HomeMy WebLinkAboutDA KU21.22-74 - Water and Wastewater to 1017 & 1018 Jayla Cove Record&Return to:
Clay County Utility Authority KU21/22- /4
3176 Old Jennings Road
Middleburg,Florida 32068-3907
WATER&WASTEWATER SERVICE
TO 1017 & 1018 JAYLA COVE
Parcel Nos. 13-04-25-020320-001-00& (Kingsley System)
13-04-25-020320-002-00 Name of Project
Clay County
DEVELOPER AGREEMENT
THIS DEVELOPER AGREEMENT("Agreement"), made and entered into this (Qfh day of
Apd ,2022,by and between PATRICK K.JETT,a married man,dealing
with his non-homestead property,hereinafter referred to as"Developer",and CLAY COUNTY UTILITY
AUTHORITY,an independent special district established under Chapter 94-491,Laws of Florida,Special
Acts of 1994,hereinafter referred to as "Utility".
WHEREAS, Developer owns or controls lands located in Clay County, Florida, and described in
Exhibit "A", attached hereto and incorporated herein by reference (hereinafter"Property");
c WHEREAS, Developer desires that the Utility provide central water, pumping, treatment and
distribution service and/or central wastewater collection,treatment and disposal service for the Property;
0
L WHEREAS,the Utility is willing to provide, in accordance with the provisions of this Agreement
central water and wastewater service to the Property and thereafter operate applicable facilities so that the
occupants of the improvements on the Property will receive adequate water and wastewater service from the
Utility; and
WI IEREAS,the parties wish to enter into this Agreement setting forth their mutual understandings
and undertakings regarding the furnishing of water and/or wastewater service by the Utility to the
Developer's Property.
NOW, THEREFORE, for and in consideration of the premises, the mutual undertakings and
agreements herein contained and assumed, Developer and Utility hereby covenant and agree as follows:
1. The foregoing statements are true and correct.
2. The following definitions and references are given for the purpose of interpreting the terms as
used in this Agreement and apply unless the context indicates a different meaning:
(a) "Consumer Installation"-All facilities ordinarily on the consumer's side of the point
of delivery.
(b) "Contribution-in-Aid-of-Construction(CIAO)"-The sum of money and/or the value
of property represented by the cost of the wastewater collection system and water distribution system
constructed or to be constructed which Developer or owner transfers,or agrees to transfer,to Utility, at no
cost to Utility, to provide utility service to specified Property.
-2-
(c) "Equivalent Residential Connection(ERC)"-A factor expressed in gallons per day
(GPD)which is used to convert a given average daily flow(ADF)to the equivalent number of residential
connections. For this purpose the average daily flow of one water ERC is(450)GPD and one wastewater
ERC is(311)GPD.
(d) "Point of Delivery"-The point where the pipes or meter of Utility are connected with
the pipes of the consumer. Point of delivery for water service shall be at the consumer's side of the meter
and for wastewater service at the lot or property line. Utility shall,according to the terms and conditions
hereof, own all pipes and appurtenances to the point of delivery unless otherwise agreed. The pipes and
appurtenances inside the point of delivery shall belong to others.
(e) "Service" -The readiness and ability on the part of Utility to furnish and maintain
water and wastewater service to the point of delivery for each lot or tract pursuant to rules and regulations of
applicable regulatory agencies.
3. Assurance of Title-Developer represents and warrants that he is the owner of the Property
and has the legal right to grant the exclusive rights of service contained in this Agreement. Upon request,
Developer agrees to deliver to Utility evidence of such ownership including any outstanding mortgages,
taxes, liens and covenants.
4. Connection Charges-In addition to the contribution of any wastewater collections systems
and water distribution systems, where applicable, and further to induce Utility to provide water and
wastewater service,Developer hereby agrees to pay to Utility the following fees and charges,as defined in
the Rate Resolution(including Service Availability Policy),upon execution of this Agreement in order to
reserve capacity in the System:
to (a) Water Capacity Charge:
($360.00 x 2.0 ERC) $ 720.00
Alternative Water Supply Surcharge:
($365.74 x 2.0 ERC) $ 731.48
SJRWMD Black Creek Connection Charge:
($100.25 x 2.0 ERC) $ 200.50
Wastewater Capacity Charge:
($3,200.00 x 2.0 ERC) $ 6.400.00
Environmental Impact Charge:
($410.00 x 2.0 ERC) $ 820.00
(b) Debt Service Charge:
($167.00 x 2.0 ERC) $ 334.00
(c) Customer Connection Charge(Tap-in) -Water $ N/A
Customer Connection Charge(Tap-in) -Wastewater $ 476.00 *
(d) Main Extension Charge-Water $ N/A
Main Extension Charge-Wastewater $ N/A
(e) Meter Installation Charge $ 658.64 **
(f) Plan Review Fee $ 38.50
(g) Inspection Fee $ 38.50
(h) Recording Fee $ 125.00
Total $ 10,542.62
* - See paragraph 29 for explanation of charge.
