AGENDA ITEM:
Change Order No. 1 to Governor's Park Preliminary Civil Work Project with Petticoat Schmitt Civil
Contractors, Inc. (PSCC).
CCUA Bid No.: 22/23-Al 1
CCUA Project No.: 1127-002
CCUA Financial Job No.: 21026WP
Date: July 26,2023
BACKGROUND:
PSCC has provided construction services for the Governor's Park Preliminary Civil Work Project.
Ardurra (Civil Engineer) issued Design Clarification No. 2 to relocate storm structures S-8 and S-9 and
associated piping beneath the eastern portion of the previous constructed loop road. The relocation was
-`a required to avoid conflict with the vertical and horizontal yard piping for the future Governor's Park Water
m Treatment Plant Project.
a;
co
o On July 18,2023,PSCC submitted a change order to reconstruct the eastern portion of the loop road. Staff
r
3 negotiated the cost with PSCC.
m
ce Change Order No. 1 consists of increasing the contract value by the lump sum amount of$31,728. There
are no additional days added to the contract time.
BUDGET:
Original Project Cost: $1,905,000.00
Revised Project Cost: $1,936,728.00
ATTACHMENTS:
Change Order No. 1
PSCC Change Order Request Form
FOR Entitlement Recommendation
Design Clarification No. 2
0,\' ..ul'177 Clay County Utility Authority Warkmgtogethertaprntect
3176 Old Jennings Road public heath,cnnsen'e our
I, 1' - 1 I 'll Middleburg,Florida 32068-3907 natural resources,and
create long-term value for
217
, ,,`Y,,,�`�T� Telephone(904)213-5999 our ratepayers.
Facsimile (904)213-2498
Change Order No.: I Date: July 26,2023
Project: Governor's Park Preliminary Civil Work
CCUA Bid No.: 22/23-A 11
CCUA Project No.: 1127-002
Vendor: Petticoat-Schmitt Civil Contractors,Inc. Owner: Clay County Utility Authority
6380 Philliups Highway
Jacksonville,FL 32216
(904)751-0888
Engineer of Record: Ardurra
100 Center Creek Rd.#18
St.Augustine,Fl 32084
(904)562-2185
ORIGINAL CONTRACT TIMES ORIGINAL PREVIOUS CO CURRENT CO
NTP 5/22/2023
DAYS ADD
SUB.COMP. 120 9/19/2023 9/19/2023
FINAL COMP. 150 10/19/2023 10/19/2023
INCREASE OR
0 DECREASE IN
ITEM DESCRIPTION OF CHANGE(S) QTY UNIT PRICE CONTRACT PRICE
Contract Increase
Design Clarification to Relocate Storms Structures S-8
and S-9 I $31,728.00 $31,728.00
Contract Decrease
TOTAL INCREASE $31,728.00
TOTAL DECREASE $0.00
NET CHANGE RESULTING FROM THIS CHANGE ORDER $31,728.00
ORIGINAL CONTRACT PRICE $1,905,000.00
Net Increases by Change Orders(prior to this change order) $0.00
Net Decreases by Change Orders(prior to this change order) $0.00
Total Net Change by Change Orders(prior to this change order) $0.00
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $1,905,000.00
NET CHANGE RESULTING FROM THIS CHANGE ORDER $31,728.00
CONTRACT PRICE INCLUDING THIS CHANGE ORDER $1,936,728.00
This document shall become an amendment to the contract and all provisions of the contract will apply hereto
ly o,CAigned by Cnnoyn Swain
=US,Ensvmmgaiawla com,
Camryn Swa na,C 26 t641 Swam
Accepted by: xosaozza sara,.aano Date:
Engineer of Record ,Remit byUbTabw
.us.[*a�.egy.thcastecimn mn,
Charles Toffe l � tm1-b�°�IM-•
Accepted by: • 2307: 1536,.uia0 Date:
Vendor
Accepted by: &2
Date: 3"ate —Z-7
Cr
SECTION 00660
Change Order Request Form
Project: Governor's Park Preliminary Civil Work
Bid No.: 2022/2023-All Project No.: 1127-002
Change Order No.: 1
Change in Contract Times (Days) (Days)
Original Contract time: Substantial Completion: 120 Ready for Final Payment: 150
Increased from previous C.O.: Substantial Completion: 0- Ready for Final Payment: 0
Decreased from previous C.O.: Substantial Completion: 0 Ready for Final Payment: 0
Contract time prior to this C.O.: Substantial Completion: 0 Ready for Final Payment: 0
Increase in time on this C.O.: Substantial Completion: 0 Ready for Final Payment: 0
Decrease in time on this C.O.: Substantial Completion: 0 Ready for Final Payment: 0
Contract time with all approved
C.O.s: Substantial Completion: 120 Ready for Final Payment: 150
Change in Contract Price
Original Contract Price: $1,905,000.00
Increased from previously approved C.O.: $0.00
Decreased from previously approved C.O.: $0.00
Increase in Contract price this C.O.: $31,728.00
Decrease in Contract price this C.O.: $0.00
Contract price with all approved C.O.s: $1,936,728.00
The undersigned Contractor certifies to the best of my knowledge and belief: (1) all items and amounts shown above are correct; (2)
all Work performed and Reimbursable Expenses fully comply with the terms and conditions of the Contract Documents; (3) all
previous progress payments received from Clay County Utility Authority (CCUA) , on account of Work done under the Contract
referred to above have been applied to discharge in full all obligations of Contractor incurred in connection with Work covered by
prior Applications for Payment;
00660-1
CHANGE ORDER REQUEST FORM
MAY 2023
SECTION 00660
Change Order Request Form
(4) title to all materials and deliverables incorporated in said Work or otherwise listed in or covered by this Application for Payment
will pass to the CCUA at the time of payment clear of all liens, claims, security interests and encumbrances; (5) payment is due and
has not been previously requested for these,ounts; (6) no markup has been applied to reimbursable expenses.
,11(rt— ---- v.
