HomeMy WebLinkAboutDA CU22.23-10 - Branan Field Village Townhomes Return to:
Clay County Utility Authority
3176 Old Jennings Road CU22/23-1 O
Middleburg, Florida 32068-3907
BRANAN FIELD VILLAGE TOWNHOMES
92 TOWNHOMES
Parcel Nos.: 32-04-25-008102-000-00 & _- _ Clay Utility System_-
32-04-25-008102-013-00 (Name of Project)
Clay County
DEVELOPER AGREEMENT
THIS AGREEMENT GRANTS TO THE"UTILITY"(AS HEREINAFTER DEFINED)AN ENFORCEABLE LIEN '.
ATTACHING TO THE LANDS DESCRIBED IN.EXHIBIT"A"HEREIN (THE"PROPERTY")FOR CERTAIN
DEFERRED CAPACITY AND CONNECTION CHARGES TO BE PAID UPON APPLICATION FOR SERVICE.
THIS DEVELOPER AGREEMENT("Agreement"),made and entered into this elQ day of Mal'
2023,by and between D.R.HORTON,INC.-JACKSONVILLE a Delaware corporation,hereinafter referred to
as "Developer", and CLAY COUNTY UTILITY AUTHORITY, an independent special district established
under Chapter 94-491,Laws Of Florida, Special Acts of 1994,hereinafter referred to as "Utility".
co
WHEREAS, Developer desires that the Utility provide central potable water, pumping, treatment and
co distribution service; central wastewater collection, treatment and disposal service; and central reclaimed water
service for the Property;
WHEREAS,the Utility is willing to provide, in accordance with the provisions of this Agreement central
ce potable water,wastewater,and reclaimed water service to the Property and thereafter operate applicable facilities so
that the occupants of the improvements on the Property will receive adequate potable water, wastewater, and
reclaimed water service from the Utility; and
WHEREAS, the parties wish to enter into this Agreement setting forth`their mutual understandings and
undertakings regarding the furnishing of potable water and wastewater service by the Utility to the Property.
NOW, THEREFORE, for and in consideration of the premises, the mutual undertakings and agreements
herein contained and assumed,Developer and Utility hereby covenant and agree as follows:
1. The foregoing statements are true and correct.
2. The following definitions and references are given for the purpose of interpreting the terms as used in
this Agreement and apply unless the context indicates a different meaning:
(a) "Consumer Installation All facilities ordinarily on the consumer's side of the point of
delivery.
(b) "Contrib.u't°ion=in-Ai'd-of-Construction<(CIAC)"'- The sum of money and/or the value of
property represented by the cost of the wastewater collection system, potable water distribution system, and
reclaimed water distribution system constructed or to be constructed which Developer or owner transfers,or agrees
to transfer,to Utility,if so designated by the Utility, at no cost to Utility to provide utility service to the Property.
I ,
-2-
, .
. . .
(c) .'_!,Equivalent-Residentialronneetibit(ERC) A factor eXPr-essed in gallons pet day(GPD)
which is used to convert:tigiVen avdri:00444:f1*.-(Apir)toll:it-00i valentiiiiinber-Pf residential connections For
this purpose the flow one p6t-able Water ERC is(45(I)GPD,one wastewater ERC is(3-11)-GPD,and
one reclaimed water ERC is (275),GPD ..
. .. . _. .
...
;
.. . .
(d') '":P.Oilit Of Deliverid"-=TherpOint,-Wfiere tho,pipeS,prineter of Utility are.--connected with the
pipes:of the eonsturte.r. Point of'del_i'vekSi,-for potable•water service and reclaimed -water service shall be at the
Consumer's sid .orthtmeter,and for WaSteWEltbr.SePtiQe at the lot or.property:liner, Utility shall,,according to the
terms and conditions hereOtown all plipts and:appurtenances to the point of delivery unless otherwise agreed! The
pipes.and appurtenances inside thOppint,dfdelivery shall 116.1000o Oteis,
.(e), !!Set-ViCe".-, The feaditieSs,and ability on the part of Utility to furnish and lmaintain potable
Water,:reclaimed:rWaer,-iitiO-w,-4gteWater service to the point of delivery for each lot or tract pursuant to rules and
regulations of applicable regulatory agencies
3. Assurance of ieprcsents is'ille.PWAPrI:eth:P.''PrOpP4
and has the legal-right,to.granfthe1exel exclusiverights of service contained':in thisAgreement._ Opohreonest;•Developer
agrees to deliver to Utility evidence of such pyvnership- including any outstanding mortgages,AaxeS,,..lie-Os-and
, ._
covenants. , -
A.. . _ ;,Connection Charge-S.,in addition to Iht,tontribution of any wastewater C011tetioriSy.steiiis-,,potable
Water,rdiStriblitiOnr,SySternS.atid;reelainied.woeivq.4en*Lwliot 4pplibtible,Iiiid-fitillier to induce utilitsao;prOvide
potable Wat6i,,,,reblait.iled.xate4.4iid WaSteWater,'ServiCe;.-1).OVCIOriertiereby:agreos.topay tolltilityaht f011Owirtgl'ees
and charges as defined iiithel.Rate'Re$Otiiti-oi (inclUdirig 'Servico,,Availability.F.Oltey), upon execution O.f,this
- .. . .
Agreement:in order,to;roserye:capacity tothc,$ystein:,
....... ___. . .._.
W. Water.Capacity,c11arge„:
_:($3-:60-..00: -:910,0 grkt$,) S: .3.3';:120.0.0..*
Alternative W,-.4f0,S..4-01y Charge
. .. . .
. .. .
.($37671 k.0200 tItC,$) :S 34.65,7. 2
SJ.WMD,Bla6kOteek-.WatefReSeinite Charge: ..... . :. _
($1.08:774c'91-00ERGS) t. 1.4,006.84 '4
W .SteVi...............ty'..Qitat:go:
($5.',209:OP:.N920.9 a...C.$). , $ _ 9,1400,00 *
. „....
Tp.141:C4PaOlY'Plarge$...1.:0 be Deterred $--- 371,184.16 i
(b) Reclaimed Water.eapeiityi,Cliarge,:..