**- Includes two 5/8-inch x 3/4-inch potable water meter installations.
Note: Item (c) is subject to increase for any material price increases incurred by Utility for this
project.Items(f)and(g)are estimates and are subject to adjustment based on actual cost incurred.
Payment of the above charges does not and will not result in Utility waiving any of its rates or rules
-3 -
, and regulations and their enforcement shall not be affected in any manner whatsoever by Developer making
payment of same. Except as specifically stated, Utility shall not be obligated to refund to Developer any
portion of the value of the above charges for any reason whatsoever nor shall Utility pay any interest upon
the above charges paid.
Except as otherwise stated in this Agreement, neither Developer nor any person or other entity
holding any of the Property by,through or under Developer, or otherwise, shall have any present or future
right, title, claim or interest in and to the charges paid or to any of the water or wastewater facilities and
properties of Utility,and all prohibitions applicable to Developer with respect to no refund of such charges,
no interest payment on said charges and otherwise, are applicable to all persons or entities.
Paid capacity or connection charges may not be applied to offset any service bill or other claims of
Utility.
5. Agreement to Serve-Utility agrees that once it provides water and wastewater service to the
customers within the Property that it will continuously provide such service,at its cost and expense, but in
accordance with the other provisions of this Agreement, the then current Rate Resolution in effect for
Utility, and the requirements of the governmental authorities having jurisdiction over the operations of
Utility. Utility shall not be liable for any temporary interruptions in service as a result of equipment failure,
emergencies or acts of God.
6. Application for Service - Developer, or any owner of any parcel of the Property, or any
occupant of any residence,building or unit located thereon shall not have the right to and shall not connect
to any consumer installation to the facilities of Utility until formal written application has been made to Utility
by the prospective user of service, or either of them, in accordance with the then effective rules and
regulations of Utility and approval for such connection has been granted.
7. Exclusive Right to Provide Service-Developer shall not engage in the business of providing
potable water services or sanitary wastewater services to the Property during the period of time Utility
provides water and wastewater services to the Property. Utility shall have the sole and exclusive right and
privilege to provide water and wastewater services to the Property and to the occupants of such residence,
building or unit constructed thereon.
8. Rates-Utility agrees that the rates to be charged to Developer and individual consumers of
water and wastewater services shall be those set forth in the then current Rate Resolution most recently
adopted by the Board Supervisors of the Clay County Utility Authority as may be amended from time to
time. However, notwithstanding any provision in this Agreement, Utility, its successors and assigns, may
establish,amend or revise,from time to time in the future,and enforce in a reasonable manner,rates or rate
schedules so established.
Notwithstanding any provision in this Agreement,Utility may establish,amend or revise,from time
to time, in the future, and enforce rules and regulations covering water and wastewater services to the
Property. However,all such rules and regulations so established by Utility shall at all times be reasonable
and subject to such regulations as may be provided by law or contract.
9. Effluent Disposal Obligation - As further consideration for this Agreement, Utility may
require Developer to take hack treated effluent for disposal,and to provide for certain wet weather storage
for such effluent on the Property. In that event,a separate agreement will be entered into for such purpose.
-4-
1 0. Quality of Wastewater-No substance other than domestic wastewater will be placed into the
sewage system and delivered to the lines of the Utility directly by Developer. The Developer shall be
required to install grease traps for all non-residential kitchen facilities and sand traps if floor drains are
connected to the Utility's sanitary wastewater transmission system. Such installation shall be in accordance
with the requirements of the Utility. Should any non-domestic wastes, grease or oils, including, but not
limited to, floor wax, paint, chlorides, or salt water or any substances and materials which contain any
hazardous,flammable,toxic and/or industrial constituents,be directly delivered by Developer to the lines,of
the Utility, Developer will be responsible for payment of the cost and expense required in correcting or
repairing any resulting damage to the system or property of third parties.
In the event Utility determines that the Property to be served poses a threat of introducing chlorides,
salt water, or similar constituents into the collection or transmission system at levels determined by the
Utility to be harmful to the wastewater system, including,but not limited to,the system's ability to provide
effluent meeting reuse standards as an irrigation supply source, the Utility has the right, in its reasonable
discretion,to decline or discontinue service to such property or customer and to require such pretreatment or
other measures as are necessary to protect the integrity of Utility's system and the ability to serve its
members.