Charles T.:f: Project Director
DESCRIPTION UNIT QTY UNIT COST EXT. COST
Labor LS $ 8,222.00 $ 8,222.00
Materials LS $ 11,335.00 $ 11,335.00
Equipment LS $ 8,023.00 $ 8,023.00
Maintenance of Traffic LS $ - $ -
Bonding LS $ 320.00 $ 320.00
General Conditions LS $ 656.00 $ 656.00
-
Overhead and Profit(10%) LS $ 3,172.00 $ 3,172.00
-
to
Total firm fixed cost not to exceed
amount: $ 31,728.00
00660-2
CHANGE ORDER REQUEST FORM
MAY 2023
SECTION 00660
Change Order Request Form
Description: PSCC will provide complete labor,equipment, and materials necessary to reconstruct a portion of the Eastern
Loop Road to accommodate the design change which moves Storm Structures S-8 and S-9,and associated piping,into a portion of
the road.
Justification for the request: PSCC received DCN No. 2 instructing us to move the storm structures S-8 and S-9 and
associated piping into the Eastern Loop Road.However,the road was already constructed prior to receipt of the DCN. As a result,
the road will need to be rebuilt in order to accommodate the move. The design clarification was issued after the road was
constructed and all work pertaining to the DCN will be rework on our end. This was not in the original contract documents and is an
additional scope of work to the contract.
State the firm fixed cost not to exceed amount in words: T 'Ay one thousand,seven hundred and twenty eight dollars and no cents.
,7,---'
Contractor Signature: Date: 7Ij9/Z3
Printed Name: Charles Tofferi Title: Project Director
00660-3
CHANGE ORDER REQUEST FORM
MAY 2023
�PETTICOAT-SCHMITT
�,C/V/L CONTRACTOR, /NC_
6380 Philips Highway*Jacksonville,FL 32216*(904)751-0888*Fax:(904)751-0988
July 18th, 2023
Via Email
Ms. Cam ryn Swain (cswain@ardurra.com)
Engineering Associate
Ardurra
100 Center Creek Rd,#108
St.Augustine, FL 32084
RE: Change Order Request#1—DCN#1 Project Impacts
Governor's Park Preliminary Civil Work
Ardurra Project#100435.07
CCUA Project#1127-002
PSCC Project No. 22174-02
Dear Ms. Swain,
Please allow this letter and supporting documentation to serve as Change Order Request #1 for the
above referenced project.
Background
to
On June 16, 2023 PSCC received Design Clarification No. 2 (DCN), attached herein, instructing PSCC to
move storm structures S-8, S-9 and the interconnecting pipe directly to the east to the center of Eastern
Loop Road.
PSCC informed Ardurra that the DCN would result in rework costs as the Eastern Loop Road had already
been completed. Moving the storm structures into the road would force PSCC to remove all material
currently installed in order to install the relocated storm piping and structures, and then rebuild the
road.
PSCC requests a change order to rebuild the road as designed. The below scope and pricing is provided
for clarification per DCN No. 2.
Scope of Work
PSCC will all furnish labor, equipment and material required to remove and rebuild the inverted crush
crete driveway on the eastern loop road, install storm structures S-8 and S-9, including all
interconnecting piping, and then reinstall the subgrade and base material. The work is expected to take
2 weeks. Pricing includes only the removal and reinstallation of the road. The installation of the storm
piping was carried in the base bid and thus, is not included in the cost for the rework.
Change Order Request Summary
ORIGINAL CONTRACT VALUE $ 1,905,000.00
PREVIOUSLY REVISED CONTRACT VALUE $ 1,905,000.00
Page 1 of 2
CCUA Governor's Park
PSCC Project No:22174-02
TOTAL CHANGE ORDER REQUEST#1 $ 31,728.00
NEW CONTRACT VALUE $ 1,936,728.00
CHANGE IN CONTRACT DURATION 0 CALENDAR DAYS
If you have any questions or need additional information, please don't hesitate to contact us.
Sincerely,
&aided 7
Charles Tofferi
Project Director
PETTICOAT-SCHMITT CIVIL CONTRACTORS, INC.
Phone: (904) 647-9774
Email: ctofferi@petticoatschmitt.com
Cc: Jeff Rumer, PSCC Executive Vice President (jrumer@petticoatschmitt.com
Kanuka Mareddy, PSCC Project Engineer(kmareddy@petticoatschmitt.com)
Brandi Manning, PSCC Project Coordinator(bmanning@petticoatschmitt.com )
to
Page 2 of 2
/V
ARDURRA
100 Center Creek Road,Ste 108
St.Augustine,FL 32084
Phone: 904-562-2185
Fax: 888-215-3836
DESIGNER CLARIFICATION: NO-02
Title: Clarification of Stormwater Structure Location and
East Loop Road Grading
Project: Governor's Park Preliminary Civil Work
Ardurra Project No.: 100435.07
Clarification by: David Rasmussen,Ardurra Group Inc.
Date: May 22,2023
Submitted to: Charles Tofferi,PS
Nathan Rinnert,PS
cc: Warrick Sams, CCUA
Linda Ortiz, CCUA
Paul Steinbrecher, CCUA
Drawing No(s): C-7.0,C-9.0, CD-5
Specification No.: N/A
Clarification: Stormwater structures S-8 and S-9 and the connecting pipe between are to
be moved directly east to center of eastern loop road.No changes to invert or rim
elevations have been made. The eastern loop road will now be inverted. 12" of LBR 40
can be substituted for 6" of LBR 100 as clarified in RFI #2.
Refer to sheets"C-7.0," "C-9.0," and "CD-5," for clarification of stormwater structures
and East Loop Road Grading.
Clay County Utility Authority
Governor's Park Preliminary Civil Work
/\\/
ARDURRA
COLLABORATE.INNOVATE.CREATE.
July 18, 2023
Linda S. Ortiz, MBA
Construction and Inspection Services Coordinator
Clay County Utility Authority
3176 Old Jennings Rd
Middleburg, FL 32068
Subject: Change Order Request#1 FOR Entitlement Recommendations
Clay County Utility Authority
Governor's Park Preliminary Civil Work Project
CCUA Project No.: 1127-002
PSCC Project No.: 22174-02
Ardurra Group, Inc. Project No.: 100435.07
Dear Ms. Ortiz:
Petticoat-Schmitt Civil Contractors, Inc. (PSCC) is providing construction services for the
to Governor's Park Preliminary Civil Work Project.
