HomeMy WebLinkAboutCA ITB 1819-7 Sewer Wetwell and Manhole Rehab Renewal and Price Increase Request EXECUTIVE SUMMARY
AGENDA ITEM:
Proposed Approval of Continuing Contract Renewal for Sewer, Wetwell and Manhole Rehabilitation
Services (Parts B and C), ITB# 18/19-A7
Date: June 2,2022
BACKGROUND:
The Sewer, Wetwell and Manhole Rehabilitation Services Continuing Contract with Vortex Services,
LLC (Part B)and Insituform Technologies,LLC (Part C)expires on June 18, 2022. The terms of each
contract allow an additional twenty-four (24) month period renewal, contingent upon mutual
agreement of both parties. Both firms agreed to renew the contracts with a requested rate increase. Per
the contract, CCUA may consider a rate increase in either of the renewal years based on verifiable
changes in the marketplace and Consumer Price Index (CPI). Clay County Utility Authority(CCUA)
staff compared the rates and have determined the rates to be consistent with market conditions.
co
cThe Distribution & Collection Department routinely uses the contracts to rehabilitate aging
CT infrastructure.Insituform's Cured-in-place Pipe(CIPP)process extends the life of gravity sewer mains,
co
o while Vortex's manhole repair and lining extends the life of sewer manholes. CCUA typically line
E 20,000 linear feet of gravity sewer pipe and 150 gravity sewer manholes.
4-
a>
lY BUDGET IMPACT:
Staff budgeted $1,000,000 for this fiscal year and $1,150,000 next fiscal year. To date, staff spent
$263,472.89 of the funds budgeted for this fiscal year. Staff is evaluating if funds budgeted for next
fiscal year are sufficient or whether they need to be adjusted.
RECOMMENDATION:
Staff respectfully requests the Board of Supervisors approve the Contracts for Sewer, Wetwell and
Manhole Rehabilitation Services (Parts B and C), ITB#18/19-A7, to be extended for an additional
twenty-four(24) month term with rate increase.
ATTACHMENTS:
Renewal Acceptance Letters
Insituform Technologies, LLC. Rate Increase Request
Insituform Technologies, LLC Manufacture Letters for Rate Increase
Vortex Services, LLC. Rate Increase Request
Vortex Services, LLC Manufacture Letter for Rate Increase
//AW(Author)
//AB,AW(Review)
//TS(Final)
j Clay County Utility Authority Working together to
3176 Old Jennings Rd. protect public health,
Middleburg,Florida 32068-3907 conserve our natural
r,. Telephone(904)213-2413 resources,and create
� i� ,, Facsimile(904)213-2436 long-term value for
>>l our ratepayers.
May 2, 2022
Ms. Diane Partridge
Insituform Technologies, LLC.
1798 Edison Avenue
Chesterfield, MO 63005
Re: Renewal of Part C—CIPP Sanitary Sewer Lining System
Continuing Contract for Sanitary Sewer, Wetwell and/or Manhole Rehabilitation Services Bid
No. 18/19-A7
Dear Ms. Partridge:
The above referenced contract is scheduled to expire on June 18,2022.The contract terms allow for a
renewal period of 24-months,contingent upon the mutual agreement of both parties.The Clay County Utility
Authority (CCUA) is hereby providing written notice of interest in renewing the existing contract for an
additional 24-month period, continuing from June 19, 2022, through June 18, 2024. Please review Article
5.02 of the Standard Form of Agreement(page 00520-3)regarding fee modifications and price adjustments
and provide any requested price adjustments to accompany this letter for the contract renewal. Please notify
CCUA and advise if you agree and would like to renew the existing contract for the additional 24-months by
signing this letter below and returning it our office.
CCUA appreciates your cooperation. We look forward to continuing business with you and your
organization in the coming years.
