Bid Summary
7
• Project bid 12/21/22 at $65.5 M
• Pipeline portion on budget
• Plant over budget ,
w,� Pipeline
Board deferred action 1/3/23 to allow -�; .
staff to investigate bid and negotiate " e:tx,
with the contractor or seek other *¢
alternatives
:11116\4\„..,.\
ARDURRA
Bid Investigation
• Large backlog in Florida resulting in less competition between general
contractors
Labor shortage in NE Florida
• Average cost of labor has doubled to $48-52 /hr
• Equipment rental costs doubled
• Subcontractor shortage resulting in less competition and higher pricing
• Market data indicate recent WRF bids in Florida range between $50-
$60/gal
• Peters Creek WRF original bid was $44.58/gal
1RDURRA
3
Schedule of Events
Accomplished multiple tasks concurrently:
• Contractor Voluntary Reduction
• Process Design Alternatives
• Key Stakeholder Updates
Task Start Date Completion Dec-22 Jan-23 Feb-23
Date ®22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Bid Opening 12/21/22 2/17/23 I
Board Meeting to Defer 1/3/23 I
Action
Voluntary Reduction 1/5/23
Kickoff Meeting
Wharton-Smith Voluntary 1/6/23 2/13/23 --- '
Reduction _
Ardurra Alternatives 1/6/23 2/13/23 ' I
Analysis
Voluntary Reduction 2/14/23
Review Meeting I
GP Stakeholder Outreach 1/25/23 2/22/23 II
Board Update 2/21/23
/ /
ARDURRA
4
Discussion Items
_•.
Contractor Voluntary Alternative Recommendati ;
Reduction Treatment Options &
Next Steps
ARDURRA
Discussion Items
�•r
Contractor Voluntary Alternative Recommendation
Reduction Treatment Options &
Next Steps
1RDURRA
Before and After . .
„...,•.
..„
_:___
...-,._,- ..____1\_.
.,„
__
. . ., _
___., \ _
, ,
-(1:,-- - ..-•-• x ___, \„,
<,,
.\ - - -,----. I a, 1. ,__--- 1 5
.mow ■
Ty,- \ = rono ��
MR,MIME POND
• . • • • • in'z 171:7
°''''' '''''' '. - I .f c .
mo
I 4 ',.,.4,:•E'r'.i'calil
Y.ON6[.ao/2 1 - -
O.0I11.01 Monty
•
• NM
..am.Cn
ARDURRA \ . •
MM.Of Run..n• (.dU ND S..ccEss MMur
Contractor Voluntary Reduction
/i--- , .,, .Precast RCW Bldg �� W i I
I'� .�-.— 1( —( r i J
I
,,;,� .c-��+�i� Chemical Bldg _� :. I�:�
=IL Carrousel �'� `�
dirk_ 11 �`� Reconfiguration
N. ' '� xi
ian
I
�`' 1 Metal Maint/Ops/ 1 wr
1 sim, _ Electrical Bldg 4 i
* r ❑ n
a g
' ,-L. :1 - Odor Control and JJ o-Q
®-
Re 17i`;1 Grit Removal
Hig1 o.
Jr on / \� � Pump Stations , on E
Q p Q
2` u
: 454 s1, ' 'Mir"
_ - Operations Bldg '
1 - 1 : 1 and Parking Lot J.
ARDURRA I !
Contractor Voluntary Reduction
• Finalizing costs for March 7 Board
• "J20% reduction in plant cost
• ^'17% reduction in total cost relative to original bid
• .. • • . - . original Contractor BicrIlltw Contractor
General & Administrative $ 3,150,100.00 $ 3,150,100.00
Interim Plant Mods $ 800,000.00 $ 800,000.00
Plant $ 54,467,000.00 $ 43,572,126.00
Pipeline $ 7,119,900.00 $ 6,736,261.00
Plant Prepurchase $ 9,935,003.20 $ 7,841,003.20
Pipeline Prepurchase $ 8,063,432.00 $ 7,651,600.00
otal Plant Cost . 2,103.20 54,563,229.2 i
lant $/GAL* 44.58 35. -
ARDURRA otal Project Co ,435.20 69,751,090.