Change Order Request No. 1 is the proposed cost required for PSCC to finalize the project
due to Design Clarification No. 2. Design Clarification No. 2, submitted on June 16, 2023,
moved storm structures S-8 and S-9, and associated piping into a portion of the eastern
loop road to accommodate vertical and horizontal clearances of yard piping to be
installed for the Governor's Park Water Treatment Plant Project. The eastern portion of the
road was mostly constructed at the time of issuance of DC No. 2. The cost includes the
materials, equipment, and labor necessary to reconstruct the portion of road disturbed.
PSCC submitted a change order request on July 18, 2023 for a lump sum amount of
$31,728.00 and zero (0) additional days to the contract duration.
Schedule:
Substantial Completion contract time was 120 days
Substantial Completion contract time is 120 days
Budget:
The project construction budget was $1,905,000.00
The project after Change Order No. 1 is now $1,936,728.00
Yours truly,
JtaaLn
Camryn Swain, El -Ardurra Engineer
100 Center Creek Rd. #108 St.Augustine, FL 32084 904.562.2185 www.ardurra.com
_� __
_�� NOTES: �GfND
- �.n. RUNOFF DIRECTION
\ —� 1. SILT FENCE TO BE INSTALLED ALONG LIMOS OF GONSfRUCiOA _._— SW/ME CENTERLINE
—� PERIMETER. --- PROPERTY LINE
2. DISTURBED GROUND SURROUNDING STORMWATEP.POLO TO DE STAEIL2E0 .- GILT FENCE -
UPON COMPLETION.SEE SHEET CD-1 FOP DETAILS. Q TREE PROTECTION FENCE �+
.1. OTHER AREAS OF DISTURBED GROUND SHALL REMAIN NOT STABRIZEO I__..•'1 WERANO
FOLLOWING NOTICE OF TERMINATION. Ti/i. I WETLAND BUFFER •
\ / 4. EROSION CONTROL DEVICES SHALL REMAIN ON STTE FOLLOWING NOTICE _-,_-,_ FUTURE STRUCTURE
OF TERMINATION,
\ / 5. STOCKPILE EXCESS MATERIAL EAST OF PROPOSED STORMWATER POND.
a \ LLUA PROPERTY ONE /
X\\
.
/
i I
''4S\ / ./ I 1
rc. \ ��_; �+..FV� FUTURE STORMWATER T J - •
1111111111111‘4 \ POND EXPANSION
\ -\\ q I 0 z
1 cc
8- INIMVNIIIII‘ft VAIPI... -- 1 .1_
\\ \ "IIr. 11. n Qza U
STORMWATERPOND W Q".!1.
Ili
V\il
Z
w,a. + s i Tt �'saij' �, o
iiiimill rr-..,:/ : : : :
/
P.
/ /f//��i��!% !iii/��//�y y /e% iy Nor
liL
i,.:: , . „, .. ... .. Cl g yt
i 4 \\\
PLAN
G8 SCALE: 1 60 �I•
•
0 60 12F®
3k
GRAPHIC PROS.100435.07
%z CONFORMED FOR CONSTRUCTION I>UT C-7.0
1 / )FOFND.
TREE PROTECTION FENCE i
--"- SWALE CENTERLINE
IMIIIIIIIIIIIIIIIII
- PROPERT LINE
I / -•-•- SILT FENCE i
/ I I WETLAND
TECTION FENCE 6
.- . 11 WEIUND BUFFER w
. I.
• . = / RUI{OFF DIRECTION }^
SF / NOTES:- F RE STRUCTURE
TRANSFORMER,FUEL //(ppp///JJJ,,, C
E SIS GE TM'N, p/%_ \ I. SILT FENCE TO BE INSTALLED
k
XT 1' ANO GENEfiAiOR /J \ ALONG LIMITS OF CONSTRUCTION
C PERIMETER.
kg
f.F,E•74,75 FUTU-.WELL p3 0 2, DISNR9EO GROUND SURROUNDAA B
< ]3.4 E�GE:72.50 _1 $-i7 R0 D \ STABILIZED UPON COMPLETION. 8¢
$-8 TYPE Q GE:72.98 \ SEE SHEET COt FOR DETIS.
' NV:66,81(W) INV:88.59(W)4. 3 a
X73.3 INV:69,01(5) INV:66.49(E) \INV:66.49 CS) 3, GROUND ILL
NOD
73.6 :NV:66.81(E) ALIGNMEM:ORNEWAY STABILZEO FOLLOWING NOTICE OF
3 NJONMENT:OR AY
STA:7+46.69 TERMINATION. B
,N,y StA 7449.63 OFF:163.335
OFF:66.799 N:2040865.3850 1. EROSION COMROL DEVICES SHALL
g.
N:2040865346 E:434101.2]43 REMAIN ON SRE FOLLOWING
i 5.0 E:434004.7343
NOTICE OF TERMINATION. y
5. STOCKPILE IXLE55 MATERML EAST
106 LF OF 1. __ji,El�■ 9�L�OF 19'RCP O 01Jx 77 LF OF 24'RCP 0 1.B4% OF PROPOSED ETORMWATER POND.
WIWI
705' TAO \
of I I.
.•- - \ a�
E 1 II IL `(�I \ • IN 5-17 24'FFC
Id INV:65,00(DR I _
�e r // ALIGNMENT:DRIVEWAY
ti
NI
I, • "----- C STA:7447.95
'd dim
Ia OFF:2fi0.039
' - \ 1 N:20401365.3859 N
OF " " F.Y-. I UT E:434177.9817
,,, O 1.00; ELUILDI AL FUN'-0.5 MG m
r3 11 BUILDING POTAB WATER CST I W
a al IO 01' N r Tit INLET PROTECTION z Z Q
n I-17 1 1 IA 1 z J Y
' !76.5 7fi. 76.5 III S RW N , Im \ -�'- 0 STORMWATER POND O CC d 5
u 11 -� PUMP .01 23.9 74.0 TON EL,=]3,0
POND BOTTOM EL=61.0 • a In-
o a I = II 31 I ' o Z_Z U
''='J ! STATION C
^d ( F.F 76.61 J •T o C)>-
cc
ui ! lI & II I�( I F 5-11 TYPE It K • a k9 0 >
V R FUTURE INV:66.70(N) 'W^ W
� u CHEMICAL /' ALIGNMENT:DRIVEWAY Z
1 y� CC
aLr BUILDING I - 514:6+64.76 •
d' d
�„ FU:'E 0.75 MG OFT:183.0]0 W
o I ! 1111
F.F.E.=]B.Bi II POTAB WATER GSi = N:2040779.6153
' H., I --i E:4341012746 Q
gg PORTABLE SLOG. -I�� 41 ! 1 z
I6 FLOW METER -� i.i.E.•74.75 GE:7.50 [[ M Q
F.F.E.-74.75 I� 4"-
INV:.9.32(N) / )
AUG ENT:DRIVEWAY
a 1 ' ' Ili; STA: 97.09 i n
OFF 80711.
