Loading...
HomeMy WebLinkAboutFYI 3. CO1 with PSCC_1 Executive Summary EXECUTIVE SUMMARY AGENDA ITEM: Change Order No. 1 to Governor's Park Preliminary Civil Work Project with Petticoat Schmitt Civil Contractors, Inc. (PSCC). CCUA Bid No.: 22/23-Al 1 CCUA Project No.: 1127-002 CCUA Financial Job No.: 21026WP Date: July 26,2023 BACKGROUND: PSCC has provided construction services for the Governor's Park Preliminary Civil Work Project. Ardurra (Civil Engineer) issued Design Clarification No. 2 to relocate storm structures S-8 and S-9 and associated piping beneath the eastern portion of the previous constructed loop road. The relocation was -`a required to avoid conflict with the vertical and horizontal yard piping for the future Governor's Park Water m Treatment Plant Project. a; co o On July 18,2023,PSCC submitted a change order to reconstruct the eastern portion of the loop road. Staff r 3 negotiated the cost with PSCC. m ce Change Order No. 1 consists of increasing the contract value by the lump sum amount of$31,728. There are no additional days added to the contract time. BUDGET: Original Project Cost: $1,905,000.00 Revised Project Cost: $1,936,728.00 ATTACHMENTS: Change Order No. 1 PSCC Change Order Request Form FOR Entitlement Recommendation Design Clarification No. 2 0,\' ..ul'177 Clay County Utility Authority Warkmgtogethertaprntect 3176 Old Jennings Road public heath,cnnsen'e our I, 1' - 1 I 'll Middleburg,Florida 32068-3907 natural resources,and create long-term value for 217 , ,,`Y,,,�`�T� Telephone(904)213-5999 our ratepayers. Facsimile (904)213-2498 Change Order No.: I Date: July 26,2023 Project: Governor's Park Preliminary Civil Work CCUA Bid No.: 22/23-A 11 CCUA Project No.: 1127-002 Vendor: Petticoat-Schmitt Civil Contractors,Inc. Owner: Clay County Utility Authority 6380 Philliups Highway Jacksonville,FL 32216 (904)751-0888 Engineer of Record: Ardurra 100 Center Creek Rd.#18 St.Augustine,Fl 32084 (904)562-2185 ORIGINAL CONTRACT TIMES ORIGINAL PREVIOUS CO CURRENT CO NTP 5/22/2023 DAYS ADD SUB.COMP. 120 9/19/2023 9/19/2023 FINAL COMP. 150 10/19/2023 10/19/2023 INCREASE OR 0 DECREASE IN ITEM DESCRIPTION OF CHANGE(S) QTY UNIT PRICE CONTRACT PRICE Contract Increase Design Clarification to Relocate Storms Structures S-8 and S-9 I $31,728.00 $31,728.00 Contract Decrease TOTAL INCREASE $31,728.00 TOTAL DECREASE $0.00 NET CHANGE RESULTING FROM THIS CHANGE ORDER $31,728.00 ORIGINAL CONTRACT PRICE $1,905,000.00 Net Increases by Change Orders(prior to this change order) $0.00 Net Decreases by Change Orders(prior to this change order) $0.00 Total Net Change by Change Orders(prior to this change order) $0.00 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $1,905,000.00 NET CHANGE RESULTING FROM THIS CHANGE ORDER $31,728.00 CONTRACT PRICE INCLUDING THIS CHANGE ORDER $1,936,728.00 This document shall become an amendment to the contract and all provisions of the contract will apply hereto ly o,CAigned by Cnnoyn Swain =US,Ensvmmgaiawla com, Camryn Swa na,C 26 t641 Swam Accepted by: xosaozza sara,.aano Date: Engineer of Record ,Remit byUbTabw .us.[*a�.egy.thcastecimn mn, Charles Toffe l � tm1-b�°�IM-• Accepted by: • 2307: 1536,.uia0 Date: Vendor Accepted by: &2 Date: 3"ate —Z-7 Cr SECTION 00660 Change Order Request Form Project: Governor's Park Preliminary Civil Work Bid No.: 2022/2023-All Project No.: 1127-002 Change Order No.: 1 Change in Contract Times (Days) (Days) Original Contract time: Substantial Completion: 120 Ready for Final Payment: 150 Increased from previous C.O.: Substantial Completion: 0- Ready for Final Payment: 0 Decreased from previous C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Contract time prior to this C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Increase in time on this C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Decrease in time on this C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Contract time with