Sincerely,
CLAY COUNTY UTILITY AUTHORITY ACCEPTANCE: YES NO OTHER
Insituform Technologies WiAle
Angelia Wilson NAME: Diane e Partrid9 L -(I
Procurement Manager Contracting and Attesting Officer
TITLE:
/aw 5/20/22
DATE:
cc: Jeremy D. Johnston
Teri Shoemaker
Insituform Technologies,LLC is a subsidiary of Aegion Corporation
Insituform 17988 Edison Avenue
Chesterfield,MO 63005
Technologies; L1_L' www.insituform.com
May 11th, 2022
Clay County Utility Authority
Angelia Wilson
Procurement Manager
3176 Old Jennings Rd
Middleburg, FL 32068
Re: Part C— CIPP Sanitary Sewer Lining System No. 18/19-A7— Requested Price Increases
Ms. Wilson,
Insituform Technologies LLC is submitting this letter in reference to the overwhelming price increases
that our Company and industry as a whole have experienced over the last 18 — 24 months. As not only
the installer of CIPP liners, we are also the world's largest manufacturer of CIPP liners and our raw
material costs have risen dramatically over this timeframe. We've experienced cost increases in the
range of 30 — 80% for certain aspects of raw materials primarily due to shortages of product and global
supply chain issues.
to Unfortunately, these material cost increases are coming at a time where we're also experiencing dramatic
cost increases in many other aspects of our services. Aside from material cost increases, our labor costs
have risen in response to the labor shortages and an attempt to retain laborers. Fuel costs, in particular
diesel, have increased in this same timeframe severely impacting operating costs on our installation side.
Below is a blended summary of cost increase percentages our Company has incurred:
• Raw Materials — 18%
• Labor— 19.7%
• Fuel —40%
• Accommodations—44%
With this letter, I'm attaching proposed pricing adjustments and letters from some of our material
suppliers that we have requested to substantiate these cost increases. Please let me know if you or any
persons at CCUA have any questions concerning this matter or require additional information.
Sincerely,
Brandt Curvel
Sr. Project Manager
Insituform Technologies LLC
Jacksonville, FL
lay County Utility Authority
ontract No. 18/19-A7 Part C
ured-in-Place Continuing Services Contract
CURRENT PROPOSED
ITEM UNIT UNIT
NO. DESCRIPTION UNIT PRICE PRICE INCREASE
A. Sanitary Sewer Line Clean and Inspection
1 Light Cleaning (<1/4 diameter)
a. 4" diameter LF $2.20 $2.35 6.82%
b. 6"diameter LF $2.20 $2.35 6.82%
c. 8" diameter LF $1.80 $1.95 8.33%
d. 10" diameter LF $1.80 $1.95 8.33%
e. 12" diameter LF $2.20 $2.40 9.09%
f. 14" diameter LF $3.40 $3.65 7.35%
g. 18" diameter LF $5.60 $6.05 8.04%
h. 20" diameter LF $5.60 $6.05 8.04%
i. 24" diameter LF $7.80 $8.40 7.69%
2 Tuberculation Cleaning
a. 4" diameter LF $22.30 $22.30 0.00%
b. 6"diameter LF $22.30 $22.30 0.00%
c. 8" diameter LF $20.10 $20.10 0.00%
d. 10" diameter LF $27.90 $27.90 0.00%
e. 12" diameter LF $27.90 $27.90 0.00%
to f. 14" diameter LF $27.90 $27.90 0.00%
g. 18" diameter LF $27.90 $27.90 0.00%
h. 20" diameter LF $33.50 $33.50 0.00%
i. 24" diameter LF $33.50 $33.50 0.00%
3 Root Removal
a. 4" diameter LF $8.90 $8.90 0.00%
b. 6"diameter LF $8.90 $8.90 0.00%
c. 8" diameter LF $8.90 $8.90 0.00%
d. 10" diameter LF $11.20 $11.20 0.00%
e. 12" diameter LF $11.20 $11.20 0.00%
f. 14" diameter LF $13.40 $13.40 0.00%
g. 18" diameter LF $17.90 $17.90 0.00%
h. 20" diameter LF $20.10 $20.10 0.00%