.030(00)-(;474-00,E:RCO. - $ .. 14,100.00
._. ... .
Dbbt.$.eiVice:'0114gd-
($1491)*0 .t.900 tit_CO, $ I-330800
f c) IViidii-E:rkt6tigi,bii:C. 0-- --Wit-e'r $ - N/A
Miiiii...Extetisibil-Ctiatge.7-Wastewater: :$1- '51444:60 ** `
Malitil'Aterisibri'COargC: ReelaiMed.Waier :$: N/A
,(d) Meter Installation Charge ta_-- N/A
• Olttent Reclaimed:Meterr'-lnstallatiOn: 1$ 'i ::1 328.62
(e) Plan Review Fee S .808.50
(f) Inspection Fee
(g) Recording Fee .
Subtotal 456-869.75
-
Less Total CapacityCharges to.be Deferred . -' 372'3,84.16
Total due at execution of Developer Agreement '$;, '111'53:87
. . 142.00
:.
'
:$_-_ :84 ,685.59-''
•
.'.
* - Includes 92.00 ERCs for water and wastewater for the 92 townhomes and 47.00 ERCs for reclaimed
iiTiOtion water service for the Property (based on 12,821.92 AGPD), all in accordance with Utility's
Rate'Resolution. . .
** -. 8.6e...par4ge4pii:44for txplaofitibii.bfohatop .. .
*** - The pmEible-wa.ter meters-will:.be paid by,each builder or customer upon application for building water •
for eachtownbome (does not inelude.nieter boxes).
**** - Includes one 2-inch reclaimed water meter for irrigation (does not include a meter box).
Note: Items (e) and(f)are estimates and are subject to adjustment based on actual cost incurred.
-3-
Method of..PaViiieitt/.Securi:ty interest - Utility agrees to defer payment and collection of certain capacity
charges as set forth above on an individual per lot basis,until such time as water service is applied for as to such lot
within the Property. In consideration for such delay Developer does hereby grant,convey,hypothecate,and pledge
to Utility a security interest in the lands described in Exhibit"A"herein. Such security interest shall constitute an
enforceable lien on the individual lots as depicted on the plat of said lands recorded(or to be recorded)in the public
records of Clay County, Florida. The lien hereby created will be released by Utility on a lot by lot basis upon
payment to Utility of the capacity charges assigned to the lot(s)to be released. The party requesting the release shall
be responsible for recording the release in the public records.
The priority of the lien granted herein is governed by Chapter 94-491,Laws of Florida,Special Acts of 1994
(the"Act"), which is recorded in OR BK 1524,PG 1798-1836,public records of Clay County, Florida. Specific
reference is made to Section 11 and Section 19.(6)and(9)of the Act,respectively,which provide in pertinent part
that the priority of such lien"... shall be superior and paramount to the interest on such parcel or property of any
owner, lessee,tenant,mortgagee, or other person except the lien of county taxes and shall be on a parity with the
lien of any such county taxes." Utility shall not be obligated to provide the services herein for any particular lot or
parcel until such time as the capacity charges and related costs have been paid in full for that lot or parcel.
Payment of the charges in paragraph 4 does not and will not result in Utility waiving any of its rates or rules
and regulations and their enforcement shall not be affected in any manner whatsoever by Developer making
payment of same.Except as specifically stated,Utility shall not be obligated to refund to Developer any portion of
the value of the above charges for any reason whatsoever nor shall Utility pay any interest upon the above charges
paid. -
to Except as otherwise stated in this Agreement,neither Developer nor any person or other entity holding any
of the Property by,through or under Developer, or otherwise, shall have any present or future right,title,claim or
interest in and to the charges paid or to any of the potable water, reclaimed water, or wastewater facilities and
properties of Utility, and all prohibitions applicable to Developer with respect to no refund of such charges, no
interest payment on said charges and otherwise, are applicable to all persons or entities.
Paid capacity or connection charges may not be applied to offset any service bill or other claims of Utility.
•
5. On-Site Installations-On-site facilities are those located within the Property for which Developer is
requesting service. Developer shall convey to Utility,if so designated by Utility,all on-site water and wastewater
lines,laterals,mains,lift stations,pump stations and appurtenant facilities(collectively referred to as"Components"
or"On-Site System")on the Property with all contractual guarantees relating thereto. Conveyance shall take place
within a reasonable time after installation of the On-Site System but prior to Utility's obligation to provide service.
Until such time as the On-Site System is conveyed,the same shall be operated and maintained by Developer. In its
sole discretion,Utility may decline to accept the On-Site System,may lease the On-Site System from Developer,or
•
agree to such other arrangement as it deems appropriate.
Utility shall have the right and obligation, at the Developer's expense, to construct and/or approve the
construction of the on-site installations which shall be owned and maintained by Utility,if so designated by Utility.
The Utility shall also have the right to review all plans and specifications, connections to its system and the
Developer shall pay a fee equal to the Utility's actual cost to review such plans and specifications.The Utility shall
have the right to inspect all phases of construction undertaken by outside contractors for facilities which are to be
owned by the Utility, if so designated by Utility. The Developer will reimburse the Utility for its costs for such
inspection, including all overhead associated with same. Where on-site temporary pump stations or backflow
prevention devices are required,they shall be paid for one hundred percent(100%)by the Developer without any
provision for refund. Utility reserves the right to require backflow prevention devices on all potable water service
connections.
-4-
The On-Site System shall be constructed in compliance with all regulatory requirements and the -
specifications and requirements of Utility. No construction shall commence until Utility has reviewed and approved
Developer's contractor and the plans and specifications for construction of the potable water,reclaimed water,and
wastewater systems for the project. The proposed electrical transformer layout of the electric utility providing
service must be provided to the Utility prior to commencement of construction.
Developer shall guarantee Utility against defects in material and workmanship for the portion of the On-Site
System to be owned by.the Utility or County,if so designated by Utility. Developer shall secure from its contractor
a written and fully assignable warranty that the system installed will be and remain free from all defects,latent or
otherwise,with respect to workmanship,materials and installation in accordance with Utility-approved plans and
specifications,for a period of two(2)years from the date of the system acceptance by the Utility,and immediately
assign the same and the right to enforce the same to the Utility on or before such date.