all approved C.O.s: Substantial Completion: 120 Ready for Final Payment: 150 Change in Contract Price Original Contract Price: $1,905,000.00 Increased from previously approved C.O.: $0.00 Decreased from previously approved C.O.: $0.00 Increase in Contract price this C.O.: $31,728.00 Decrease in Contract price this C.O.: $0.00 Contract price with all approved C.O.s: $1,936,728.00 The undersigned Contractor certifies to the best of my knowledge and belief: (1) all items and amounts shown above are correct; (2) all Work performed and Reimbursable Expenses fully comply with the terms and conditions of the Contract Documents; (3) all previous progress payments received from Clay County Utility Authority (CCUA) , on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of Contractor incurred in connection with Work covered by prior Applications for Payment; 00660-1 CHANGE ORDER REQUEST FORM MAY 2023 SECTION 00660 Change Order Request Form (4) title to all materials and deliverables incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to the CCUA at the time of payment clear of all liens, claims, security interests and encumbrances; (5) payment is due and has not been previously requested for these,ounts; (6) no markup has been applied to reimbursable expenses. ,11(rt— ---- v. Charles T.:f: Project Director DESCRIPTION UNIT QTY UNIT COST EXT. COST Labor LS $ 8,222.00 $ 8,222.00 Materials LS $ 11,335.00 $ 11,335.00 Equipment LS $ 8,023.00 $ 8,023.00 Maintenance of Traffic LS $ - $ - Bonding LS $ 320.00 $ 320.00 General Conditions LS $ 656.00 $ 656.00 - Overhead and Profit(10%) LS $ 3,172.00 $ 3,172.00 - to Total firm fixed cost not to exceed amount: $ 31,728.00 00660-2 CHANGE ORDER REQUEST FORM MAY 2023 SECTION 00660 Change Order Request Form Description: PSCC will provide complete labor,equipment, and materials necessary to reconstruct a portion of the Eastern Loop Road to accommodate the design change which moves Storm Structures S-8 and S-9,and associated piping,into a portion of the road. Justification for the request: PSCC received DCN No. 2 instructing us to move the storm structures S-8 and S-9 and associated piping into the Eastern Loop Road.However,the road was already constructed prior to receipt of the DCN. As a result, the road will need to be rebuilt in order to accommodate the move. The design clarification was issued after the road was constructed and all work pertaining to the DCN will be rework on our end. This was not in the original contract documents and is an additional scope of work to the contract. State the firm fixed cost not to exceed amount in words: T 'Ay one thousand,seven hundred and twenty eight dollars and no cents. ,7,---' Contractor Signature: Date: 7Ij9/Z3 Printed Name: Charles Tofferi Title: Project Director 00660-3 CHANGE ORDER REQUEST FORM MAY 2023 �PETTICOAT-SCHMITT �,C/V/L CONTRACTOR, /NC_ 6380 Philips Highway*Jacksonville,FL 32216*(904)751-0888*Fax:(904)751-0988 July 18th, 2023 Via Email Ms. Cam ryn Swain (cswain@ardurra.com) Engineering Associate Ardurra 100 Center Creek Rd,#108 St.Augustine, FL 32084 RE: Change Order Request#1—DCN#1 Project Impacts Governor's Park Preliminary Civil Work Ardurra Project#100435.07 CCUA Project#1127-002 PSCC Project No. 22174-02 Dear Ms. Swain, Please allow this letter and supporting documentation to serve as Change Order Request #1 for the above referenced project. Background to On June 16, 2023 PSCC received Design Clarification No. 2 (DCN), attached herein, instructing PSCC to move storm structures S-8, S-9 and the interconnecting pipe directly to the east to the center of Eastern Loop Road. PSCC informed Ardurra that the DCN would result in rework costs as the Eastern Loop Road had already been completed. Moving the storm structures into the road would force PSCC to remove all material currently installed in order to install the relocated storm piping and structures, and then rebuild the