HomeMy WebLinkAboutLB 2022-2023 Budget Resolution Final CLAY COUNTY UTILITY AUTHORITY
RESOLUTION NO. 2022/2023-02
A RESOLUTION OF THE BOARD OF
SUPERVISORS OF THE CLAY COUNTY
UTILITY AUTHORITY ADOPTING FISCAL
YEAR 2022/2023 ANNUAL BUDGET;
PROVIDING AN EFFECTIVE DATE.
WHEREAS, the annual budget for the Clay County Utility Authority(the "Authority") for
Fiscal Year 2022/2023, beginning October 1, 2022, and continuing through September 30, 2023,
incorporates anticipated revenues and expenditures for all systems to be operated by the Authority
for such period; and
WHEREAS, Chapter 94-491, Laws of Florida, Special Acts of 1994, which created the
Authority as a multicounty, independent special district of the State of Florida,directs and requires
that the Authority annually adopt its budget for the then current fiscal year, following the same
procedure as followed by Clay County, Florida, for budget adoption and approval; and
co WHEREAS, the Authority has duly submitted to the Board of County Commissioners for
c Clay County,Florida,its proposed annual budget for Fiscal Year 2022/2023,and has duly published
a notice of its public hearing to consider the final adoption of its annual budget for Fiscal Year
vs
0 2022/2023, together with a budget summary describing the contents of the entire budget; and
c
L
WHEREAS, the Authority has previously published its proposed budget for Fiscal Year
re 2022/2023,the final version of which is attached hereto as Exhibit"A" and herein incorporated by
reference, following a duly noticed public rate hearing on September 13, 2022 at which time the
Board received staff comments and public comments on the then proposed budget and the proposed
rates for Fiscal Year 2022/2023, upon which the proposed budget was based; and
WHEREAS, the Authority finds that it is in its best interest, and in the best interest of its
ratepayers as a whole,to adopt its annual budget for Fiscal Year 2022/2023 in the form as attached
as Exhibit "A" hereto, being the same budget as published by the Board in advance of the Public
Rate Hearing.
NOW THEREFORE,BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF
THE CLAY COUNTY UTILITY AUTHORITY, an independent special district created and
existing under Chapter 94-491, Laws of Florida, Special Acts of 1994, as follows:
1 Resolution No. 2022/2023-02
Section 1. The Board does hereby formally adopt and approve the Authority's annual budget
for Fiscal Year 2022/2023 in the form as attached hereto as Exhibit "A".
Section 2. This Resolution shall become effective as of October 1, 2022.
DULY ADOPTED,by the Board of Supervisors of the Clay County Utility Authority, and
effective as of October 1, 2022.
CLAY COUNTY UTILITY AUTHORITY,
BY ITS BOARD OF SUPERVISORS
By:
, Chairman
ATTEST:
By:
Janice Loudermilk, Secretary
Clay County Utility Authority
(Seal)
2 Resolution No. 2022/2023-02
Exhibit "A"
NOTICE OF
PUBLIC HEARING
The Clay County Utility Authority has tentatively adopted a budget for Fiscal Year 2022/2023. A public
hearing will be held on Tuesday, September 13, 2022 at 7:00 p.m. in the Clay County Utility Authority Board
Room, 3176 Old Jennings Road, Middleburg, Florida.
BUDGET SUMMARY
CLAY COUNTY UTILITY AUTHORITY
PROPOSED BUDGET FOR 2022/2023
Operating Capital Self Insurance Total Fund
Fund Fund Fund Budget
Revenues:
Projected Cash at October 1, 2022 $ 2,000,000 $ 79,753,659 $ 525,000 $ 82,278,659
Water&Sewer Revenue 63,660,738 63,660,738
Miscellaneous Revenue/Borrowing 3,198,252 34,000,000 37,198,252
Fund Transfers 13,426,255 13,426,255
Total Revenues $ 68,353,990 $ 127,179,914 $ 525,000 $ 196,563,904
Expenditures:
Debt Service $ 9,238,085 $ - $ - $ 9,238,085
o Fund Transfers 13,426,255 13,426,255
Operation Expenses 41,670,797 41,670,797
Due in Lieu of Taxes 2,523,853 2,523,853
Capital Projects 125,194,754 125,194,754
Projected Cash at September 30, 2023 2,000,000 1,985,160 525,000 4,510,160
Total Expenditures $ 68,353,990 $ 127,179,914 $ 525,000 $ 196,563,904
Additional information on the proposed budget is available at www.clayutility.org/rates or you can come
to the office of the Clay County Utility Authority at 3176 Old Jennings Road, Middleburg, Florida, Monday
through Friday 8:00 a.m. to 5:00 p.m. except legal holidays.