The Developer shall also provide to the Utility, at Developer's sole expense, such maintenance bond and
other form of securityacceptable to Utilityin such amounts approved byUtility,which byits or their express terms
r rr r
protect and indemnify Utility against any loss,damage,costs,claims,debts or demands by reason of defects,latent
or otherwise, in the system to be and remain in effect for two (2)years from the date of the system acceptance by
Utility.
In addition to any other promises, guarantees or warranties to be provided by Developer to the Utility
hereunder, Developer agrees to protect and indemnify Utility against any loss, damage, costs, claims, debts or
demands by reason of defects,latent or otherwise,in the system which could not have been reasonably discovered
upon normal engineering inspection,to be and remain in effect for a period of two (2)years from the date of the
system's acceptance by Utility.
to
Developer agrees to transfer to Utility, if so designated by Utility, title to all water distribution and
wastewater collection systems installed by Developer or Developer's contractor,which the Utility has agreed shall
be owned and maintained by it pursuant to the provisions of this Agreement and shall:
(a) Deliver a Bill of Sale and No Lien Affidavit in a form acceptable to Utility for such potable water
distribution,reclaimed water distribution, and wastewater collection systems.
(b) Provide copies of invoices and Release of Liens from contractor for installation of the utility systems
as well as for any repairs to the Systems which may have been caused by other subcontractors during construction.
(c) Assign any and all warranties and/or maintenance bonds as set forth herein.
(d) Provide all operations, maintenance and parts manuals, as-built plans complying with Utility's
specifications,and other documents required for operation of the utility system.
(e) Convey to Utility,if so designated by Utility, easements and/or rights-of-way covering all areas in
which potable water,reclaimed water,and wastewater systems are installed,with adequate legal access to same,by
recordable document satisfactory to Utility.
(f) Convey to Utility,if so designated by Utility,by recordable document in form satisfactory to Utility,
fee simple title to lift station and pump station sites, along with recordable ingress/egress easement documents.
(g) Provide a copy of the Project Engineer's final certification of completion to the Florida Department of
Environmental Protection certifying installation of all potable water and wastewater facilities in accordance with
approved plans.
-5-
6. Off-Site_ nstallations-Developer shall further construct all transmission mains,pump stations and
appurtenant facilities necessary to connect the On-Site System to the nearest appropriate point in Utility's
transmission system, as determined by Utility. Utility may require Developer to oversize off-site transmission
mains and appurtenant facilities in a manner consistent with Utility's Wastewater System Master Plan. The costs
•
associated with construction of over-sized facilities which provide Utility with excess capacity for the benefit of
other properties may be subject to refundable advance treatment pursuant to Utility's Service Availability Policy,as
then in effect. The same construction standards,warranty requirements,maintenance bond requirements,transfer of
title by Bill of Sale,and indemnification requirements,as provided under paragraph 5 of this Agreement,shall also
apply to the Off-Site installations.
7. Agreement to Serve-Upon the completion of construction of the On-Site and Off-Site Facilities by
Developer, or an appropriate phase thereof,and compliance with the terms and conditions of this Agreement and
Utility's Service Availability Policy, Utility will allow connection or oversee the connection of the wastewater
collection facility,potable water distribution facility,and/or reclaimed water facility installed by Developer to the
central facilities of Utility in accordance with all rules, regulations and orders of the applicable governmental
authorities. Utility agrees that once it provides potable water, reclaimed water, and/or wastewater service to the
customers within the Property that it will continuously provide such service, at its cost and expense, but in
accordance with the other provisions of this Agreement,the then current Rate Resolution in effect for Utility,and
the requirements of the governmental authorities having jurisdiction over the operations of Utility. Utility shall not
be liable for any temporary interruptions in service as a result of equipment failure, emergencies or Act of God.
The covenants and agreements of Developer contained in Paragraphs 5, 6, and 7, hereof shall survive
Utility's acceptance of any On-site and Off-site Facilities and Utility's commencement of service to the Property.
Should any such covenant or agreement of Developer in fact be outstanding following either or both of such dates,
then,notwithstanding any contrary provision contained herein,Utility may,upon thirty(30)days advance written
to notice and demand for cure mailed to Developer,temporarily interrupt service to the Property until such outstanding
covenantor agreement of Developer is satisfied in full. Utility shall not be liable for any temporary interruptions in
service as a result of any action authorized or permitted by this paragraph.
8. Application for Service-Developer,or any owner of any parcel of the Property,or any occupant of
any residence, building or unit located thereon shall not have the right to and shall not connect any consumer
installation to the facilities of Utility until formal written application has been made to Utility by the prospective
user of service,or either of them,in accordance with the then effective rules and regulations of Utility and approval
for such connection has been granted.
9. Easements'-Developer hereby grants and gives to Utility,its successors and assigns,but subject to
the terms of this Agreement, the exclusive right or privilege to construct, own, maintain and operate the potable
water,reclaimed water,and wastewater facilities to serve the Property in,under,upon,over and across the present
and future streets, roads, alleys, utility easements, reserved utility strips and utility sites. Mortgagees, if any,
holding prior liens on the Property shall be required to release such liens, subordinate their position or join in the
grant or dedication of the easements or rights-of-way, or give to Utility assurance by way of a "non-disturbance
agreement",that in the event of foreclosure,mortgagee would continue to recognize the easement rights of Utility.
All potable water, reclaimed water, and wastewater collection facilities, save and except installations owned by
Developer,or its successors or assigns,shall be covered by easements or rights-of-way if not located within platted
or dedicated roads or rights-of-way for utility purposes and there shall be adequate legal access to same.
The use of easements granted by Developer to Utility shall not preclude the use by other utilities of these
easements,such as for cable television,telephone,electric,or gas utilities. However,the use of such non-exclusive
easements by third parties shall not interfere with Utility's utilization of same. Utility hereby agrees that all
easement grants will be utilized in accordance with the established and generally accepted practices of the potable
water, reclaimed water, and wastewater industry with respect to the installation of all its facilities in any of the
easement areas.
