HomeMy WebLinkAboutEDB Rejection of All Bids for ITB21 22-A20 �pV cot;XI CLAY COUNTY UTILITY AUTHORITY MEMORANDUM AUTIO TO: Jeremy D. Johnson, Executive Director FROM: Angelia C. Wilson, Procurement Manager DATE: September 1, 2022 RE: Rejection of All Bids for ITB#2021/2022-A20 On August 12, 2022, Clay County Utility Authority (CCUA) received two (2)bid responses for ITB# 2021/2022-A20 entitled Ridaught Water Treatment Plant (WTP) Ground Storage Tank (GST) Rehabilitation Project. The responses were from Wharton-Smith Inc. and Petticoat- Schmitt Civil Contractors, Inc. Both contractors are engaged under CCUA's Water/Wastewater Infrastructure General Construction Services Continuing Contract 2021/2022-A03. After completing a price analysis of the bid responses, the engineer of record found the pricing submitted were significantly in excess of the opinion of probable construction cost and recommended rejection of bid. ca Based on the bid pricing, staff recommends the Board of Supervisors reject the two (2) bid responses. Because this project is not time critical, staff will have time to evaluate options for rebidding the project. 0 NC) Attachments: ITB Solicitation Article 19- Evaluation of Bids and Award of Contract Section 19.01 Engineer of Record Opinion of Probable Construction Costs Bid Tabulation //AW(Author) //AW, JP, PS (Review) //PS (Final) ARTICLE 19—EVALUATION OF BIDS AND AWARD OF CONTRACT 19.01 Owner reserves the right to reject any or all Bids, including without limitation, incomplete, irregular, not in conformance with the specifications, invitation, or Instructions to Bidders, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible or the Bidder is behind by 10 percent or more on completing an approved progress schedule for the Owner at the time of advertising the work. A Bid may be found to be irregular or non-responsive by reasons that include, but are not limited to, failure to utilize or complete the prescribed forms, modifying the Bid specifications, submitting conditional Bids, incomplete Bids, submitting indefinite or ambiguous Bids, executing forms or the Bid sheet with improper and/or undated signatures or failure to provide all required information. Other conditions which may cause rejection of the Bids include, evidence of collusion among Bidders, obvious lack of experience or expertise, and failure to perform or meet financial obligations on previous agreements. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. cti0 cot,,v — — ) Constar e 100% Opinion of Probable Construction Costs an Anluna Company .11PY AU'rX9�� PROJECT: CCUA RIDAUGHT WTP GST REHAB PROJECT CCUA PROJECT NO.2203-XXX CCUA BID NO.21/22-XX Direct Construction Costs Qty Unit Unit Cost Total Cost CIVIL Mobilization/Demobilization 1 LS $30,000 $ 30,000 Sitework 1 LS $19,938 $ 19,938 Demolition and Salvage 1 LS $10,325 $ 10,325 GST REHABILITATION AND MODIFICATIONS Piping, Fittings, and Valves 1 LS $121,611 $ 121,611 Equipment and Accessories 1 LS $165,010 $ 165,010 GST Rehabilitation 1 LS $173,900 $ 173,900 GST Modifications 1 LS $38,250 $ 38,250 ELECTRICAL General Electrical Work 1 LS $15,000 $ 15,000 Allowances 1 LS $ 5,000.00 $ 5,000 Subtotal $ 579,034 General Conditions 10.00% $ 57,903 Subtotal $ 636,900 Escalation 5.00% $ 31,847 Contingency 5.00% $ 33,439 Total Contractor Cost $ 702,223 to 1 GS'P� COUnrTP Project Mgr:David R,P.E. CCUA Ridaught WTP Ground Storage Tank Rehabilitation