HomeMy WebLinkAboutEDB GP WTP RFQ Execution Executive Summary EXECUTIVE SUMMARY AGENDA ITEM: Proposed Agreement with Dewberry Engineers, Inc. for Engineering and Construction Services to Value Engineer, Redesign and Rebid the Governor's Park Water Treatment Plant, and to Provide Services During Construction for all construction activities at the Governor's Park Plant Site. RFQ No. 2022/2023-A17 CCUA Project No.: 1127-002 CCUA Financial Job No.: 21026WP Date: April 18, 2023 BACKGROUND: Staff completed a request for qualifications (RFQ) process. As previously reported on March 21, 2023, Dewberry's was the only submission received. Dewberry is a well-respected firm with highly capable and qualified staff to complete the professional engineering design services needed for this project. Staff negotiated the attached Scope and Fee proposal with Dewberry Engineers, Inc. for co c $705,284.53. The proposal includes value engineering to ensure the resulting project provides :' CCUA with the best long-term value. Also included are project management, document 2, preparation, permitting, and bidding and construction administration services. Additionally, to L realize efficiencies on required inspection staff presence, Dewberry will provide construction and a engineering inspection for all construction activities at the Governor's Park site including the ce master lift station and reclaimed storage and pumping facility which were designed by their subconsultant, Ardurra. BUDGET: Staff budgeted$9,450,000 for this project in the updated Capital Improvement Program presented to the Board of Supervisors on March 21, 2023. CCNA: Because the total construction cost for the Governor's Park WTP is expected to exceed$4 million, the engineering services proposed herein have been procured via RFQ in compliance with CCNA, F.S. s. 287.055. RECOMMENDATION: Staff respectfully recommends the Board of Supervisors approve the negotiated scope of services and execution of a contract with Dewberry Engineers, Inc. to provide the services described for //DD,DP(Author) //PS,AW(Review) //PS(Final) the Governor's Park WTP and related projects. ATTACHMENTS: Scope and Fee Proposal Contract //DD, DP(Author) //PS,AW(Review) //PS(Final) ;:Sa Dewberry Engineers Inc. 863.345.0838 �';'% Dewberry® 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 SCOPE OF SERVICES Governor's Park Water Treatment Plant (GPWTP) Rebid April 11, 2023 A. Project Background and Description Dewberry Engineers (CONSULTANT) was requested by Clay County Utility Authority (AUTHORITY) to provide engineering services to rebid the GPWTP. Our team (CONSULTANT and subconsultant Ardurra Group) have worked over the last 12 months on jointly developing with the AUTHORITY the Governor's Park site and the various projects (GPWTP, Reclaimed Storage and Pumping Facility, Wastewater Lift Station and Site Work/Stormwater Facilities) located at the site. Because of the accelerated schedule for placing the GPWTP in service, the GPWTP included the use of existing components of steel package plants as a means of reducing cost and accelerating the construction schedule. The components proposed for re-use included horizontal steel storage tanks, a tower aerator, and two existing portable buildings. Additionally, a leased sodium hypochlorite storage tank and metering pumps located in one of the portable buildings were proposed in lieu of a permanent facility. to The project was bid to the Authority's as-needed general contractors. This contacting mechanism has a construction cost limitation of$4 million. The bids exceeded this amount, requiring the AUTHORITY to reject the bids. As part of the post-bid evaluation, the bid results were discussed with the bidders. As well as the current expensive construction climate, insight was obtained from the bidders as to project components that carried perception of risk, and which might have resulted in higher construction bid amounts. A unanimous perception of the bidders was that relocation and rehabilitation of the existing steel storage tanks and tower aerator carried risk and resulted in higher bid prices. As a result, the rebid package will replace the steel storage tanks and tower aerator with a 500,000-gallon pre- stressed concrete storage tank with integral aerator, which will provide storage through approximately 2035. Other bidders indicated that the proposed masonry block and roof truss construction of the proposed electrical and control room presented a high unit cost (per square foot) because the difficulty of obtaining interest from local builders for this type of construction because of the competition from residential and commercial construction. An additional cost factor was stated to be the required coordination of multiple subs (concrete, block mason, roofers, plumbers, HVAC) required for the building. The bidders suggested that a pre-cast/pre-engineered building could provide economy. Page 1 of 11 ;:Sa Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry® 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 Several bidders also indicated that the leased hypochlorite system might be provided as a permanent purchased system for similar cost. This analysis by the AUTHORITY and the project team resulted in recommendations to re- evaluate certain components of the previous bid package, as part of the re-bidding of the GPWTP to general contractors not constrained by the $4 million "as-needed" contract limit. The scope of services for the redesign and rebidding of the GPWTP will include the following: • Evaluate the project plans and specifications for potential cost savings and value improvements. • Replace the steel ground storage tanks and tower aerator with 500,000-Gallon Ground Storage Tank (GST) with integral aerator. • Evaluate the use of pre-cast/pre-manufactured building components (wall and roof panels with doors) in lieu of or as an alternative to masonry block construction and roof trusses. • Evaluate elimination of the future walls and roof for the high service pump station. This will allow elimination of the pipe trench, and probable reduction in the size of the slab. • Evaluate replacement of the leased sodium hypochlorite storage and metering equipment with a purchased system located in a precast concrete building. • Evaluate the level of detail for the instrumentation and controls to ensure compatibility to with the AUTHORITY's design standards. The CONSULTANT shall provide professional engineering services for the re-design, re- permitting, re-bidding and construction services for the GPWTP, as outlined in the scope of services. B. Scope of Services Upon authorization to proceed from the AUTHORITY, the CONSULTANT will provide the following identified services. This authorization shall be in full force and effect until the CONSULTANT completes all services as described in the CONSULTANT Agreement and any subsequent modifications hereto. PHASE 100— PROJECT MANAGEMENT Task 101 — Project Management This task consists of overall management of the Project including contract administration, budget management, invoicing, monthly status reports, project scheduling, and coordination with the AUTHORITY and CONSULTANT's sub-consultants. Eighteen (18) months of project management are provided, including miscellaneous meeting as required by the AUTHORITY. Dewberry® Page 2 of 11 ;:�� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 Task 102 — Meetings The CONSULTANT will attend meetings as tabulated below with the AUTHORITY. Other specific meetings are included in the tasks described in this scope of services. The CONSULTANT will prepare a meeting agenda and meeting minutes. Meeting minutes shall be distributed within three working days of the date of the meeting. 1. Kick-off meeting. 2. Value Engineering (VE)workshop with the AUTHORITY. 3. Issued for Bid (IFB) design review meeting for the GPWTP re-bid documents. The IFB review meeting will include the electrical/I&C designer. This will be a virtual meeting. 4. Monthly progress meetings over the course of the 18-month schedule. The scope assumes eight (8) meetings will be in person and ten (10) meetings will be virtual via Teams. PHASE 200 —VALUE ENGINEERING Task 201 —Value Engineering to The existing project bidding documents, which include pre-purchased equipment information, will be evaluated by a qualified team of reviewers to identify any areas where efficiencies can be obtained, to verify consistency and to identify VE concepts. The electrical and instrumentation and control will be evaluated by SUBCONSULTANT Ardurra. The general civil, mechanical (HVAC and plumbing) and process mechanical)will be evaluated by the CONSULTANT. The structural will be evaluated by SUBCONSULTANT Wekiva Engineers. The CONSULTANT and SUBCONSULTANTS will then develop value engineering concepts and costs for those concepts, including revision of the overall Engineer's Opinion of Probable Construction Cost (EOPCC). A workshop will be held at the AUTHORITY to present the proposed revisions to the project plans. PHASE 300 — IFB DOCUMENTS Task 301 — IFB Documents CONSULTANT will prepare and submit Issued for Bid (IFB) design documents, incorporating the proposed changes identified in Task 201, and consisting of the following: 1. Design drawings, consisting of one (1) signed and sealed electronic copy in PDF format. These drawings shall be prepared as 22-inch by 34-inch full-sized drawings which can be printed 11-inch by 17-inch half-size to scale. Dewberry® Page 3 of 11 ;:�� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 2. Technical specifications, consisting of one (1) signed and sealed electronic copy in PDF format. Technical specifications will include Division 0 bidding documents. 3. One (1) copy of a final EOPCC in PDF format. 4. Updates to the prepurchase bid for the piping, fittings, valves and pipeline appurtenances. These documents will be modified if required for any AUTHORITY comments. The anticipated sheets are listed in Attachment A-2. PHASE 400— PERMITTING SERVICES This phase consists of the preparation and submittal of the forms and documents that are required for obtaining regulatory and construction permits/approvals for the Project. The costs of the permits are not included in the fee and will be paid by the AUTHORITY. Task 401 — Specific Permit to Construct Public Water System (PWS) Components The project currently has an approved water system permit. This task consists of the to preparation of the forms and supporting documents that are required to modify that permit and obtain regulatory and construction permits/approval for the project permit. CONSULTANT shall prepare for and attend one (1) pre-application meeting, with the objective of determining whether the project modifications require a new permit application, or if the changes can be reflected in the record drawings for the project. The scope for the Specific Permit to Construct PWS Components shall include the following services: 1. Prepare and submit permit application (including all required forms and supporting documentation) to the Florida Department of Environmental Protection (FDEP). 