11. Binding Effect of Agreement-This Agreement shall be binding upon and shall inure to the
benefit of Developer, Utility and their respective assigns and successors by merger, consolidation,
conveyance or otherwise. Any assignment or transfer by Developer shall be subject to Utility approval
which shall not be unreasonably withheld provided the assignee or transferee shall acknowledge in writing
that it assumes the duties and responsibilities of Developer as set forth in this Agreement.
to
12. Notice - Until further written notice by either party to the other, all notices provided for
herein shall be in writing and transmitted by messenger,by mail or by telegram,and if to Developer,shall be
mailed or delivered to Developer at:
Mr. Patrick K. Jett
4279 Cedar Road
Orange Park, Florida 32065
and if to the Utility at:
Clay County Utility Authority
3176 Old Jennings Road
Middleburg,Florida 32068-3907
13. Laws of Florida-This Agreement shall be governed by the laws of the State ofFlorida and it
shall be and become effective immediately upon execution by both parties hereto, subject to any approvals
which must be obtained from governmental authority, if applicable.
14. Costs and Attorney's Fees -In the event the Utility or Developer is required to enforce this
Agreement by court proceedings, by instituting suit or otherwise, then venue shall lie in Clay County,
Florida,and the prevailing party shall be entitled to recover from the other party all cost incurred,including
reasonable attorney's fees.
-5 -
15. Force Majeure - In the event that the performance of this Agreement by either party is
prevented or interrupted in consequence of any cause beyond the control of either party,including,but not
limited to acts of God or of the public enemy,war,national emergency,allocation or of other governmental
restrictions upon the use or availability of labor or materials,civil disorder,strike,embargo,natural disaster
or catastrophe, unforeseeable failure or breakdown of transmission, treatment or other facilities,
governmental rule, act, order, restriction, regulation, statute, ordinance, or order, decree, judgment,
restraining order or injunction of any court, said party shall not be liable for such non-performance.
16. Indemnification - Developer agrees to indemnify and hold the Utility harmless from and
against any and all liabilities,claims,damages,costs and expenses(including reasonable attorney's fees)to
which it may become subject by reason of or arising out of Developer's performance of this Agreement.
This indemnification provision shall survive the actual connection to Utility's wastewater and water
distribution system.
MISCELLANEOUS PROVISIONS
17. The rights,privileges,obligations and covenants of Developer and Utility shall survive the
completion of the work of Developer with respect to completing the facilities and services to any
development phase and to the Property as a whole.
18. This Agreement supersedes all previous agreements or representations, either verbal or
written, heretofore in effect between Developer and Utility, made with respect to the matters herein
contained,and when duly executed,constitutes the agreement between Developer and Utility. No additions,
alterations or variations of the terms of this Agreement shall be valid,nor can provisions of this Agreement
to be waived by either party,unless such additions,alterations,variations or waivers are expressed in writing
and duly signed.
19. Whenever the singular number is used in this Agreement and when required by the context,
the same shall include the plural, and the masculine, feminine and neuter genders shall each include the
others.
20. Whenever approvals of any nature are required by either party to this Agreement,it is agreed
that same shall not be unreasonably withheld or delayed.
21. The submission of this Agreement for examination by Developer does not constitute an offer
but becomes effective only upon execution thereof by Utility.
22. Failure to insist upon strict compliance of any of the terms,covenants,or conditions herein
shall not be deemed a waiver of such terms,covenants,or conditions,nor shall any waiver or relinquishment
of any right or power hereunder at any one time or times be deemed a waiver or relinquishment of such right
or power at any other time or times.
23. It is because of inducements offered by Developer to Utility that Utility has agreed to provide
water and wastewater services to Developer's project.Capacity reserved hereunder cannot and shall not be
assigned by Developer to Third Parties without the written consent of Utility,except in the case of a bona-
fide sale of Developer's Property.
24. Utility shall,as aforesaid,at all reasonable times and hours,have the right of inspection of
Developer's internal lines and facilities. This provision shall be binding on the successors and assigns of the
Developer.
- 6 -
25. The parties hereto recognize that prior to the time Utility may actually commence upon a
program to carry out the terms and conditions of this Agreement.Utility may be required to obtain approval
from various state and local governmental authorities having jurisdiction and regulatory power over the
construction,maintenance,and operation of Utility. The Utility agrees that it will diligently and earnestly
make the necessary proper applications to all governmental authorities and will pursue the same to the end
that it will use its best efforts to obtain such approval. Developer agrees to provide necessary assistance to
Utility in obtaining the approvals provided for herein. Upon execution of this Agreement, Utility may
require the payment of a reasonable fee to defray Utility's legal,engineering,accounting and administrative
and contingent expense.
26. It shall be Developer's responsibility or Developer's customers'responsibility, utilizing the
project's water and wastewater service within Developer's project,to apply to Utility for service after the
installation of the water and wastewater utilities have been completed and accepted by Utility. Upon
completion of application for water and wastewater service and payment of the appropriate charges set forth
in Utility's then current applicable Rate Resolution,including any security deposits required,service will be
initiated to customers within Developer's Property.