Following the public hearing, which may be adjourned from time to time, The Board of Supervisors may
adopt or modify the proposed budget.
In accordance with the Americans with Disabilities Act, any person needing a special accommodation to
participate in this matter, should contact the Clay County Utility Authority by mail at 3176 Old Jennings Road,
Middleburg, Florida 32068 or by telephone at(904)272-5999 x 2464, no later than 7 days prior to the hearing or
proceeding for which this notice has been given. Those requiring auditory assistance can access the foregoing
telephone number by contacting the Florida Relay service at 1-800-955-8770 (Voice) or 1-800-955-8771 (TDD).
If any person intends to appeal any decision related to this action, such person will need to provide a court
reporter at such person's own expense, for a transcript of the proceedings. All interested persons are invited to
attend.
CLAY COUNTY UTILITY AUTHORITYJeremy Johnston, Executive Director
CLAY COUNTY UTILITY AUTHORITY
2022/2023 PROPOSED OPERATING BUDGET
Revenues:
Water Revenue 19,537,747
Sewer Revenue 30,970,932
Reclaimed Revenue 5,576,935
Connection Fees,AWS&DEP Grants 7,575,124
Miscellaneous Revenue 2,084,210
Capital Fund-Const.Dept.Labor,OH,&Equipment 527,493
Interest-Restricted 2,335
Interest-Non Restricted 584,214
Total Revenues $66,858,990
Expenditures:
Budget Carryforward ($589,667)
Debt Service-Interest 1,920,828
Debt Service-Principal _ 7,317,257
Debt Service-Stabilization -
Restricted Interest Income 2,335
Renewal&Replacement Fund 2,615,873
Environmental Reuse Capital Fund 1,211,727
Connection Fee Fund,AWS&DEP Grants 7,575,124
Departmental Capital Fund 1,386,263
Capital Reserve 1,224,600
Total Debt and Capital Expenditures $22,664,340
Operation Expenses:
Wages $13,989,746
Capitalized Wages ($569,540)
Health Insurance 2,634,823
Retirement 1,419,769
Licenses, Education,&Uniforms 351,725
Payroll Taxes 994,120
Workers Compensation ins. 192,277
tO General Liability&Property Insurance 966,619
Transportation Expense 723,366
Rental Space 49,706
Communication Expense 524,779
Electric&Fuel-W/P 744,000
Electric&Fuel-L/S 440,000
Electric&Fuel-STP 1,466,000
Electric&Fuel-Office 39,374
Chemicals Water 233,400
Chemicals Sewer 950,000
Supplies-Water 1,839,615
Supplies-Sewage 1,240,684
Supplies Office 619,841
Software 992,754
Engineering Expense 386,000
Legal Expense 537,126
Audit Expense 34,000
Subcontractors-Water 802,552
Subcontractors-Water Testing 108,000
Subcontractors-Sewage 1,108,929
Subcontractors-Sewage Testing 190,500
Subcontractors AWS -
Subcontractors General 3,791,033
Sludge Removal&Treatment 2,684,753
Bad Debt Expense 500
Miscellaneous 565,076
Contingency 1,039,583
Board Of Directors Compensation 52,194
Due in Lieu of Taxes 2,523,853
Total Operation Expenses $43,667,157
CLAY COUNTY UTILITY AUTHORITY
2022/2023 PROPOSED OPERATING BUDGET
Construction Department Expenses:
Wages $176,341
Health Insurance 34,686
Retirement 17,343
Payroll Taxes 13,267
Workers'Compensation Insurance 6,605
Property/Liability Insurance 54,000
Equipment Fuel, Repairs&Maintenance 30,000
Field Supplies&Small Tools 10,000
Office Supplies _ 250
Material&Subcontractors 2,100
Miscellaneous Expenses&Employee Training 33,184
Contingency Reserve 45,333
Depreciation 104,385
Total Construction Department Costs 527,493
Total Expenditures $66,858,990
(OVER)UNDER BUDGET ($0)
to
Clay County Utility Authority
