewer system. Staff identified manholes needing attention to prevent failure. With the help of the asset management system and field investigations, CCUA prepared a list of forty-five(45)manholes and engaged Vortex to visit the sites and provide a quote for rehabilitation work. 0 BUDGET: 0 ce Staff reviewed Vortex's proposal and determined the fee of $87,949.75 to be reasonable and consistent with the unit pricing contract. The current Capital Improvement Plan (CIP) includes sufficient funding to cover this project. RECOMMENDATION: Staff respectfully requests the Board of Supervisors approve of Task Order No. 8 with Vortex Services for the Fiscal Year 2021-2022 Manhole Rehabilitation. ATTACHMENTS: Task Order No. 8 Vortex Services Proposal Map & Photos Clay County Utility Authority Contract No. 18/19-A7(b)—Continuing Contract for Sewer, Wetwell and/or Manhole Rehabilitation Services (Part B) Vortex Services Task Order#8 FY21-22 Manhole Rehabilitation A) Perform all requested contract services as detailed below. B) Coordinate construction schedule with Mr. Steve Rencarge at 272-5999,extension 2433. C) CCUA staff must be given a MINIMUM of five (5) working days' notice before construction commences. D) Contractor agrees to abide by all federal,state, and local safety regulations as well as CCUA safety policies. E) Contractor must provide a project specific payment and performance bond before construction commences. F) This document, along with any attachments,shall become an amendment to the Continuing Contract for Sewer,Wetwell and/or Manhole Rehabilitation Agreement Project No. 18/19-A7—Part B — CIPP Sanitary Sewer Lining System and all provisions of the Agreement will apply hereto. G) Task Authorization#3 8 cost is not to exceed$87,949.75 without prior written authorization from Mr. Jeremy Johnston,Executive Director,272-5999, extension 2464. IItem# Item Description Estimated Quantity Unit Unit Price Total Price C. Clean And Coat Existing Sanitary Sewer Manhole(4- 25u.uu VF $128.u0 $32,000.00 0 Foot Diameter) K. Invert Replacement 10.00 EACH $400.00 $4,000.00 I. Install Frame&Cover 2.00 EACH $1,200.00 $2,400.00 N. Stop Leak(Per MH Without Lining) 45.00 EACH $1,000.00 $45,000.00 0.1 Traffic Control-MOT Index 601 Or 602(Per Day) 5.00 EACH $550.00 $2,750.00 Q. Construction Video&Photos(Per Work Order) 1.00 EACH $500.00 $500.00 R. Bonds(1.5%) 1.00 LS $1,299.75 $1,299.75 Total Bid Price: $87,949.75 Accepted by: _— Date: Contractor: Benjamin Roese,Managing Member Vortex Services Accepted by: Date: Owner: Jeremy D.Johnston,Executive Director Clay County Utility Authority �_ To: Clay County Utility Authority Contact: Steve Rencarge Address: 3176 Old Jennings Road Phone: Middleburg, FL 32068 Fax: Project Name: Clay County -Work Order No. 3-Proposal Bid Number: 196661-03 Project Location: Clay County, FL Bid Date: 2/8/2022 Item# Item Description Estimated Quantity Unit Unit Price Total Price C. Clean And Coat Existing Sanitary Sewer Manhole(4- 250.00 VF $128.00 $32,000.00 Foot Diameter) K. Invert Replacement 10.00 EACH $400.00 $4,000.00 I. Install Frame&Cover 2.00 EACH $1,200.00 $2,400.00 N. Stop Leak(Per MH Without Lining) 45.00 EACH $1,000.00 $45,000.00 0.1 Traffic Control-MOT Index 601 Or 602 (Per Day) 5.00 EACH $550.00 $2,750.00 Q. Construction Video&Photos(Per Work Order) 1.00 EACH $500.00 $500.00 R. Bonds(1.5%) 1.00 LS $1,299.75 $1,299.75 Total Bid Price: $87,949.75 to Notes: • If necessary,Owner/Contractor will provide dewatering and or bypass pumping • If necessary,Owner/Contractor will provide maintenance of traffic(MOT) • Owner/Contractor will provide a portable hydrant meter for our use. • Owner/Contractor will provide a local area and pay disposal fees to dispose the debris that is pulled from the cleaning process after it is decanted. Disposal site must be less than 10 miles away from job site. • Owner/Contractor will be responsible for providing an onsite disposal area for any debris removed from the storm pipes. It will then be the Owner/Contractor's responsibility to properly haul off and dispose this material. • Owner/Contractor will provide access to each and every manhole • If necessary,Owner/Contractor will provide Permits&Fees • Water used to clean pipe segment to be decanted in the pipe segment or adjacent pipe/outfall area ACCEPTED: CONFIRMED: The above prices,specifications and conditions are satisfactory and Vortex Services are hereby accepted. Buyer: Signature: Authorized Signature: Date of Acceptance: Estimator: Ross Cooke rcooke©vortexcompanies.com 2/8/2022 2:54:41 PM Page 1 of 1 General Vicinity of Manholes included in the project: _ I }ate Po Rd fMridy.s 4a Z o 0 ` enPy a `'�, g e el,r° 4e r f.- I 4.' 4a� - O t's Oi' 00 �•a' all.+ yVw J.. O K O` nor I. O�QO?O O .�� cd �'v0 O re #r° J �` O a O . O O Oy^ ,r; 0 n O O Q Ov" • 41 dip ' so 7a, houd 5qti h 0,0, O 14 1 c Lale°el a 0' i RI Johns Rm.,..wr +6 to - a CelOninp F1 Example of CCUA crew inspecting a manhole to determine if repair is needed: x ...' iv- r ,. 4• • • Aiiiiktio... * Qwc.aw-.7./ra W :4 7i+