-6-
10. Utility's Exclusive Right to'nil ity Facilities-Developer agrees with Utility that all potable water,
reclaimed water,and wastewater facilities accepted by Utility in connection with providing potable water,reclaimed
water and wastewater services to the Property, shall at all times remain in the sole, complete and exclusive
ownership of Utility, and any person or entity owning any part of the Property or any residence, building or unit
constructed or located thereon,shall not have any right,title,claim or interest in and to such facilities or any part of
them,for any purpose,including the furnishing of potable water,reclaimed water,and wastewater services to other
persons or entities located within or beyond the limits of the Property.
11. Exclusive_Right to Provide Sery >e:-Developer shall not engage in the business of providing potable
water services or sanitary wastewater services to the Property during the period of time Utility provides potable
water and wastewater services to the Property. Utility shall have the sole and exclusive right and privilege to
provide potable water and wastewater services to the Property and to the occupants of such residence,building or
unit constructed thereon.
12. Rates-Utility agrees that the rates to be charged to Developer and individual consumers of potable
water and wastewater services shall be those set forth in the then current Rate Resolution most recently adopted by
the Board of Supervisors of Utility as may be amended from time to time. However,notwithstanding any provision
in this Agreement, Utility, its successors and assigns, may establish, amend or revise, from time to time in the
future, and enforce in a reasonable manner,rates or rate schedules so established.
Notwithstanding any provision in this Agreement,Utility may establish,amend or revise,from time to time,
in the future, and enforce rules and regulations-covering potable water and wastewater services to the Property.
However,all such rules and regulations so established by Utility shall at all times be reasonable and subject to such
to regulations as may be provided by law or contract.
13. Quality of.Wastewater-No substance other than domestic wastewater will be placed into the sewage
system and delivered to the lines of the Utility directly by Developer. The Developer shall be required to install
grease traps for all non-residential kitchen facilities and sand traps if floor drains are connected to the Utility's
sanitarywastewater transmission system. Such installation shall be in accordance with the requirements of the
Y q
Utility. Should any non-domestic wastes,grease or oils,including,but not limited to,floor wax,paint,chlorides,or
salt water or any substances and materials which contain any hazardous, flammable, toxic and/or industrial
constituents, be directly delivered by Developer to the lines, of the Utility, Developer will be responsible for
payment of the cost and expense required in correcting or repairing any resulting damage to the system or property
of third parties.
14. Binding Effect of:Agreement-This Agreement shall be binding upon and shall inure to the benefit of
Developer,Utility and their respective assigns and successors by merger,consolidation,conveyance or otherwise.
Any assignment or transfer by Developer shall be subject to Utility approval which shall not be unreasonably
withheld provided the assignee or transferee shall acknowledge in writing that it assumes the duties and
responsibilities of Developer as set forth in this Agreement.
15. Notice-Until further written notice by either party to the other,all notices provided for herein shall
be in writing and transmitted by messenger,by mail or by electronic mail,and if to Developer,shall be mailed or
delivered to Developer at:
Mr. Philip A. Fremento
D.R. Horton, Inc. -Jacksonville
4220 Racetrack Road
Saint Johns,Florida 32259
-7-
and if to the Utility at:
Clay County Utility Authority
3176 Old Jennings Road
Middleburg, Florida 32068-3907
or at such other address as specified in writing by either party to the other.
16. Laws:of Florida.-This Agreement shall be governed by the laws of the State of Florida and it shall be
and become effective immediately upon execution by both parties hereto,subject to any approvals which must be
obtained from governmental authority, if applicable.
17. Costs :and Attorney's :Fees,- In the event the Utility or Developer is required to enforce this
Agreement by court proceedings,-by instituting suit or otherwise,then venue shall lie in Clay County,Florida,and
the prevailing party shall be entitled to recover from the other party all cost incurred,including reasonable attorney's
fees.
18. Force Majeure-In the event that the performance of this Agreement by either party is prevented or
interrupted in consequence of any cause beyond the control of either party,including,but not limited to Act of God
or of the public enemy,war,national emergency,allocation or of other governmental restrictions upon the use or
availability of labor or materials, civil disorder, strike, embargo, natural disaster or catastrophe, unforeseeable
failure or breakdown of transmission, treatment or other facilities, governmental rule, act, order, restriction,
regulation, statute, ordinance, or order, decree,judgment, restraining order or injunction of any court, said party
shall not be liable for such non-performance.
to 19. Indenuni fication-Developer agrees to indemnify and hold the Utility harmless from and against any
and all liabilities, claims, damages, costs and expenses (including reasonable attorney's fees) to which it may
become subject by reason of or arising out of Developer's performance of this Agreement. This indemnification
provision shall survive the actual connection to Utility's potable water,reclaimed water and wastewater systems.
MISCELLANEOUS PROVISIONS_
20. The rights, privileges, obligations and covenants of Developer and Utility shall survive the
completion of the work of Developer with respect to completing the facilities and services to any development phase
and to the Property as a whole.
21. This Agreement supersedes all previous agreements or representations, either verbal or written,
heretofore in effect between Developer and Utility, made with respect to the matters herein contained,and when
duly executed,constitutes the agreement between Developer and Utility. No additions,alterations or variations of
the terms of this Agreement shall be valid,nor can provisions of this Agreement be waived by either party,unless
such additions, alterations, variations or waivers are expressed in writing and duly signed.
22. Whenever the singular number is used in this Agreement and when required by the context,the same
shall include the plural, and the masculine, feminine and neuter genders shall each include the others.
23. Whenever approvals of any nature are required by either party to this Agreement, it is agreed that
same shall not be unreasonably withheld or delayed.
24. The submission of this Developer Agreement for examination by Developer does not constitute an
offer but becomes effective only upon execution thereof by Utility.
25. Failure to insist upon strict compliance of any of the terms,covenants,or conditions herein shall not
be deemed a waiver of such terms,covenants,or conditions,nor shall any waiver or relinquishment of any right or
power hereunder at any one time or times be deemed a waiver or relinquishment of such right or power at any other
time or times.
-8-
26. It is because of inducements offered by Developer to Utility that Utility has agreed to provide potable
water, reclaimed water, and wastewater services to Developer's project. Developer understands and agrees that
capacity reserved hereunder cannot and shall not be assigned by Developer to Third Parties without the written
consent of Utility, except in the case of a bona-fide sale of Developer's property.