Project Congaing Estimator:John C-Sinn. Water Treatment Plant Y OW�iM 100%Estimate Review-Updated Indirects 6?, ¢�,5'" onA �Company Rev.No:2 rLI2'Y AUTaO Date:3/7/2022 Salavacte/Demolition and Debris Removal Demolistion 5 Day $0.00 $0 24.00 $115.00 $2,760 $156.25 $6,250 Based on previous Bids Debris Removal 1 Day $0.00 $0 1.00 $115.00 $115 $150.00 $1,200 Based on previous Bids Civil Based on previous Bids Mobilization and General Conditions 1 LS $30,000.00 $30,000 Based on previous Bids Sod 3000 SF $1.17 $3,510 2.00 $114.00 $228 Retail Price Dewatering 1 LS $0.00 $0 120.00 $115.00 $13,800 $175.00 $1,400 Based on previous Bids Bollards 2 EA $500.00 $1,000 Based on previous Bids Mechanical 7 Days 320.00 $187.50 $60,000 $156.25 $8,750 $0 Based on previous Bids 8"Tee-MJ DI 1 EA $1,650.00 $1,650 Based on previous Bids 8"45 Degree-FLG DI 1 EA $1,750.00 $1,750 Based on previous Bids 8"45 Degree-MJ DI 3 EA $1,550.00 $4,650 Based on previous Bids 20"x 8"Reducer_FLG 1 EA $6,758.00 $6,758 Based on previous Bids 8"90 Degree-FLG(Base Bend) 1 EA $3,250.00 $3,250 Based on previous Bids 8"90 Degree-FLG DI 1 EA $2,100.00 $2,100 Based on previous Bids 20"90 Degree-FLG DI(Base Bend) 1 EA $7,530.00 $7,530 Based on previous Bids PVC Piping/Fittings/Valves 1 LS $1,573.00 $1,573 8"DI Pipe 100 LF $200.00 $20,000 Ferguson 7-14-21 8"SS Pipe 3 LF $200.00 $600 Ferguson 7-14-21 8"Plug Valve 1 EA $3,000.00 $3,000 CS3 Waterworks 5-19-21 Fuipment and Accessories Discharge Pressure Gauge 2 EA $105.00 $210 Ferguson 4-1-21 8"Dismatling Joint-FLG 316SS 1 EA $3,500.00 $3,500 Ferguson 7-1-21 Cascade Aerator 1 LS $160,000.00 $160,000 Crom Proposal Wash down station 1 LS $1,300.00 $1,300 Based on previous Bids Structural 15 Days 160.00 $115.00 $18,400 $156.25 $18,750 Based on previous Bids GST Concrete Repair 1 LS $10,000.00 $10,000 Based on previous Bids GST Concrete Coating 1 LS $30,000.00 $30,000 Based on previous Bids Aerator Curb 8 CY $1,500.00 $12,000 Based on previous Bids Concrete Pad 1 LS $1,250.00 $1,250 Based on previous Bids Concrete Beams 30 CY $2,200.00 $66,000 Based on previous Bids Concrete Cores 1 LS $7,500.00 $7,500 Based on previous Bids Concrete Toppings 31 CY $750.00 $23,250 Based on previous Bids Guardrails 200 LF $125.00 $25,000 Based on previous Bids Electrical Site Light Pole 1 LS $3,000.00 $3,000 Based on previous Bids Electrical Work 1 LS $12,000.00 $12,000 Based on previous Bids Allowance SUBTOTAL $412,381 $95,303 $36,350 $30,000 General Conditions 10.0% $41,238 $9,530 $3,635 $3,000 Escalation 5.0% $22,681 $5,242 $1,999 $1,650 Contingency 5.0% $23,815 $5,504 $2,099 $1,733 TOTAL ESTIMATED CONSTRUCTION COST I $500,115 I I$115,579 $44,083 I $36,383 I Petticoat-Schmitt Civil Contractors,Inc. Wharton-Smith,Inc. # Items Selected Lowest QuantityRE UnitMeasur UnitPrice TotalCost UnitPrice TotalCost 0 #0-1 Mobilization/Demobilization $0 $65,000.0 1 Lump Sum $135,000.$135,000.0 $65,000.0$65,000.0 #0-2 Site Preperation $0 $8,000.0 1 Lump Sum $8,000.0 $8,000.0 $35,000.0$35,000.0 #0-3 Structural Work $0 $716,000.1 Lump Sum $780,000.$780,000.0 $716,000.$716,000.0 #0-4 Mechanical Work $0 $362,000.1 Lump Sum $362,000.$362,000.0 $590,000.$590,000.0 #0-5 Electrical Work $0 $50,000.0 1 Lump Sum $66,000.0$66,000.0 $50,000.0$50,000.0 #0-6 Testing and Start Up $0 $5,000.0 1 Lump Sum $8,000.0 $8,000.0 $5,000.0 $5,000.0 #0-7 Total Bid $0 $1,359,00 1 Lump Sum $1,359,00$1,359,000.0 •$1,461,00$1,461,000.0