HomeMy WebLinkAboutEDB Rejection of All Bids for ITB21 22-A20 �pV cot;XI
CLAY COUNTY UTILITY AUTHORITY
MEMORANDUM
AUTIO
TO: Jeremy D. Johnson, Executive Director
FROM: Angelia C. Wilson, Procurement Manager
DATE: September 1, 2022
RE: Rejection of All Bids for ITB#2021/2022-A20
On August 12, 2022, Clay County Utility Authority (CCUA) received two (2)bid responses for
ITB# 2021/2022-A20 entitled Ridaught Water Treatment Plant (WTP) Ground Storage Tank
(GST) Rehabilitation Project. The responses were from Wharton-Smith Inc. and Petticoat-
Schmitt Civil Contractors, Inc. Both contractors are engaged under CCUA's Water/Wastewater
Infrastructure General Construction Services Continuing Contract 2021/2022-A03.
After completing a price analysis of the bid responses, the engineer of record found the pricing
submitted were significantly in excess of the opinion of probable construction cost and
recommended rejection of bid.
ca Based on the bid pricing, staff recommends the Board of Supervisors reject the two (2) bid
responses. Because this project is not time critical, staff will have time to evaluate options for
rebidding the project.
0
NC)
Attachments:
ITB Solicitation Article 19- Evaluation of Bids and Award of Contract Section 19.01
Engineer of Record Opinion of Probable Construction Costs
Bid Tabulation
//AW(Author)
//AW, JP, PS (Review)
//PS (Final)
ARTICLE 19—EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, incomplete,
irregular, not in conformance with the specifications, invitation, or Instructions to Bidders,
nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves
the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and
evaluation, to not be responsible or the Bidder is behind by 10 percent or more on
completing an approved progress schedule for the Owner at the time of advertising the
work. A Bid may be found to be irregular or non-responsive by reasons that include,
but are not limited to, failure to utilize or complete the prescribed forms, modifying
the Bid specifications, submitting conditional Bids, incomplete Bids, submitting
indefinite or ambiguous Bids, executing forms or the Bid sheet with improper and/or
undated signatures or failure to provide all required information. Other conditions which
may cause rejection of the Bids include, evidence of collusion among Bidders, obvious
lack of experience or expertise, and failure to perform or meet financial obligations on
previous agreements. Owner may also reject the Bid of any Bidder if Owner believes
that it would not be in the best interest of the Project to make an award to that Bidder.
Owner also reserves the right to waive all informalities not involving price, time, or
changes in the Work and to negotiate contract terms with the Successful Bidder.
cti0 cot,,v
— — ) Constar
e 100% Opinion of Probable Construction Costs an Anluna Company
.11PY AU'rX9��
PROJECT: CCUA RIDAUGHT WTP GST REHAB PROJECT CCUA PROJECT NO.2203-XXX
CCUA BID NO.21/22-XX
Direct Construction Costs Qty Unit Unit Cost Total Cost
CIVIL
Mobilization/Demobilization 1 LS $30,000 $ 30,000
Sitework 1 LS $19,938 $ 19,938
Demolition and Salvage 1 LS $10,325 $ 10,325
GST REHABILITATION AND MODIFICATIONS
Piping, Fittings, and Valves 1 LS $121,611 $ 121,611
Equipment and Accessories 1 LS $165,010 $ 165,010
GST Rehabilitation 1 LS $173,900 $ 173,900
GST Modifications 1 LS $38,250 $ 38,250
ELECTRICAL
General Electrical Work 1 LS $15,000 $ 15,000
Allowances 1 LS $ 5,000.00 $ 5,000
Subtotal $ 579,034
General Conditions 10.00% $ 57,903
Subtotal $ 636,900
Escalation 5.00% $ 31,847
Contingency 5.00% $ 33,439
Total Contractor Cost $ 702,223
to
1
GS'P� COUnrTP Project Mgr:David R,P.E.
CCUA Ridaught WTP Ground Storage Tank Rehabilitation Project Congaing Estimator:John C-Sinn.