road. PSCC requests a change order to rebuild the road as designed. The below scope and pricing is provided for clarification per DCN No. 2. Scope of Work PSCC will all furnish labor, equipment and material required to remove and rebuild the inverted crush crete driveway on the eastern loop road, install storm structures S-8 and S-9, including all interconnecting piping, and then reinstall the subgrade and base material. The work is expected to take 2 weeks. Pricing includes only the removal and reinstallation of the road. The installation of the storm piping was carried in the base bid and thus, is not included in the cost for the rework. Change Order Request Summary ORIGINAL CONTRACT VALUE $ 1,905,000.00 PREVIOUSLY REVISED CONTRACT VALUE $ 1,905,000.00 Page 1 of 2 CCUA Governor's Park PSCC Project No:22174-02 TOTAL CHANGE ORDER REQUEST#1 $ 31,728.00 NEW CONTRACT VALUE $ 1,936,728.00 CHANGE IN CONTRACT DURATION 0 CALENDAR DAYS If you have any questions or need additional information, please don't hesitate to contact us. Sincerely, &aided 7 Charles Tofferi Project Director PETTICOAT-SCHMITT CIVIL CONTRACTORS, INC. Phone: (904) 647-9774 Email: ctofferi@petticoatschmitt.com Cc: Jeff Rumer, PSCC Executive Vice President (jrumer@petticoatschmitt.com Kanuka Mareddy, PSCC Project Engineer(kmareddy@petticoatschmitt.com) Brandi Manning, PSCC Project Coordinator(bmanning@petticoatschmitt.com ) to Page 2 of 2 /V ARDURRA 100 Center Creek Road,Ste 108 St.Augustine,FL 32084 Phone: 904-562-2185 Fax: 888-215-3836 DESIGNER CLARIFICATION: NO-02 Title: Clarification of Stormwater Structure Location and East Loop Road Grading Project: Governor's Park Preliminary Civil Work Ardurra Project No.: 100435.07 Clarification by: David Rasmussen,Ardurra Group Inc. Date: May 22,2023 Submitted to: Charles Tofferi,PS Nathan Rinnert,PS cc: Warrick Sams, CCUA Linda Ortiz, CCUA Paul Steinbrecher, CCUA Drawing No(s): C-7.0,C-9.0, CD-5 Specification No.: N/A Clarification: Stormwater structures S-8 and S-9 and the connecting pipe between are to be moved directly east to center of eastern loop road.No changes to invert or rim elevations have been made. The eastern loop road will now be inverted. 12" of LBR 40 can be substituted for 6" of LBR 100 as clarified in RFI #2. Refer to sheets"C-7.0," "C-9.0," and "CD-5," for clarification of stormwater structures and East Loop Road Grading. Clay County Utility Authority Governor's Park Preliminary Civil Work /\\/ ARDURRA COLLABORATE.INNOVATE.CREATE. July 18, 2023 Linda S. Ortiz, MBA Construction and Inspection Services Coordinator Clay County Utility Authority 3176 Old Jennings Rd Middleburg, FL 32068 Subject: Change Order Request#1 FOR Entitlement Recommendations Clay County Utility Authority Governor's Park Preliminary Civil Work Project CCUA Project No.: 1127-002 PSCC Project No.: 22174-02 Ardurra Group, Inc. Project No.: 100435.07 Dear Ms. Ortiz: Petticoat-Schmitt Civil Contractors, Inc. (PSCC) is providing construction services for the to Governor's Park Preliminary Civil Work Project. Change Order Request No. 1 is the proposed cost required for PSCC to finalize the project due to Design Clarification No. 2. Design Clarification No. 2, submitted on June 16, 2023, moved storm structures S-8 and S-9, and associated piping into a portion of the eastern loop road to accommodate vertical and horizontal clearances of yard piping to be installed for the Governor's Park Water Treatment Plant Project. The eastern portion of the road was mostly constructed at the time of issuance of DC No. 2. The cost includes the materials, equipment, and labor necessary to reconstruct the portion of road disturbed. PSCC submitted a change order request on July 18, 2023 for a lump sum amount of $31,728.00 and zero (0) additional days to the contract duration. Schedule: Substantial Completion contract time was 120 days Substantial Completion contract time is 120 days Budget: The project construction budget was $1,905,000.00 The project after Change Order No. 1 is now $1,936,728.00 Yours truly, JtaaLn Camryn Swain, El -Ardurra Engineer 100 Center Creek Rd. #108 St.Augustine, FL 32084 904.562.2185 www.ardurra.com _� __ _�� NOTES: �GfND - �.n. RUNOFF DIRECTION \ —� 1. SILT FENCE TO BE INSTALLED ALONG LIMOS OF GONSfRUCiOA _._— SW/ME CENTERLINE —� PERIMETER. --- PROPERTY LINE 2. DISTURBED GROUND SURROUNDING STORMWATEP.POLO TO DE STAEIL2E0 .