IL1 = E. \ N:2.O7t t.9519 u '( .�
4k I I . '-NtORO.TANK. E:4 094.7292 n
gt II y.Z f.F.E.•74.75-
9 I 0��� 1
1-4 lArigi
CHEM.SLOG. 0-05 MG
F.G.E.=74.75 33
Jr 73.7'
0
Al- ' k73.6 Y 0.02)l�AG 1 .a Tax-i__. Li 0��
76 :0
- Wr3.2
TED CROWN I'1 `I TOWER AERATOR f.
\ 3 C�-�'
iE CRUSH CRETE ,� M-: .- $
z DRNEWAY 1•-V LLLiii �C /�/ g
S Q d
n / �,F- `�, • /0.9 SERE LEFT
0 /CAL 20 VERIFY SCALE
XN jam.. • -I
0RAP.C SCALE 4 rjaeencoaz
ZI WE MARCH2023
,/�\' SILT FENCE \I/ PROD.100435.07
±¢ �/ CONFORMED FOR CONSTRUCTION OWN. C-9.0
SEE SHEET C-10.0 FOR CONTINUATION
amseammine
o
24Aft
'PVC DR 25 ( 1,g
S•DIP ORNN v (FUTURE) 10 t0
I.E.-65.38 FINISHED GRADE
(FUTURE) SLOPE 2; SLOPE 2X TWO SS PIP E
I
�, � MAX 8 24'-38• %% r �%���%�" '�;c 1=1L—1 I
E FREE FLOW ZONETO 1 ACCEPT FIELD INLET. / \ . 1I y
OPEN RIP h BOTTOM. is
o i • CO. _
6 W B.GRADED AGGREGATE BASE COURSE(LBR 100) 1
u B•AIR INTAKE W/SST COMPACTED TO SEM OF MODIFIED PROCTOR 1
E INSECT SCREEN NOTES: 5 m
E SANITARY SEWER OH il (FUTURE)
a FRAME&COVER \ 12•MIN BTABIUZEO SUBGRADE(1640)
COMPACTED 10 BBS OF MODIFIED 1. SURROUNDING GROUND TO REMAIN NOT STABIU7ED. 1
_ 6
`
U — PROCTORll
RS B•DIP SS ,. 4
b LE-6520 4.5 if, INVERTED CROWN CRUSH CRETE DRIVEWAY
2•PVC DRAIN
Q DETAILS 0 .5
6•VENT(FUTURE) B•BP BEND(FUTURE)
J
PLAN zo J
ii
G W cc
ci§u§ SANITARY SEWER NH EC ) }O
cai FRAME&COVER LU Q CO
m 6•AIR INTAKE (~Q 'd J
V (FUTURE) Q O 'V,>
cC i cc U
m �'� �- za
m
k RIM EL-74.20 . Ill I— W Z
n �.- �. GRADE EL-73.70• >—
_ ,. wn� V, w
ig t
65.PRE CAST POLYETHYLENE UNER CC Q
1- MANHOLE MANUFACTURED BY Q
STANDARD PRECAST CO. I—Z
(AGRU SURE GRIP)OR Q
Lig WO SS HALF PIPE APPROVED EQUAL Z
g FREE FLOW ZONE TO Q
o ACCEPT FIELD INLET.
N
OPEN TOP N BOTTOM. I 24•PVC OR 25
(FUTURE) t p.
g.. (FB•DIPDRAINl�
S (FUTURE)
4...,
I
I'.
pi S
INVERT EL-65.36 h�11 ; 1 rta 0i�'
9—*1.
�fi I W ;INVERT EL-63.3B ��-., /
m$ - -z...�,�3;: V', INVERT EL-b3.28. n
zg , i 46
',j SECTION --- d�,A
-
F� ce I I<-$
SCALE NONE 3� r
'' Bg
o NOTES:
1. ALL PIPE WALL PENETRATIONS EXCEPT B•SOLITARY SEWER UNE
UFROM SS-2 TO BE PLUGGED FOR FUTURE UNE CONNECTIONS.
4 FILE SEE LEFT
8E MASTER MANHOLE VERIFY E
d6 DETAIL O
Gg NONE
3a 6 MARCH 2f43
ttroJ.100935.07
�� CONFORMED FOR CONSTRUCTION DWG CD-5
.
4p,,.>
—
1� �l rut[7!E uEdALLID ALOE LESS a Cv IH.t.'C. ',"
!��1 ,. xi _ KAPOK,EMEnn
ELHE
2.pDmrpgpE,'Ut CAOUNO:WILI.POC STOVAriit r x•O aE a.C.,:m `MR a
- Ur.CcwUION-L SHUT CO-I PO CCrM-' -eEE rE�oTRnaN rENCE
a.D1,1E...E.:x T.MUM SORT.•Ewe.,s:+x.tn
ouwmc wircE VC iEg1*YU PAM
/" a.iPa'Y6K cOHIIQ mcn swu Kum a m mantra KM ECN HIMIS SMUCfYq
STOCKPILE5.STOCKF EXCESS MAiFRtK FAST Of PROPOSED SiORUNAiEP POND.
\
CLW PROPERTY ORE / -�
IfI-11
\\\\
._______-..,_-_ --- t
\\ El' I/
POND.2,I.t.
1. \� -- — a : 1r \\ i
1 ' r--- i (51.NY aj
g }�� I �r a ►� ' \ �oY ��
I,
-� (,,�{� i SIOPu..Ea KOHL z GC Q Cl>
1 l , ■11■1 /I , >11
nu,
z c<
it / jl l 1�1 J a z o
0.
i .( -i.N .1 �+-. ily Q W J
/ �' �1' - I WQ� d
/// l' \ /.." P*4',
.11 .. 41191:4101 s<?‘ C 1 Iiii
ili L'.'-.
p./
.. . . . ce,,_
8 i 'F‘
3z IHII / �4
s
.0 SEE '
q :F
PLAN K.e a
srxc: r-sc Ra,.
y OK
GRAPHIC
PRO1'F03475•07
CONFORMED FOR CONSTRUCTION wa C-7.0 1
/ AND
KE I TREE PROTECTION'EKE e 4r rE•C p
ue
PNO[RF(n(
D-
i T1 PIOACODN ISNC(
t.