i. 24" diameter LF $20.10 $20.10 0.00%
4 TV Pipe Inspection
a. 6"diameter LF $0.90 $0.95 5.56%
b. 8" diameter LF $0.90 $0.95 5.56%
c. 10" diameter LF $0.90 $0.95 5.56%
d. 12" diameter LF $1.90 $2.00 5.26%
e. 14" diameter LF $1.90 $2.00 5.26%
f. 18" diameter LF $1.90 $2.00 5.26%
g. 20" diameter LF $1.90 $2.00 5.26%
h. 24" diameter LF $2.80 $3.00
5 Clean & TV Inspection -Sewer Lateral
a. Lateral Inspection 0' to 40' EA $307.20 $368.60 19.99%
b. Additional Lateral Inspection >40' LF 1 $11.20 $13.40 19.64%
B. Sanitary Sewer Rehabilitation
1 Sanitary Sewer Lining
a. 6" diameter
lay County Utility Authority
ontract No. 18/19-A7 Part C
ured-in-Place Continuing Services Contract
CURRENT PROPOSED
ITEM UNIT UNIT %
NO. DESCRIPTION UNIT PRICE PRICE INCREASE
1 4.5mm nominal thickness (.177) LF $29.40 $34.30 16.67%
b. 8" diameter
1 6.0mm nominal thickness (.236) LF $25.20 $30.00 19.05%
2 7.5mm nominal thickness (.295) LF $27.50 $32.30 17.45%
3 9.0 mm normal thickness (.354) LF $29.00 $33.80 16.55%
c. 10" diameter
1 6.0mm nominal thickness (.236) LF $32.00 $38.10 19.06%
2 7.5mm nominal thickness (.295) LF $34.60 $40.70 17.63%
3 9.0 mm normal thickness (.354) LF $36.10 $42.20 16.90%
d. 12" diameter
1 6.0mm nominal thickness (.236) LF $40.00 $48.90 22.25%
2 7.5mm nominal thickness (.295) LF $43.00 $52.70 22.56%
3 9.0 mm normal thickness (.354) LF $44.50 $54.60 22.70%
e. 14" diameter
1 6.0mm nominal thickness (.236) LF $50.30 $61.20 21.67%
2 7.5mm nominal thickness (.295) LF $53.70 $65.40 21.79%
3 9.0 mm normal thickness (.354) LF $55.60 $67.90 22.12%
to e. 18" diameter
1 6.0mm nominal thickness (.236) LF $61.90 $73.80 19.22%
2 7.5mm nominal thickness (.295) LF $66.40 $79.50 19.73%
3 9.0 mm normal thickness (.354) LF $72.40 $87.10 20.30%
4 10.5 mm nominal thickness (.413) LF $79.90 $96.50 20.78%
f. 20" diameter
1 6.0mm nominal thickness (.236) LF $63.80 $74.00 15.99%
2 7.5mm nominal thickness (.295) LF $69.80 $81.00 16.05%
3 9.0 mm normal thickness (.354) LF $77.30 $88.50 14.49%
4 10.5 mm nominal thickness (.413) LF $89.40 $103.70 16.00%
5 12 mm nominal thickness (.472) LF $104.50 $122.50 17.22%
g. 24" diameter
9.0 mm normal thickness (.354) LF $96.30 $118.90 23.47%
10.5 mm nominal thickness (.413) LF $103.80 $128.30 23.60%
12 mm nominal thickness (.472) LF $114.40 $141.60 23.78%
13.5 mm nominal thickness (.531) LF $131.00 $162.50 24.05%
15 mm nominal thickness (.591) LF $150.60 $187.20 24.30%
2 Sectional CIPP Lining
a. 6" diameter
1 3' in length EA $2,233.80 $2,233.80 0.00%
2 4' in length EA $2,457.20 $2,457.20 0.00%
3 6' in length EA $2,568.90 $2,568.90 0.00%
4 8' in length EA $2,680.60 $2,680.60 0.00%
b. 8" diameter
1 3' in length EA $2,345.50 $2,345.50 0.00%
2 4' in length EA $2,457.20 $2,457.20 0.00%
3 6' in length EA $2,568.90 $2,568.90 0.00%
4 8' in length EA $2,680.60 $2,680.60 0.00%
c. 10" diameter
lay County Utility Authority
ontract No. 18/19-A7 Part C
ured-in-Place Continuing Services Contract
CURRENT PROPOSED
ITEM UNIT UNIT 0/0
NO. DESCRIPTION UNIT PRICE PRICE INCREASE
1 3' in length EA $2,568.90 $2,568.90 0.00%
2 4' in length EA $2,680.60 $2,680.60 0.00%
3 6' in length EA $2,904.00 $2,904.00 0.00%
4 8' in length EA $3,015.70 $3,015.70 0.00%
d. 12" diameter
1 3' in length EA $2,792.30 $2,792.30 0.00%
2 4' in length EA $2,904.00 $2,904.00 0.00%
3 6' in length EA $3,015.70 $3,015.70 0.00%
4 8' in length EA $3,127.40 $3,127.40 0.00%