27. The Developer shall not place any conservation easements over any of the easement lands
that contain Utility's water or wastewater facilities for the project covered by this Agreement.
28. The landscaping(new or existing)for this project shall not include the planting of any trees
within seven and one-half feet(7 ft. 6 in.)of the water and/or wastewater main to be owned by Utility.
to 29. The charge shown in paragraph 4(c)"Customer Connection Charge(Tap-in)-Wastewater"
includes a 2-inch PVC force main connection to the existing 2-inch force main through the 2-inch service
stub terminating at the 2-inch ball valve and check valve assembly housed in a DFW-1324 valve box,which
terminates in an easement at or near Developer's Property line,where Developer will make the connection.
30. The Utility shall own and maintain all water facilities upstream ofthe downstream side of the
potable water meter,and all facilities downstream of the downstream side of the potable water meter shall be
owned and maintained by Developer. Utility shall have access to the water meter for meter reading and
maintenance purposes.
31. It shall be the Developer's responsibility to notify the Utility and install or have installed an
approved lead free backflow prevention assembly immediately downstream of Utility's 5/8-inch x 3/4-inch
potable water meter, should all there be an alternative water source on the Property.
32. The wastewater connection point is a pressure force main connection point and will require
the Developer,its successors and assigns,at its/their sole cost and expense,to install and maintain a grinder
pump station and piping, capable of pumping the anticipated flow at the required pressure condition, and
Developer shall be responsible for connection of said piping to Utility's system at the valve box within
Utility's easement in order for the flow to be pumped into Utility's system for treatment and disposal.
In addition, Developer, its successors and assigns, hereby agree(s) to install and maintain a
Flowmatic ball check valve,Model 508(epoxy coated cast iron body),at its/their sole cost and expense,on
the discharge side of the Developer's grinder pump station.The Flowmatic ball check valve shall be placed
in a protective valve box with a lid. The check valve and valve box shall be positioned on a horizontal
segment of pipe at least(2) linear feet outside of the grinder pump station.
-7 -
Prior to the start-up of the grinder pump station, Developer, its successors and assigns, will be
required to pull the grinder pump for Utility's inspection to ensure the proper grinder pump and check valve
have been provided.If the proper grinder pump and check valve have been provided,the system start-up will
be allowed to proceed.If not,Developer,its successors and assigns,shall correct the pump station and check
valve and call for a follow-up inspection.An additional service charge will be assessed for the follow-up
inspection.
33. The Developer will own and maintain the private pumping station and check valve on the
Property, and in the event of an electrical power outage, it shall be Developer's responsibility to provide
backup power,if continuous service is desired. Utility is in no way responsible for damages or injury,either
directly or indirectly,related to sanitary sewage overflows, spills or stoppages related to loss of electrical
power or any malfunction of the privately owned facilities.
34. All wastewater installations upstream of Developer's point of connection shall be owned and
maintained by Developer,and all installations downstream of this point of connection shall be owned and
maintained by Utility.
35. The Developer will be responsible for the site restoration of their Property,upon completion
of the project.
36. This Agreement does not include any other developments(future additions)that are planned
for this Property. A separate agreement will be prepared for the additional requirements of each future
development on the Property when such development is initiated.
to
37. The construction of this project will not commence until receipt of all permits,and easements
if necessary,and this Agreement are executed and the charges stated herein are paid.
38. The Agreement will need to be executed by Developer,and the charges paid(shown on page
2 of Agreement),prior to October 1, 2022, or this Agreement will be subject to any Service Availability
charge increases approved by Utility's Board of Supervisors for the next fiscal year beginning October 1,
2022; and this Agreement is subject to any material cost increases which Utility may experience after
October 1,2022.
[Signatures Begin Next Page]
- 8 -
IN WITNESS WHEREOF, Developer and Utility have executed or have caused this Agreement,
with the named Exhibits attached, to be duly executed in several counterparts, each of which counterpart
shall be considered an original executed copy of this Agreement.
WITNES . DEVELOPER:
Witness: By: (Seal)
Print Name: I: .v1 c1. (v)I-)char" I Patrick K. Jett
Witness: R__../0 -- David Smolder
Print Name: 1 hL j 1 1.{`( =.ApY Pu@(�� Notary Public
` • State of Florida
Nor,
My Commission Expires 09/03/2022
STATE OF 1011 Commission No. GG 241428
COUNTY OF Clay
The foregoing instryment was ackn1pwledged before me by means of El physical presence or ❑
online notarization,this day of Han 1. , 2022, y ATRICK K. JETT, who is personally
known to me or has produced �1—P(✓ entification.