R'J PROTON ITweTUAE
_xcs j
• ^ ` SILT FENCE TO BE INSTALLED
/ PERIMETER ILL
Y �` X /'( E D HONG LAIRS Dr CONSTRUCTION !1 `T �I\krIts.,/i5.47S°6ryr }�y1 3 ;1 DSTURBEO cilWxo sIMROunpWc
j TS. T¢� ` STORMMATFA POND TO BE
i —aSTyt� � :v. \ STA&UZED UPON`OI.mLLTIOx
S1�aaAD pMNsi SEE SxEET CA-1 OR OCTALia1'/.?SJ �'N'i T.EA7 Nn.(aJ \J. OTNER ARFAS OT DISTURBEDwrt W.OT« iM:Of.tl
i J1SR r,A N.AI AUCNMOO.OmPM1LWArSTAHIU1IZEO FOU O%&INO NOTCE OF
01Jx>•.fAlOrr'.T 3S5
C'N' c:OAIuYtl.J66D .. EROSION CANTPOL OMCES SINLL C•a4WW., • _^ NipT2TU N�'OIICE Off lrauooTIfY $iS. STOCNPILE EtCESa N/.TERPT.EAST
- _ 4114__ .. _ _ OF PROPOSED STORWU.TER POND. -r.Y 1_' V_jI T- O• _ os•r a Ts. E•_l__a:x Tf. iA•RV e'DI IT,•I LA
1A ��, ICco
am es.00 Oil
- 1 - I,F Oa Natal
DRY NgOi
iii •
RL a I `F.
/ •`•YD .• ETi�i p q> M6771i••• \ \ I el_
�� 1.. iuUri-. \tll I ror w�ou FUI �i I ,a /` n .IST TTIOTSCICI
•• x 0
it ;E 7 ,,n, r,.l � � �pp G-3
I .iG. 11 ^. 1 AaaiARTw roRo
-` -T`V. ® tas a•rin d—
7I.0 ••sXTDa tsx > A ! TICI iin011 d•51.0 LC VI
=11 r L»3'� 13 Q p 0 O>
l Q V
{a r.�,� r ; Z w Z
!E TtDo w
^�•� i' ' AALLN1KAT 11,4,OI Mew 5 Z o L7
a I ° AOIDIYC .I PM MN.]i R - c
rI ro tig cr ��........ oir TOTsry a
..G,1.YLE wnG._J _.rxr z
Row:¢*:R LEL->R.>a 1I GC AD N) a Q
F / 1.11 E Cr TT Is I a ���1•
g_ r_ N v■o um,. y
L rncn..-.• ! ,
-
: )
I "4.D•.C/a.r.•'•A6.-.!' �_,:. I • 1 •-I Y `I
1
3 ......_
UWk. rT.� _ _ DAv uO T. �..r.-- .t `IL
L __H r 1I E _ y_,..: i s .._
IT�
..-,-1
1
,..
e r
. _ - :
3 r I_ a C <D:;:i 141
gl i c- 3 e
C '' '�;!" TOWER AEMTOR / <g it y
1' U f
Cl
A ¢ 1 .At SCALE an ISM=
SILT FENCE �1, 1i.0
r
\ �J
s SEC BRED C-Too roe-• Ka FOR CONSTRUCTION D•a C-9,0
Mi •i4.m t2t lgg,c'L uC..I.Z.u..,�..� 'fie 14. `K2 a%.4rtwls/in.na r...4.K^'c�i.r\ofw t.n,.:i bww.L:44/ir. i,,ran•Jr eiCA n-i vnmr n,C,,,a rrnm
t71x.u:..t;..__.
p RE
Sci
p .ti.s''t :a
v ww�w�sr�� v a
a R' m "Lg
Bb Z ;til f� � I In,
E. s i t'i 11 z
n a1, ;,':-1 g z 4
gi SSft: /
• �7�—!ice
.. ?T AAA t11� 2 .� !m 8X
I K PlgOi P >.
I
c, 8g1 p
a
I
il ,
iT if \Lr
A \ i,1:i'
gli
�$%
I�e
1 r ii,I
NI
Al
g a \,i;
I'i'l
lz ti
it
4,411
I,if q
`,i
a ' fir=:
if
Il-
0
44
o ,.�
. •
R 4; 4' �� �� a:,,,; SANITARY SEWER MASTER MANHOLE
$ 'il i ` _ '1 AND INVERTED ROAD DETAILS
4 1 v g �RDURRA e�''.fieer,.`,,,: GOVERNOR'S PARK
C PRELIMINARY CIVIL WORK a s a —
r. .,.,, .._,-Mut — — ---- - - GIs rn +-� c "-`_
__
NOTES: �GfND
-� �.... RUNOFF DIRECTION
—� 1. SILT FENCE TO BE INSTALLED ALONG LIMITS OF GONSfRUCiOA _._— SWALE CENTERLINE
—� PERIMETER. --- PROPERTY LINE 7
2. DISTURBED GROUND SURROUNDING STORMAATEP.POLO TO DE SIAEIL2E0 ._ SILT FENCE -
UPON COMPLETION.SEE SHEET CD-1 FOP DETAILS. Q TREE PROTECTION FENCE 6
.3. OTHER AREAS OF DISTURBED GROUND SHALL REMAIN NOT STADIUZEO I__..•'1 WETLAND
FOLLOWING NOTICE OF TERMINATION. Ti i. I WETLAND BUFFER 6-
/ 4. EROSION CONTROL DEVICES SHALL REMAIN ON STTE FOLLOWING NOTICE _-,_-,_ FUTURE STRUCTURE
L.....:...... OF TERMINATION.
\ / 5. STOCKPILE EXCESS MATERIAL EAST OF PROPOSED STORMWATER POND.
s /
\ LLUA PROPERTY ONE-,,,.....,,,,„..„,....., . ,,,/
\.