e. 14" diameter
1 3' in length EA $2,792.30 $2,792.30 0.00%
2 4' in length EA $2,904.00 $2,904.00 0.00%
3 6' in length EA $3,015.70 $3,015.70 0.00%
4 8' in length EA $3,127.40 $3,127.40 0.00%
f. 18" diameter
1 3' in length EA $3,015.70 $3,015.70 0.00%
2 4' in length EA $3,127.40 $3,127.40 0.00%
3 6' in length EA $3,239.00 $3,239.00 0.00%
to 4 8' in length EA $3,462.40 $3,462.40 0.00%
g. 20" diameter
1 3' in length EA $3,127.40 $3,127.40 0.00%
2 4' in length EA $3,239.00 $3,239.00 0.00%
3 6' in length EA $3,350.70 $3,350.70 0.00%
4 8' in length EA $3,462.40 $3,462.40 0.00%
h. 24" diameter
1 3' in length EA $4,356.00 $4,356.00 0.00%
2 4' in length EA $4,467.70 $4,467.70 0.00%
3 6' in length EA $4,579.30 $4,579.30 0.00%
4 8' in length EA $4,691.00 $4,691.00 0.00%
3 Lateral CIPP Lining
a. Top Hat up to 36"
1 4" lateral connection EA $2,345.50 $2,859.30 21.91
2 6" lateral connection EA $2,345.50 $2,859.30 21.91
3 8" lateral connection EA $2,485.10 $3,026.80 21.80%
b. Full Wrap - up to 36"
1 4" lateral connection EA $2,345.50 $2,859.30 21.91
2 6" lateral connection EA $2,345.50 $2,859.30 21.91
3 8" lateral connection EA $2,485.10 $3,026.80 21.80%
c. Lateral Lining 0 -40' EA $1,563.70 $1,904.30 21.78%
d. Additional Lateral Lining >40' LF $83.80 $102.80 22.67%
e. Lateral Cutout & Polish EA $160.00 $175.00 9.38%
f. Lateral Grout EA $360.00 $400.00 11.11
4 Cleanout Installation
a. 4" cleanout EA $1,675.40 $1,675.40 0.00%
b. 6" cleanout EA $1,787.10 $1,787.10 0.00%
c. 8" cleanout EA $1,898.80 $1,898.80 0.00%
lay County Utility Authority
ontract No. 18/19-A7 Part C
ured-in-Place Continuing Services Contract
CURRENT PROPOSED
ITEM UNIT UNIT %
NO. DESCRIPTION UNIT PRICE PRICE INCREASE
5 Site Restoration
a. Concrete SF $27.90 $27.90 0.00%
b. Paver Removal and Replacement SF $55.80 $55.80 0.00%
c. Sodding SF $4.50 $4.50 0.00%
d. Seeding and Mulching SF $3.40 $3.40 0.00%
6 Dewatering LF $22.30 $22.30 0.00%
7 Erosion and Sediment Control LF $2.20 $2.20 0.00%
8 Tanker Truck for Bypass (Daily Rate) EA $2,792.30 $3,900.00 39.67%
C. Maintenance of traffic
a. Traffic Control-MOT Index 601 or 602 (per day) LS $368.60 $405.60 10.04%
b. Traffic Control-MOT Index 603 or higher (per da, LS $1,228.60 $1,452.00 18.18%
c. Traffic Control-MOT Index 601 or 602 (per week LS $1,842.90 $2,027.20 10.00%
d. Traffic Control-MOT Index 603 or higher (per we LS $6,143.00 $7,259.90 18.18%
D. Administration
a. Emergency Response Mobilization EA $4,500.00 $4,700.00 4.44%
b. Construction Video and Photography EA $1,116.90 $1,116.90 0.00%
E. Bonds
to a. Contract Performance and Payment % 1.50% 1.50%
A0C
Trusted Solutions
April 6, 2022
Ralph Western
Chief Operating Officer Infrastructure Solutions
Insituform Technologies, LLC
17988 Edison Avenue
Chesterfield, MO 63005
Dear Ralph,
As you are aware, the primary ingredients for polyester and vinyl ester resins have experienced rapid cost
escalations over the past 18 months. The primary drivers for these increases are supply/demand
fundamentals and logistic challenges. Beginning in late 2020, as the global economy began emerging
from the pandemic, inventories of many petrochemicals were at very low levels due to production
slowdowns during the height of the pandemic. The low inventories, coupled with a rapid escalation in
demand, left the market tight for many materials. Early last year Winter Storm Uri exacerbated the issue.