2. Prepare and submit responses to Requests for Additional Information (RAls). This effort is limited to two (2) sets of review questions/comments unless otherwise required to address errors and/or omissions of CONSULTANT in preparing and submitting requisite application documents. Task 402 — Environmental Permitting Environmental permitting services will be provided under an existing consultancy contract with the AUTHORITY's consultant (Ardurra) who is performing other design work at the Governor's Park site. The environmental permits will include facilities designed under this scope of services. The CONSULTANT shall coordinate with and provide information to the Dewberry® Page 4 of 11 ;:�� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 AUTHORITY's consultant (Ardurra) as required for the environmental permitting. No separate fee is included for environmental permitting in this scope. Task 403 — Clay County Development Review The AUTHORITY has a permit application pending with Development Review Package to Clay County. This permit was prepared by the AUTHORITY'S consultant (Ardurra Group). The CONSULTANT shall coordinate with and provide information to the AUTHORITY's consultant as required for the environmental permitting. PHASE 500— BID PHASE SERVICES It is assumed that the AUTHORITY will bid the project to qualified contractors and enter into one (1) contract for construction of the project. The AUTHORITY shall be responsible for advertisement of the Project and distribution of the Project documents, including all costs associated therewith. The CONSULTANT shall work to create interest among qualified contractors prior to the project being advertised for bidding with acknowledgement of the challenging bidding environment. Task 501 —Bid Documents to Prepared under Task 301. Task 502 —Pre-Bid Meeting The CONSULTANT shall prepare a presentation for the construction package and attend in person a pre-bid meeting at the AUTHORITY's office followed by a site visit to the project site. The CONSULTANT's electrical and l&C subconsultant shall attend this meeting. Task 503 —Bid Addenda CONSULTANT shall prepare bid addenda as required to address/respond to questions and comments submitted to the AUTHORITY by prospective bidders. Task 504— Bid Recommendation CONSULTANT shall evaluate bids, including qualifications of contractors, and recommend award. Dewberry® Page 5 of 11 ;:�� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 PHASE 600 — CONSTRUCTION ADMINISTRATION SERVICES These services will be performed during construction of the Project. For the purpose of this Amendment, it is assumed that the construction duration will not exceed 380 calendar days. Task 601 — Pre-Construction Meeting The CONSULTANT, including the electrical and l&C designer and inspector shall attend one (1) pre-construction meeting chaired by the AUTHORITY's construction manager. The CONSULTANT shall prepare any materials requested by the AUTHORITY and review/contribute to the meeting agenda. Task 602 — Preliminary Matters and Contract Documents The CONSULTANT shall provide signed and sealed sets of conformed construction drawings (2 full-size sets, two half-size sets and one electronic copy, in PDF format), and technical specifications (two (2) signed and sealed hard copies and one (1) electronic copy, in PDF format) for distribution to the AUTHORITY. The CONSULTANT shall provide the contractor the required number of signed and sealed documents in accordance with the bid documents. The conformed construction drawings and technical specifications shall incorporate all changes and to clarifications to the documents during the bid and pre-award phases. The CONSULTANT shall review and approve the preliminary schedule of shop drawings and submittals, the preliminary schedule of values, and the construction schedule for the Project. The CONSULTANT shall provide written interpretations and clarifications of the Contract Documents as requested by the contractor and determine the acceptability of work. The CONSULTANT will render in writing their opinions concerning the contractor's requests for formal decisions on claims and disputes. The CONSULTANT will disapprove or reject work which, in the opinion of CONSULTANT, is defective and/or requires special inspection or testing as may be deemed necessary to assess conformance with the Contract Documents. Task 603 — Shop Drawing Review Review contractor's shop drawings and other submittals for general conformance with the Contract Documents. The CONSULTANT shall conduct reviews of shop drawings, including initial and re-reviews as follows: • Electrical and instrumentation 12 reviews • Process mechanical and civil 40 reviews • HVAC/Plumbing 10 reviews • Structural 13 reviews Dewberry® Page 6 of 11 ;:'.� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 In addition to the shop review of new equipment being provided under the re-bid documents, shop review of CCUA pre-purchased equipment will be required, as follows: • Pre-purchased well pumping equipment. • Pre-purchased high service pumping equipment. • Pre-purchased electrical motor controls and VFD equipment. • Pre-purchased piping, pipe fittings, pipe accessories, and valves. Task 604— Construction Progress Meetings and Factory Acceptance Testing (FAT) Attend twelve (12) monthly construction progress meetings chaired by the AUTHORITY's construction manager. The CONSULTANT's inspector shall attend the meeting in person. The CONSULTANT's project manager shall attend the meeting by TEAMs. The SUBCONSULTANT electrical and l&C designer will attend one (1) FAT at a local integrator's factory, for acceptance testing of control system panels and components before shipment to the project site. The testing procedures shall be as provided by the Contractor or their Subcontractors. The CONSULTANT will provide testing minutes, completed forms based on Contractor's submittal, and a listing of any deficiencies to be corrected before equipment shipment. to Task 605— Construction Site Visits The CONSULTANT's Engineer of Record (EOR), or designated representative, will visit the site at intervals deemed appropriate by the CONSULTANT to review the construction of the Project for conformance with Contract Documents. The project budget includes two (2) visits a month for a 11.5-month active construction on site for the civil/process mechanical design. The structural subconsultant shall make two (2) site visits during construction. The civil and electrical and l&C designer of subconsultant Ardurra shall make two (2) visits a month for an 11.5-month active construction on site. Task 606— Limited Progress Inspections The CONSULTANT shall provide limited construction phase services. The purpose of this work is to have sufficient knowledge of the construction to certify the project complete to the regulatory agencies and the AUTHORITY. The CONSULTANT shall assist the AUTHORITY during the construction. The CONSULTANT shall also perform inspections of the Project on a regular basis to provide information on the Contract Documents and document that the work is being performed in accordance with the intent of the design. The CONSULTANT will witness or review test results and require corrective action for failing tests. Full-time inspection of the work being performed is not required. It is anticipated that construction inspection will be required for the 350-day construction period for twenty-four (24) hours per week; however, this may be Dewberry® Page 7 of 11 ;:'.� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 subject to modification during if additional on-site activities require CONSULTANT to be present. The CONSULTANT'S inspector shall inspect the Governor's Park Water Treatment Plant as well as the AUTHORITY'S other project on site, the lift station and reclaimed water project designed by SUBCONSULTANT Ardurra. Task 607 —Applications for Payment The CONSULTANT will review Applications for Payment submitted by the contractor, including updated progress schedules, and will indicate in writing to the AUTHORITY a recommendation of payment or return the application to the contractor specifying in writing the reasons for not recommending payment. The CONSULTANT's recommendation of payment will constitute a representation by the CONSULTANT to the AUTHORITY that: 1. The work has progressed to the point indicated; 2. The quality of the work, as observed by the CONSULTANT, is within the design intent of the Contract Documents; and 3. The conditions precedent to the contractor's being entitled to such payment appear to have been fulfilled based on the CONSULTANT'S site observations. In the event that the work has not progressed in accordance with the approved construction to schedule, the CONSULTANT will request that the contractor submit a schedule recovery plan indicating corrective actions necessary to put the work back on schedule. The CONSULTANT shall submit the contractor's Application for Payment to the AUTHORITY within five (5) working days of receipt of the same. The CONSULTANT will review up to twelve (12) pay applications. Task 608 — Requests for Information (RFIs) Review RFIs submitted by the contractor and provide written responses to the contractor. The CONSULTANT shall maintain an RFI log for the Project. The CONSULTANT shall conduct reviews and prepare responses for RFIs, as follows: • Electrical and instrumentation 4 reviews/responses • Process mechanical and civil 12 reviews/responses • HVAC/Plumbing 2 reviews/responses • Structural 5 reviews/responses Task 609 — Change Orders/Contingency Releases/Allowance Authorization Releases (AARs) The CONSULTANT will review requests from the contractor for changes in Contract Price or Contract Time and provide written comments to the contractor and the AUTHORITY. If acceptable, the CONSULTANT will prepare a written Change Order to be signed by the CONSULTANT and the contractor and submitted to the AUTHORITY for approval. This task Dewberry® Page 8 of 11 ;:�� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 includes the review of Allowance Authorization Releases (AARs) and contingency releases. The CONSULTANT shall review change orders, as follows: • Electrical and instrumentation 2 reviews/responses • Process mechanical and civil 5 reviews/responses • HVAC/Plumbing 1 reviews/responses Task 610 — Substantial Completion Upon written notification and receipt of a list of items to be completed/corrected from the contractor, the CONSULTANT will visit the site to determine if the work or a designated portion thereof is substantially complete. For the purpose of this task, the CONSULTANT assumes that two (2) substantial completion site visits will be required. One structural substantial completion visit is budgeted. When the work (or a portion thereof) is deemed to be substantially complete, the CONSULTANT shall prepare a Certificate of Substantial Completion that establishes the date of Substantial Completion. The Certificate of Substantial Completion shall be accompanied by a list of items to be completed/corrected. Task 611 — Project Close-Out Upon written notification from the contractor that the entire work is complete, the CONSULTANT to shall