*$/GAL based on costs associated with Plant only (highlighted rows)
Discussion Items
r _....r_
Contractor Voluntary Alternative Recommendation
Reduction Treatment Options &
Next Steps
1RDURRA
Alternative Treatment Op
_____
-01
i 4 _-4 ;; '7'
ram►. at Nine alternatives 1
�� ,`�J evaluated
r focused on
I r �th 1 process options
_l
Alternative Summary Table
[ - Alternative Description Result
�'=--" 1 Original Design No change, No savings
_ 2 Original Design + Smaller Ditch Lower Cost Savings
3 2 Davco Tks w/ Membranes i Feasible, Lower Cost Savings
4 12 Davco Tks w/ 60' Diam Clarifiers I Feasible, Lower Cost Savings
5 1 Davco Tk w/ Membranes Feasible, Lower Cost Savings
6 2 Davco Tks w/ Internal Clarifiers Lower Capacity (0.9 mgd), Less Savings
7 PC/Mid Clay WWTP Interconnection Lowest Regional Capacity, Very Limited ROI
8 2.56 mg Pond West Side of Site Larger Pond Vol, Less Cost Savings
9 1.28 mg Pond West Side of Site Less Cost Savings
ARDURRA 10 1.28 mg Pond On Site Highest Cost Savings
11
ReductionContractor Vo untar
Pros Cons
• Additional $3.5M in voluntary reduction • Larger area to construct
• Provides higher level of nitrogen removal • Exposed liner replacement every 15 yrs
• Accessing mechanical equipment in pond labor
_ ' •::-ter' intensive
Y ,p,, �.;, • • Operator familiarity, spare part and equipment
differences relative to Carousel standard
; a _ ` , •1
1 !_ + i= r _ -i"'
' i '
_—mow
tik r
ARDURRA
12
Discussion Items
__..
Contractor Voluntary Alternative Recommendation
Reduction Treatment Options &
Next Steps
1RDURRA
Recommendation
• Accept Contractor Voluntary Reduction of $13.8M
• $36/gal versus $50-60/gal in current market
• Construct the carrousel based system
• Best value, meets existing project schedule
• Takes full advantage of pre-purchased equipment
• Operations are familiar with this process
• Spare parts are interchangeable between plants
• Will be expandable to achieve additional nutrient removal in the future
• •I . • I • :•• 1 - • . • : •.
General & Administrative $ 3,150,100.00 $ 3,150,100.00 $ 3,150,100.00
Interim Plant Mods $ 800,000.00 $ 800,000.00 $ 800,000.00
Plant $ 54,467,000.00 $ 43,572,126.00 $ 40,302,318.00
Pipeline $ 7,119,900.00 $ 6,736,261.00 $ 6,736,261.00
Plant Prepurchase $ 9,935,003.20 $ 7,841,003.20 $ 7,841,003.20
Pipeline Prepurchase $ 8,063,432.00 $ 7,651,600.00 $ 7,651,600.00
otal Plant Cos 67,552,103.2 54,563,229.2 1,293,421.20
44.5M, 35.9= 33.74
ARDURRA otal Project 83,535,435.2L69,751,090.20-7 6,481,282.20
*$/GAL based on costs associated with Plant only (highlighted rows)
N ext Ste ps
• Return March 7th with proposed contract with Wharton-Smith, Inc.
• Finalize cost
• Begin conforming drawings
• Substantial Completion remains December 2024
• Proceed with gopher tortoise removal now through Ardurra sub
1RDURRA
15
•
i
-�.'I^lark , -
vs 11111- All.
:111k"1
Q
101*
4.
/\\/
u e st 10 n s ?
ARDURRA
COLLABORATE.INNOVATE.CREATE.
16
1.4 .--•- •••••••4-..."a-.'-- ___ _ . Ili\17.kiim ,
1 IMi 1*.m..1 .11111.11 ":11111- • ' --, --7-..;?,7, i
uosiorr
r A i 1 t e k77 m g I•''',''''--—' .__
:47:P11\21,
-
Q
r:;-,.••• -11, 4e.r--; 'All i 1 k
1**Attk .4irli I/ i I.
Peters Creek Water Reclamation Facility / //\\
and Pipeline Project Bi U ateCOLLABORATE.INNOVATE.CREATE.
February 21, 2023