Most petrochemical facilities located in Texas and Louisiana suffered significant damage from the storm,
causing extensive outages.The shutdowns severely disrupted the production and supply of most
petrochemicals which resulted in extreme raw material shortages, and in some instances total curtailment
(i.e., no availability). The shortages caused rapid and substantial cost increases for these materials. Since
that time,the petrochemical market still has not fully recovered from this event. There continues to be
very strong demand and periodic supply challenges for materials remain which has continued to support
higher prices. Global logistics challenges are also contributing to the increases. Ocean bound freight
capacity is tight and rates have escalated rapidly which is hindering imports. This is allowing domestic
chemical producers to increase margins. The shortage of domestic truck drivers is also causing rapid
freight increases on both raw material and resin deliveries. The combination of all these factors have
caused resin prices to continue to increase for Insituform Technologies. The price adjustments in
aggregate during the period of October 2020 to April 2022 have increased more than 50%for polyester
resins and 87%for vinyl ester resins. Unfortunately,there appears to be no sign of immediate relief in the
foreseeable future.
Please contact me anytime for additional details.
Sincerely,
Michael Diehl
Director of Marketing, Americas
AOC/955 Highway 57/ Collierville, TN 38017/ USA
+ 1 901 854 2800/americas@aocresins.com/aocresins.com
[J BLD
H , V LES L
May 2, 2022
Dave Raymond
Business Development Manager
Aegion
6927 Business Park Blvd
Jacksonville, FL 32256
RE: For your consideration, price increase
Dear Dave,
As you are aware, inflation is at a 40 year high the price for commodities has risen to a ten-year
high (Bloomberg). Since we priced the Daytona Bid, here are the price increases.
Resin Supplies have increased — 32.1 %
Liner Material —4.8%
Fuel (Gas and Diesel) — 79.0%
Labor Cost—33.7%
to Accommodations —44.9%
To make things worse, shipping costs are also increasing, and the supply chain can not keep up
with demand. Undoubtedly, your organization is already aware of these issues and struggling
just as we are.
We have tried to prevent asking for any price increases for as long as possible as we want to
provide the best product at a competitive price. However, the increase in the cost for our
materials is getting too great for us to absorb, and we are asking you to consider discussing a
slight price increase.
Attached are letters from a couple of our suppliers that explains the situation in greater detail.
Yours Sincerely,
£04Weado
Gordon Marshall
Business Development Manager
BLD Services, LLC
2424 Tyler Street, Kenner, LA 70062
IJouiyon
March 14, 2022
Dear Francois (Aegion),
Due to a force majeure declared by one of our suppliers we must inform you that the supply of Perkadox 16 from
our facilities in Mexico has been adversely impacted by a shortage of raw material.
We continue to evaluate the impact of this event on our production capabilities, but we may not be able to supply
enough of our Perkadox 16 and Perkadox 16 based products to meet all of our orders in a timely fashion.
Of course, we will continue to monitor the situation and make every reasonable effort to minimize the disruption of
our supply and the consequences for you.We will provide you with timely updates on the situation and its impact
on our business until there is full resolution. As always, your Nouryon Polymer Specialties Account Manager is
available to address any questions or concerns you may have regarding this situation.