--—
La
/
f.
rc. \ Mill, FUTURE STORMWATER T J - •
\ POND IXPANSION
CC
cl
\\
I-LI VI
111,‘71,:.,.. ,, I..1
7111111461701111111111/..—
(.9 STORMWATER POND WQO( _______,.":111.o:
I Q Q W_zJ Q (7 wW JcG�
ag / •I I W Q d
i.
z
LA
w,
R:
§- / . ., _. __ "IMP, . i , ,,(17.7._.„7, ;,,i :.,-.-::/::':.,: .':''+':.:::,...::,:::,:.:1.:: :N,,„ --- --40: ../..Kr./, *. \d
-
o.
o
.2 /
g= _ •' C�a
g/ C— 1 0.0 I �i
ga
r Cl 3 -3 / y . . . • p 06I\ <36 g.
xa
PLAN
G8 SCALE: 1 60 �I•
• IO 60 12.®'
85 GRAPHIC SCALE PROS.100435.07
%z CONFORMED FOR CONSTRUCTION Irv+G. C-7.0
/ )IF
TREE PROTECTION PENCE /^ --"- SWALE CENTERLINE
J - PROPER LINE
IMIIIIIIIIIIIIIIIII I / -•-•- SILT FENCE i
/ I I WETLAND
EFEN TECTION FENCE 6
.- . .• WETLAND BUFFER w
• 'I • . = / RUI{OFF DIRECTION }^
SF / NOTES:- F RE STRUCTURE
TRANSFORMER,FUEL //(ppp//7,,,, C
STORAGE TM'N, p/%_ \ 1, SILT FENCE TO BE INSTALLED
k
I X7 1' AN0 GENEfiAiOR /J \ ALONG LIMITS OF CONSTRUCTION
C PERIMETER.
F.F.E=74.75 fUTU-.WELL p3 0 2. DISTURBED GROUND SURROUNDING
< ]3.4 E _1 $-10 TYPE 0 \ STORMWATER POND TO BE
STABILIZED UPON COMPLETION.
$-8 1YPE Q GE:72.98 \ SEE SHEET CO-1 FOR DETAILS.
GE
\ilk ' �:6.81(W) INV:88.59(W) 81
" RN:69.01(5) INV:66.49(E) \3, GROUND NAL OTHER AREAS�REMASIN NOD11111x713
3.6 !NV:66.81(E) ALIGNMENT:DRIVEWAY STABIUZEO FOLLOWING NOTICE OF
3 AUGNMENT:OR AY
I I STP:]+48.69 TERMINATION. F
,N,y StA 7i49.63 OFF:183.335
"I � OFF:86.798 N:2040865.3850 1. EROSION CONTROL DEVICES SHALL
N:2040865346 E:434101.2]43 • REMAIN ON SRE FOLLOWING
i• 5.0 E:4J<Ow.7343
NOTICE OF TERMINATION. y
5, STOCKPILE EXCESS MATERIAL EAST
106 LF OF 1. • __�■ N?LL OF 19'RCP O 01Jxrie ]]LF OF 24'RCP 0 1.B4% OF PROPOSED 9TORMWATER POND.
li
705' TEN
of I• • •- -- / a�u
z I • `(�I I. $-17 24'FFC
• I0 INV:65,00(W) I
�e r // ALIGNMENT:ORNEWAY
!1
NI1 'dlrlN Ia OFF:260,039
�'L - \ 1 N:2040865.3859 N
OF " " F.Y.. I UT E:434177.9817
,,, O 1.00x ELECTMGGL FUN'-0.5 MG m
r3 11 BUILDING POTAB WATER CST W
a RI 10 ON, N r Tit INLET PROTECTION z Z
lq.
"r^' ' n �?
I I_1 N
z J o
II IR Im \ '-
o= I I7. . 76.5 -r! SPWPII .OAB.8 ]4.0u ! ` -� 0 STORMWATER POND
TON EO Ug.
POND BOTTOM EL=fi10 • a In 5
STATION 10 c,Z Z -
d p
11
II �I� RN 0-
FUTURE INV:66,70(N) W CHEMICAL /' ALIGNMENT:DRIVEWAY Z
1 I�1,y� CC
aLr BUILDING I - STA:6+64.76 d' 0-
�„ FU:'E 0.75 MG Ofi:,83.0]0 W
o I ! III
F.F.E.=]B.Bi II POTAB WATER GSi L= N:2040779.6153
' II., I --1 E:4341012746 d p
PORTABLE BLDG. -I�� Lt • ! z
IN FLOW METER -� POR325LE B GE:7.50 [[ Q
F.F.E.-74.75 I� A"-
IINV:.9.32(N) / 9
LIG ENT:DRIVEWAY
a I ' : -' tilt STA: 97.09 i n
OFF 8
IL1 = HYDRO.
\ N:2.6.524 0711.9519 ,A '( .�
' /
4k I I E.
. '-NYORO.TANK. E:4 094.7292 n O
F
i ����F1
CHEM.SLOG.'..IV P4 I; ,,,________ .__ ___.„,
0-05 MG
F.i.E.=Ill - 33
I
Jr
--al
73.7'
o
�- / INVERTED CROWN 113 I TOWER AERATOR 3 �-�'
g CRUSH CRETE � M-: .- $
DRNEWAY •-V LLLiii -C / g
S Q d
81 / ���///, •`�, • /0.9 SERE LEFT
r�' /CAL 20 VERIFY SCALE
i.
CRAP C -I
FjP RAP,C SCALE wisp MARCH2O23
,/�\' SILT FENCE , \I/ ?Rol 100435.07
�/ CONFORMED FOR CONSTRUCTION OWN. C-9.0
SEE SHEET C-10.0 FOR CONTINUATION
l
24'PVC DR 25 ( 4;
le DIP ORNN v (FUTURE) 10 t0
LE.65.3E FINISHED GRADE
(FUTURE) SLOPE 2; SLOPE 2%
6 N
, MAX 8 24'-36• % %%%%%%�%���%/���%���%�" ;c 1=1L—1 3
�` FREE FLOW ZONETO / e3
ACCEPT FIELD INLET. / \ 6. 1I y q
OPEN RIP h BOTTOM. is
o i • *It _
6 0 6•GRADED AGGREGATE 60.5E COURSE(LOR 100) �j
u e•AIR INTAKE W/SST COMPACTED TO SEM OF MODIFIED PROCTOR ' g
E INSECT SCREEN NOTES: Vs
E SANITARY SEWER OH (FUTURE)
a FRAAZ&COVER \ * 12•MIN STABIUZ SUOGRADE(LRR40)
COMPACTED 10 BBS OF MODIFIED 1. SURROUNDING GROUND TO REMAIN NOT STABIU7ED.