27. Utility shall, as aforesaid, at all reasonable times and hours, have the right of inspection of
Developer's internal lines and facilities. This provision shall be binding on the successors and assigns of the
Developer.
28. The parties hereto recognize that prior to the time Utility may actually commence upon a program to
carry out the terms and conditions of this Agreement,Utility may be required to obtain approval from various state
and local governmental authorities having jurisdiction and regulatory power over the construction,maintenance,and
operation of Utility. The Utility agrees that it will diligently and earnestly make the necessary proper applications to
all governmental authorities and will pursue the same to the end that it will use its best efforts to obtain such
approval. Developer agrees to provide necessary assistance to Utility in obtaining the approvals provided for herein.
Upon execution of this Agreement, Utility may require the payment of a reasonable fee to defray Utility's legal,
engineering, accounting and administrative and contingent expense.
29. It shall be Developer's responsibility to provide acceptable as-built drawings of the potable water,
wastewater and reclaimed water systems installed by Developer,in accordance with Utility's standard specifications,
details and notes,which are to be accepted by Utility for ownership and maintenance,as set forth in paragraph 5(d)
herein;and Utility's charges associated with the review and quality assurance of the CAD as-built survey drawings
will be paid directly by Developer's licensed underground utility contractor and shall be provided in accordance with
CCUA's "As-built Specifications Standards Manual", which can be obtained from the Utility's website
to (www.clayutility.org).It shall be Developer's responsibility to properly instruct his contractor to contact Utility for •
an estimate of such charges and clarification of the required as-built drawing procedures.
30. It shall be Developer's responsibility or Developer's customers' responsibility, who utilize the
project's water,wastewater,and reclaimed services within Developer's project,to apply to Utility for service after
the installation of the water,wastewater,and reclaimed utilities have been completed and accepted by Utility. Upon
completion of application for water,wastewater,and reclaimed services and payment of the appropriate charges set
forth in Utility's then current applicable Rate Resolution,including any security deposits required,service will be
initiated to customers within Developer's Property.
31. Developer shall not place any conservation easements over any of the easement lands that contain
Utility's water, wastewater or reclaimed facilities for the project covered by this Agreement.
32. Developer shall grant an easement to Utility covering any portion of the potable water,wastewater,
and reclaimed water facilities that Utility agrees to own and maintain, and Developer shall be responsible for
providing the legal description for such easement to Utility.
33. The landscaping for this project(new or existing)shall not include the planting of any trees within
seven and one-half feet(7 ft. 6 in.)of any of the water,wastewater and/or reclaimed water mains to be owned by
Utility.
34. Connection to Utility's existing 12-inch water main and the existing 12-inch reclaimed water main
and the construction of the water and reclaimed water services from the mains to the meter locations, shall be
installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all requirements of
Utility prior to Utility's acceptance for ownership and maintenance.Utility shall own and maintain the tap through
the meters,and all facilities downstream of the meters shall be owned and maintained by Developer. Utility shall
have access to all water meters during normal business hours, for meter reading purposes.
8...o..A.ailabdil.Uk.tloper Apreetnnt Masi r FilelDetelup.r AFreementstCro>s Cr kVrGR Nranan field Villap.,Tmrnhones 171i1112RD)92 Units)MO do,
r
-9-
35. Utility shall own and maintain all facilities upstream of the downstream side of the reclaimed water
meter and potable water meters, and such facilities shall be installed by Developer's State of Florida Licensed
Underground Utility Contractor and shall meet all of the requirements of Utility prior to Utility's acceptance for
ownership and maintenance. All facilities downstream of the downstream side of the reclaimed water meter and the
potable water meters shall be owned and maintained by Developer. Utility shall have access to all of the water
meters during normal business hours, for meter reading purposes.
36. Utility requires verification that each individual townhome unit is connected to the proper meter,and
that no outside hose bibbs, that may be used by other tenants, are connected to the same meter as an individual
townhome unit. Developer shall require his contractor to assist Utility in gaining access to each townhome unit in
order to conduct this investigation as the meters are installed.
r
connect manhole theconnection to Utility's
37. Developer shall onne t to Utility's existing sanitary sewer anho a and ty
system shall be installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all
of the requirements of Utility prior to Utility's acceptance for ownership and maintenance. All mains and service
lateral lines servicing Developer's Property,which are located upstream of the connection to the existing sanitary
sewer manhole, shall be Developer's responsibility for ownership and maintenance and Utility shall own and
maintain all facilities downstream of Developer's connection to the existing sanitary sewer manhole.
38. Air conditioning condensation discharge lines and any other piping that may intentionally or
unintentionally drain storm water shall not connect to Utility's wastewater system.
to 39. All elements of the Florida Department of Environmental Protection rules and regulations regarding
the use of reclaimed water within the project will be adhered to at all times. This specifically pertains to the Public
Notice(posting of signs)provisions of the Florida Department of Environmental Protection rules and regulations,as
well as all specific requirements pertaining to the use of reclaimed water in public areas and on roadways.
40. No wells shall be permitted within or upon the Property for any reason.
41. Developer shall be required to install an on-site irrigation system in full compliance with Utility's
Reclaimed Water Policy(i.e.,"Reuse Policy"),a true copy of which,in its current form,is attached hereto as Exhibit
"B", and shall require that this system be operated and maintained in accordance with the rules and regulations of
Utility,as well as all governmental agencies having jurisdiction over such reclaimed water system,and all parcels
lying within the Property are hereby so restricted.
42. All irrigation contractors employed by Developer to install reclaimed water irrigation systems within
the Property shall be registered with Utility.The criteria for registration is included in Utility's Cross-Connection
Control Policy. Once registered,such irrigation contractor shall comply completely with Utility's Cross-Connection
Control Policy and Reuse Policy. Cross-connection control inspections will not be conducted for irrigation
contractors that are not registered with Utility.
43. The charges shown on page 2, paragraph 4 (a) through (g) of this Agreement, are to assess the
charges for Branan Field Village Townhomes,as shown on the plans prepared by Adkinson Engineering,PA.(see
Exhibit"C"),and do not include any other developments(future additions,buildings and/or out parcel projects,etc.)
that are planned for this Property.