David Smolder
Notary Public
State of Florida er Print Name: D,-/At�
No, My Commission Expires 09/03/2022 Notary Public in and for the
Commission No. GG 241428 County and State Aforesaid
to My Commission Expires:4'/,/92-
WITNESSES: UTILITY:
CLAY COUNTY VT' ' UTHORITY
•
Witness: I By:
Print Name: je",,,,t0 M. rton +rem. ohnst►n. P.E., M.B.A.
ec • ec ,r
WitnessaPaRek11W%v. v
Print Name: Summer '. .erndt (Corporate Seal)
STATE OF FLORIDA
COUNTY OF CLAY
The foregoing instrument was acknowledged before me by means of t l physical presence or ❑
online notarization, this day of , 2022, by JEREMY D. JOHNSTON, as
EXECUTIVE DIRECTOR of CLAY COUNTY UTILITY AUTHORITY,who is personally known to
me.
LPVI OR%
410.6iff
Notary Public State of Flood. Print ame: Summer P. Bemdt
Summer P E Berndt
My commiuior,GG esoe78. Notary Public in and for the
ir Expiresot,zeno24 County and State Aforesaid
My Commission Expires:
WATER& WASTEWATER SERVICE
TO 1017 & 1018 JAYLA COVE
Parcel Identification Nos. 13-04-25-020320-002-00 and 13-04-25-020320-001-00
Official Records Book 4588, Page 292-296, Clay County, Florida
EIIBIT "A"
PORTION OF SECTION 13, TOWNSHIP 4 SOUTH, RANGE 25 EAST, CLAY COUNTY,
FLORIDA, FLORIDA;TOGETHER WITH A PORTION OF BLOCK 2, SECTION 8, AS SHOWN
ON PLAT OF RIDGEWOOD, RECORDED IN PLAT BOOK Q, PAGE 663, OF THE PUBLIC
RECORDS OF CLAY COUNTY,FLORIDA;AND A PORTION OF FORMER GORDON STREET
AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
FOR A POINT OF REFERENCE, COMMENCE AT'THE SOUTHWEST CORNER.OF';LOT I
BLOCK I, AS SHOWN ON THE PLAT OF SAUNDARLEE, RECORDED IN PLAT BOOK 5,
'..PAGE 36, OF SAID PUBLIC RECORDS OF SAID COUNTY, SAID CORNER LYING ON THE
NORTHEASTERLY RIGHT-OF-WAY LINE OF COUNTY ROAD NO.C-209-A,ALSO KNOWN
AS .MOODY AVENUE (FORMERLY STATE ROAD NO. 209-A PER STATE ROAD
DEPARTMENT RIGHT-OF-WAY MAP,SECTION 71502-2601);-THENCE SOUTHWESTERLY
- ALONG.THE NORTHEASTERLY RIGHT-OF-WAY LINE, RUN THE FOLLOWING FIVE (5)
COURSES AND DISTANCES; COURSE Na 1; THENCE SOUTH 85°52'05" WEST, A;
DISTANCE OF 80.89 htr.-1 TOTHEPOINT OF BEGINNING;COURSE NO.2:THENCE SOUTH
85°52'05"`'WEST,A DISTANCE OF 154.67 FEET,COURSE'NO. 3: SOUTH 84°44'00" WEST,�A
DISTANCE OF 7.78 FEET;.-COURSE NO:4: THENCE SOUTH.87°07'44" WEST, A DISTANCE
to OF 186:11 FEET . TO. THE POINT OF . CURVATURE -OF A CURVE CONCAVE
NORTHWESTERLY AND HAVING RADIUS OF 356.15 FEET; COURSE Na 5: THENCE
SOUTHWESTERLY ALONG AND AROUND THE ARC OF SAID CURVE,•A DISTANCE OF.
45.19 FEET, SAID ARC BEING SUBTENDED BY A:CHORD BEARING AND DISTANCE OF':
SOUTH 83°2918" WEST,.45.16 FEET, MORE OR-LESS TO THE CENTERLINE OF LUCY'
BRANCH; THENCE"IN A-NORTHWESTERLY DIRECTION:MEANDERING ALONG THE
CENTERLINE OF LUCY BRANCH,A DISTANCE OF 214`FEET,MORE OR LESS TO A POINT
WHICH BEARS NORTH 89°51'52"WEST,A DISTANCE OF 393 FEET MORE OR LESS FROM
REFERENCE POINT "J', THENCE SOUTH 89°51'52" EAST, A DISTANCE.OF 393 MORE OR.
LESS TO REFERENCE POINT"I";THENCE SOUTH 74°14'02" EAST,A DISTANCE OF47.71
-FEET TO THE POINT OF CURVATURE OF A CURVE CONCAVE SOUTHWESTERLY AND
HAVING A RADIUS 25.00 FEET; THENCE SOUTHEASTERLY ALONG AND AROUND THE.
