Loading...
HomeMy WebLinkAboutEDB GP WTP Construction Bid Doc EXECUTIVE SUMMARY AGENDA ITEM: Recommended Selection of the Governor's Park Water Treatment Plant(WTP)Construction Bid RFQ No. 2022/2023-A17. CCUA Project No.: 1127-002 CCUA Financial Job No.: 21026WP Date: March 16, 2023 BACKGROUND: CCUA will construct a new WTP to serve the Governor's Park service area. CCUA solicited bids for construction of the plant from the four (4) continuing services general contractors engaged under Master Contract 2021/2022-A03. At the January 3, 2023, meeting, staff recommended and received authorization to reject all bids received as they exceeded the maximum contract value of$4 million. Subsequently, staff interviewed the contractors to ascertain the reasons that the bids exceeded the Engineer's Opinion of Probable Construction Cost and the maximum contract value. Based on these as interviews, staff deemed it necessary to modify the drawings, develop specifications, and re-advertise a the project to any qualified bidder in the open market. A Request for Qualifications (RFQ) was co advertised on CCUA's Bonfire Procurement Platform on February 10, 2023, and in the Florida Times o Union on February 15,2023.A single submission was received from Dewberry Engineers,Inc.,by the r 3 closing date, March 3, 2023. ce EVALUATION: The single RFQ submission was evaluated and scored by the project Evaluation Committee. Dewberry Engineers, Inc., ranked 94.0 for the proposal received. Reviewers noted that this Firm and the Subcontractors identified in the submittal are well qualified to support CCUA in the subject professional services area. RECOMMENDATION: Staff respectfully recommends the Board of Supervisors approval and authorization to negotiate and execute the contract with Dewberry Engineers, Inc., for the engineering services identified above. Additionally, staff requests approval of the attached Bid Documents. ATTACHMENTS: Times Union Advertisement Pre-Submission Meeting Attendance Submittal Closing Attendance Project Scoring //DP(Author) //DP,DD,AB (Review) //PS(Final) REQUEST FOR QUALIFICATIONS NOTICE IS HEREBY GIVEN THAT Clay County Utility Authority (CCUA), Clay County, Florida, will be accepting sealed Statements of Qualifications (SOQs) for RFQ# 22/23-A17 Governor's Park Water Treatment Plant (WTP) Construction Bid Update, which will be received until 2:00 P.M. (EST), March 3, 2023. The complete Solicitation package can be obtained by visiting: https://clayutility.bonfirehub.com/portal/?tab=openOpportunities. Submissions must be posted to the Clay County Utility Authority Bonfire Procurement Portal located at https://clayutility.bonfirehub.com. (Hard-copies will not be accepted). CCUA is seeking Statements of Qualifications (SOQs) from Florida Licensed Engineering Firms to efficiently and effectively modify existing water treatment plant design and specifications. The Successful Contractor will provide CCUA with bid documents demonstrating a timeous path to bidding and construction of a plant that will serve CCUA with both the best long-term value while remaining within the existing project budget of$6 million. A Mandatory Pre-Submission Meeting and Site Tour will be held on Friday, February 17, 2023, at 1:00 P.M. (EST) at the following location: Clay County Utility Authority Board of Supervisors Room (Boardroom) 3176 Old Jennings Road Middleburg, Florida 32068-3907 All questions or concerns regarding this Solicitation must be submitted on the CCUA Bonfire Procurement portal https://clayutility.bonfirehub.com prior to 12:00 P.M. (EDT) on Wednesday, February 22, 2023. Late questions may be answered at the discretion of CCUA. All responses to questions will be uploaded to the Portal and issued in an Addendum on Friday, February 24, 2023. CCUA reserves the right to change the time and date of the Pre-Submission Meeting and Site Tour, the Submittal Due Date and Time, to waive formalities in any solicitation, to reject any or all submittals with or without cause, and/or to accept the submittal or any portion thereof that, in CCUA's sole and absolute judgment, will be in the best interest CCUA. PRE-SUBMISSION MEETING SIGN-IN SHEET Governor's Park WTP Construction Bid Document Update CCUA RFQ No. 22/23-A17 Date: February 17, 2023 Name Company Email/Phone Nur Darrin G. Parker tie, Clay County Utility Authority dgparker• ility... Darrell Damrow Clay County Utility Authority (a clayutility.orq Joe Paterniti Clay County Utility Authority ipaterniti(a�clavutility.org Paul Steinbrecher Clay County Utility Authority psteinbrecher a(�clayutility.orq I : WI arl ¢.A.A. 4. 50-4.1p f E+f +I An S rn Nt PE KK 41_1r .'e4zs-y gN e /k i M fek.e4-1.2-e, ° 0 Nib.. PRE-SUBMISSION MEETING SIGN-IN SHEET Governor's Park WTP Construction Bid Document Update CCUA RFQ No. 22/23-A17 Date: February 17, 2023 Name Company Email/Phone Nur ,r Darrin G. Parker ,! Clay County Utility Authority dgparker. Darrell Damrow Clay County Utility Authority .w(c�clavutilitv.orq Joe Paterniti Clay County Utility Authority ipaternitiCr�clavutilitv.orq Paul Steinb echer Clay County Utility Authority psteinbrecher(a,ciayutility.orq I � d✓1 v.rl Q, We. PSa>1 af' ity. +1 "/N D W .S EIAi 1. td rti rL- 414sc stTtiziz-y eelk6 M pek.ci Gam 0 CLAY COUNTY UTILITY AUTHORITY Compiled Matrix - Dewberry Engineers, Inc. RFQ# 2022/2023-A17 Governor's Park Water Treatment Plant (WTP) Construction Bid Document Update Evaluation Criteria Possible Points Evaluator#1 - DD Evaluator#2 - PS Evaluator#3 - JP Professional Staff Experience 30 25 30 30 Project Approach and Work Plan 40 35 37 40 to Company Experience 30 24 30 30 84 97 100 AVERAGE SCORE 94