visit the site to determine if the work is complete as required by the Contract Documents. For the purpose of this task, the CONSULTANT assumes that one (1) final completion site visit will be required. When the work is deemed to be complete by the CONSULTANT and the AUTHORITY, the CONSULTANT shall review the contractor's final Application for Payment and accompanying documentation and provide a written recommendation of payment to the AUTHORITY. The CONSULTANT shall also give written notice to the AUTHORITY and the contractor that the work is acceptable subject to the provisions of the AUTHORITY'S General Conditions. The CONSULTANT shall review contractor's as-built drawings for completeness and compliance with AUTHORITY requirements. This effort shall include the preparation of written comments for submission to the contractor based on the CONSULTANT's review of the as-built drawings. The CONSULTANT shall prepare record drawings based on the contractor's as-built data. One (1) complete 22" x 34" set of draft record drawings shall be submitted for review by the AUTHORITY. The CONSULTANT shall incorporate all comments from the draft review, then submit signed and sealed electronic (PDF) set and AutoCAD files and one (1) signed and sealed 22" x 34" hard copy set of the record drawings to the AUTHORITY within 30 days of the receipt of the contractor's final as-built drawings and AUTHORITY comments. The CONSULTANT shall prepare and submit a "Certification and Request for Clearance to Place Permitted PWS Components into Operation" (Form 62-555.900(9)) to FDEP for each non- Dewberry® Page 9 of 11 ;:�� Dewberry Engineers Inc. 863.345.0838 �•;•% Dewberry 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 contiguous portion of the Project. The CONSULTANT shall prepare and submit an "As-Built Certification and Request for Conversion to Operation Phase" (Form 62-330.310(1)) to the SJRWMD. C. Deliverables The CONSULTANT shall prepare and submit to the Authority, including electronic format when applicable, deliverables as identified in the tasks of this scope of services. D. Schedule The CONSULTANT will proceed with the services identified herein immediately upon receipt of an executed copy of this Consultant Purchase Order and a formal Notice-to-Proceed (NTP) from the AUTHORITY. A preliminary version of the Project schedule in Microsoft Project is included as Attachment A-3. E. Compensation This AGREEMENT establishes a lump sum cost of$705,284.53. Compensation for the services performed under this Agreement shall include all personnel services, any reimbursable to expenses, which may include, but are not necessarily limited to, such items as reproduction, travel, communication expenses, and postage and shipping. Attachment A-1 shows the breakdown by task. F. The AUTHORITY's Responsibilities The AUTHORITY will provide the following information for the CONSULTANT and /or perform the following services related to the Project: • Allow CONSULTANT scheduled access to the project site. • Provide one representative by the AUTHORITY to coordinate, schedule, and receive comments/information related to this project. • The AUTHORITY will furnish the CONSULTANT with readily available studies, reports, and other data pertinent to the CONSULTANT's services. All documents and data provided by the AUTHORITY shall be provided in digital format (e.g., PDF, database files, spreadsheet, etc.) to the greatest extent feasible and practical. G. Services Not Included Service not specifically described in the tasks above are not included. Dewberry® Page 10 of 11 Dewberry®erry Dewberry Engineers Inc. 863.345.0838 �•;•% 1479 Town Center Drive,Suite D214 www.dewberry.com Lakeland,FL 33803-7974 H. Assumptions The Scope of Services and compensation arrangement outlined in this Consultant Purchase Order are based on the following assumptions: 1. Project water quality is assumed to require no additional treatment beyond cascade tray aerator and disinfection. 2. The AUTHORITY will provide review comments on project submittals in accordance with the draft schedule. to Dewberry® Page 11 of 11 Attachment A-1 Clay County Utility Authority Governor's Park Water Treatment Plant Rebid Dewberry , Dewberry Staff Total Subs Total Direct Costs Grand Total Principal in Project Manager/Design Senior Technical Charge Manager Quality Control Senior Tech. Senior Technical Professional II Professional Dewberry Dewberry]Hydro& Officer Dpty PM Professional Ill Professional III (DH) Lead Inspector I/Inspector Des/CADD Mgr. Admin Professional Total Hours Total Dewberry HVAC/Plumbing Wikeva Ardurra Total Subs Subs Phase/Task Task Description $ 285.04 $ 272.18 $ 223.55 $ 197.90 $ 135.23 $ 128.25 $ 120.00 $ 100.00 $ 101.48 $ 90.00 $ 80.00 Task 200 Project Management 36 212 0 74 0 0 104 0 0 0 109 535 $ 103,808.20 $ - $ 740.00 $ 40,711.20 $ 41,451.20 $ 145,259.40 $ 3,600.00 $ 148,859.40 Task 101 Project Management 36 108 0 18 0 0 0 0 0 0 108 270 $ 51,859.08 $ - $ - $ 40,711.20 $ 40,711.20 $ 92,570.28 $ Task 102 Meetings 0 104 0 56 0 0 104 0 0 0 1 265 $ 51,949.12 $ $ 740.00 $ - $ 740.00` $ 52,689.12 $ 3,600.00 Task 200 Value Engineering 5� 8 12 0 46 0 48� 0 0� 0 121 $ 18,536.28 $ - $ 2,150.00 $ 14,500.40 $ 16,650.40 $ 35,186.68 $ - $ 35,186.68 Task 201 Value Engineering 5 8 12 0 48 0 48 0 0 0 0 121 $ 18,536.28 $ - $ 2,150.00 $ 14,500.40 $ 16,650.40 $ 35,186.68 $Task 300 IFB Documents 2 27 11 0 114 0 228 0 0 217.5 0 599.5 $ 72,729.21 $ 10,560.00 $ 9,400.00 $ 50,077.20 $ 70,037.20 $ 142,766.41 $ 100.00 $ 142,866.41 Task 301 IFB Set 2 27 11 0 114 0 228 0 0 217.5 0 599.5 $ 72,729.21 $ 10,560.00 $ 9,400.00 $ 50,077.20 $ 70,037.20 $ 142,766.41 $ 100.00 Task400 Permitting Services 0 16 0 0 0 0 18 0 0 22 2 58 $ 8,654.88 $ - $ - $ 2,223.20 $ 2,223.20 $ 10,878.08 $ 200.00 $ 11,078.08 Task 401 Specific Permit to Construct PWS Components 0 13 0 0 0 0 12 0 0 16 1 42 $ 6,498.34 $ - $ - $ - $ - $ 6,498.34 $ 200.00 Task 402 Environmental Permitting 0 0 0 0 0 0 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - $ - Task403 Clay County Development Review 0 3 0 0 0 0 6 0 0 6 1 16 $ 2,156.54 $ - $ - $ 2,223.20 $ 2,223.20 $ 4,379.74 $ - Task 500 Bid Phase Services 2 18 0 0 0 0 28 0 0 20 4 72 $ 10,949.32 $ - $ 750.00 $ 13,053.40 $ 13,803.40 $ 24,752.72 $ 500.00 $ 25,252.72 Task 501 Bid Documents 0 4 0 0 0 0 8 0 0 16 0 28 $ 3,488.72 $ - $ - $ 12,976.40 $ 12,976.40 $ 16,465.12 $ 300.00 Task 502 Pre-Bid Meeting 0 8 0 0 0 0 8 0 0 0 0 16 $ 3,137.44 $ - $ - $ 44.00 $ 44.00 $ 3,181.44 $ 200.00 Task 503 Bid Addenda 1 2 0 0 0 0 4 0 0 4 4 15 $ 1,989.40 $ - $ 750.00 $ 33.00 $ 783.00 $ 2,772.40 $ - Task504 Bid Recommendation 1 4 0 0 0 0 8 0 0 0 0 13 $ 2,333.76 $ - $ - $ - $ - $ 2,333.76 $ - Task600 Construction Administration Services 33.5 0 0 0 0 440 0 1340 56 58 2021.5 $ 240,673.64 $ 9,240.00 $ 8,900.00 $ 76,727.60 $ 94,867.60 $ 335,541.24 $ 6,500.00 S 342,041.24 Task 601 Pre-Construction Meeting 0 8 0 0 0 0 8 0 8 0 2 0 $ 4,109.28 $ - $ - $ 76,727.60 $ 76,727.60 $ 80,836.88 $ 400.00 Task 602 Preliminary Matters and Contract Documents 0 2 0 0 0 0 12 0 0 4 4 22 $ 2,664.36 $ - $ - $ - $ - $ 2,664.36 $ 200.00 Task 603 Shop Drawing Review 10 20 0 0 0 0 80 0 0 0 20 130 $ 19,494.00 $ - $ 4,450.00 $ - $ 4,450.00 $ 23,944.00 $ 200.00 Task 604 Progress Meetings and FAT 6 12 0 0 0 0 0 0 96 0 15 129 $ 15,918.48 $ - $ - $ - $ - $ 15,918.48 $ - Task605 Construction Site Visits 0 0 0 0 0 0 184 0 0 0 0 184 $ 22,080.00 $ - $ 1,335.00 $ - $ 1,335.00 $ 23,415.00 $ 4,300.00 Task 606 Limited Progress Inspections 0 0 0 0 0 0 0 0 1200 0 0 1200 $ 121,776.00 $ - $ - $ - $ - $ 121,776.00 $ - Task 607 Applications for Payment 3 6 0 0 0 0 42 0 12 0 12 75 $ 9,705.96 $ - $ - $ - $ - $ 9,705.96 $ 200.00 Task 608 Requests for Information 6 12 0 0 0 0 36 0 0 12 0 66 $ 10,376.40 $ - $ 890.00 $ - $ 890.00 $ 11,266.40 $ 200.00 Task 609 Change Orders/Contingecy Releases/AARs 2.5 20 0 0 0 0 20 0 0 5 5 52.5 $ 9,406.20 $ - $ - $ - $ - $ 9,406.20 $ 200.00 Task 610 Substantial Completion 0 9 0 0 0 0 16 0 16 0 0 41 $ 5,993.30 $ - $ 890.00 $ - $ 890.00 $ 6,883.30 $ 600.00 Task 611 Project Closeout 6 31 0 0 0 0 42 0 8 35 0 122 $ 19,149.66 $ - $ 1,335.00 $ - $ 1,335.00 $ 20,484.66 $ 200.00 Tasks 601-611 Plumbing $ 4,440.00 $ - $ - $ 4,440.00 $ 4,440.00 $ Tasks 601-611 HVAC $ 4,800.00 $ - $ - $ 4,800.00 $ 4,800.00 $ - $ - $ - $ - $ Grand Total 78.5 23 74 162 0 866 0 1340 315.5 173 3407 $ 455,351. 19,800.00 $ 21,940.00 $ 197,293.00 $ 239,033.00 $ 10,900.00 $ 705,284.53 to Basic Services ATTACHMENT A-2 SHEET NO. DWG NO. DESCRIPTION GENERAL DRAWINGS 01 G-01 COVER SHEET 02 G-02 SHEET INDEX 03 G-03 GOVERNOR'S PARK INTERIM WTP GENERAL NOTES 04 G-04 GENERAL NOTES-I 05 G-05 GENERAL NOTES-II 06 G-06 LEGEND,ABBREVIATIONS,AND SYMBOLS 07 G-07 PROCESS FLOW DIAGRAM 08 G-08 FACILITY LOCATION PLAN 09 G-09 OVERALL SITE PLAN CIVIL DRAWINGS 10 C-01 EXISTING CONDITIONS AND PROPOSED FACILITIES AND GRADING PLAN 11 C-02 PLANT EQUIPMENT RELOCATION PLAN PETERS CREEK 12 C-03 PLANT EQUIPMENT RELOCATION PLAN LUCY BRANCH-I 13 C-04 PLANT EQUIPMENT RELOCATION PLAN LUCY BRANCH-II 14 C-05 PLANT EQUIPMENT RELOCATION PLAN GREENWOOD 15 C-06 PLANT EQUIPMENT RELOCATION PLAN MEADOWBROOK 16 C-07 YARD PIPING PLAN 17 C-08 CIVIL DETAILS-I 18 C-09 CIVIL DETAILS-II 19 C-10 CIVIL DETAILS-III 20 C-11 CIVIL DETAILS-IV t0 21 C-12 CIVIL DETAILS-V STRUCTURAL DRAWINGS 22 S-01 GENERAL STRUCTURAL NOTES,ABBREVIATIONS AND SYMBOLS 23 S-02 HIGH SERVICE PUMP STATION BUILDING FOUNDATION PLAN 24 S-03 HIGH SERVICE PUMP STATION BUILDING ROOF PLAN 25 S-04 HIGH SERVICE PUMP STATION BUILDING SECTIONS 26 S-05 HIGH SERVICE PUMP STATION BUILDING ELEVATIONS 27 S-06 BUILDING SCHEDULES AND DETAILS 28 S-07 RESTROOM PLAN AND ELEVATIONS 29 S-08 CHEMICAL FEED AND STORAGE BUILDING PLANS 30 S-09 CHEMICAL FEED AND STORAGE BUILDING SECTIONS 31 S-10 CHEMICAL FEED AND STORAGE BUILDING ELEVATIONS AND D 32 5-11 GST's&HYDROTANK FOUNDATION PLAN AND DETAIL 33 S-12 MISCELLANEOUS SLAB PLANS AND DETAILS 34 S-13 TYPICAL STRUCTURAL DETAILS 35 S-14 TYPICAL STRUCTURAL DETAILS PROCESS MECHANICAL DRAWINGS 36 M-01 WELL PUMP PLAN AND SECTION 37 M-02 HIGH SERVICE PUMP BUILDING PLAN 38 M-03 HIGH SERVICE PUMP BUILDING SECTIONS 39 M-04 GROUND STORAGE TANK 1 PLAN AND SECTIONS 40 M-05 GROUND STORAGE TANK 2 PLAN AND SECTIONS 1 of 2 ATTACHMENT A-2 SHEET NO. DWG NO. DESCRIPTION 41 M-06 GROUND STORAGE TANK 2 PLAN AND SECTIONS 42 M-07 HYDROPNEUMATIC TANK PLAN 43 M-08 HYDROPNEUMATIC TANK SECTIONS AND DETAILS 44 M-09 CHEMICAL BUILDING PLAN AND SECTIONS 45 M-10 SODIUM HYPOCHLORITE PROCESS FLOW DIAGRAM 46 M-11 RECLAIMED WATER SUPPLY 47 M-12 FLOW METER PLAN AND SECTION 48 M-13 MECHANICAL DETAILS-I 49 M-14 Mechanical Details-II PLUMBING DRAWINGS 50 P-01 PLUMBING SYMBOLS ABBREVIATIONS,NOTES,AND SCHEDULES 51 P-02 ELECTRICAL BUILDING PLUMBING PLAN 52 P-03 CHEMICAL BUILDING PLUMBING PLAN HVAC DRAWINGS 53 H-01 HVAC SYMBOLS,ABBREVIATIONS,AND NOTES 54 H-02 ELECTRICAL BUILDING HVAC PLAN 55 H-03 CHEMICAL BUILDING HVAC PLAN 56 H-04 HVAC DETAILS 57 H-05 HVAC SCHEDULES ELECTRICAL DRAWINGS 58 E-01 ELECTRICAL LEGEND&SCHEDULES 59 E-02 SINGLE LINE DIAGRAM tO 60 E-03 CONTROL WIRING DIAGRAMS 61 E-04 SECURITY SYSTEM DETAILS 62 E-05 ELECTRICAL SITE PLAN 63 E-06 ELECTRICAL BUILDING