ARC OF SAID CURVE A DISTANCE OF 28.24.FEET, SAID ARC BEING SUBTENDED BY A
CHORD BEARING AND DISTANCE OF SOUTH`36°29'50"EAST,26.77 FEET`TO THE POINT'
OF TANGENCY OF SAID CURVE; THENCE SOUTH 04°07'55" EAST,A DISTANCE OF 51.45'
FEET TO THE POINT OF BEGINNING.
TOGETHER WITH A 30 FOOT EASEMENT FOR INGRESS ,EGRESS:
A PORTION OF SECTION 13, TOWNSHIP 4 SOUTH, RANGE 25 EAST, CLAY COUNTY,
FLORIDA;TOGETHER WI13-I A PORTION OF BLOCK 2, SECTION 8,AS SHOWN ON PLAT
OF RIDGEWOOD, RECORDED IN PLAT BOOK Q,PAGE 663,OF THEPUBLIC RECORDS OF
CLAY.COUNTY,FLORIDA; AND A PORTION OF FORMER GORDON STREET AND BEING
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
FOR A POINT OF REFERENCE, COMMENCE AT.THE°SOUTHWEST:CORNER OF LOT 1,
BLOCK 1, AS SHOWN ON THE PLAT OF SAUNDARLEE; RECORDED IN PLAT BOOK 5,
PAGE 36, OF SAID.PUBLIC RECORDS OF SAID COUNTY, SAID CORNER LYING ON THE
NORTHEASTERLY RIGHT-OF-WAY'LINEOF COUNTY ROAD NO.C-209-A,ALSO KNOWN:
AS -MOODY AVENUE (FORMERLY STATE ROAD 'NO. 209-A PER STATE ROAD
■
X:\Service Availability\Developer Agreoment Naeler File\Developer Ag[eeent,\Moody Re.d\AGR.1D17 s _018 Jayla tovl.Jett.V WW.SFR.SPB.dom
DEPARTMENT RIGHT-OF-WAY MAP, SECTION 71502-2601); THENCE SOUTH 85°52'05
WEST, ALONG LAST SAID LINE. A DISTANCE OF 65.89 FEET TO THE POINT OF
BEGINNING; THENCE CONTINUE SOUTH 85°52'05" WEST, A DISTANCE OF 30.00 FEET;
THENCE NORTH 04°07'55" WEST, A DISTANCE OF 51.45 FEET TO THE POINT OF
CURVATURE OF A CURVE CONCAVE SOUTHWESTERLY AND HAVING A RADIUS 10.00
FEET; THENCE NORTHWESTERLY ALONG AND AROUND THE ARC OF SAID CURVE A
DISTANCE OF 1130 FEET, SAID ARC BEING SUBTENDED BY A CHORD BEARING AND
DISTANCE OF NORTH 36°29'50"WEST, 10.71 FEET TO THE POINT OF TANGENCY OF SAID
CURVE;THENCE NORTH 68°51'45" WEST,A DISTANCE OF 65.89 FEET,TO THE POINT OF
CURVATURE OF A CURVE CONCAVE SOUTHEASTERLY AND HAVING A RADIUS OF
25.00 FEET; THENCE NORTHWESTERLY ALONG AND AROUND THE ARC OF SAID
CURVE A DISTANCE OF 16.09 FEET, SAID ARC BEING SUBTENDED BY A CHORD
BEARING AND DISTANCE OF NORTH 87°17'51" WEST, 15.81 FEET, TO THE POINT OF
REVERSE CURVATURE OF A CURVE CONCAVE NORTHWESTERLY AND HAVING A
RADIUS OF 25.00 FEET;THENCE SOUTHWESTERLY ALONG AND AROUND THE ARC OF
SAID CURVE A DISTANCE OF 110.71 FEET,SAID ARC BEING SUBTENDED BY A CHORD
BEARING AND DISTANCE OF NORTH 21°08'15" EAST, 40.00 FEET, TO THE POINT THE
POINT OF REVERSE CURVATURE OF A CURVE CONCAVE NORTHEASTERLY AND
HAVING A RADIUS OF 25.00 FEET; THENCE NORTHEASTERLY ALONG AN])":AROUND
THE ARC OF SAID CURVE A DISTANCE OF 16.09 FEET, SAID ARC BEING SUBTENDED
BY A CHORD BEARING AND DISTANCE OF SOUTH 50°25'40" EAST, 15.81 FEET, TO THE
POINT OF TANGENCY OF SAID CURVE,THENCE SOUTH 68°51'45"EAST,A DISTANCE OF
65.89 F.h.IGI, TO TEE POINT OF CURVATURE OF A CURVE CONCAVE SOUTHWESTERLY
AND HAVING A RADIUS OF 40.00 FEET; THENCE SOUTHEASTERLY ALONG AND
AROUND THE ARC OF SAID CURVE A DISTANCE OF 45.19.FEET, SAID ARC BEING
to SUBTENDED BY A CHORD BEARING AND DISTANCE OF SOUTH 36°29'50" EAST, 42.83