2022/2023 Proposed Self Insurance Fund Budget
TOTAL SELF
INSURANCE
FUND
FUND BALANCE:
Sewer Backup $ 500,000
Unemployment 25,000
Fund Balance, Estimated as of October 1, 2022 $ 525,000
EXPENDITURES:
Expenditures will be Board Approved per Occurrence
Total Expenditures $ -
Fund Balance September 30, 2023 $ 525,000
to
Clay County Utility Authority
2022/2023 Capital Projects Expenditures Budget
And Five Year Capital Projects Plan
Adjusted for Prior Year Jobs Not Completed as of 3/31/2022 ADJUSTED
FISCAL YEAR Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year
2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 TOTALS
REVENUES:
Balance October 1,2021,to include Transfers 138,289,659 138,289,659
Funds Spent on Jobs Prior to FY 2020/2021 (34,594,874) (34,594,874)
Renewal,Replacement&Betterment 2,414,518 2,615,873 2,694,349 2,775,179 2,858,434 2,944,187 16,302,540
Departmental Capital Transfer 1,052,400 1,052,400 1,000,000 1,000 000 1,000 000 1,000 000 6,104,800
Environmental Reuse Capital Fund Transfer 1,140,408 1,236,218 1,248,580 1,261,066 1,273,677 1,286,413 7,446,362
Capacity Fees Transfer 4,078,314 4,079,570 4,283,549 4,497,726 4,722,612 4,958,743 26,620,513
Grant Revenue 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 9,000,000
Alternative Water Supply Transfer 688,309 721,747 743,399 765,701 788,672 812,333 4,520,162
Debt Service Charge 200,400 200,400 200,400 200,400 200,400 200,400 1,202,400
Surplus Transfer(Operating Contingency Utility&Capital Reserve,includes add'l R&R) 3,416,509 3,775,457 4,009,994 4,130 294 4,254,203 4,381,829 23,968,285
Restricted Interest Earnings 5,120 2,285 5,000 5,000 5,000 5,000 27,405
Borrowing Utilization of Surplus Funds if needed (83,862,187) 110,010 804 63,749,347 21,619,012 18,849,147 (689,044) 129,677,079
Balances After Transfers 34,328,576 125,194,754 79,434,618 37,754,378 35,452,145 16,399,860 328,564,332
CAPITAL EXPENDITURES:
RENEWAL,REPLACEMENT&BETTERMENT
Departmental Capital 1,260 674.43 1,386,263.08 1,250 000.00 1,250 000.00 1,250 000.00 1,250,000.00 7,646,937.51
Knight Boxx/Old Jennings Force Main Extension 9,114.95 450 000.00 459,114.95
Lucy Branch Maintenance Building Repairs and Renovations 10,739.84 109,260.16 120,000.00
Rehab SP WW Clarifer#1/under drain 1-2 64,176.20 1,485,000.00 248,430.00 1,797,606.20
Lake Asbury WM Improvements(602 Lake Asbury Road&Aldersgate St.) 0.00 170,000.00 1,530 000.00 1,700,000.00
Wesley RD WM Improvements(Branscomb Road to Arthur Moore Drive) 0.00 200 000.00 1,800 000.00 2,000,000.00
Server Lifecycle Replacement 1,925,000.00 1,925,000.00
ERP Software Replacement 1,400 000.00 1,400,000.00
SCADA System 0.00 1,260 048.00 698,158.00 1,146,178.00 1,146,178.00 1,146,178.00 5,396,740.00
Meadowbrook WTP Upgrades-(GST#3 repair,Transfer switch,GST#2 roof repair,Aerator repair,n 82,308.00 2,000 000.00 1,917,692.00 4,000,000.00
Meadowbrook Well Rehab 16,895.00 350,000.00 366,895.00
Miller St.WWTP Upgrades(Complete Paving of Loop Road,Refurbish Influent Structure(Exterior),r 0.00 640,500.00 640,500.00
Ridgecrest WTP-Replace Softstart&Crossline Starters with VFD's 1,070 654.00 940,574.00 2,011,228.00
Ridaught WTP-Phase I GST Upgrades 70,000.00 802,000.00 872,000.00
Ridaught WRF Upgrades(Install Micro-screen,Grit Removal Equipment,and Influent,Rehabilitiation 262,000.00 2,625,000.00 1,000,000.00 3,887,000.00
12"Main Connecting Postmaters WTP to Geneva Lakes WTP along CR214 793,800.00 793,800.00 1,587,600.00