POWER PLAN 64 E-07 ELECTRICAL BUILDING LIGHTING PLAN 65 E-08 GROUND STORAGE TANK ELECTRICAL PLAN 66 E-09 WELL 1 ELECTRICAL PLAN 67 E-10 WELL 2 ELECTRICAL PLAN 68 E-11 HYPOCHLORITE FACILITY ELECTRICAL PLAN 69 E-12 CONDUIT AND CABLE SCHEDULE 70 E-13 LIGHTING DETAILS 71 ED-1 CONDUIT AND CABLE SCHEDULE 72 ED-2 LIGHTING DETAILS 73 ED-3 ELECTRICAL DETAILS 74 ED-4 ELECTRICAL DETAILS 75 ED-5 ELECTRICAL DETAILS INSTRUMENTATION DRAWINGS 76 i-01 INSTRUMENTATION LEGEND&SCHEDULES 77 1-02 INSTRUMENTATION SCHEMATIC DIAGRAM 78 1-03 INSTRUMENTATION CONTROL PANEL DETAILS 79 1-04 INSTRUMENATTION PLC I/O SCHEDULE 80 I-05 INSTRUMENTATION CONTROL WIRING DIAGRAMS 81 ID-Ol INSTRUMENTATION DETAILS 82 ID-02 INSTRUMENTATION DETAILS 2 of 2 Attachment A-3 ID Task Task Name Duration Start Finish 2023 2024 0 Mode Jan Feb Mar I Apr I May I Jun I Jul I Aug I Sep I Oct I Nov I Dec Jan I Feb I Mar I Apr May Jun Jul Aug I Sep Oct I 1 Authority Notice of Award 1 day Tue 3/21/23 Tue 3/21/23 2 MPPrepare Scope and Fee 10 days Wed 3/22/23Tue 4/4/23 3 MP 4 CCUA Review 5 days Wed 4/5/23 Tue 4/11/23 4 Board of Supervisors Approval 0 days Tue 4/18/23 Tue 4/18/23 4/18 5 Value Engineering 12 days Tue 4/18/23 Wed 5/3/23 6 Internal VE 5 days Tue 4/18/23 Mon 4/24/23 7 ErShortlist VE Ideas 1 day Tue 4/25/23 Tue 4/25/23 8 Develop VE Ideas 5 days Wed 4/26/23Tue 5/2/23 94 Workshop with CCUA 1 day Wed 5/3/23 Wed 5/3/23 l 10 IFB Plan Preparation 27 days Thu 5/4/23 Fri 6/9/23 114 FDEP Water Permitting 6 days Thu 5/11/23 Thu 5/18/23 I—I 14 ErAuthority Bidding 38 days Mon 6/12/22 Wed 8/2/23 1-1 20 Board of Supervisors Approval 0 days Tue 8/15/23 Tue 8/15/23 ♦ 8/15 21 ErConformed Documents 5 days Tue 8/15/23 Mon 8/21/23 22 Er 4 Construction 353 days Tue 5/2/23 Thu 9/5/24 I I 23 Er 4 Preconstruction Meeting 1 day Tue 8/22/23 Tue 8/22/23 24 Er 4 Shop Submittal Preparation 32 days Tue 8/15/23 Wed 9/27/23 25 ErShop Drawing Review 22 days Thu 9/28/23 Fri 10/27/23 26 Er 4 Installation of Well Equipment 22 days Mon 10/30/2Tue 11/28/23 27 ErGround Storage Tank 142 days Wed Thu 3/7/24 Construction 8/23/23 31 Er 4 Piping Procurement and 222 days Mon Tue 4/16/24 Installation 6/12/23 37 ErHydrotank and Compressor 144 days Mon 10/30/:Thu 5/16/24 40 ErHypochlorite System 152 days Mon 10/30/:Tue 5/28/24 44 ErHigh Service Pump Station 193 days Thu 5/4/23 Mon 1/29/24 50 ErElectrical/Control Building 307 days Tue 5/2/23 Wed 7/3/24 56 # Well Contract Completion 0 days Wed 8/30/23 Wed 8/30/23 ♦ 8/3,0 57 MP 4 Construction Observation 250 days Fri 9/22/23 Thu 9/5/24 (Part Time) 58 ErApplications for 270 days Wed Tue 9/3/24 Payment/RFIs/Change Orders 8/23/23 59 orFacility Startup and Substantial 22 days Thu 7/4/24 Fri 8/2/24I7mm Completion 60 orFinal Completion and Project 22 days Mon 8/5/24 Tue 9/3/24 Closeout Task Project Summary 0 0 Manual Task I I Start-only C Deadline Project: GP Rebid Schedule Split Inactive Task Duration-only Finish-only 7 Progress Date:Wed 3/29/23 Milestone ♦ Inactive Milestone O Manual Summary Rollup External Tasks Manual Progress Summary Inactive Summary 0 Manual Summary External Milestone ♦ Page 1 CONTRACT BETWEEN CLAY COUNTY UTILITY AUTHORITY AND DEWBERRY ENGINEERS, INC. THIS AGREEMENT for GOVERNOR'S PARK WATER TREAMENT PLANT (WTP) CONSTRUCTION BID DOCUMENT UPDATE (or this "Agreement") is made and entered between Clay County Utility Authority("CCUA"), an independent special district established and created pursuant to Chapter 94-491, Laws of Florida, by Special Act of 1994, 3176 Old Jennings Road,Middleburg,Florida 32068,and DEWBERRY ENGINEERS,INC.,4651 Salisbury Road, Suite 400, Jacksonville, Florida 32256, (hereinafter referred to as the "CONTRACTOR"). WITNESSETH: WHEREAS, in response to a publicly advertised Request for Qualifications No. 2022/2023-A17 Governor's Park WTP Construction Bid Document Update, the Consultant submitted qualifications to CCUA and was selected by CCUA as a qualified applicant in the best interest of CCUA; and WHEREAS, CCUA and the Consultant have negotiated mutually satisfactory terms for the execution of the Agreement and is incorporated by reference and made part hereof; and WHEREAS, the Consultant hereby certifies it has been granted and possesses valid, current licenses to do business in the State of Florida, issued by the respective State Board(s) responsible for regulating and licensing the professional services to be provided and performed by the Consultant pursuant to this Agreement; and WHEREAS, the selection and engagement of the Consultant has been made by CCUA in accordance with the provisions of the Consultants' Competitive Negotiation Act ("CCNA"), Section 287.055, Florida Statues, and NOW,THEREFORE, in consideration of the mutual covenants,terms, and provisions contained herein, and for other good and valuable consideration, the receipt and legal sufficiency of which is hereby expressly acknowledged, the parties hereto agree that, with mutual acceptance of this Agreement as indicated hereinafter by the execution of this Agreement by both parties, a legally enforceable contract shall exist between both parties consisting of: SECTION 1. TERM OF CONTRACT. A. The term of this Agreement shall become effective April 21, 2023 and continue through October 30, 2024. SECTION 2. SERVICES BY THE CONSULTANT. A. ASSIGNMENT OF WORK: Work to be performed by the Consultant shall be on an as needed basis as determined by CCUA. All work shall be mutually negotiated with the Page 1 of 21 Consultant and CCUA by Supplemental Agreements at the request of CCUA, When requested, by CCUA, the Consultant shall prepare a detailed scope of services (hereinafter referred to as "Scope"), list deliverables, schedules, work hour budget and a not to exceed fee budget for the associated work needed to complete the "Supplemental Agreement" (herein so called) for CCUA's review and approval prior to the Consultant beginning any work. Fees shall be based on the established contract hourly rates, feed and charges and as set forth in each Supplemental Agreement. B. COMMENCEMENT OF WORK: The Consultant shall not commence work on the Project or Supplemental Agreement without prior written Notice to Proceed(hereinafter referred to as "NTP") by CCUA. Following the issuance of such NTP the Consultant shall be authorized to commence work promptly and shall carry on all such services and work as may be required in a timely and diligent manner to completion. The Consultant hereby releases CCUA from any claim for damages or compensation, whether in contract, tort or otherwise, in the event that no NTP is issued pursuant to this Agreement. C. SCHEDULE OF WORK: All services and duties shall be conducted and performed by the Consultant diligently, completely and in accordance with professional standards of conducted and performance. The Consultant acknowledges the importance of CCUA's schedules and agrees to put forth its reasonable professional efforts in performing the services under this Agreement with due diligence to achieve the mutually agreed upon schedules. The Consultant agrees to employ, engage, retain and/or assign an adequate number of personnel throughout the period of this Agreement so that all Supplemental Agreement(s) and Scope(s) will be provided, performed, and completed in a timely and diligent manner throughout. Should the Consultant be obstructed or delayed in the prosecution or completion of its obligations under this Agreement and its Supplemental Agreement(s) as a result of causes beyond the control of the Consultant, or its subconsultant(s) and/or subcontractor(s), and not due to its fault or neglect, the Consultant shall notify CCUA in writing,within five(5)calendar days after the commencement of such delay, stating the cause(s) thereof and requesting an extension of the Consultant's time performance. Upon receipt of the Consultant's request for an extension of time, CCUA will begin determination with the Consultant of the length of extension and legitimacy of cause. D. ADDITIONAL SERVICES: "Additional services" (herein so called) beyond the work identified in the Supplemental Agreement Scope shall only be authorized to be performed or provided by the Consultant when agreed to in writing in advance by both parties. In any case in which the Consultant deems that additional compensation is due for its services or materials which is not expressly covered in the Supplemental Agreement, or not specifically authorized in writing by CCUA, the Consultant shall notify CCUA in writing and must receive prior written approval therefrom CCUA. If the Consultant fails to provide its written notice or does not receive CCUA's written approval prior to performing or providing any Additional Services, the Consultant shall not receive and additional compensation for the same. E. QUALITY CONTROL: The Consultant shall perform Quality Control(hereinafter referred to as "QC") review for all deliverables and supporting work prepared by the Consultant Page 2 of 21 upon which those documents are based. The Consultant shall provide CCUA with a summary of each QC reviewed document which identifies the document reviewed and the QC review steps that were performed. The Consultant shall keep the original or copy of each QC reviewed document bearing distinguishable markings that identify the QC review steps that were performed by whom and when for the Duration of this Agreement and in accordance with the Retention of Documents section of this Agreement. The Consultant shall provide copies of the QC documents to CCUA upon request. F. STANDARD OF CARE: The Consultant shall put forth its reasonable professional efforts to comply with applicable laws, codes, rules, and regulations in effect as of the date of the execution of this Agreement and the date of deliverables or submissions. In providing services the Consultant shall perform in a manner which, at a minimum, is consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances at the same time and in the same or similar locality. The Consultant is responsible for the quality, accuracy, completeness, and coordination of all deliverables and other services the Consultant or it subconsultants, subcontractors, or vendors provide. G. ESTIMATES OF PROBABLE CONSTRUCTION COST: In providing estimates of probable construction cost, CCUA understands that the Consultant has no control over the cost or availability of labor, equipment, or materials, or over market conditions or a contractor's pricing, and that the Consultant's estimates of probable construction costs are made on the basis of the Consultant's professional judgment and experience.The Consultant makes no warranty, express or implied, that the bids or the negotiated cost of the work will not vary from the Consultant's estimate of probable construction cost. H. CERTIFY, CERTIFICATION: A statement of the Consultant's opinion, based on its own observation of conditions, to the best of the Consultant's professional knowledge, information, and belief. Such statement of opinion does not constitute a warranty or guarantee, either express or implied. I. PERMITS AND APPROVALS: The Consultant shall assist CCUA in preparing, coordinating, applying, and submitting for those permits,approvals