We apologize for any inconvenience this may cause to your company and value our continued relationship.
to Best regards,
A
Rob van de Graaf
Sales Director Americas
Nouryon Polymer Specialties
4/5/2022
Dear Francois, EN TEC
I thought I might take a moment to reflect on some of the events of the last year+that has created a
great deal of instability and consequential dramatic changes in the domestic polypropylene
marketplace. The result of those changes and influences has of course caused a rather sharp increase
in PP prices.
The upward turbulence in the market really started towards the end of 2020 as the U.S.began its initial
recovery from the pandemic. A sharp rebound in demand presented a rather significant challenge to a
supply base that had throttled back production to match that of previous lackluster consumer and
industrial consumption patterns. The result was increased pricing pressure as the market tried to return
to a closer balance between supply and demand. Then....at the beginning of that initial demand
recovery period,the southern U.S. and more specially the energy producing section of the gulf coast
was hit with a major winter storm that crippled a great deal of the countries oil production and
refinery capacity. Much of that capacity remained offline for several more months while repairs to the
infrastructure were made. The unfortunate result of that relatively high demand vs extreme limitations
of polymer feedstocks and polymer itself was a surge in prices by as much as over 70%. We did see
some improvement to the imbalance as we moved through Q4 of 2021 but not nearly enough to get the
markets back to the pre-inflationary periods that occurred from December 2020 through
August/September of 2021. More stabile and declining prices remained prevalent through January but
various production asset outages,both planned and unplanned along with severe logistical challenges
have lead to another rebound in costs during both February and March. The result of these pressures
and changes has left PP prices on average over 40%higher than they were at the end of 2020.
Specific PP prices($/LB)can vary greatly depending upon customer volumes, specific producer/
specific producer grades but the attached line graph provides a good illustration of the swings in
market values based on data accumulated by the major polymer index reporting entity of IHS.
Please let me know if you would like any additional information on the history that caused this rather
dramatic affect.
Warm Regards,
Marc Sanders
Account Manager
Entec Polymers
f - a Ravago ISO9001-z000
company cenahea
114
ENTEC POLYMERS LLC
1900 Summit Tower Blvd • Suite 900 • Orlando • FL • 32810 (407)875-9595 (407)875-5700 •
www.entecresins.com
Historical PP-CP Pricing Dec 2020 -YTD 2022
$/LB
to
Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22
MONTH —IHS PP-C
All values shown are as per reported by IHS
1,TY AUTtr+p¢ Clay County Utility Authority Working together to
3176 Old Jennings Rd. protect public health,
Middleburg,Florida 32068-3907 conserve our natural
\ Telephone(904)213-2413 resources,and create Facsimile(904)213-2436 long-term value for
our ratepayers.
May 2, 2022
Mr. Ben Roese
Vortex Services, LLC
10200 US Highway 92 E.
Tampa, FL 33610
Re: Renewal of Part B—Manhole/Lift Station Wetwell Coating System
Continuing Contract for Sanitary Sewer, Wetwell and/or Manhole Rehabilitation Services Bid
No. 18/19-A7
Dear Mr. Roese:
The above referenced contract is scheduled to expire on June 18,2022.The contract terms allow for a
renewal period of 24-months,contingent upon the mutual agreement of both parties.The Clay County Utility
Authority (CCUA) is hereby providing written notice of interest in renewing the existing contract for an
additional 24-month period, continuing from June 19, 2022, through June 18, 2024. Please review Article
5.02 of the Standard Form of Agreement(page 00520-3)regarding fee modifications and price adjustments
and provide any requested price adjustments to accompany this letter for the contract renewal. Please notify
CCUA and advise if you agree and would like to renew the existing contract for the additional 24-months by
signing this letter below and returning it our office.
CCUA appreciates your cooperation. We look forward to continuing business with you and your
organization in the coming years.
Sincerely, With Price Adjustment
CLAY COUNTY UTILITY AUTHORITY ACCEPTANCE: ® NO OTHER
Vortex Services,LLC.