- GILT FENCE - UPON COMPLETION.SEE SHEET CD-1 FOP DETAILS. Q TREE PROTECTION FENCE �+ .1. OTHER AREAS OF DISTURBED GROUND SHALL REMAIN NOT STABRIZEO I__..•'1 WERANO FOLLOWING NOTICE OF TERMINATION. Ti/i. I WETLAND BUFFER • \ / 4. EROSION CONTROL DEVICES SHALL REMAIN ON STTE FOLLOWING NOTICE _-,_-,_ FUTURE STRUCTURE OF TERMINATION, \ / 5. STOCKPILE EXCESS MATERIAL EAST OF PROPOSED STORMWATER POND. a \ LLUA PROPERTY ONE / X\\ . / i I ''4S\ / ./ I 1 rc. \ ��_; �+..FV� FUTURE STORMWATER T J - • 1111111111111‘4 \ POND EXPANSION \ -\\ q I 0 z 1 cc 8- INIMVNIIIII‘ft VAIPI... -- 1 .1_ \\ \ "IIr. 11. n Qza U STORMWATERPOND W Q".!1. Ili V\il Z w,a. + s i Tt �'saij' �, o iiiimill rr-..,:/ : : : : / P. / /f//��i��!% !iii/��//�y y /e% iy Nor liL i,.:: , . „, .. ... .. Cl g yt i 4 \\\ PLAN G8 SCALE: 1 60 �I• • 0 60 12F® 3k GRAPHIC PROS.100435.07 %z CONFORMED FOR CONSTRUCTION I>UT C-7.0 1 / )FOFND. TREE PROTECTION FENCE i --"- SWALE CENTERLINE IMIIIIIIIIIIIIIIIII - PROPERT LINE I / -•-•- SILT FENCE i / I I WETLAND TECTION FENCE 6 .- . 11 WEIUND BUFFER w . I. • . = / RUI{OFF DIRECTION }^ SF / NOTES:- F RE STRUCTURE TRANSFORMER,FUEL //(ppp///JJJ,,, C E SIS GE TM'N, p/%_ \ I. SILT FENCE TO BE INSTALLED k XT 1' ANO GENEfiAiOR /J \ ALONG LIMITS OF CONSTRUCTION C PERIMETER. kg f.F,E•74,75 FUTU-.WELL p3 0 2, DISNR9EO GROUND SURROUNDAA B < ]3.4 E�GE:72.50 _1 $-i7 R0 D \ STABILIZED UPON COMPLETION. 8¢ $-8 TYPE Q GE:72.98 \ SEE SHEET COt FOR DETIS. ' NV:66,81(W) INV:88.59(W)4. 3 a X73.3 INV:69,01(5) INV:66.49(E) \INV:66.49 CS) 3, GROUND ILL NOD 73.6 :NV:66.81(E) ALIGNMEM:ORNEWAY STABILZEO FOLLOWING NOTICE OF 3 NJONMENT:OR AY STA:7+46.69 TERMINATION. B ,N,y StA 7449.63 OFF:163.335 OFF:66.799 N:2040865.3850 1. EROSION COMROL DEVICES SHALL g. N:2040865346 E:434101.2]43 REMAIN ON SRE FOLLOWING i 5.0 E:434004.7343 NOTICE OF TERMINATION. y 5. STOCKPILE IXLE55 MATERML EAST 106 LF OF 1. __ji,El�■ 9�L�OF 19'RCP O 01Jx 77 LF OF 24'RCP 0 1.B4% OF PROPOSED ETORMWATER POND. WIWI 705' TAO \ of I I. .•- - \ a� E 1 II IL `(�I \ • IN 5-17 24'FFC Id INV:65,00(DR I _ �e r // ALIGNMENT:DRIVEWAY ti NI I, • "----- C STA:7447.95 'd dim Ia OFF:2fi0.039 ' - \ 1 N:20401365.3859 N OF " " F.Y-. I UT E:434177.9817 ,,, O 1.00; ELUILDI AL FUN'-0.5 MG m r3 11 BUILDING POTAB WATER CST I W a al IO 01' N r Tit INLET PROTECTION z Z Q n I-17 1 1 IA 1 z J Y ' !76.5 7fi. 76.5 III S RW N , Im \ -�'- 0 STORMWATER POND O CC d 5 u 11 -� PUMP .01 23.9 74.0 TON EL,=]3,0 POND BOTTOM EL=61.0 • a In- o a I = II 31 I ' o Z_Z U ''='J ! STATION C ^d ( F.F 76.61 J •T o C)>- cc ui ! lI & II I�( I F 5-11 TYPE It K • a k9 0 > V R FUTURE INV:66.70(N) 'W^ W � u CHEMICAL /' ALIGNMENT:DRIVEWAY Z 1 y� CC aLr BUILDING I - 514:6+64.76 • d' d �„ FU:'E 0.75 MG OFT:183.0]0 W o I ! 1111 F.F.E.=]B.Bi II POTAB WATER GSi = N:2040779.6153 ' H., I --i E:4341012746 Q gg PORTABLE SLOG. -I�� 41 ! 1 z I6 FLOW METER -� i.i.E.•74.75 GE:7.50 [[ M Q F.F.E.-74.75 I� 4"- INV:.9.32(N) / ) AUG ENT:DRIVEWAY a 1 ' ' Ili; STA: 97.09 i n OFF 80711. IL1 = E. \ N:2.O7t t.9519 u '( .� 4k I I . '-NtORO.TANK. E:4 094.7292 n gt II y.Z f.F.E.•74.75- 9 I 0��� 1 1-4 lArigi CHEM.SLOG. 0-05 MG F.G.E.=74.75 33 Jr 73.7' 0 Al- ' k73.6 Y 0.02)l�AG 1 .a Tax-i__. Li 0�� 76 :0 - Wr3.2 TED CROWN I'1 `I TOWER AERATOR f. \ 3 C�-�' iE CRUSH CRETE ,� M-: .- $ z DRNEWAY 1•-V LLLiii �C /�/ g S Q d n / �,F- `�, • /0.9 SERE LEFT 0 /CAL 20 VERIFY SCALE XN jam.. • -I 0RAP.C SCALE 4 rjaeencoaz ZI WE MARCH2023 ,/�\' SILT FENCE \I/ PROD.100435.07 ±¢ �/ CONFORMED FOR CONSTRUCTION OWN. C-9.0 SEE SHEET C-10.0 FOR CONTINUATION amseammine o 24Aft 'PVC DR 25 ( 1,g S•DIP ORNN v (FUTURE) 10 t0 I.E.