and extensions required by law and rule for projects similar to the one for which the Consultant's services are being engaged. This assistance shall consist of completing and submitting forms and other supportive information necessary to the appropriate regulatory agencies having jurisdiction over the Consultant's documents and other services normally provided by the Consultant and shall be included in the Scope of the Supplemental Agreement. J. LICENSES: The Consultant agrees to obtain and maintain throughout the period this Agreement is in effect, all such licenses as are required to do business in the State of Florida, including but not limited to licenses required by the respective State Board(s) and other governmental agencies responsible for regulating and licensing the professional services provided and performed by the Consultant pursuant to this Agreement and the Scope and services provided therein. Page 3 of 21 K. RESPONSIBILITY TO CORRECT: In accordance with the generally accepted standards of the Consultant's profession, the Consultant agrees to be responsible for the professional quality, technical adequacy and accuracy, timely completion, and the coordination of all data, studies, surveys, designs, specifications, calculations, estimates, plans, drawings, construction documents, photographs, reports, memoranda, other documents and instruments, and other services, work and materials performed, provided and/or furnished by Consultant or by any subconsultant(s)and/or subcontractor(s)retained or engaged by the Consultant pursuant to this Agreement (hereinafter referred to as "Work Products"). The Consultant shall, without additional compensation, correct, revise, or have corrected or revised any errors, omissions and other deficiencies in such Work Products resulting from consultant or any subconsultant(s),vendor(s)or subcontractor(s)engaged by the Consultant. SECTION 3. COMPENSATION. A. OVERHEAD AND PROFIT RATES: Proposed overhead rates shall conform to Federal Acquisition Regulations as established by a governmental audit or certified to by a Certified Public Accountant. Fees to the Consultant shall be established based on raw hourly salary rates plus a not to exceed overhead and profit rate factor of 1.9 for a combined total hourly multiplier of 2.9 for services. Profit rates shall only be applied to direct labor plus overhead. No markup or profit shall be paid on non-labor related job costs, reimbursables, or on services provided by subconsultants, vendors or others. Any work or professional services subcontracted for by the Consultant for which CCUA has agreed to reimburse the Consultant shall not be marked-up but shall be payable by CCUA only in the exact amount reasonably incurred by the Consultant. No other such subcontracted services shall be reimbursed. B. COMPLETION: Payment of the entire fee or lump sum amount is contingent upon Consultant's final completion of the entire Scope as specified in this Agreement. Such final completion of the Scope must be acceptable to and accepted by CCUA. Such acceptance by CCUA may not be unreasonably denied. In the event the Consultant does not complete the entire Scope,then the lump sum amount will be pro-rated using the ratio that the amount actually completed, and which is acceptable to and accepted by CCUA bears to the entire Scope. Unless otherwise set forth in this Agreement the Consultant shall be responsible for providing and performing whatever services, work, equipment, material, personnel, supplies, facilities, transportation, and administrative support that are necessary and required to complete all of the Scope and conformance with the provisions of this Agreement. C. INVOICE PROCEDURE: Invoices shall be submitted by the Consultant monthly on an "as incurred"basis and shall be made by CCUA in accordance with the Local Government Prompt Payment Act (the "Act"). Upon receipt of a proper statement, invoice or draw request CCUA shall have the number of days provided in the Act in which to make payment. Invoices shall be in a form and containing such documentation as reasonably required by CCUA. Each such invoice shall include project name, project number, breakdown of charges, description of service(s), work provided and/or performed, supportive documentation, the amount of payment requested, the amount previously paid, Page 4 of 21 the total contract value, the percent completed since the last invoice, the total percent completed to date, and any other such information as may be reasonable and necessary to secure the written approval of the invoice by CCUA. Each invoice shall contain a statement that it is made subject to the provisions and penalty of Section 837.06, Florida Statutes. If CCUA objects to any portion of an invoice, CCUA shall so notify the Consultant. CCUA shall identify specific cause of the disagreement and the amount in dispute and request revision. Any dispute over invoiced amounts due which cannot be resolved within thirty (30) calendar days after presentation of invoice by direct negotiation between the parties shall be resolved in accordance with the Dispute Resolution provision of this Agreement. D. PROMPT PAYMENT TO SUBCONSULTANTS AND VENDORS: The Consultant as a condition precedent to progress and final payments to the Consultant, the Consultant shall provide to CCUA, with its requisition for payment, documentation that sufficiently demonstrates that the Consultant has made proper payments to its subconsultants and vendors from all prior payments that Consultant has received from CCUA. The Consultant shall not unreasonably withhold payments to subconsultants and vendors if such payments have been made to the Consultant. If the Consultant withholds payment to its subconsultants and vendors, which payment has been made by CCUA to the Consultant, the Consultant shall return said payment to CCUA. The Consultant's failure to pay undisputed amounts to the subconsultants and vendors within thirty (30) business days, after the Consultant receives payment from CCUA, shall be a breach of this Agreement and may result in termination of this Agreement in the discretion of CCUA. E. PAYMENT WHEN SERVICES ARE TERMINATED AT THE CONVENIENCE OF CCUA: In the event of termination of this Agreement at the convenience of CCUA, and not due to the fault of the Consultant, CCUA shall compensate the Consultant only for: (1) all services performed prior to the effective date of termination,including the overhead and profit allocable to the services performed; (2) reimbursable expenses then due; and (3) reasonable expenses incurred by the Consultant in affecting the termination of services and work, and incurred by the Consultant's submittal to CCUA of drawings, plans, data, and other documents therefor. F. PAYMENT WHEN SERVICES ARE SUSPENDED: In the event CCUA suspends the Consultant's services of work on all or part of the services required to be provided and performed by the Consultant pursuant to this Agreement, CCUA shall compensate the Consultant only for services performed prior to the effective date of suspension, including the overhead and profit allocable to the services performed, and reimbursable expenses then due and any reasonable expenses incurred or associated with, or as a result of such suspension. G. NON-ENTITLEMENT TO ANTICIPATED FEES: In the event the services required pursuant to this Agreement are terminated, eliminated, cancelled, or decreased due to: termination; suspension in whole or in part; and and/or are modified by the subsequent issuance of Supplemental Agreement(s) other than receiving the compensation set forth in Sections 2.E and 2.F above, the Consultant shall not be entitled to receive compensation for anticipated professional fees, profit, general and administrative overhead expenses or Page 5 of 21 for any other anticipated income or expense which may be associated with the services which are terminated, suspended, eliminated, cancelled or decreased. H. TRAVEL: CCUA shall not be billed or invoiced for time spent traveling to and from the Consultant's offices or other points of dispatch of its subcontractors, employees, officers, or agents in connection with the services being rendered, other than as provided for in this Agreement. If and only if travel and per diem expenses are addressed in the contract or agreement in a manner which expressly provides for CCUA to reimburse the Consultant for the same, then CCUA shall reimburse the Consultant only for those travel and per diem expenses reasonably incurred and only in accordance with the provisions of Section 112.061, Florida Statutes. In the event the Consultant has need to utilize hotel accommodations or common carrier services, CCUA shall reimburse the Consultant for its reasonable expense incurred thereby provided prior approval of the Executive Director of CCUA, or its designee, is obtained. I. REIMBURSIBLE: CCUA shall not be liable to reimburse the Consultant for any courier service, telephone, facsimile, copying expenses or postage charges incurred by the Consultant. SECTION 4. PERSONNEL A. QUALIFIED PERSONNEL: The Consultant agrees when the services to be provided and performed relate to a professional service(s) which, under Florida Statutes, requires a license, certificate of authorization or other form of legal entitlement to practice such services,to employ and/or retain only qualified personnel to be in responsible charge of all Scope to be provided pursuant to this Agreement. B. CONSULTANT'S PROJECT MANAGER: The Consultant agrees to employ and designate, in writing, a qualified and, if required by law, a licensed professional to serve as the "Consultant's Project Manager" (herein so called). The Consultant's Project Manager shall be authorized and responsible to act on behalf of the Consultant with respect to directing, coordinating, and administering all aspects of the Scope to be provided and performed under this Agreement and Supplemental Agreement(s) thereto. The Consultant's Project Manager shall have full authority to bind and obligate the Consultant on any matter arising under this Agreement and Supplemental Agreement(s) unless substitute arrangements have been furnished in advance to CCUA by the Consultant in writing. The Consultant agrees that the Consultant's Project Manager shall devote whatever time is required to satisfactorily direct, supervise and manage the Scope and services provided and performed by the Consultant throughout the entire period this Agreement is in effect. SECTION 5. RETENTION OF DOCUMENTS. 