12"WM Extension Hwy.100 to Brooklyn Bay Rd.(Keystone) 705,000.00 705,000.00
6"WM Extension Woodland Dr.to Payne Rd.via SR21 305,000.00 305,000.00
Booster Station(Hwy.100 @ Commercial Dr.-Keystone) 41,000.00 41,000.00
Keystone Heights-Lakeside Street/Hilltop Street Water Main Rehabilitation 0.00 237,600.00 237,600.00
Keystone Wastewater Treatment Plant-Phase II Construction 0.00 7,150,000.00 7,150,000.00
Fleming Oaks WTP Electrical Upgrades&Hydro Tank 190,000.00 544,910.00 348,000.00 1,082,910.00
Pace Island WTP:Electrical&Hydro Tank Upgrades(Replace Hydrotank Tank#1 and Electrical) 220 000.00 544,910.00 348,000.00 1,112,910.00
Old Jennings WTP Electrical Upgrade 250,000.00 500 000.00 450 000.00 1,200,000.00
Spencer's WTP Electrical Upgrade _ 39,291.00 244,910.00 148,000.00 432,201.00
Tanglewood Electrical Upgrade 35,325.00 221,114.00 132,136.00 388,575.00
Orange Park South Electrical Upgrade 87,276.00 532,820.00 339,940.00 960,036.00
Fleming island WRF electrical upgrades Nault upgrades 296,171.00 1,786,190.00 1,175,520.00 3,257,881.00
Miller WRF Electrical Upgrades 125,005.00 832,824.00 539,942.00 1,497,771.00
Ridaught WRF Electrical Upgrades 233,291.00 1,408,910.00 924,000.00 2,566,201.00
Spencer's WRF Electrical Upgrades 90,491.00 552,110.00 352,800.00 995,401.00
Oakleaf WTP Electrical Upgrades 34,291.00 342,910.00 377,201.00
Rehab PS 4 800,000.00 800,000.00
Rehab PS 62,Manifold 67 320,000.00 1,000,000.00 1,320,000.00
Upgrade Lift Stations 11,41,69,51 542,000.00 542,000.00 1,000,000.00 1,000,000.00 3,084,000.00
Upgrade Lift Station 98 542,000.00 542,000.00
Upgrade Lift Stations 9,43,24,59 542,000.00 542,000.00 1,000,000.00 2,084,000.00
Clay County Utility Authority
2022/2023 Capital Projects Expenditures Budget
And Five Year Capital Projects Plan
Adjusted for Prior Year Jobs Not Completed as of 3/31/2022 ADJUSTED
FISCAL YEAR Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year
2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 TOTALS
Upgrade Lift Station 111 542,000.00 542,000.00 1,084,000.00
Upgrade Lift Station 56 125,000.00 1,000,000.00 1,125,000.00
Lift Station#2-Upgrade 125,468.60 2,822,677.56 2,948,146.16
Lift Station#3 Foxbay-Upgrade 36,297.00 849,703.00 886,000.00
WTP Ground Storage Tanks:add Handrails 576,000.00 576,000.00
Fleming WRF Clarifier No.1 Upgrade 300,000.00 908,000.00 1,208,000.00
Water Plant Meters Retrofits 0.00 108,000.00 300,000.00 300,000.00 300,000.00 300,000.00 1,308,000.00
Gravity Sewer Lining 300,594.25 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 5,300,594.25
Lift Station Generators 57,822.13 330,000.00 387,822.13
Lift Station Bypass Pump 200,000.00 200,000.00
Keystone Heights High School WM relocation 143,000.00 143,000.00
Manhole Rehab 150,000.00 150,000.00 150,000.00 150,000.00 150,000.00 750,000.00
FH and Gate Valve replacement 105,000.00 210,000.00 210,000.00 210,000.00 210,000.00 945,000.00
Potable and Reclaimed Water Meter and backflow device replacement 761,250.00 1,600 000.00 1,650 000.00 1,700 000.00 1,750 000.00 7,461,250.00
SYSTEM EXPANSION
Governor's Park WTP Design and Build 200 000.00 4,925,000.00 3,700 000.00 625,000.00 9,450,000.00
Meadow Lake WTP-New Ground Storage Tank and Electrical Service upgrade 1,985,331.00 1,163,793.00 3,149,124.00
Saratoga Spring WTP,WRF&offsite Mains 7,000,000.00 9,591,000.00 16,591,000.00
Mid Clay WWTP-Phase II Plant Expansion 4,500,000.00 2,750,000.00 7,250,000.00