X A,ailabilii)Deadoper Mare,F Agr,emrnls1Crus.C,,V,GR DrananField Village Iolanhomw 1711 I1R141•I)92 Ilnns)MG do
-10-
•
44. The charge shown in paragraph 4(b) "Main Extension Charge-Wastewater",of this Agreement,is
Developer's prorata share of the cost for the gravity main and wastewater force main across Old Jennings Road,
installed with the Surnmerbrook Subdivision development, as well as Developer's prorata share of the cost to
upgrade Lift Station#111,which is necessary to accommodate the additional wastewater flow from this project.
45. The construction of this project will not commence until Utility is in receipt of an executed
Agreement, the charges due from Developer stated herein are paid, and all permits and easements have been
received.
46. Water,wastewater and reclaimed water service for Branan Field Village Townhomes,is contingent
upon the completion and final acceptance by Utility of the water, wastewater and reclaimed water infrastructure
being installed as part of Developer Agreement No.CU22/23-7,titled"Ascend Branan Field Village Apartments—
300 Units",recorded in Official Records Book 4524,pages 871 through 887 of the Public Records of Clay County,
Florida.
47. This Agreement will need to be executed by Developer and the charges paid(shown on page 2 of
Agreement),prior to October 1,2023, and the construction of the utilities shall be commenced prior to October 1,
2023,or this Agreement will be subject to any Service Availability charge increases currently approved which may
be applicable or which may be approved by Utility's Board of Supervisors for the next fiscal year beginning October
1,2023;and this Agreement is subject to any material cost increases which Utility may experience after October 1,
2023.
to [Signatures Begin Next Page]
•
X:%SSunnu AemlahJtl)VDmdup T AgrcTnunl MaeiT I'ilulDovinpT A@re•m nIACrols Cr w•kVA(iR i3mnan I+idd 5hllupu I OM nhumes Dlil'IiRRlil) Ume MO due
F
•
•
•
-11-
IN WITNESS WHEREOF,Developer and Utility have executed or have caused this Agreement,with the
named Exhibits attached,to be duly executed in several counterparts,each of which counterpart shall-be considered
an original executed copy of this Agreement.
WITNESSES: DEVELOPER: t
D.R. HORTON, INC.—JACKSONVILLE,
a Delaware corporation
Witness: �� � By:. 103
Print Name: j� ,,a-) . Philip A. Fremento, Vice President
Witness:, (Corporate Seal)
Print Nam i�Viku r -.
STATE OF FLORIDA
COUNTY OF. 'ST.JOHNS •
The foregoing instrument was acknowledged before me by means of ® physical presence or ❑ online
notarization this day of. / ,2023,,by PHILIP A.FREMENTO,as VICE PRESIDENT of
D.R.HORTON,INC.—JACKSONVIL E,a Delaware corporation,who is personally knato me or who has
produced . . ._ ._ . ,as identification.
to
Printedame:. Deborah E. McClure
60YPuee DEBORAH E.MCCLURE Notary Public, State of Florida at Large
Commission#GG 967814
.=�=,F My Commission Expires:
N„•... !a . aQ Expires July 10,2024
9lFoF Bonded Thru Budget Notary Services
•
•
X'Sem=Aroilebilily\Dci eloper Agreement Mentor File1De.eloper Agrc menis Crn.Creek\M A Brenon rfield Villuge rownhomas DEFERRED BRED 92 Und./MG don
•
-12-
WITNESSES: UTILITY:
CLAY COUNTY UTILI • _THORITY '
•
Witnes ..- r. _ B ;, \' �
Print Na e: _j 1 � �_{. ,S Je e 1 y D (t ston, '.E., M.B.A.
E4-c . e :�..
(Corporate Seal)
Witness:• `p" •- .
Print Name:_ Summer P. Bern t '
•
STATE OF FLORIDA
COUNTY OF CLAY
The foregoing instrument was acknowledged before me by means of® physical presence or ❑ online
notarization this day of_I•AOl'I , 2023, by JEREMY D. JOHNSTON, as EXECUTIVE
DIRECTOR of the CLAY COUNTY UTILITY AUTHORITY, who is personally known to me.
to , . . fiiii,,,go__ _ _ . , i
Print ame:: Summer P. Berndt
oviv4, Notary Public State of Florida NOta Public
Summer P E Berndt
+�1 My commission GG 950878. State of Florida at Large
� d Expires 01/26/2024 —,t
. My Commission Expires: 01/cQ(P/ Y
X:1Service Aveilebiliy0eveloper Agreement Mesloo Filellleveloper A gAtemergn\Cross Creek\AGR 13renen Field Mega I ownhomes IDIiF3iRRIiI)92 limb 1MG doe
it
BRANAN FIELD VILLAGE TOWNHOMES
92 TOWNHOMES
Parcel Nos. 32-04-25-008102-000-00 & 32-04-25-008102-013-00
Official Records Book 4638,Page 2057,Public Records, Clay County,Florida
EXHIBIT "A"
EAST PARCEL
- s
A PORTION OF THE WEST 1/2 OF SECTION 32,TOWNSHIP 4 SOUTH,RANGE 25 EAST,CLAY COUNTY,FLORIDA.ALSO
BEING A PORTION OF THOSE LANDS AS DESCRIBED IN EXHIBIT"A"AS RECORDED IN OFFICIAL RECORDS BOOK 3927,
PAGE 949 OF THE PUBLIC RECORDS OF CLAY COUNTY, FLORIDA AND BEING MORE PARTICULARLY DESCRIBE AS
FOLLOWS:
FOR A POINT OF REFERENCE, COMMENCE AT THE INTERSECTION OF THE EAST LINE OF THE WEST 1/2 OF SAID
SECTION 32 WITH THE SOUTH RIGHT-OF-WAY LINE OF COUNTY ROAD C-220-A, ALSO KNOWN AS OLD JENNINGS
ROAD, A VARIABLE WIDTH RIGHT-OF-WAY; THENCE SOUTH 00° 07' 01" EAST, ALONG LAST SAID EAST LINE,A
to DISTANCE OF 35.00 FEET TO THE SOUTHEAST CORNER OF PARCEL 803,AS RECORDED IN OFFICIAL RECORDS BOOK
3348, PAGE 127 OF THE PUBLIC RECORDS OF SAID COUNTY AND THE POINT OF BEGINNING.THENCE CONTINUE
SOUTH 00°07'01"EAST ALONG THE EAST LINE OF THE WEST 1/2 OF SAID SECTION 32,A DISTANCE OF 879.48 FEET
TO THE NORTHEAST CORNER OF LANDS DESCRIBED IN OFFICIAL RECORDS BOOK 3042, PAGE 1 OF THE PUBLIC
RECORDS OF SAID COUNTY;THENCE DEPARTING EAST LINE OF THE WEST 1/2 OF SAID SECTION 32 SOUTH 89°52'
20"WEST ALONG THE NORTH LINE THEREOF,A DISTANCE OF 245.49 FEET;THENCE CONTINUE ALONG SAID NORTH