FEET, TO THE POINT OF TANGENCY OF SAID CURVE; THENCE SOUTH 04°07'55" EAST,
A DISTANCE OF 51.45 FEET TO THE POINT OF BEGINNING_
•
AND`
A PORTION OF SECTION 13, TOWNSHIP 4 SOUTH, RANGE 25 EAST, CLAY COUNTY;
FLORIDA,FLORIDA;TOGETHER.WITH A PORTION OF BLOCK 2, SECTION 8,AS SHOWN
ON PLAT OF RIDGEWOOD, RECORDED IN PLAT BOOK Q, PAGE 663, OF THE PUBLIC
RECORDS OF CLAY COUNTY,FLORIDA;AND A PORTION OF FORMER GORDON STREET
AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
FOR A POINT OF REFERENCE, COMMENCE AT THE NORTHWEST CORNER OF LOT 2,
BLOCK 1 AS SHOWN ON THE PLAT OF SAUNDERLEE, RECORDED IN PLAT BOOK 5,
PAGE 36,OF SAID PUBLIC RECORDS OF SAID COUNTY;THENCE SOUTH 89°42'30"WEST,
ALONG THE SOUTH BOUNDARY LINE OF LOT 15, AS SHOWN ON THE PLAT OF
SAUNDARLEE UNIT TWO, RECORDED IN PLAT BOOK 6, PAGE 24, SAID PUBLIC
RECORDS OF SAID COUNTY,A DISTANCE OF 157.14 FEET TO THE POINT OF BEGINNING;
THENCE SOUTH 15°19'21"WEST,A DISTANCE OF 113.53 FEET;THENCE NORTH 74°14,02"
WEST,A DISTANCE OF 47.71 FEET,THENCE NORTH 89°51'52" WEST, A DISTANCE OF 393
FEET MORE OR LESS TO THE CENTERLINE OF LUCY BRANCH; THENCE IN A
NORTHWESTERLY DIRECTION MEANDERING ALONG SAID CENTERLINE, A DISTANCE
OF 100 FEET MORE OR LESS TO POINT WHICH BEARS SOUTH 89°42'30" WEST, A
DISTANCE OF 504 FEET MORE OR LESS FROM THE POINT OF'BEGINNING: THENCE
NORTH 89°42'30" EAST, A DISTANCE OF 504 FEET MORE OR LESS TO THE POINT OF
BEGINNING.
%:\Sery Availabllity\Developer Agrceecnt Hasten F'i_c\Developer Agre.�evts\Hoody Aoad`,AGA._O17 c 131B aayla Cnvc..lrtt_W WW.SF'H.3PN_dcc
TOGETHER WITH A 30 FOOT EASEMENT FOR INGRESS &EGRESS:
A PORTION OF SECTION 13, TOWNSHIP 4 SOUTH, RANGE 25 EAST, CLAY COUNTY,
FLORIDA; TOGETHER WITH A PORTION OF BLOCK 2, SECTION 8, AS SHOWN ON PLAT
OF RIDGEWOOD,RECORDED IN PLAT BOOK Q, PAGE 663,OF THE PUBLIC RECORDS OF
CLAY COUNTY, FLORIDA; AND A PORTION OF FORMER GORDON STREET AND.BEING
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
FOR A POINT OF REFERENCE, COMMENCE AT THE SOUTHWEST CORNER OF LOT 1,
BLOCK I, AS SHOWN ON THE PLAT OF SAUNDARLEE, RECORDED IN PLAT BOOK 5,
PAGE 36, OF SAID PUBLIC RECORDS OF SAID COUNTY, SAID CORNER LYING ON THE
NORTHEASTERLY RIGHT-OF-WAY LINE OF COUNTY ROAD NO.C-209-A,ALSO KNOWN
AS MOODY AVENUE (FORMERLY STATE ROAD NO. 209-A PER STATE ROAD
DEPARTMENT RIGHT-OF-WAY MAP, SECTION 71502-2601); THENCE SOUTH 85°52'05"
WEST, ALONG LAST SAID LINE, A DISTANCE OF 65.89 FEET TO THE POINT OF
BEGINNING; THENCE CONTINUE SOUTH 85°52'0S"'WEST, A DISTANCE OF 30.00 FEET;
THENCE NORTH 04°07'55" WEST, A DISTANCE OF 51.45 FEET TO THE POINT OF
CURVATURE OF A CURVE CONCAVE SOUTHWESTERLY AND HAVING A RADIUS 10.00
FEET; THENCE NORTHWESTERLY ALONG AND AROUND THE ARC OF SAID CURVE A
DISTANCE OF 11.30 FEET,SAID ARC BEING SUBTENDED BY A CHORD BEARING AND
DISTANCE OF NORTH 36°29'50"WEST, 10.71 FEET TO THE POINT OF TANGENCY OF SAID
CURVE;THENCE NORTH 68°51'45" WEST,A DISTANCE OF 65.89 FEET, TO THE POINT OF
to CURVATURE OF A CURVE CONCAVE SOUTHEASTERLY AND HAVING A RADIUS OF
25.00 FEET; THENCE NORTHWESTERLY ALONG AND AROUND THE ARC OF SAID