-65.38 FINISHED GRADE (FUTURE) SLOPE 2; SLOPE 2X TWO SS PIP E I �, � MAX 8 24'-38• %% r �%���%�" '�;c 1=1L—1 I E FREE FLOW ZONETO 1 ACCEPT FIELD INLET. / \ . 1I y OPEN RIP h BOTTOM. is o i • CO. _ 6 W B.GRADED AGGREGATE BASE COURSE(LBR 100) 1 u B•AIR INTAKE W/SST COMPACTED TO SEM OF MODIFIED PROCTOR 1 E INSECT SCREEN NOTES: 5 m E SANITARY SEWER OH il (FUTURE) a FRAME&COVER \ 12•MIN BTABIUZEO SUBGRADE(1640) COMPACTED 10 BBS OF MODIFIED 1. SURROUNDING GROUND TO REMAIN NOT STABIU7ED. 1 _ 6 ` U — PROCTORll RS B•DIP SS ,. 4 b LE-6520 4.5 if, INVERTED CROWN CRUSH CRETE DRIVEWAY 2•PVC DRAIN Q DETAILS 0 .5 6•VENT(FUTURE) B•BP BEND(FUTURE) J PLAN zo J ii G W cc ci§u§ SANITARY SEWER NH EC ) }O cai FRAME&COVER LU Q CO m 6•AIR INTAKE (~Q 'd J V (FUTURE) Q O 'V,> cC i cc U m �'� �- za m k RIM EL-74.20 . Ill I— W Z n �.- �. GRADE EL-73.70• >— _ ,. wn� V, w ig t 65.PRE CAST POLYETHYLENE UNER CC Q 1- MANHOLE MANUFACTURED BY Q STANDARD PRECAST CO. I—Z (AGRU SURE GRIP)OR Q Lig WO SS HALF PIPE APPROVED EQUAL Z g FREE FLOW ZONE TO Q o ACCEPT FIELD INLET. N OPEN TOP N BOTTOM. I 24•PVC OR 25 (FUTURE) t p. g.. (FB•DIPDRAINl� S (FUTURE) 4..., I I'. pi S INVERT EL-65.36 h�11 ; 1 rta 0i�' 9—*1. �fi I W ;INVERT EL-63.3B ��-., / m$ - -z...�,�3;: V', INVERT EL-b3.28. n zg , i 46 ',j SECTION --- d�,A - F� ce I I<-$ SCALE NONE 3� r '' Bg o NOTES: 1. ALL PIPE WALL PENETRATIONS EXCEPT B•SOLITARY SEWER UNE UFROM SS-2 TO BE PLUGGED FOR FUTURE UNE CONNECTIONS. 4 FILE SEE LEFT 8E MASTER MANHOLE VERIFY E d6 DETAIL O Gg NONE 3a 6 MARCH 2f43 ttroJ.100935.07 �� CONFORMED FOR CONSTRUCTION DWG CD-5 . 4p,,.> — 1� �l rut[7!E uEdALLID ALOE LESS a Cv IH.t.'C. '," !��1 ,. xi _ KAPOK,EMEnn ELHE 2.pDmrpgpE,'Ut CAOUNO:WILI.POC STOVAriit r x•O aE a.C.,:m `MR a - Ur.CcwUION-L SHUT CO-I PO CCrM-' -eEE rE�oTRnaN rENCE a.D1,1E...E.:x T.MUM SORT.•Ewe.,s:+x.tn ouwmc wircE VC iEg1*YU PAM /" a.iPa'Y6K cOHIIQ mcn swu Kum a m mantra KM ECN HIMIS SMUCfYq STOCKPILE5.STOCKF EXCESS MAiFRtK FAST Of PROPOSED SiORUNAiEP POND. \ CLW PROPERTY ORE / -� IfI-11 \\\\ ._______-..,_-_ --- t \\ El' I/ POND.2,I.t. 1. \� -- — a : 1r \\ i 1 ' r--- i (51.NY aj g }�� I �r a ►� ' \ �oY �� I, -� (,,�{� i SIOPu..Ea KOHL z GC Q Cl> 1 l , ■11■1 /I , >11 nu, z c< it / jl l 1�1 J a z o 0. i .( -i.N .1 �+-. ily Q W J / �' �1' - I WQ� d /// l' \ /.." P*4', .11 .. 41191:4101 s<?‘ C 1 Iiii ili L'.'-. p./ .. . . . ce,,_ 8 i 'F‘ 3z IHII / �4 s .0 SEE ' q :F PLAN K.e a srxc: r-sc Ra,. y OK GRAPHIC PRO1'F03475•07 CONFORMED FOR CONSTRUCTION wa C-7.0 1 / AND KE I TREE PROTECTION'EKE e 4r rE•C p ue PNO[RF(n( D- i T1 PIOACODN ISNC( t. R'J PROTON ITweTUAE _xcs j • ^ ` SILT FENCE TO BE INSTALLED / PERIMETER ILL Y �` X /'( E D HONG LAIRS Dr CONSTRUCTION !1 `T �I\krIts.,/i5.47S°6ryr }�y1 3 ;1 DSTURBEO cilWxo sIMROunpWc j TS. T¢� ` STORMMATFA POND TO BE i —aSTyt� � :v. \ STA&UZED UPON`OI.mLLTIOx S1�aaAD pMNsi SEE SxEET CA-1 OR OCTALia1'/.?SJ �'N'i T.EA7 Nn.(aJ \J. OTNER ARFAS OT DISTURBEDwrt W.OT« iM:Of.tl i J1SR r,A N.AI AUCNMOO.OmPM1LWArSTAHIU1IZEO FOU O%&INO NOTCE OF 01Jx>•.fAlOrr'.T 3S5 C'N' c:OAIuYtl.J66D .. EROSION CANTPOL OMCES SINLL C•a4WW., • _^ NipT2TU N�'OIICE Off lrauooTIfY $iS. STOCNPILE EtCESa N/.TERPT.EAST - _ 4114__ .. _ _ OF PROPOSED STORWU.TER POND. -r.Y 1_' V_jI T- O• _ os•r a Ts. E•_l__a:x Tf. iA•RV e'DI IT,•I LA 1A ��, ICco am es.00 Oil - 1 - I,F Oa Natal DRY NgOi iii • RL a I `F. / •`•YD .• ETi�i p q> M6771i••• \ \ I el_ �� 1.. iuUri-. \tll I ror w�ou FUI �i I ,a /` n .IST TTIOTSCICI •• x 0 it ;E 7 ,,n, r,.l � � �pp G-3 I .iG. 11 ^. 1 AaaiARTw roRo -` -T`V. ® tas a•rin d— 7I.0 ••sXTDa tsx > A ! TICI iin011 d•51.0 LC VI =11 r L»3'� 13 Q p 0 O> l Q V {a r.�,� r ; Z w Z !E TtDo w ^�•� i' ' AALLN1KAT 11,4,OI Mew 5 Z o L7 a I ° AOIDIYC .I PM MN.]i R - c rI ro tig cr ��........ oir TOTsry a ..G,1.YLE wnG._J _.rxr z Row:¢*:R LEL->R.