LINE SOUTH 55° 03' 49" WEST, A DISTANCE OF 276.51 FEET;THENCE NORTH 34° 56' 11" WEST, A DISTANCE OF
133.29 FEET;THENCE NORTH 00°00'06"WEST,A DISTANCE OF 491.64 FEET;THENCE NORTH 45°06'52"WEST,A
DISTANCE OF 44.70 FEET;THENCE NORTH 00°06'52"WEST,A DISTANCE OF 151.82 FEET TO A POINT ON THE SOUTH
LINE OF LANDS DESCRIBED IN OFFICIAL RECORDS BOOK3348,PAGE 127 OF THE PUBLIC RECORDS OF SAID COUNTY;
THENCE NORTH 23°01'03" EAST ALONG THE SOUTH LINE THEREOF,A DISTANCE OF 180.02 FEET;THENCE NORTH
89°58'21"EAST ALONG THE SOUTH LINE THEREOF,A DISTANCE OF 119.15 FEET;THENCE NORTH 00°24'56"WEST
ALONG THE EAST LINE THEREOF, A DISTANCE OF 85.62 FEET TO THE SOUTHWEST,CORNER OF SAID PARCEL 803;
THENCE NORTH 89°35'55"EAST ALONG THE SOUTH LINE OF SAID PARCEL 803,A DISTANCE OF 389.79 FEET TO THE
POINT OF BEGINNING.
LAND THUS DESCRIBED CONTAINS 11.43 ACRES, MORE OR LESS.
EXHIBIT "B"
REUSE POLICY
PAGE 1 OF 2
Effective.Date- Thirty (30) days after Board's approval of the policy, for all developments that have not
met the filing requirements of the County's Zoning Department,which requires each new development to be
reviewed by the Development Review Committee (DRC), or for those developments not requiring DRC
approval,which have been quoted charges to connect to the Clay County Utility Authority's(CCUA)water
and/or wastewater systems within twelve months prior to the effective date of the reuse policy. A filing for
a DRC meeting,which is incomplete as of the effective date of this policy,shall not be considered as filed
timely for the prior policy to apply.
If the developer has not commenced substantial construction on his project, which was filed with
DRC prior to the effective date of this policy, within fifteen months after the effective date o_f the policy,
then said development shall come under the provisions of this policy.
r�ppliealiilit. ,- This policy will be applicable to all developments that file for a Development Review
Committee review after the effective date of this policy. This shall include:
A. Developments occurring under Development of Regional Impact(DRI) agreements which
may not be technically required to install residential reuse,but who choose to do so in settlement of minor
and/or major modifications to the structure and composition of developments within the DRI.These shall be
regulated and charged under this proposed policy and effective date criteria the same as all other
developments.
to B. Exceptions to the applicability of this policy and/or effective date are as follows:
1. Developments occurring under DRI agreements or Florida Quality Development
(FQD) agreements, which are not required by said agreement to install residential
reuse and who do not volunteer to provide residential reuse piping systems.
2. Developments which, as of the date of enactment of this policy, own and maintain
their own reuse pumping plant and purchase bulk service from the CCUA.
3. Developments which have prepaid connection fees prior to January 1, 1998, at a
prior approved rate and still have an inventory of prepaid connections, shall be
exempt until such prepaid connections are used up.
4. Developments and/or communities that own, operate and maintain their own reuse
infrastructure as of January 1, 1998.
;Developments Rcquired'toI'nstall Wastewatet Effluent Reuse Piping Systems and-Take•Rcusc'Water
When it is Available-All developments occurring after the effective date of this policy will be reviewed by
the CCUA staff for feasibility of the installation of a reuse piping system for irrigation purposes.These shall
include commercial,public facilities,industrial, as well as residential developments.
Suiiimary'..of.Criteila to bc.:Utilized by'Staff t Evaluate and.Determine if Reuse Pining•Sys'tenis will
be Required-
(1) Financial feasibility of extending a trunk main to an area at that time,or some planned future •
-
date, to provide reuse water to the proposed reuse system. This item shall consider the size of the
development, distance to nearest master planned reuse trunk main or planned reuse plant, remaining
developable property in the area,complexity of existing development of area which trunk mains must pass
through,natural geographical barriers (or obstacles), environmental damage, etc.
x ltimrce A.aitahililytlIminpa Agrment Master FdctlIc.clops,AgrmnermtCro:.CratAlik Urmvn Field Vilinge I'nanhomer DliFlikklil7921IoU IMu doo
EXHIBIT "B"
REUSE POLICY
PAGE 2 OF 2
(2) Remaining developable land in the area(new area with very little existing development and
much growth potential will be considered more feasible than an already built-out area).
(3) Availability of adequate reuse water within a reasonable time to service the reuse system.
(4) CCUA's budgetary restraints.
(5) Length of time before a reuse plant or pump station is expected to be built in the area.
Surcharge for Developments not required to Install Reuse Piping Systems - Due to the built-out
condition of certain geographical areas and the Other evaluation of feasibility considerations noted above,it
will not be practical to require all areas to install reuse piping systems. All developments that are not
required to install the reuse system shall pay a surcharge per ERC as its share of the burden of the reuse
system installations at a rate set forth in the "proposed charges for service availability".