Ben Roese
Angelia Wilson NAME:
Procurement Manager Vice President
TITLE:
/aw 5/4/2022
DATE:
cc: Jeremy D. Johnston
Teri Shoemaker
Part B-Manhole or Lift Station Wetwell Rehabilitation
VORTEX SERVICES,LLC Original Renewal April
2022
ITEM ESTIMATED Price
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE Increase UNIT PRICE
Clean and Coat New Sanitary Sewer Manhole (4-foot
A. diameter) 50 VF $ 115.00 14.95% $ 132.19
Clean and Coat New Sanitary Manhole(5-foot diameter)
B. 50 VF $ 140.00 14.95% $ 160.93
Clean and Coat Existing Sanitary Sewer Manhole (4-foot
C. diameter) 1000 VF $ 128.00 14.95% $ 147.14
Clean and Coat Existing Sanitary Sewer Manhole (5-foot
D. diameter) 1000 VF $ 152.00 14.95% $ 174.72
E. Clean and Coat Existing Wetwell 5000 SF $ 13.00 14.95% $ 14.94
F. Interior Manhole Coating/Lining Repair 50 SF $ 20.00 14.95% $ 22.99
Adjust manhole frame and cover(adjustment rings not-to-
G. exceed 12") 25 EA $ 750.00 14.95% $ 862.13
Adjust manhole frame and cover with cone or riser section
(Each additional foot over initial 12") 14.95% $ 287.38
H. 5 VF $ 250.00
I. Install frame&cover(24") 1 EA $ 1,200.00 14.95% $ 1,379.40
to J. Install frame&cover(36") 1 EA $ 1,375.00 14.95% $ 1,580.56
K. Invert Replacement 50 EA $ 400.00 14.95% $ 459.80
L. Inside Drop System 4"-8" 25 EA $ 913.94 14.95% $ 1,050.57
M. Inside Drop System 10"-12" 25 EA $ 1,065.55 14.95% $ 1,224.85
N. Stop Leak(per manhole without lining) 50 EA $ 1,000.00 14.95% $ 1,149.50
0. Maintenance of Traffic
1. Traffic Control-MOT Index 601 or 602 (per day) 2 LS $ 550.00 9.45% $ 601.98
2. Traffic Control-MOT Index 603 or higher(per day) 4 LS $ 700.00 9.45% $ 766.15
3. Traffic Control-MOT Index 601 or 602 (per week) 2 LS $ 2,200.00 9.45% $ 2,407.90
Traffic Control-MOT Index 603 or higher(per week) $ 2,800.00 9.45%
4. 4 LS $ 3,064.60
Emergency Response Mobilization (per Work 9.45%
P. Order) 5 EA $ 5,000.00 $ 5,472.50
Q. Construction Video and Photos(per Work Order) 20 EA $ 500.00 9.45% $ 547.25
Sub-total Part B
Construction Performance& Payment Bond Not to Exceed 2%
R. %
Total Part B
5.02 Fee Modification Material CPI
(25%x increase cost of materials)+(75%x CPI Index) Increase 22.00% 12.60%
From June 2019-April 2022 Factor 25.00% 75.00%
Total 5.50% 9.45%
14.95%
CI(
REPAIR
QUADEX® MATERIALS
A VORTEX COMPANY
April 6th, 2022
Benjamin Roese
RVP, Vortex Services, LLC
Benroese@vortexcompanies.com
RE: 2019-2022 Quadex GeoKrete Price Increases & Supply Chain Volatility
Dear Ben:
This letter is to confirm the severity of price increases we have discussed over the last several
months. Since January of 2019, Quadex's GeoKrete has increased in price 22% due to a variety
of raw material cost increases, packaging costs increases, labor shortages and shipping costs
increases; shipping costs along have surcharged 150-250% in some cases.
Please do not hesitate to contact me should you require further detail and or information
to regarding ongoing market forces.
Kind Regards,
Regards,
Andrew Gonnella
President, Products
CIPP Corp LLC I Vortex Companies
andrewg@vortexcompanies.com
V RTEX COMPANY
18150 Imperial Valley Drive I Houston,TX 77060 I www.vortexcompanies.com I 1-855-WHYDIG1