11
` _
U PROCTOR
RS 6'DIP SS -1
. 418
b LE-65.36 �) 41 INVERTED CROWN CRUSH CRETE DRIVEWAY I
24 P(FUTURE) Q VC DRAIN DSETAIL 0 .5
64 VENT(FUTURE) 6•90'BEND(FUTURE)
J
PLAN zo J
ii
2 w
u§ ci SANITARY SEWER NH EC ) }O
EL, FRAME&COVER LU Q Q
m 6•AIR INTAKE (~Q 'a'.J
V (FUTURE) Q O ,to>
CC ,CCU
k ,,RIM EL-74.20 .• L-LI I— W Z
n �.- �. GRADE EL-73.70• >—
_ a
w n�t 0w
ig
6'A PRE CAST POLYETHYLENE LINER CC Q
S MANHOLE AS MANUFACTURED BYQ
STANDARD PRECAST CO. I—Z
(AGRU SURE GRIP)OR Q
46•tl SS HALF PIPE APPROVED EQUAL Z
G FREE FLOW ZONE TO Q
o5 ACCEPT FIELD INLET.
OPEN TOP 6:BOTTOM. I 24'P60 OR 25 Li)(FU(FUTURE) t p.
g.. B•DIP( DRAINFUTURE)
S.
S (FUTURE)
�• I
1•.
INVERT EL-65.36 1poi S
�1 I ; 1 rta ,�'
"1—*T
5fi I W ;INVERT EL-63.36 '��-=; _
m$ - -z...�,;3; V', INVERT EL-b3.26. n
zg , i rcW»I
Emil
`j SECTION -
d�,A
F� 10<-$
SCALE NONE --- 3� r
Bg
o j NOTESS
1. ALL PIPE WALL PENETRATIONS B•SOLITARY SEWER UNE
UFROM SS-2 TO BE PLUGGED FORUR FUTURE UNE CONNECTIONS.
4 FILE SEE LEFT
E MASTER MANHOLE VERIFY E
d6
DETAIL O
GS NONE
3aDOZE, MAREH2@3
.300935.07
.. CONFORMED FOR CONSTRUCTION DwG. CD-5
__
NOTES: �GfND
-� �.... RUNOFF DIRECTION
—� 1. SILT FENCE TO BE INSTALLED ALONG LIMITS OF GONSfRUCiOA _._— SWALE CENTERLINE
—� PERIMETER. --- PROPERTY LINE 7
2. DISTURBED GROUND SURROUNDING STORMAATEP.POLO TO DE SIAEIL2E0 ._ SILT FENCE -
UPON COMPLETION.SEE SHEET CD-1 FOP DETAILS. Q TREE PROTECTION FENCE 6
.3. OTHER AREAS OF DISTURBED GROUND SHALL REMAIN NOT STADIUZEO I__..•'1 WETLAND
FOLLOWING NOTICE OF TERMINATION. Ti i. I WETLAND BUFFER 6-
/ 4. EROSION CONTROL DEVICES SHALL REMAIN ON STTE FOLLOWING NOTICE _-,_-,_ FUTURE STRUCTURE
L.....:...... OF TERMINATION.
\ / 5. STOCKPILE EXCESS MATERIAL EAST OF PROPOSED STORMWATER POND.
s /
\ LLUA PROPERTY ONE-,,,.....,,,,„..„,....., . ,,,/
\.
--—
La
/
f.
rc. \ Mill, FUTURE STORMWATER T J - •
\ POND IXPANSION
CC
cl
\\
I-LI VI
111,‘71,:.,.. ,, I..1
7111111461701111111111/..—
(.9 STORMWATER POND WQO( _______,.":111.o:
I Q Q W_zJ Q (7 wW JcG�
ag / •I I W Q d
i.
z
LA
w,
R:
§- / . ., _. __ "IMP, . i , ,,(17.7._.„7, ;,,i :.,-.-::/::':.,: .':''+':.:::,...::,:::,:.:1.:: :N,,„ --- --40: ../..Kr./, *. \d
-
o.
o
.2 /
g= _ •' C�a
g/ C— 1 0.0 I �i
ga
r Cl 3 -3 / y . . . • p 06I\ <36 g.
xa
PLAN
G8 SCALE: 1 60 �I•
• IO 60 12.®'
85 GRAPHIC SCALE PROS.100435.07
%z CONFORMED FOR CONSTRUCTION Irv+G. C-7.0
/ )IF
TREE PROTECTION PENCE /^ --"- SWALE CENTERLINE
J - PROPER LINE
IMIIIIIIIIIIIIIIIII I / -•-•- SILT FENCE i
/ I I WETLAND
EFEN TECTION FENCE 6
.- . .• WETLAND BUFFER w
• 'I • . = / RUI{OFF DIRECTION }^
SF / NOTES:- F RE STRUCTURE
TRANSFORMER,FUEL //(ppp//7,,,, C
STORAGE TM'N, p/%_ \ 1, SILT FENCE TO BE INSTALLED
k
I X7 1' AN0 GENEfiAiOR /J \ ALONG LIMITS OF CONSTRUCTION
C PERIMETER.
F.F.E=74.75 fUTU-.WELL p3 0 2. DISTURBED GROUND SURROUNDING
< ]3.4 E _1 $-10 TYPE 0 \ STORMWATER POND TO BE
STABILIZED UPON COMPLETION.
$-8 1YPE Q GE:72.98 \ SEE SHEET CO-1 FOR DETAILS.
