Loading...
HomeMy WebLinkAboutCA 5. Project Quench Potable Reuse Project with Carollo Executive Summary AGENDA ITEM: Proposed Amendment No. 1 to Supplemental Agreement(SA)No. 6 for Professional Engineering Services Agreement 18/19 No 3 with Carollo Engineers, Inc. (Carollo) to Provide Construction Administration, Startup Services, and Public Engagement Support for the Potable Reuse Pilot Project. Date: July 27,2023 Project Number: 3019-001 Financial Job Number: 20022WL BACKGROUND: CCUA staff requests approval of Amendment No. 1 to SA No. 6 with Carollo to provide potable reuse pilot construction administration,startup services,and supplemental public engagement support.SA No. 6 was executed on November 22, 2022. We based the original SA with Carollo for the professional engineering services during construction on Time and Materials. Over the past year, Carollo has been providing valuable construction administration services related to Requests for Information(RFIs), equipment submittals, and field • inspections. We experienced an elevated need for Carollo's professional engineering services due to c the pace of construction. The pace of construction by the contractor resulted in a large number of RFI submissions and equipment submittals to procure equipment with long lead times. Due to the o elevated need for Carollo's services,we seek approval of Amendment No. 1 to SA No. 6 to continue i Carollo's engagement through construction. c We based the proposed amendment to SA No. 6 on an additional 220 hours of professional ce engineering services. We estimate the additional hours will provide sufficient time to address any remaining equipment submittals, respond to RFIs,participate in construction meetings, and facility start-up services. We calculated the 220 hours at a blended rate of$180 per hour. Our calculation resulted in a maximum value of $39,600 for the professional engineering services through the remainder of construction. Because this SA is a time and materials assignment, we will pay Carollo for the hours worked. If Carollo does not use the full 220 hours,we will not be billed for the unused hours. We are including supplemental public outreach services with the Dalton Agency within this amendment to SA No.6.The Dalton Agency serves as a subconsultant to Carollo for this assignment. The Dalton Agency successfully provided public outreach support through Phase 1 of this project to secure grant funding through the St. Johns River Water Management District. Phase 2 included in this amendment will focus on creating the public outreach material and video conceptualized in Phase 1. The overall work breakdown structure for the amended SA is in three(3)tasks as follows: Task Description Total 1 —Project Management No change 2—Construction Admin& Startup $39,600 3 — Supplemental Public Outreach $32,550 Total $72,150 BUDGET: We itemized the current status of the total project budget below. Project Budget Table Project Development $377,864.48 Design& Project Management $349,919.51 Construction Admin $128,728.72 Public Outreach $165,718.13 Construction $4,540,000.00 Sub-Total $5,562,230.84 Amendment No. 1 to SA#6 $72,150.00 Remaining Budget $1,134,619.16 Total $6,769,000.00 RECOMMENDATION: Staff respectfully recommends the Board of Supervisors approve Amendment No. 1 to Supplemental Agreement No. 6 with Carollo to provide additional professional engineering services during construction and development of public outreach materials. ATTACHMENTS: Amendment No. 1 to Supplemental Agreement No. 6 Scope and fee dated July 26, 2023 Amendment No. 1 to Supplemental Agreement No. 6 to Professional Engineering Services Agreement 18/19 No. 3 to provide Professional Engineering Services for the Potable Reuse Pilot Project. CCUA Project No. 3019-001 Engineer: Jason Assouline Owner: Clay County Carollo Engineering, Inc. Utility Authority 200 East Robinson Street, Suite 1400 Orlando, FL, 32801 Date: August 01, 2023 Item: Description of Services: Provide professional engineering services as requested and identified in the attached scope of services and fee proposal. Task 1 Project Management No Change Task 2 Construction Admin& Startup $39,600 - Task 3 Supplemental Public Outreach $32,550 to Total $72,150 The Contract time shall commence on August 01, 2023. This document, along with the Scope and Fee Proposal, shall become an amendment to the Professional Engineering Services Agreement and all provisions of the Agreement will apply hereto. Accepted by: Date: Engineer: Jason Assouline Carollo Engineering, Inc Accepted by: Date: Owner: Jeremy D. Johnston, P.E., MBA, Executive Director Clay County Utility Authority CLAY COUNTY UTILITY AUTHORITY ALTERNATIVE WATER SUPPLY— POTABLE REUSE PILOT CONSTRUCTION ADMINISTRATION, STARTUP SERVICES, AND PUBLIC OUTREACH RFQ 18/19 No.3 I Supplemental Agreement No. 6 to BASIS OF FEE ESTIMATE July 26, 2023 1 Exhibit A CCUA Potable Reuse Project Amendment No. 1 to