>a 1I GC AD N) a Q F / 1.11 E Cr TT Is I a ���1• g_ r_ N v■o um,. y L rncn..-.• ! , - : ) I "4.D•.C/a.r.•'•A6.-.!' �_,:. I • 1 •-I Y `I 1 3 ......_ UWk. rT.� _ _ DAv uO T. �..r.-- .t `IL L __H r 1I E _ y_,..: i s .._ IT� ..-,-1 1 ,.. e r . _ - : 3 r I_ a C <D:;:i 141 gl i c- 3 e C '' '�;!" TOWER AEMTOR / <g it y 1' U f Cl A ¢ 1 .At SCALE an ISM= SILT FENCE �1, 1i.0 r \ �J s SEC BRED C-Too roe-• Ka FOR CONSTRUCTION D•a C-9,0 Mi •i4.m t2t lgg,c'L uC..I.Z.u..,�..� 'fie 14. `K2 a%.4rtwls/in.na r...4.K^'c�i.r\ofw t.n,.:i bww.L:44/ir. i,,ran•Jr eiCA n-i vnmr n,C,,,a rrnm t71x.u:..t;..__. p RE Sci p .ti.s''t :a v ww�w�sr�� v a a R' m "Lg Bb Z ;til f� � I In, E. s i t'i 11 z n a1, ;,':-1 g z 4 gi SSft: / • �7�—!ice .. ?T AAA t11� 2 .� !m 8X I K PlgOi P >. I c, 8g1 p a I il , iT if \Lr A \ i,1:i' gli �$% I�e 1 r ii,I NI Al g a \,i; I'i'l lz ti it 4,411 I,if q `,i a ' fir=: if Il- 0 44 o ,.� . • R 4; 4' �� �� a:,,,; SANITARY SEWER MASTER MANHOLE $ 'il i ` _ '1 AND INVERTED ROAD DETAILS 4 1 v g �RDURRA e�''.fieer,.`,,,: GOVERNOR'S PARK C PRELIMINARY CIVIL WORK a s a — r. .,.,, .._,-Mut — — ---- - - GIs rn +-� c "-`_ __ NOTES: �GfND -� �.... RUNOFF DIRECTION —� 1. SILT FENCE TO BE INSTALLED ALONG LIMITS OF GONSfRUCiOA _._— SWALE CENTERLINE —� PERIMETER. --- PROPERTY LINE 7 2. DISTURBED GROUND SURROUNDING STORMAATEP.POLO TO DE SIAEIL2E0 ._ SILT FENCE - UPON COMPLETION.SEE SHEET CD-1 FOP DETAILS. Q TREE PROTECTION FENCE 6 .3. OTHER AREAS OF DISTURBED GROUND SHALL REMAIN NOT STADIUZEO I__..•'1 WETLAND FOLLOWING NOTICE OF TERMINATION. Ti i. I WETLAND BUFFER 6- / 4. EROSION CONTROL DEVICES SHALL REMAIN ON STTE FOLLOWING NOTICE _-,_-,_ FUTURE STRUCTURE L.....:...... OF TERMINATION. \ / 5. STOCKPILE EXCESS MATERIAL EAST OF PROPOSED STORMWATER POND. s / \ LLUA PROPERTY ONE-,,,.....,,,,„..„,....., . ,,,/ \. --— La / f. rc. \ Mill, FUTURE STORMWATER T J - • \ POND IXPANSION CC cl \\ I-LI VI 111,‘71,:.,.. ,, I..1 7111111461701111111111/..— (.9 STORMWATER POND WQO( _______,.":111.o: I Q Q W_zJ Q (7 wW JcG� ag / •I I W Q d i. z LA w, R: §- / . ., _. __ "IMP, . i , ,,(17.7._.„7, ;,,i :.,-.-::/::':.,: .':''+':.:::,...::,:::,:.:1.:: :N,,„ --- --40: ../..Kr./, *. \d - o. o .2 / g= _ •' C�a g/ C— 1 0.0 I �i ga r Cl 3 -3 / y . . . • p 06I\ <36 g. xa PLAN G8 SCALE: 1 60 �I• • IO 60 12.®' 85 GRAPHIC SCALE PROS.100435.07 %z CONFORMED FOR CONSTRUCTION Irv+G. C-7.0 / )IF TREE PROTECTION PENCE /^ --"- SWALE CENTERLINE J - PROPER LINE IMIIIIIIIIIIIIIIIII I / -•-•- SILT FENCE i / I I WETLAND EFEN TECTION FENCE 6 .- . .• WETLAND BUFFER w • 'I • . = / RUI{OFF DIRECTION }^ SF / NOTES:- F RE STRUCTURE TRANSFORMER,FUEL //(ppp//7,,,, C STORAGE TM'N, p/%_ \ 1, SILT FENCE TO BE INSTALLED k I X7 1' AN0 GENEfiAiOR /J \ ALONG LIMITS OF CONSTRUCTION C PERIMETER. F.F.E=74.75 fUTU-.WELL p3 0 2. DISTURBED GROUND SURROUNDING < ]3.4 E _1 $-10 TYPE 0 \ STORMWATER POND TO BE STABILIZED UPON COMPLETION. $-8 1YPE Q GE:72.98 \ SEE SHEET CO-1 FOR DETAILS. GE \ilk ' �:6.81(W) INV:88.59(W) 81 " RN:69.01(5) INV:66.49(E) \3, GROUND NAL OTHER AREAS�REMASIN NOD11111x713 3.6 !NV:66.81(E) ALIGNMENT:DRIVEWAY STABIUZEO FOLLOWING NOTICE OF 3 AUGNMENT:OR AY I I STP:]+48.69 TERMINATION. F ,N,y StA 7i49.63 OFF:183.335 "I � OFF:86.798 N:2040865.3850 1. EROSION CONTROL DEVICES SHALL N:2040865346 E:434101.2]43 • REMAIN ON SRE FOLLOWING i• 5.0 E:4J<Ow.7343 NOTICE OF TERMINATION. y 5, STOCKPILE EXCESS MATERIAL EAST 106 LF OF 1. • __�■ N?LL OF 19'RCP O 01Jxrie ]]LF OF 24'RCP 0 1.B4% OF PROPOSED 9TORMWATER POND. li 705' TEN of I• • •- -- / a�u z I • `(�I I. $-17 24'FFC • I0 INV:65,00(W) I �e r // ALIGNMENT:ORNEWAY !1 NI1 'dlrlN Ia OFF:260,039 �'L - \ 1 N:2040865.3859 N OF " " F.Y.. I UT E:434177.9817 ,,, O 1.00x ELECTMGGL FUN'-0.5 MG m r3 11 BUILDING POTAB WATER CST W a RI 10 ON, N r Tit INLET PROTECTION z Z lq. "r^' ' n �? I I_1 N z J o II IR Im \ '- o= I I7. . 