GE
\ilk ' �:6.81(W) INV:88.59(W) 81
" RN:69.01(5) INV:66.49(E) \3, GROUND NAL OTHER AREAS�REMASIN NOD11111x713
3.6 !NV:66.81(E) ALIGNMENT:DRIVEWAY STABIUZEO FOLLOWING NOTICE OF
3 AUGNMENT:OR AY
I I STP:]+48.69 TERMINATION. F
,N,y StA 7i49.63 OFF:183.335
"I � OFF:86.798 N:2040865.3850 1. EROSION CONTROL DEVICES SHALL
N:2040865346 E:434101.2]43 • REMAIN ON SRE FOLLOWING
i• 5.0 E:4J<Ow.7343
NOTICE OF TERMINATION. y
5, STOCKPILE EXCESS MATERIAL EAST
106 LF OF 1. • __�■ N?LL OF 19'RCP O 01Jxrie ]]LF OF 24'RCP 0 1.B4% OF PROPOSED 9TORMWATER POND.
li
705' TEN
of I• • •- -- / a�u
z I • `(�I I. $-17 24'FFC
• I0 INV:65,00(W) I
�e r // ALIGNMENT:ORNEWAY
!1
NI1 'dlrlN Ia OFF:260,039
�'L - \ 1 N:2040865.3859 N
OF " " F.Y.. I UT E:434177.9817
,,, O 1.00x ELECTMGGL FUN'-0.5 MG m
r3 11 BUILDING POTAB WATER CST W
a RI 10 ON, N r Tit INLET PROTECTION z Z
lq.
"r^' ' n �?
I I_1 N
z J o
II IR Im \ '-
o= I I7. . 76.5 -r! SPWPII .OAB.8 ]4.0u ! ` -� 0 STORMWATER POND
TON EO Ug.
POND BOTTOM EL=fi10 • a In 5
STATION 10 c,Z Z -
d p
11
II �I� RN 0-
FUTURE INV:66,70(N) W CHEMICAL /' ALIGNMENT:DRIVEWAY Z
1 I�1,y� CC
aLr BUILDING I - STA:6+64.76 d' 0-
�„ FU:'E 0.75 MG Ofi:,83.0]0 W
o I ! III
F.F.E.=]B.Bi II POTAB WATER GSi L= N:2040779.6153
' II., I --1 E:4341012746 d p
PORTABLE BLDG. -I�� Lt • ! z
IN FLOW METER -� POR325LE B GE:7.50 [[ Q
F.F.E.-74.75 I� A"-
IINV:.9.32(N) / 9
LIG ENT:DRIVEWAY
a I ' : -' tilt STA: 97.09 i n
OFF 8
IL1 = HYDRO.
\ N:2.6.524 0711.9519 ,A '( .�
' /
4k I I E.
. '-NYORO.TANK. E:4 094.7292 n O
F
i ����F1
CHEM.SLOG.'..IV P4 I; ,,,________ .__ ___.„,
0-05 MG
F.i.E.=Ill - 33
I
Jr
--al
73.7'
o
�- / INVERTED CROWN 113 I TOWER AERATOR 3 �-�'
g CRUSH CRETE � M-: .- $
DRNEWAY •-V LLLiii -C / g
S Q d
81 / ���///, •`�, • /0.9 SERE LEFT
r�' /CAL 20 VERIFY SCALE
i.
CRAP C -I
FjP RAP,C SCALE wisp MARCH2O23
,/�\' SILT FENCE , \I/ ?Rol 100435.07
�/ CONFORMED FOR CONSTRUCTION OWN. C-9.0
SEE SHEET C-10.0 FOR CONTINUATION
l
24'PVC DR 25 ( 4;
le DIP ORNN v (FUTURE) 10 t0
LE.65.3E FINISHED GRADE
(FUTURE) SLOPE 2; SLOPE 2%
6 N
, MAX 8 24'-36• % %%%%%%�%���%/���%���%�" ;c 1=1L—1 3
�` FREE FLOW ZONETO / e3
ACCEPT FIELD INLET. / \ 6. 1I y q
OPEN RIP h BOTTOM. is
o i • *It _
6 0 6•GRADED AGGREGATE 60.5E COURSE(LOR 100) �j
u e•AIR INTAKE W/SST COMPACTED TO SEM OF MODIFIED PROCTOR ' g
E INSECT SCREEN NOTES: Vs
E SANITARY SEWER OH (FUTURE)
a FRAAZ&COVER \ * 12•MIN STABIUZ SUOGRADE(LRR40)
COMPACTED 10 BBS OF MODIFIED 1. SURROUNDING GROUND TO REMAIN NOT STABIU7ED.
11
` _
U PROCTOR
RS 6'DIP SS -1
. 418
b LE-65.36 �) 41 INVERTED CROWN CRUSH CRETE DRIVEWAY I
24 P(FUTURE) Q VC DRAIN DSETAIL 0 .5
64 VENT(FUTURE) 6•90'BEND(FUTURE)
J
PLAN zo J
ii
2 w
u§ ci SANITARY SEWER NH EC ) }O
EL, FRAME&COVER LU Q Q
m 6•AIR INTAKE (~Q 'a'.J
V (FUTURE) Q O ,to>
CC ,CCU
k ,,RIM EL-74.20 .• L-LI I— W Z
n �.- �. GRADE EL-73.70• >—
_ a
w n�t 0w
ig
6'A PRE CAST POLYETHYLENE LINER CC Q
S MANHOLE AS MANUFACTURED BYQ
STANDARD PRECAST CO. I—Z
(AGRU SURE GRIP)OR Q
46•tl SS HALF PIPE APPROVED EQUAL Z
G FREE FLOW ZONE TO Q
o5 ACCEPT FIELD INLET.
OPEN TOP 6:BOTTOM. I 24'P60 OR 25 Li)(FU(FUTURE) t p.
g.. B•DIP( DRAINFUTURE)
S.
S (FUTURE)
�• I
1•.
INVERT EL-65.36 1poi S
�1 I ; 1 rta ,�'
"1—*T
5fi I W ;INVERT EL-63.36 '��-=; _
m$ - -z...�,;3; V', INVERT EL-b3.26. n
zg , i rcW»I
Emil
`j SECTION -
d�,A
F� 10<-$
SCALE NONE --- 3� r
Bg
o j NOTESS
1. ALL PIPE WALL PENETRATIONS B•SOLITARY SEWER UNE
UFROM SS-2 TO BE PLUGGED FORUR FUTURE UNE CONNECTIONS.
4 FILE SEE LEFT
E MASTER MANHOLE VERIFY E
d6
DETAIL O
GS NONE
3aDOZE, MAREH2@3
.300935.07
.. CONFORMED FOR CONSTRUCTION DwG. CD-5