Fleming Island Reg.WWTP-2nd BCR Plant,Two Tanks 3,900,000.00 3,300,000.00 7,200,000.00
Doctors'Lake Septic to Sewer Phase II 1,883,333.00 316,667.00 2,200,000.00
CCUA Storage Building and Site Improvements 2,373,708.00 1,539,608.00 3,913,316.00
CCUA Administrative Building Phase I 125,089.00 4,000,000.00 4,125,089.00
CCUA Administrative Building Phase II 0.00 350,000.00 3,950,000.00 4,300,000.00
North Campus Driveway 36,341.00 750,000.00 786,341.00
Aquarius Concourse Relocation Utility Relocations 1,948,637.00 195,000.00 2,143,637.00
North Middleburg Water&Sewer Extension and Interconnection(Water Interconnect,Forcemain exte 400,000.00 2,600,000.00 3,000,000.00
Infill Projects 1,261,678.98 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 1,761,678.98
Henley Road 12"WM Loop-Sandridge to Small Lake 11,241.94 94,758.06 106,000.00
Peters Creek WTP Well 3&2nd GST 150,000.00 2,900,000.00 2,000,000.00 5,050,000.00
Peters Creek W WTP-Land Acquisition 0.00 3,000,000.00 3,000,000.00
Peters Creek WRF-Phase II 2,290,025.00 24,181,127.00 17,068,959.00 279,429.00 43,819,540.00
Pier Station E/W WM Extension and Interconnect(State Road 16 and FCOB) 0.00 2,000,000.00 1,000,000.00 3,000,000.00
Pier Station Force Main Extensions(State Road 16 and FCOB) 0.00 1,000,000.00 1,200,000.00 2,200,000.00
Pier Station Master Pump Station(State Road 16 and FCOB) 0.00 1,000,000.00 1,000,000.00
Pier Station WTP Expansion 0.00 3,000,000.00 3,000,000.00 6,000,000.00
Ravines to Henly Road Water Main Extension 250,000.00 2,000,000.00 390,000.00 2,640,000.00
Ravines WTP 2nd GST 0.00 750,000.00 750,000.00
Spencer's WWTP:Phase 6 Expansion 0.00 750,000.00 5,500,000.00 6,250,000.00
Spencers WTP-Ground Storage&High Service Pump 0.00 565,000.00 1,000,000.00 1,565,000.00
Water System Interconnects-Misc 0.00 675,000.00 675,000.00
Longbay Rd.Master Pump Station and Force Main 0.00 200,000.00 500,000.00 500,000.00 1,200,000.00
Swimming Penn Creek WM Interconnect 250,000.00 2,000,000.00 1,000,000.00 3,250,000.00
Sandridge Parallel Sewer FM(PS#110 to RVZ Park via Creekview Tr.—5,000 LF 1,000,000.00 200,000.00 1,200,000.00
Reinhold Projects E/W interconnect#1 (W,WW&Reclaimed Mains from FCE interchange along we: 3,000,000.00 3,000,000.00 6,000,000.00
Reinhold Projects E/W interconnect #2(W,WW&Reclaimed Mains along FC Connector East of into 2,000,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 12,000,000.00
Reinhold Projects N/S interconnect#1 Saratoga WM to West of 1st Coast Expressway(11,200 if 18-in 3,700,000.00 3,700,000.00 7,400,000.00
Reinhold Projects N/S interconnect#2(W&Reclaimed Mains from Saratoga WTP to 1st Coast Conn( 2,200,000.00 2,200,000.00 4,400,000.00
16-inch WM Challenger Dr Interconnect to Atlantis dr.-Atlantis to Brannan mill(2-Segments) 1,000,000.00 1,000,000.00 2,000,000.00
16-inch WM Atlantis to Kindlewood 500,000.00 1,500,000.00 2,000,000.00
Upsizing pipes to accommodate Rookery GCS 466,000.00 466,000.00
FDOT 447180-1:US 17 from Eagle Harbor to Doctors Inlet Bridge 310,000.00 310,000.00
FDOT 443302-1:SR15(US17)From Water Oak Lane to Eagle Harbor Parkway 90,000.00 90,000.00
Clay County Utility Authority
2022/2023 Capital Projects Expenditures Budget
And Five Year Capital Projects Plan
Adjusted for Prior Year Jobs Not Completed as of 3/31/2022 ADJUSTED
FISCAL YEAR Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year
2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 TOTALS