76.5 -r! SPWPII .OAB.8 ]4.0u ! ` -� 0 STORMWATER POND TON EO Ug. POND BOTTOM EL=fi10 • a In 5 STATION 10 c,Z Z - d p 11 II �I� RN 0- FUTURE INV:66,70(N) W CHEMICAL /' ALIGNMENT:DRIVEWAY Z 1 I�1,y� CC aLr BUILDING I - STA:6+64.76 d' 0- �„ FU:'E 0.75 MG Ofi:,83.0]0 W o I ! III F.F.E.=]B.Bi II POTAB WATER GSi L= N:2040779.6153 ' II., I --1 E:4341012746 d p PORTABLE BLDG. -I�� Lt • ! z IN FLOW METER -� POR325LE B GE:7.50 [[ Q F.F.E.-74.75 I� A"- IINV:.9.32(N) / 9 LIG ENT:DRIVEWAY a I ' : -' tilt STA: 97.09 i n OFF 8 IL1 = HYDRO. \ N:2.6.524 0711.9519 ,A '( .� ' / 4k I I E. . '-NYORO.TANK. E:4 094.7292 n O F i ����F1 CHEM.SLOG.'..IV P4 I; ,,,________ .__ ___.„, 0-05 MG F.i.E.=Ill - 33 I Jr --al 73.7' o �- / INVERTED CROWN 113 I TOWER AERATOR 3 �-�' g CRUSH CRETE � M-: .- $ DRNEWAY •-V LLLiii -C / g S Q d 81 / ���///, •`�, • /0.9 SERE LEFT r�' /CAL 20 VERIFY SCALE i. CRAP C -I FjP RAP,C SCALE wisp MARCH2O23 ,/�\' SILT FENCE , \I/ ?Rol 100435.07 �/ CONFORMED FOR CONSTRUCTION OWN. C-9.0 SEE SHEET C-10.0 FOR CONTINUATION l 24'PVC DR 25 ( 4; le DIP ORNN v (FUTURE) 10 t0 LE.65.3E FINISHED GRADE (FUTURE) SLOPE 2; SLOPE 2% 6 N , MAX 8 24'-36• % %%%%%%�%���%/���%���%�" ;c 1=1L—1 3 �` FREE FLOW ZONETO / e3 ACCEPT FIELD INLET. / \ 6. 1I y q OPEN RIP h BOTTOM. is o i • *It _ 6 0 6•GRADED AGGREGATE 60.5E COURSE(LOR 100) �j u e•AIR INTAKE W/SST COMPACTED TO SEM OF MODIFIED PROCTOR ' g E INSECT SCREEN NOTES: Vs E SANITARY SEWER OH (FUTURE) a FRAAZ&COVER \ * 12•MIN STABIUZ SUOGRADE(LRR40) COMPACTED 10 BBS OF MODIFIED 1. SURROUNDING GROUND TO REMAIN NOT STABIU7ED. 11 ` _ U PROCTOR RS 6'DIP SS -1 . 418 b LE-65.36 �) 41 INVERTED CROWN CRUSH CRETE DRIVEWAY I 24 P(FUTURE) Q VC DRAIN DSETAIL 0 .5 64 VENT(FUTURE) 6•90'BEND(FUTURE) J PLAN zo J ii 2 w u§ ci SANITARY SEWER NH EC ) }O EL, FRAME&COVER LU Q Q m 6•AIR INTAKE (~Q 'a'.J V (FUTURE) Q O ,to> CC ,CCU k ,,RIM EL-74.20 .• L-LI I— W Z n �.- �. GRADE EL-73.70• >— _ a w n�t 0w ig 6'A PRE CAST POLYETHYLENE LINER CC Q S MANHOLE AS MANUFACTURED BYQ STANDARD PRECAST CO. I—Z (AGRU SURE GRIP)OR Q 46•tl SS HALF PIPE APPROVED EQUAL Z G FREE FLOW ZONE TO Q o5 ACCEPT FIELD INLET. OPEN TOP 6:BOTTOM. I 24'P60 OR 25 Li)(FU(FUTURE) t p. g.. B•DIP( DRAINFUTURE) S. S (FUTURE) �• I 1•. INVERT EL-65.36 1poi S �1 I ; 1 rta ,�' "1—*T 5fi I W ;INVERT EL-63.36 '��-=; _ m$ - -z...�,;3; V', INVERT EL-b3.26. n zg , i rcW»I Emil `j SECTION - d�,A F� 10<-$ SCALE NONE --- 3� r Bg o j NOTESS 1. ALL PIPE WALL PENETRATIONS B•SOLITARY SEWER UNE UFROM SS-2 TO BE PLUGGED FORUR FUTURE UNE CONNECTIONS. 4 FILE SEE LEFT E MASTER MANHOLE VERIFY E d6 DETAIL O GS NONE 3aDOZE, MAREH2@3 .300935.07 .. CONFORMED FOR CONSTRUCTION DwG. CD-5 __ NOTES: �GfND -� �.... RUNOFF DIRECTION —� 1. SILT FENCE TO BE INSTALLED ALONG LIMITS OF GONSfRUCiOA _._— SWALE CENTERLINE —� PERIMETER. --- PROPERTY LINE 7 2. DISTURBED GROUND SURROUNDING STORMAATEP.POLO TO DE SIAEIL2E0 ._ SILT FENCE - UPON COMPLETION.SEE SHEET CD-1 FOP DETAILS. Q TREE PROTECTION FENCE 6 .3. OTHER AREAS OF DISTURBED GROUND SHALL REMAIN NOT STADIUZEO I__..•'1 WETLAND FOLLOWING NOTICE OF TERMINATION. Ti i. I WETLAND BUFFER 6- / 4. EROSION CONTROL DEVICES SHALL REMAIN ON STTE FOLLOWING NOTICE _-,_-,_ FUTURE STRUCTURE L.....:...... OF TERMINATION. \ / 5. STOCKPILE EXCESS MATERIAL EAST OF PROPOSED STORMWATER POND. s / \ LLUA PROPERTY ONE-,,,.....,,,,„..„,....., . ,,,/ \. --— La / f. rc. \ Mill, FUTURE STORMWATER T J - • \ POND IXPANSION CC cl \\ I-LI VI 111,‘71,:.,.. ,, I..1 7111111461701111111111/..— (.9 STORMWATER POND WQO( _______,.":111.o: I Q Q W_zJ Q (7 wW JcG� ag / •I I W Q d i. z LA w, R: §- / . ., _. __ "IMP, . i , ,,(17.7._.„7, ;,,i :.,-.-::/::':.,: .':''+':.:::,...::,:::,:.:1.:: :N,,„ --- --40: ../..Kr./, *. \d - o. o .2 / g= _ •' C�a g/ C— 1 0.0 I �i ga r Cl 3 -3 / y . . . • p 06I\ <36 g. xa PLAN G8 SCALE: 1 60 �I• • IO 60 12.®' 85 GRAPHIC SCALE PROS.100435.07 %z CONFORMED FOR CONSTRUCTION Irv+G. C-7.0 / )IF TREE PROTECTION PENCE /^ --"- SWALE CENTERLINE J - PROPER LINE IMIIIIIIIIIIIIIIIII I / -•-•- SILT FENCE i / I I WETLAND EFEN TECTION FENCE 6 .