the Construction Administration, Startup Services, and Supplemental Public Outreach Basis of Fee Estimate Construction of the Project Quench potable reuse demonstration facility at Clay County Utility Authority(CCUA) Mid-Clay Regional Water Reclamation Facility(MCRWRF) is approximately half completed.This scope of work amends the professional services to be performed by Carollo Engineers, Inc. (CONSULTANT)to continue to support the construction activities of the facility which have extended beyond the initially anticipated timeline, primarily due to delays in the procurement of electrical gear. In addition to additional construction support, this amendment includes professional services to support CCUA in the development and implementation of a public communication and outreach to materials (work to be completed by Dalton Agency as a subconsultant to Carollo). I. SCOPE SUMMARY TASK 2— PILOT FACILITY CONSTRUCTION ADMINISTRATION AND PILOT STARTUP • Task 2.1—Pilot Facility Construction Administration o CONSULTANT will attend additional project progress meetings and other construction related meetings as necessary to support the ongoing construction of the facility. o CONSULTANT will respond to additional requests for information (RFI) issued by the contractor(8 RFIs assumed).A total of 2 hours is assumed per RFI response. o CONSULTANT will review submittals (including resubmittals) at 6 hours per submittal (28 assumed). TASK 3 — PUBLIC OUTREACH & COMMUNICATION PROGRAM • Task 3.2—Develop Messaging and Communication Tools o CONSULTANT will contract with Dalton Agency to advance the development of public outreach materials,as described in the attached scope of work(Exhibit C). II. PROJECT ASSUMPTIONS • Pilot facility construction services will continue through March 2024. Most of the construction/installation will be completed by January 2024 and Q1 2024 will mostly be focused on startup and commissioning of the pilot systems. 2 o The Contractor will manage and will be responsible for maintaining the overall construction schedule. Extension of the construction duration beyond the assumed period is outside of the CONSULTANT's control. o Startup and commissioning are already included in the CONSULTANTS original scope of work. III. PAYMENT FOR SERVICES The total estimated time and materials (T&M) not to exceed fee for this scope of services is $72,150.This amount is based on an estimate of 220 additional hours for SDC support (Task 200) which includes time for submittal and RFI review as additional project progress meetings and an aggregate hourly rate of$180/hr.The Task 300 fee is based on the proposed amount described in Dalton Agency's attached scope of work. A summary of the fee for this amendment is included in Exhibit B. Services will be billed monthly by CONSULTANT on a T&M basis with a total contract not to exceed amount based on billing rates provided in continuing services agreement between CONSULTANT and CCUA under Civil and Environmental Engineering Professional Services RFQ 18/19 No.3. to 3 Exhibit B PROFESSIONAL SERVICES FEE BREAKDOWN The work breakdown structure for the new SA is in three tasks as follows: Task Description Total 1—Project Management No change 2—Construction Admin &Startup $39,600 3—Supplemental Public Outreach $32,550 Total $72,150 to 4 dalt•n. Exhibit C atl.jax.nsh scope of work Clay County Utility Authority Project Quench video Phase 2 deliverables Item cost webpage/landing page $11,250 • Design • Programming - Email sign-up - Downloadable materials information kiosks/stands/displays TBD education presentation and materials (5th- $11,500 to 12 graders) - Script • PowerPoint • Lesson plan • Activities (i.e. coloring pages, worksheet, etc.) video production $9,800 - $1,500 Production/Shoot: One day video shoot with videographer, no talent, no props included • $500 Voiceover talent • $100 Music licensing • $2,300 Stock footage (about 30+ shots) • $3,600 Editing video • $1,800 Animation total $32,550 timing Bill 50%of phase 2 cost by August 5, 2023, and the remaining 50%at phase 2 completion terms agency expectations • Provide services as outlined above • Provide responsive service 889 howell mill rd. nw, suite 3000 • atlanta, ga 30318 dltn.com d. • Archive all files for at least one year • Alert client promptly to changes in deliverables or timeline client expectations • Provide executed agreement for services • Provide ongoing input and approval for projects • provide agreed upon payments for services In the event of a change to the scope of work,whether traceable to the client, agency, or otherwise, this scope will be revised and resubmitted to the client. If you accept our proposal, please execute by signing below and emailing to: awinter@daltonagency.com. AGENCY: Dalton to 140 w. monroe street jacksonville,fl 32202 CLIENT: Carollo 390 interlocker crescent,suite 800 broomfield,co 80021 889 howell mill rd. nw, suite 3000 • atlanta, ga 30318 dltn.com