CR-220 at Old Hard Rd.Intersection 410,000.00 410,000.00
Tanglewood Neighborhood Water Main Relocations 85,000.00 85,000.00
Habitat Drive Water Main Relocations 265,000.00 265,000.00
CR 218 widening from Pine Tree Lane to Cosmos 425,000.00 250,000.00 250,000.00 925,000.00
Sandridge Road widening from Henley to CR 209 40,000.00 40,000.00 80,000.00
CR 220 widening Baxley to Henley Rd 75,000.00 175,000.00 250,000.00
CR 220 widening from Henley to Knightbox 50,000.00 100,000.00 150,000.00
CR 315 widening-Utility Relocation(design FY 23 construct FY 24) 922,000.00 922,000.00
CR220 Quadrant Intersection 578,000.00 578,000.00
College Drive RRR 0.00 200 000.00 200,000.00
ALTERNATIVE WATER SUPPLY -
AMI Demand Management 750,000.00 750,000.00 1,500,000.00
Onsite Stormwater Harvesting 330 000.00 2,550 000.00 2,880,000.00
Irrigation CUP 510,000.00 510,000.00
Public Access Reuse Storage 2,042,000.00 3,242,000.00 3,301,000.00 1,693,000.00 1,628,000.00 11,906,000.00
Purified Water Pilot Study 319,000.00 4,450,000.00 750,000.00 5,519,000.00
Subtotals 31,207,796.32 113,813,412.80 72,213,289.06 34,322,162.00 32,229,223.00 14,908,964.00 298,694,847.18
Contingency 3,120,779.63 11,381,341.28 7,221,328.91 3,432,216.20 3,222,922.30 1,490,896.40 29,869,484.72
TOTAL CAPITAL EXPENDITURES 34,328,575.95 125,194,754.08 79,434,617.97 37,754,378.20 35,452,145.30 16,399,860.40 328,564,331.90
Capital Expenditures Breakdown:
Renewal,Replacement&Betterment 6,787,524 35,038,893 26,186,234 17,998,949 22,709,145 11,421,860 120,142,606
System Expansion 27,222,052 83,153,861 48,926,384 13,154,429 10,300,000 3,350,000 186,106,726
Altemative Water Supply 319,000 7,002,000 4,322,000 6,601,000 2,443,000 1,628,000 22,315,000
34,328,576 125,194,754 79,434,618 37,754,378 35,452,145 16,399,860 328,564,332
Clay County Utility Authority
Proposed Departmental Capital Budget
FY 2022-2023
Description Total Budget
Water Treatment
Toyota Forklift $ 36,000.00
Pole Barn $ 15,000.00
Portable Gas/hydraulic valve exerciser $ 13,000.00
Diesel Generator w/GFCI $ 17,500.00
$ 81,500.00
Wastewater Treatment
Pro-turn-260-27hp Kawasaki-60inch Mower $ 9,804.60
Replace Roof-Storage Building Miller WWTP $ 10,000.00
Hauler 800xgas yard cart $ 8,774.00
$ 28,578.60
Distribution&Collection
DPH-3B Hydrostatic Test Pump $ 5,000.00
Dri-Prime CD150S Pump Trailer Mounted $ 55,000.00
(3)Ground Penetrating Radars $ 60,000.00
908 Front End Loader $ 128,000.00
289D3 Skid Steer $ 122,000.00
GMC Sierra 2500 Crew Cab $ 52,000.00
Chevrolet Silverado 3500 Dually with Work Body $ 52,000.00
Chevrolet Silverado 2500 4X4 Work Body $ 51,000.00
$ 525,000.00
GIS None
Customer Service Public Relations None
t0 Construction
Caterpillar Mini Excavator 305D $ 65,000.00
$ 65,000.00
Service Availability None
IT
VDI Server Graphics Cards $ 62,000.00
VDI Server Expansion $ 157,000.00
Cannon Color Plotter TX-4100 $ 14,000.00
Cannon Model IT Advance IR6555 $ 10,000.00
$ 243,000.00
Facility Management
Security System Expansion $ 10,000.00
CCTV System Expansion $ 12,000.00
Fleet Vehicle $ 35,000.00
Facilities/Fleet Vehicle $ 45,000.00
Lucy Branch Roof Replacement $ 20,000.00
Lucy Branch Fence Replacement $ 15,000.00
$ 137,000.00
Inventory
JH 4,500 lb.36 Volt Pantograph Single Reach Truck $ 56,184.48
$ 56,184.48
Construction and Inspection Services None
Engineering None
Master Departmental Capital Contingency $ 250,000.00
Total Department Budgets $ 1,386,263.08