1. The Consultant agrees to maintain all documents, including electronic documents, related to the Project for a period of not less than five(5)years, in a reasonably accessible manner consistent with the Consultant's internal document retention policy. Page 6 of 21 A. REASONABLY ACCESSIBLE: In order to be considered reasonably accessible, such documents must not be deleted or totally destroyed such that they cannot be reproduced or only be restored at a significant cost. B. DOCUMENT RETENTION POLICY: A written policy by which each employee, subcontractor, and subconsultant and its subcontractors or subconsultants of any tier, follows the same protocol to retain all required documents related to a project in a consistent, organized manner sufficient to allow efficient retrieval of same. SECTION 6. PUBLIC FUNDS CCUA's performance of this Agreement shall be contingent upon and subject to the existence of lawfully appropriated public funds for each fiscal year (i.e., October 1 through and including the next following September 30) of CCUA. SECTION 7. EXTENT OF AGREEMENT This Agreement,together with the Request for Qualifications ("RFQ"),Addendums, Consultant's response submittal to the RFQ, all attachments and forms, represents the final and completely integrated Agreement between the parties regarding its subject matter and supersedes all prior negotiations, representations, or agreements, either written or oral. Any pre-printed provisions of the Consultant's written materials, contract forms, or documents to the contrary notwithstanding, no transportation surcharges shall apply, and no policies of the Consultant available on the Consultant's website or retained in the Consultant's office are incorporated by reference nor shall be deemed to be part of this Agreement,unless the same is attached this Agreement,and separately signed by the duly authorized signor for CCUA. SECTION 8. PROHIBITION AGAINST CONTINGENT FEES The Consultant shall not have employed or retained any company or person, other than an employee working solely for the Consultant,to solicit or secure this Agreement, and that it has not paid or agreed to pay any person,company,corporation,individual or firm,other than an employee working for the Consultant, any fee, commission percentage, gift, or any other consideration, contingent upon or resulting from the award or making of this agreement. For the breach or violation of these provisions, CCUA shall have the right to terminate this Agreement without liability and, at its discretion, to deduct from the contract price, or otherwise recover, the full amount of such a fee, commission,percentage, gift, or consideration. SECTION 9. STATUS Any pre-printed provisions of the Consultant's written materials, contract forms, or documents to the contrary notwithstanding, the CCUA's entry into the contract or agreement with consultant does not give Consultant any preferential status, "most favored nations" status, nor right of first refusal to any renewal or for any other contract or agreement to provide other goods and/or services to the CCUA. Page 7 of 21 SECTION 10. OWNERSHIP OF INSTRUMENTS OF SERVICE CCUA shall retain ownership of all Work Products including electronic files, field data, pictures, notes and other documents and instruments prepared by the Consultant as instruments of service. The Consultant shall not be liable for any re-use of such documents for other than the specific purpose intended without the Consultant's written verification or adaptation thereof SECTION 11. INSURANCE GENERAL LIABILITY INSURANCE The limits of this insurance shall not be less than the following limits: Each Occurrence Limit $1,000,000 Personal & Advertising Injury Limit $1,000,000 Medical Expense Limit(any one person) $ 10,000 General Aggregate $1,000,000 Products & Completed Operations Aggregate Limit $1,000,000 General liability coverage shall apply to "bodily injury" and to "property damage" occurring on, about, or in transit to CCUA's premises for the covered operations or professional services to be performed for CCUA by or on behalf of the additional insureds. WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE The Contractor shall purchase and maintain at the Contractor's sole expense Workers' Compensation and Employer's Liability insurance coverage for the life of this Agreement. The Limits of this insurance shall not be less than the following limits: Part One—Workers' Compensation Insurance—Unlimited Statutory Benefits as provided in the Florida Statutes Part Two—Employer's Liability Insurance Bodily Injury By Accident $1,00,000 Each Bodily Injury By Disease $1,00,000 Policy Bodily Injury By Disease $1,00,000 Each *If leased employees are used, policy must include an Alternate Employer's Endorsement. EXCESS LIABILITY INSURANCE The Contractor shall purchase and maintain at the Contractor's sole expense Excess Liability (Umbrella Form)insurance coverage for the life of this Contract. The Limits of this insurance shall not be less than the following limits: Each Occurrence Limit $1,000,000 Aggregate Limit $1,000,000 PROFESSIONAL LIABILITY (ERRORS & OMISSIONS) This additional coverage will be required for all projects involving consultants and similar exposures. The Contractor shall purchase and maintain at the Contractor's sole expense Page 8 of 21 Professional Liability insurance coverage for the life of this Agreement. The minimum amount of such insurance shall be as follows: Per Claim/Annual Aggregate $1,000,000 Professional Liability coverage will be provided on an Occurrence Form or a Claims Made Form with a retroactive date to at least the first date of this Agreement. If provided on a Claims Made Form,the coverages must respond to all claims reported within three(3)years following the period for which coverage is required and which would have been covered had the coverage been on an occurrence basis. CYBER AND DATA SECURITY LIABILITY This additional coverage will be required of Contractor for information technology services, software providers, programmers, and similar exposures. The Contractor shall purchase and maintain at the Contractor's sole expense Cyber and Data Security Liability insurance coverage for the life of this Contract. The minimum amount of such insurance shall be as follows: Technology Errors and Omissions Liability coverage $1,000,000/per claim Media $1,000,000/per claim Network and Data(Information) Security $1,000,000/per claim Policy coverage must include Third Party Liability coverage. CRIME/FIDELITY COVERAGE This additional coverage will be required for all service providers involving information technology services,Pension consulting and administration,and similar exposures. The Contractor shall purchase and maintain at the Contractor's sole expense Crime/Fidelity and/or Fiduciary Liability insurance coverage for the life of this Contract. The minimum amount of such insurance shall be as follows: Third Party Employee Dishonesty $1,000,000 Contractor shall require each of its subcontractors/vendors to likewise purchase and maintain at their expense Commercial General Liability insurance, Workers' Compensation and Employer's Liability coverage, Automobile Liability insurance and Excess Liability insurance coverage meeting the same limit and requirements as the Contractor/Vendors insurance. Certificates of Insurance acceptable to CCUA for the Contractor / subcontractor / vendor's insurance must be received within five (5) days of Notification of Selection and at time of signing Agreement. Certificates of Insurance and the insurance policies required for this Agreement shall contain an endorsement that coverage afforded under the policies will not be cancelled or allowed to expire until at least thirty(30) days prior written notice has been given to CCUA. Certificates of Insurance and the insurance policies required for this Agreement will include a provision that policies, except Workers' Compensation, are primary and noncontributory to any insurance maintained by the Contractor/subcontractor/vendor. Page 9 of 21 CCUA must be named as an Additional Insured and endorsed onto the Commercial General Liability (CGL), Auto Liability and Excess Liability policy(ies). A copy of the endorsement(s) must be supplied to CCUA within ten(10)days following the execution of the Agreement or prior to the first date of professional services being provided,whichever comes first. The Contractor waives, and the Contractor shall ensure that the Contractor's insurance carrier waives, all subrogation rights against CCUA and CCUA's officers, employees, and volunteers for all losses or damages. CCUA requires the policy to be endorsed with WC 00 03 13 Waiver of our Right to Recover from Others or equivalent. CCUA shall retain the right to review, at any time, coverage from, and amount of insurance. The procuring of required policies of insurance shall not be construed to limit the Contractor's liability or to fulfill the indemnification provisions and requirements of this Agreement. The Contractor shall be solely responsible for payment of all premiums for insurance contributing to the satisfaction of this Agreement and shall be solely responsible for the payment of all deductibles and retentions to which such policies are subject, whether or not CCUA is an insured under such policy(ies). A. The CONTRACTOR shall name CCUA as a certificate holder and as additional insured,to the extent of the services to be provided hereunder,on all required insurance policies, and provide CCUA with proof of same. B. The CONTRACTOR, and any authorized subcontractor(s), shall provide CCUA's Procurement Department with Certificate(s) of Insurance evidencing such coverage for the duration of this Agreement. Said Certificate(s)of Insurance shall be dated and show: 1. The name of the insured CONTRACTOR; 2. The Agreement by name and CCUA Contract or RFQ number; 3. The name of the insurer; 4. The number of the policy; 5. The effective date; 6. The termination date; and 7. A statement that the insurer will mail notice to CCUA at least thirty(30) days prior to any material changes in the provisions or cancellation of the policy. C. Receipt of certificates or other documentation of insurance or policies or copies of policies by CCUA, or by any of its representatives, which indicates less coverage than is required, does not constitute a waiver of the CONTRACTOR's obligation to fulfill the insurance requirements specified herein. D. The CONTRACTOR shall ensure that any subcontractor(s),hired to perform any of the duties contained in the Scope of Services of this Agreement,maintain the same insurance requirements set forth herein. In addition, the CONTRACTOR shall maintain proof of same on file and made readily available upon request by CCUA. Page 10 of 21 SECTION 12. NON-RENEW Any pre-printed provisions of the Consultant's written materials, contract forms or documents to the contrary notwithstanding, the same shall not automatically renew but shall be renewed only upon subsequent written agreement of the parties. SECTION 13. TERMINATION AND SUSPENSION CCUA or the Consultant may terminate this Agreement at any time, with or without cause, by giving ten (10) days' notice to the other in writing. In the event of termination, all finished or unfinished Work Products prepared by the Consultant pursuant to this Agreement, shall be provided to CCUA. In the event CCUA terminates this Agreement prior to completion without cause, Consultant may complete such analyses and records as may be necessary to place its files in order. This Agreement shall be terminated, with twenty-four(24)hour notice to the Consultant in the event that funds become unavailable to CCUA for any reason whatsoever. This Agreement, or any portion hereof, may be suspended from time to time for