CURVE A DISTANCE OF :16.09 FEET, SAID ARC BEING SUBTENDED BY A CHORD
BEARING AND DISTANCE'OF NORTH 87°17 51" WEST, 15.81 FEET, TO THE POINT OF
REVERSE CURVATURE OF A CURVE CONCAVE NORTHWESTERLY AND HAVING A
RADIUS OF 25.00 FEET;THENCE SOUTHWESTERLY ALONG AND AROUND THE ARC OF
SAID CURVE A DISTANCE OF 110.71 FEET, SAID ARC BEING SUBTENDED BY A CHORD
BEARING AND DISTANCE OF NORTH 21°08'15" EAST, 40.00 FEET, TO THE POINT THE
POINT OF REVERSE CURVATURE OF A CURVE CONCAVE NORTHEASTERLY AND
HAVING A RADIUS OF 25.00 FEET;THENCE NORTHEASTERLY ALONG AND AROUND
THE ARC OF SAID CURVE A DISTANCE OF 16.09 FEET, SAID ARC BEING SUBTENDED
BY A CHORD BEARING AND DISTANCE OF SOUTH 50°25'40" EAST, 15.81 FEET, TO THE
POINT OF TANGENCY OF SAID CURVE;THENCE SOUTH 68°51'45"EAST,A DISTANCE OF
65.89 FEET, TO THE POINT OF CURVATURE OF A CURVE CONCAVE SOUTHWESTERLY
AND HAVING A RADIUS OF 40.00 FEET; THENCE SOUTHEASTERLY ALONG AND
AROUND THE ARC OF SAID CURVE A DISTANCE OF 45.19 FEET, SAID ARC BEING
SUBTENDED BY A CHORD BEARING AND DISTANCE OF SOUTH 36°29'50" EAST, 42.83
FEET, TO THE POINT OF TANGENCY OF SAID CURVE; THENCE SOUT11,04°07'55" EAST,
A DISTANCE OF 51.45 FEET TO THE POINT OF BEGINNING.
:\service Ava11. iiity\Doveloper Agreement Nester Pile\Developer Ag reements\Noody Ro.dV R.1D11 a 1013 J.yi.Covo.Jett.W&t4W.SFR.SPB.dOC
)3,,,-
�
\ 58 I N
`, '‘
Wt F.
N.\ �\ ROBIN RD !-—
•
63 j s
< �7 P
—
i
.\
5, L L
1018
Install Water and
Wastewater to
existin• laterals
to
I
.834
2.FM)on C4-1 Q
b -
MOODY CS9 i
• _
3�C4-1 co.
\ _ G2-1.G� -1 .
:. -- \ %.
\` c . c.
A.
Disclaimer:The information displayed on this drawing or sheet is for a general visual representation purposes only.The drawing is based upon numerous sources of public
information which include but are not limited to Clay County Property Appraisers, FDOT, SJRWMD, and the Clay County Utility Authority's (CCUA)own records.All
/ information included in the drawing is general in nature and not site specific.Any cimensions or other information is approximate and needs to be field verified.CCUA does
not offer any guarantees,certifications,or warranties,either expressed or implied,in regards to the accuracy of the information represented on these drawings.The drawing
_, is not a survey and should not be construed in any manner as such.By receiving this drawing,the recipient is agreeing to hold CCUA harmless for any errors or omissions
- which may be present in this&awing.All interested parties are strongly encouraged to engage a Professional Surveyor and Mapper licensed in the State of Florida to field
verify all site,property,infrastructure,and utility information prior to any decisions or actions.
c
C
N, Title:
` ClayCountyUtilityAuthority CCUA Web Map
3176 Old Jennings Road Info:
Middlebur Florida 320683907 — Water Features
g+ Prepared by CCUAGIS Portal Phone 904 272-5999 - Gravity Sewer Features
41612022,4:45:49 PMConservation.Commitment.Commundy Forced Sewer Features
YAUTHD 1 inch = 100 feet - Reclaimed Features