Requirement for Installation of an Automatic Sprinkler System-All developments where reuse piping
systems are required shall install or require the installation of an automatic sprinkler irrigation system
acceptable to CCUA for the development of each separate parcel(lot)within the development. Such on-site
systems shall utilize color-coded pipe for reuse water,functional rain sensors,and automatic controllers and
timers.
Approval`44 Sprin'kier Irrigation:Contractors - It is deemed by CCUA to be important that sprinkler
irrigation contractors,who connect to the reuse system,be thoroughly educated with regard to reuse systems
to in an effort to eliminate any potential cross connection with the potable water system. In this regard,all
irrigation contractors installing irrigation systems in conjunction with this reuse program must prequalify
with CCUA by providing their credentials and passing a qualification interview with CCUA's staff for the
purpose of demonstrating knowledge of the key issues regarding use of reuse water. A current certificate of
insurance,acceptable to CCUA,naming the CCUA as an additional insured shall be on file at all times with
the CCUA.
Requirement for Payment()Meuse Buse Facility Charge,-All customer classes that have reuse piping
systems available shall"be required to pay the Base Facility Charge for reuse water whether they use the
reuse water or not.
Requirement for Reuse Meter-All customer classes that have reuse piping systems available shall pay for
the installation of a reuse meter at the same time the domestic meter is requested.
Wells-All developments where reuse piping systems are installed shall prohibit the installation of wells for
irrigation purposes.
Responsibility"for:Design and Installation of Reuse Piping Systems - Where reuse piping systems are
required,the design engineer for the project shall design,at Developer's expense,the reuse piping system for
the development and any reasonable trunk mains necessary to connect to the nearest source of reuse water,
and developer shall install said system at its expense. The CCUA's existing policy regarding cost sharing for
oversized mains,refundable agreements,plan review and approval,and adherence to CCUA's specifications
and details,shall apply to these reuse piping systems,the same as the potable water distribution systems and
wastewater collection systems.
X\Same Asmlabiln)H)csclopr Agrconcnt Master FiletD.melnpmx Agrcmamutfress CrcekVGRIlronoo Fme1d Village'I'nnnhon DI7+1,1191i1)92 tlmIs]M))due
EXHIBIT "C"
DESCRIPTION OF APPROVED CONSTRUCTION PLANS
(Less and except plans to be replaced due to minor changes required) •
Project: Branan Field Village Townhomes
Engineer: Timothy Adkinson,P.E.
Adkinson Engineering,PA.
6550 St. Augustine Road,#203
Jacksonville,Florida 32217
Project No.: 1710-0004
Date: August 9,2021
Engineer Description Latest
Drawing Engineer
Number Approved
Plan Date
- --- -- - - - —T-GN-000 COVER SHEET 06/23/2022
T-GN-001 GENERAL NOTES 06/23/2022
T-C-001 EXISTING CONDITION S 06/23/2022
T-C-002 KEY SHEET 06/23/2022
T-C-003 POST DEVELOPMENT DRAINAGE MAP 06/23/2022
T-C-004 MASTER GENERAL SITE 06/23/2022
T-C-101 . GENERAL SITE PLAN 06/23/2022
T-C-200_ _PAVING.GRADING AND DRAINAGE PLANS 06/23/2022
T-C-300 UTILITY PLANS _ . 06/23/2022;.
T-C-300 _..- - STORMWATER POLLUTION PREVENTION_DETAILS 06/23/2022
T-C-301 SANITARY SEWER PROFILES - . 06/23/2022
T-C-400 _ EROSION CONTROL PLAN . 06/23/2022
T-CD-100-101 GENERAL SITE.DETAILS - _ -_. 06/23/2022
T-CD-200720.4._ rPAVINGAND GRADING:DETAILS.. 06/23/2022
T-CD-205-207 STORM WATERPOLLUTION PREVENTION DETAILS : 06/23/2022-_
Xtirn'mc AvoilanduyWewlopn,Agmmnnt Mnsrvx 1 i1 I)nvdulnn Agn m.,nUcmss Cn Yk'AC iR Urunnn Fidd Village I'uonhum�.DIiF1iRREI)73 Unil.JMU don
L� „I 1L J
1!) 4M1I1�M P ] w r N iII1
LI1 ii111."1W_t/ _\'E
M
. :VI MA 'tip• ^ 11
iili M
111m'i *Am',"
; 4 :3
� A��� I M IIIIII'�.' � MA MM MA M. r, �
� � r :: ,
"► � �� ��X7X.XtXTXfX7X�XQ I.
� - •
S
1 ...
-OLD JENNINGS RD
•
••, • —jam - , Z'
\ _
Branan Field Village Townhomes
92 Townhomes
r
DERBY GOO
:
to li
L: •
• :
•
L
• • WIIINE IR •
Disclaimer:The information displayed on this drawing or sheet is for a general visual representation purposes only.The drawing is based upon numerous sources of public
information which include but are not limited to Clay County Property Appraisers, FDOT, SJRWMD, and the Clay County Utility Authority's (CCUA)own records.All
til
information included in the drawing is general in nature and not site specific.Any cimensions or other information is approximate and needs to be field verified.CCUA does
not offer any guarantees,certifications,or warranties,either expressed or implied,in regards to the accuracy of the information represented on these drawings.The drawing
is not a survey and should not be construed in any manner as such.By receiving this drawing,the recipient is agreeing to hold CCUA harmless for any errors or omissions
which may be present in this&awing.All interested parties are strongly encouraged to engage a Professional Surveyor and Mapper licensed in the State of Florida to field
verify all site,property,infrastructure,and utility information prior to any decisions or actions.
(--CICOLJ--;\ ,../
Title:
` Clay County Utility Authority CCUA Web Map
3176 Old Jennings Road
i Info:
/�1 Middleburg, Florida 32068-3907 Prepared by CCUA GIS Portal - Water Features
'`a' Phone o 904 272-5999 5/22/2023,3:10:30 PM ill■ Gravity Sewer Features
"
Conservation.Commitment.Community - Forced Sewer Features
�TYAUTNU 1 inch = 200 feet - Reclaimed Features