various periods of time or during any of the Consultant's performance of the Supplemental Agreements proposed hereunder, permanently, or temporarily, by action of CCUA. SECTION 14. INDEPENDENT CONTRACTOR Consultant is and shall be at all times during the term of this Agreement an independent contractor and not an employee of CCUA. Consultant agrees that it is solely responsible for the payment of taxes applicable to the services performed under this Agreement and agrees to comply with all local, state, and federal laws regarding the reporting of taxes, maintenance of insurance and records, and all other requirements and obligations imposed on the Consultant as a result of its status as an independent contractor. Consultant is responsible for providing the office space and administrative support necessary for the performance of services under this Agreement. CCUA shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance of unemployment compensation programs or otherwise assuming the duties of an employer with respect to the Consultant or any employee of consultant. SECTION 15. CONFLICT OF INTEREST The Consultant represents that to the best of its knowledge and belief it presently has no interest and shall acquire no interest, either direct or indirect,which would conflict in any manner with the performance of services required hereunder. The Consultant further agrees that no person having any such interest shall be employed or engaged by the Consultant for said performance. If Consultant,for itself and on behalf of its subconsultants,is about to engage in representing another client, which it in good faith believes could result in a conflict of interest with the work being performed by the Consultant or such subconsultant under this Agreement, then it will promptly bring such conflict of interest to CCUA's attention, in writing. CCUA will advise the Consultant, in writing, within ten (10) business days if such a conflict of interest exists. If CCUA determines that there is a conflict of interest,Consultant or such subconsultant shall decline the representation upon written notice by CCUA. If CCUA determines that there is no such conflict of interest, then Page 11 of 21 CCUA shall give its written consent to such representation. If Consultant or subconsultant accepts such a representation, without obtaining the CCUA's prior written consent, and if CCUA subsequently determines that there is a conflict of interest between such representation and the work being performed by consultant or such subconsultant under this Agreement, then the Consultant or such subconsultant agrees to promptly terminate such representation. Consultant shall require each of such subconsultants to comply with the provisions of this Section. Should the Consultant fail to advise or notify CCUA as provided herein above of representation which could, or does, result in a conflict of interest, or should the Consultant fail to discontinue such representation, CCUA may consider such failure as justifiable cause to terminate this Agreement. SECTION 16. CCUA'S APPROVAL Neither review, approval, or acceptance by CCUA of services or Work Products furnished by the Consultant, or any subconsultant(s), vendor(s) or subcontractor(s) engaged by the Consultant, shall not in any way relieve Consultant of responsibility for the adequacy, completeness and accuracy of its services or Work Products or any and all of its subconsultant(s), vendor(s) and/or subcontractor(s) engaged by the Consultant to provide and perform services in connection with this Agreement. Neither the CCUA's review, approval, or acceptance of, nor payment for, any of the Consultant's services or Work Products shall be construed to operate as a waiver of any of CCUA's rights under this Agreement, or any cause of action it may have arising out of the performance of this Agreement. SECTION 17. CONFIDENTIALITY AND PUBLIC RECORDS COMPLIANCE The Consultant agrees, during the term of this Agreement, to comply with Chapter 119.071(3), Florida Statutes, and not to divulge, furnish or make available to any third person, firm or organization,without CCUA'S prior written consent, or unless incident to the proper performance of the Consultant's obligations hereunder, or in the course of judicial or legislative proceedings where such information has been properly subpoenaed, any non-public information concerning the services to be rendered by the Consultant or any subconsultant(s) or subcontractor(s), pursuant to this Agreement. Subject to the foregoing provisions and law applicable to confidential information, the Consultant will keep and maintain public records required by CCUA, which is a public agency, in order for the Consultant to perform the services and the work required by the Scope, and upon request from CCUA's custodian of public records, Contractor shall provide CCUA with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119.07, Florida Statutes, or as otherwise provided by law. The Consultant shall require all of its employees, subconsultant(s) and subcontractor(s)to comply with provisions of this paragraph. IF THE CONSULTANT HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONSULTANT'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, CONTACT: Public Records 3176 Old Jennings Road Page 12 of 21 Middleburg, Florida 32068 (904) 272-5999 Recordsreq uest(a,clayutility.org SECTION 18. PROPERTY DAMAGE The Consultant agrees to promptly repair and/or replace,or cause to have repaired and/or replaced, at its sole cost and expense and in a manner acceptable to and approved by CCUA, any property damage arising out of, or caused by, the willful or intentional misconduct or negligent acts of the Consultant, or its subconsultants and/or subcontractors. The Consultant's obligation under this subsection does not apply to property damage caused in whole or in part by any other consultant or contractor engaged directly by CCUA. CCUA reserves the right, should the Consultant fail to make such repairs and/or replacement within a reasonable period of time, to cause such repairs and/or replacement to be made by others and for all costs and expenses associated with having such repairs and/or replacement done to be paid for by the Consultant's compensation fund or by the Consultant reimbursing CCUA directly for all such costs and expenses. SECTION 19. NONDISCRIMINATION AND EQUAL OPORTUNITY The Consultant shall comply with all state and federal laws, as currently written or hereafter amended, or other applicable laws prohibiting discrimination, unless based upon a bona fide occupational qualification as provided in or as otherwise permitted by other applicable laws. Consultant's or its subconsultants, subcontractors and/or vendors shall be certified as minority business enterprise as defined in Section 288.703, Florida Statutes, to count towards participation goals or requirements. The failure of the Consultant to adhere to relevant stated requirements shall subject the Consultant to any sanctions which may be imposed upon CCUA. SECTION 20. INDEMNIFICATION The Consultant shall indemnify and hold harmless CCUA, and the CCUA's officers and employees, from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Consultant and other persons employed or utilized by the Consultant in the performance of this Agreement. All indemnification provisions contained this Agreement are separate and apart from, and are in no way limited by, any insurance provided pursuant to this Agreement or otherwise. All indemnification provisions of this Agreement, relating to Indemnification shall survive the term of this Agreement, and any holdover and/or Agreement extensions thereto, whether such term expires naturally by the passage of time or is earlier terminated earlier pursuant to the provisions of this Agreement. With respect to any indemnification by CCUA provided under the contract or agreement, any such indemnification shall be subject to and within the limitations set forth in Section 768.28, Florida Statutes, and to any other limitations, restrictions and prohibitions that may be provided by law, and shall not be deemed to operate as a waiver of CCUA's sovereign immunity. Page 13 of 21 SECTION 21. GOVERNING LAW CCUA and the Consultant agree that this Agreement and any legal actions concerning its validity, interpretation and performance shall be governed by the laws of Clay County, Florida without regard to any conflict of law's provisions, which may apply the laws of other jurisdictions. It is further agreed that any legal action between CCUA and the Consultant arising out of this Agreement, or the performance of the services shall be brought in a court of competent jurisdiction in Clay County, Florida. SECTION 22. DISPUTE RESOLUTION In an effort to resolve any conflicts that arise during or relate to the Consultant's performance of the Agreement, CCUA and the Consultant agree that all disputes between them arising out of or relating to this Agreement shall be submitted to nonbinding mediation. The Consultant further agrees to include a similar mediation provision in all agreements with independent subcontractors and subconsultants retained by the Consultant for this Agreement or any Supplemental Agreement(s), and to require all independent subcontractors and subconsultants also to include a similar mediation provision in all agreements with its subcontractors, subconsultants, suppliers, vendors and fabricators, thereby providing for mediation as the primary method for dispute resolution among the parties to all those agreements. CCUA shall not be bound by any provision requiring binding arbitration or binding mediation of disputes. If a dispute arises either party shall follow the following provisions: provide written explanation of the dispute a minimum 30 days' notice to the other party prior to mediation, the mediator shall be a member of the National Academy of Distinguished Neutrals ("NAD1V"), if an impasse is reached there shall be a sixty(60) day cooling off period required, a minimum 30 days written notice shall be provided to the other party prior to filing suit in any court after the cooling off period. SECTION 23. THIRD PARTY BENEFICIARIES Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either CCUA or the Consultant. The Consultant's services under this Agreement are being performed solely for CCUA's benefit, and no other party or entity shall have any claim against the Consultant because of this Agreement or the performance or nonperformance of services hereunder. CCUA and Consultant agree to require a similar provision in all contracts with contractors, subcontractors, subconsultants, vendors and other entities involved in this Agreement or Supplemental Agreement(s)to carry out the intent of this provision. SECTION 24. TRUTH IN NEGOTIATION CERTIFICATION The Consultant understands and agrees that execution of this Agreement by the Consultant shall be deemed to be simultaneous execution of a truth-in-negotiation certificate under this provision to the same extent as if such certificate had been executed apart from this Agreement, such certificate being required by Section 287.055, Florida Statutes. Pursuant