Water Treatment Plant Y OW�iM
100%Estimate Review-Updated Indirects 6?, ¢�,5'" onA �Company Rev.No:2
rLI2'Y AUTaO Date:3/7/2022
Salavacte/Demolition and Debris Removal
Demolistion 5 Day $0.00 $0 24.00 $115.00 $2,760 $156.25 $6,250 Based on previous Bids
Debris Removal 1 Day $0.00 $0 1.00 $115.00 $115 $150.00 $1,200 Based on previous Bids
Civil Based on previous Bids
Mobilization and General Conditions 1 LS $30,000.00 $30,000 Based on previous Bids
Sod 3000 SF $1.17 $3,510 2.00 $114.00 $228 Retail Price
Dewatering 1 LS $0.00 $0 120.00 $115.00 $13,800 $175.00 $1,400 Based on previous Bids
Bollards 2 EA $500.00 $1,000 Based on previous Bids
Mechanical
7 Days 320.00 $187.50 $60,000 $156.25 $8,750 $0 Based on previous Bids
8"Tee-MJ DI 1 EA $1,650.00 $1,650 Based on previous Bids
8"45 Degree-FLG DI 1 EA $1,750.00 $1,750 Based on previous Bids
8"45 Degree-MJ DI 3 EA $1,550.00 $4,650 Based on previous Bids
20"x 8"Reducer_FLG 1 EA $6,758.00 $6,758 Based on previous Bids
8"90 Degree-FLG(Base Bend) 1 EA $3,250.00 $3,250 Based on previous Bids
8"90 Degree-FLG DI 1 EA $2,100.00 $2,100 Based on previous Bids
20"90 Degree-FLG DI(Base Bend) 1 EA $7,530.00 $7,530 Based on previous Bids
PVC Piping/Fittings/Valves 1 LS $1,573.00 $1,573
8"DI Pipe 100 LF $200.00 $20,000 Ferguson 7-14-21
8"SS Pipe 3 LF $200.00 $600 Ferguson 7-14-21
8"Plug Valve 1 EA $3,000.00 $3,000 CS3 Waterworks 5-19-21
Fuipment and Accessories
Discharge Pressure Gauge 2 EA $105.00 $210 Ferguson 4-1-21
8"Dismatling Joint-FLG 316SS 1 EA $3,500.00 $3,500 Ferguson 7-1-21
Cascade Aerator 1 LS $160,000.00 $160,000 Crom Proposal
Wash down station 1 LS $1,300.00 $1,300 Based on previous Bids
Structural
15 Days 160.00 $115.00 $18,400 $156.25 $18,750 Based on previous Bids
GST Concrete Repair 1 LS $10,000.00 $10,000 Based on previous Bids
GST Concrete Coating 1 LS $30,000.00 $30,000 Based on previous Bids
Aerator Curb 8 CY $1,500.00 $12,000 Based on previous Bids
Concrete Pad 1 LS $1,250.00 $1,250 Based on previous Bids
Concrete Beams 30 CY $2,200.00 $66,000 Based on previous Bids
Concrete Cores 1 LS $7,500.00 $7,500 Based on previous Bids
Concrete Toppings 31 CY $750.00 $23,250 Based on previous Bids
Guardrails 200 LF $125.00 $25,000 Based on previous Bids
Electrical
Site Light Pole 1 LS $3,000.00 $3,000 Based on previous Bids
Electrical Work 1 LS $12,000.00 $12,000 Based on previous Bids
Allowance
SUBTOTAL $412,381 $95,303 $36,350 $30,000
General Conditions 10.0% $41,238 $9,530 $3,635 $3,000
Escalation 5.0% $22,681 $5,242 $1,999 $1,650
Contingency 5.0% $23,815 $5,504 $2,099 $1,733
TOTAL ESTIMATED CONSTRUCTION COST I $500,115 I I$115,579 $44,083 I $36,383
I Petticoat-Schmitt Civil
Contractors,Inc. Wharton-Smith,Inc.
# Items Selected Lowest QuantityRE UnitMeasur UnitPrice TotalCost UnitPrice TotalCost
0
#0-1 Mobilization/Demobilization $0 $65,000.0 1 Lump Sum $135,000.$135,000.0 $65,000.0$65,000.0
#0-2 Site Preperation $0 $8,000.0 1 Lump Sum $8,000.0 $8,000.0 $35,000.0$35,000.0
#0-3 Structural Work $0 $716,000.1 Lump Sum $780,000.$780,000.0 $716,000.$716,000.0
#0-4 Mechanical Work $0 $362,000.1 Lump Sum $362,000.$362,000.0 $590,000.$590,000.0
#0-5 Electrical Work $0 $50,000.0 1 Lump Sum $66,000.0$66,000.0 $50,000.0$50,000.0
#0-6 Testing and Start Up $0 $5,000.0 1 Lump Sum $8,000.0 $8,000.0 $5,000.0 $5,000.0
#0-7 Total Bid $0 $1,359,00 1 Lump Sum $1,359,00$1,359,000.0 •$1,461,00$1,461,000.0