to such certificate, the Consultant hereby states that the wage rates and other factual unit costs supporting the compensation hereunder are accurate, complete, and current at the time of contracting. Further the Consultant agrees that the compensation hereunder shall be adjusted to exclude any significant Page 14 of 21 sums where CCUA determines the Compensation was increased due to inaccurate, incomplete, or noncurrent wage rates and other factual unit costs,provided that any and all such adjustments shall be made within one (1) year following the completion date of this Agreement or Supplemental Agreement(s). SECTION 25. AMENDMENTS This Agreement may be amended only by written instrument specifically referring to this Agreement and executed with the same formalities as this Agreement. SECTION 26. ASSIGNMENT Neither party to this Agreement shall transfer, sublet or assign any rights or duties under or interest in this Agreement, including but not limited to monies that are due or monies that may be due, without the prior written consent of the other party. Subcontracting to subconsultants, normally contemplated by the Consultant as a generally accepted business practice, shall not be considered an assignment for purposes of this Agreement. SECTION 27. ATTORNEY'S FEES In any action involving the enforcement or interpretation of this Agreement, each party, whether CCUA or the Consultant, shall be responsible for its own respective attorneys' fees and costs. SECTION 28. WAIVER The failure of either party to exercise any of its rights is not a waiver of those rights. A party waives only those rights specified in writing and signed by the party waiving its rights. Oral modification or rescission of this Agreement by an employee or agent of either party, shall not release either party of its obligations under this Agreement, shall not be deemed a waiver of any rights of either party to insist upon strict performance hereof,or of either party's rights or remedies under this Agreement or by law, and shall not operate as a waiver of any of the provisions hereof. SECTION 29. SURVIVAL OF REMEDIES The parties' remedies shall survive the termination of this Agreement. SECTION 30. PROVISIONS SEVERABLE In the event any of the provisions of this agreement should be found to be unenforceable, it shall be stricken and the remaining provisions shall be enforceable. SECTION 31. FINANCIAL CONSEQUENCES Should the Consultant fail to comply with any term of this Agreement, CCUA shall take one or more of the following actions, as appropriate in the circumstances: Page 15 of 21 • Temporarily withhold payments pending correction of the deficiency, • Disallow all or part of the cost of the activity or action not in compliance, • Wholly or partially suspend or terminate this Agreement, • Withhold further awards to the Consultant, and/or • Take further remedies that may be legally or equitably available. SECTION 32. DOCUMENTS CONSTITUTING ENTIRE AGREEMENT The following documents are hereby incorporated and made part of this Agreement: 1. Exhibit A— Scope of Services 2. Exhibit B —Original Statement of Qualification(SOQ) submitted by Contractor 3. Exhibit C—Fee Schedule In the event of a conflict between the covenants, terms, and/or provisions of this Agreement and Exhibit"A,"the provisions of the Agreement shall take precedence. SECTION 33. NOTICE The parties hereto agree and understand that written notice, mailed or delivered to the last known mailing address, shall constitute sufficient notice to CCUA and the CONTRACTOR. All notices required and/or made pursuant to this Agreement to be given to CCUA and the CONTRACTOR shall be in writing and given by way of the United States Postal Service, first class mail, postage prepaid, addressed to the following addresses of record: CCUA: Clay County Utility CCUA Attention : Angelia Wilson Procurement Manager 3176 Old Jennings Road Middleburg, Florida 32068 CONTRACTOR: Dewberry Engineers, Inc. Mike Pekkala, PE 4651 Salisbury Road, Suite 400 Jacksonville, Florida 32256 SECTION 34. CLIENT SERVICE MANAGERS CCUA and the CONTRACTOR have identified individuals as "Client Service Managers" (herein so called), listed below, who shall have the responsibility for managing the Scope of Services to be performed under this Agreement. The person or individual identified by the CONTRACTOR to serve as the Client Service Manager for this Agreement, or any replacement thereof, is subject to prior written approval and acceptance by CCUA. If CCUA or CONTRACTOR replace their own current Client Service Manager with another individual, an amendment to this Agreement shall not be required. CCUA will notify the CONTRACTOR, in writing, if the current CCUA Client Service Manager is replaced by another individual. Page 16 of 21 A. CCUA Client Service Manager's contact information is as follows: Paul Steinbrecher, PE Chief Engineer Clay County Utility CCUA 3176 Old Jennings Road Middleburg, Florida 32068 Phone: 904-213-2408 Email: psteinbrecher@clayutility.org B. The CONTRACTOR Client Service Manager's contact information is as follows: Mike Pekkala, PE Dewberry Engineers, Inc. 4651 Salisbury Road, Suite 400 Jacksonville, Florida 32256 Phone: 863-345-1481 SECTION 35. COUNTERPARTS, ELECTRONIC TRANSACTION, AND ELECTRONIC SIGNATURES This Agreement may be electronically executed by the parties in counterparts up to but not exceeding the number of parties, each of which shall be deemed an original and all of which,taken together, shall constitute one agreement. Each party may deliver its executed signature page by email transmission to the other parties at the email addresses set forth herein. Delivery shall be effective and complete upon completion of such email transmission. The parties agree that electronic signatures may be use in the execution of this Agreement in accordance with Parts I and II of Chapter 668, Florida Statutes. SECTION 36. SIGNATORY. Each signatory below represents and warrants that he or she has the full power and is duly authorized, by their respective party, to enter into and perform under this Agreement. Such signatory further represents that he or she has fully reviewed and understands the terms and conditions set forth in this Agreement,including exhibits,and fully intends to abide by and comply with all of the terms and conditions set forth herein. Page 17 of 21 IN WITNESS WHEREOF, the parties hereto, by their duly authorized representatives, have executed this Agreement effective the day of , 2023. DEWBERRY ENGINEERS,INC. CLAY COUNTY UTILITY AUTHORITY By: By: Print Name: Print Name: Jeremy Johnston, MBA, PE Title: Title: Executive Director Attest: Attest: Print Name: Print Name: Angelia Wilson Title: Title: Procurement Manager Address: Address: 3176 Old Jennings Road Middleburg, Florida 32068 STATE OF COUNTY OF The foregoing instrument was executed before me this day of , 2023 by as of DEWBERRY ENGINEERS INC. who personally swore or affirmed that he/she is authorized to execute this Agreement and thereby bind the Corporation,and who is personally known to me OR has produced as identification. Signature: Print Name: NOTARY PUBLIC, State of My Commission Expires: (Stamp) FOR CCUA: Signature: Print Name: Page 18 of 21 I NOTARY PUBLIC,State of My Commission Expires: (Stamp) (Stamp) to Page 19 of 21 EXHIBIT A - SCOPE OF SERVICES 1. Review the plans and specifications provided in the Governor's Park Water Treatment Plant bid-set, evaluate potential design modifications, and propose efficient and cost-effective alternatives to the existing design including,but not limited to the following: • Eliminating the use of existing offsite steel horizontal ground storage tanks for water storage and an existing offsite tower aerator.Provide instead a 0.5 MG prestressed concrete ground storage tank with dome aerator. • Materials of construction change for the electrical/instrumentation building: e.g., the replacement of a masonry wall with truss roof with a pre-cast concrete modular building with flat roof or other options to lessen the need for multiple trades. • Replacement of a temporary leased sodium hypochlorite storage tank and metering pump skid in an existing metal building with permanent facilities. • Instrumentation and Control details of the project to ensure sufficient specification and minimize costs of bidder uncertainty. • Adequacy of the pre-purchased material referenced in section 5 below and provide recommendations. • Any other value engineering options as may be identified by the Contractor in conjunction with the Authority to provide a functional, cost-effective project. 2. The WTP is to provide water service for development that is occurring in the area. Anticipated flows that are to be served by the project are documented in the Preliminary Design Report Table 3-1. The Contractor should review the storage requirements for the plant are documented in the Preliminary Design Report Table 3-4. 3. The Contractor shall assume the duties of a successor engineer in accordance with the Florida Administrative Code. The proposed services required include: • Evaluate the project and value engineering suggestions acceptable to the Authority.Modify the project documents as required and prepare modified bid documents as engineer of record. • Time is of the essence. The Contractor provided a timeline which includes milestones resulting in substantial completion of the water plant by October 30, 2024. • If necessary,prepare an application for and obtain a modification to the existing FDEP and other permits to reflect any and all project modifications resulting from the evaluation. • Assist the Authority in bidding the project to qualified general contractors. • Provide services during construction to include preparation of conformed documents,pre- construction and periodic construction meetings, Factory Acceptance Testing for instrumentation, construction site visits by the engineer of record, limited on-site inspection, review of applications of payment, response to requests for information/clarification,change orders, substantial and final inspection,and project close- out, including record drawings. Page 20 of 21 • The Authority has pre-purchased well pumping equipment, high service pumps, piping, valves and piping accessories,and electrical motor control equipment,VFDs and automatic transfer switch. Shop drawings are in development now. The Contractor shall review and approve these shop drawings for the pre-purchased materials. 4. The services will not include: • Preliminary site civil as the contract has been awarded and is anticipated to be complete by August 1, 2023. • Design nor construction services for supply wells as those are currently under construction. Contractor will work under the direction of the Authority's designated representative. The Authority shall assign each authorized project a point of contact under the direction of the Authority for the duration of each project. Time is of the essence on this project. CCUA is targeting eighteen(18)months or less from Notice to Proceed (NTP) until plant start-up. The Contractor will detail their approach for meeting this timeframe. Page 21 of 21