- . .• WETLAND BUFFER w • 'I • . = / RUI{OFF DIRECTION }^ SF / NOTES:- F RE STRUCTURE TRANSFORMER,FUEL //(ppp//7,,,, C STORAGE TM'N, p/%_ \ 1, SILT FENCE TO BE INSTALLED k I X7 1' AN0 GENEfiAiOR /J \ ALONG LIMITS OF CONSTRUCTION C PERIMETER. F.F.E=74.75 fUTU-.WELL p3 0 2. DISTURBED GROUND SURROUNDING < ]3.4 E _1 $-10 TYPE 0 \ STORMWATER POND TO BE STABILIZED UPON COMPLETION. $-8 1YPE Q GE:72.98 \ SEE SHEET CO-1 FOR DETAILS. GE \ilk ' �:6.81(W) INV:88.59(W) 81 " RN:69.01(5) INV:66.49(E) \3, GROUND NAL OTHER AREAS�REMASIN NOD11111x713 3.6 !NV:66.81(E) ALIGNMENT:DRIVEWAY STABIUZEO FOLLOWING NOTICE OF 3 AUGNMENT:OR AY I I STP:]+48.69 TERMINATION. F ,N,y StA 7i49.63 OFF:183.335 "I � OFF:86.798 N:2040865.3850 1. EROSION CONTROL DEVICES SHALL N:2040865346 E:434101.2]43 • REMAIN ON SRE FOLLOWING i• 5.0 E:4J<Ow.7343 NOTICE OF TERMINATION. y 5, STOCKPILE EXCESS MATERIAL EAST 106 LF OF 1. • __�■ N?LL OF 19'RCP O 01Jxrie ]]LF OF 24'RCP 0 1.B4% OF PROPOSED 9TORMWATER POND. li 705' TEN of I• • •- -- / a�u z I • `(�I I. $-17 24'FFC • I0 INV:65,00(W) I �e r // ALIGNMENT:ORNEWAY !1 NI1 'dlrlN Ia OFF:260,039 �'L - \ 1 N:2040865.3859 N OF " " F.Y.. I UT E:434177.9817 ,,, O 1.00x ELECTMGGL FUN'-0.5 MG m r3 11 BUILDING POTAB WATER CST W a RI 10 ON, N r Tit INLET PROTECTION z Z lq. "r^' ' n �? I I_1 N z J o II IR Im \ '- o= I I7. . 76.5 -r! SPWPII .OAB.8 ]4.0u ! ` -� 0 STORMWATER POND TON EO Ug. POND BOTTOM EL=fi10 • a In 5 STATION 10 c,Z Z - d p 11 II �I� RN 0- FUTURE INV:66,70(N) W CHEMICAL /' ALIGNMENT:DRIVEWAY Z 1 I�1,y� CC aLr BUILDING I - STA:6+64.76 d' 0- �„ FU:'E 0.75 MG Ofi:,83.0]0 W o I ! III F.F.E.=]B.Bi II POTAB WATER GSi L= N:2040779.6153 ' II., I --1 E:4341012746 d p PORTABLE BLDG. -I�� Lt • ! z IN FLOW METER -� POR325LE B GE:7.50 [[ Q F.F.E.-74.75 I� A"- IINV:.9.32(N) / 9 LIG ENT:DRIVEWAY a I ' : -' tilt STA: 97.09 i n OFF 8 IL1 = HYDRO. \ N:2.6.524 0711.9519 ,A '( .� ' / 4k I I E. . '-NYORO.TANK. E:4 094.7292 n O F i ����F1 CHEM.SLOG.'..IV P4 I; ,,,________ .__ ___.„, 0-05 MG F.i.E.=Ill - 33 I Jr --al 73.7' o �- / INVERTED CROWN 113 I TOWER AERATOR 3 �-�' g CRUSH CRETE � M-: .- $ DRNEWAY •-V LLLiii -C / g S Q d 81 / ���///, •`�, • /0.9 SERE LEFT r�' /CAL 20 VERIFY SCALE i. CRAP C -I FjP RAP,C SCALE wisp MARCH2O23 ,/�\' SILT FENCE , \I/ ?Rol 100435.07 �/ CONFORMED FOR CONSTRUCTION OWN. C-9.0 SEE SHEET C-10.0 FOR CONTINUATION l 24'PVC DR 25 ( 4; le DIP ORNN v (FUTURE) 10 t0 LE.65.3E FINISHED GRADE (FUTURE) SLOPE 2; SLOPE 2% 6 N , MAX 8 24'-36• % %%%%%%�%���%/���%���%�" ;c 1=1L—1 3 �` FREE FLOW ZONETO / e3 ACCEPT FIELD INLET. / \ 6. 1I y q OPEN RIP h BOTTOM. is o i • *It _ 6 0 6•GRADED AGGREGATE 60.5E COURSE(LOR 100) �j u e•AIR INTAKE W/SST COMPACTED TO SEM OF MODIFIED PROCTOR ' g E INSECT SCREEN NOTES: Vs E SANITARY SEWER OH (FUTURE) a FRAAZ&COVER \ * 12•MIN STABIUZ SUOGRADE(LRR40) COMPACTED 10 BBS OF MODIFIED 1. SURROUNDING GROUND TO REMAIN NOT STABIU7ED. 11 ` _ U PROCTOR RS 6'DIP SS -1 . 418 b LE-65.36 �) 41 INVERTED CROWN CRUSH CRETE DRIVEWAY I 24 P(FUTURE) Q VC DRAIN DSETAIL 0 .5 64 VENT(FUTURE) 6•90'BEND(FUTURE) J PLAN zo J ii 2 w u§ ci SANITARY SEWER NH EC ) }O EL, FRAME&COVER LU Q Q m 6•AIR INTAKE (~Q 'a'.J V (FUTURE) Q O ,to> CC ,CCU k ,,RIM EL-74.20 .• L-LI I— W Z n �.- �. GRADE EL-73.70• >— _ a w n�t 0w ig 6'A PRE CAST POLYETHYLENE LINER CC Q S MANHOLE AS MANUFACTURED BYQ STANDARD PRECAST CO. I—Z (AGRU SURE GRIP)OR Q 46•tl SS HALF PIPE APPROVED EQUAL Z G FREE FLOW ZONE TO Q o5 ACCEPT FIELD INLET. OPEN TOP 6:BOTTOM. I 24'P60 OR 25 Li)(FU(FUTURE) t p. g.. B•DIP( DRAINFUTURE) S. S (FUTURE) �• I 1•. INVERT EL-65.36 1poi S �1 I ; 1 rta ,�' "1—*T 5fi I W ;INVERT EL-63.36 '��-=; _ m$ - -z...�,;3; V', INVERT EL-b3.26. n zg , i rcW»I Emil `j SECTION - d�,A F� 10<-$ SCALE NONE --- 3� r Bg o j NOTESS 1. ALL PIPE WALL PENETRATIONS B•SOLITARY SEWER UNE UFROM SS-2 TO BE PLUGGED FORUR FUTURE UNE CONNECTIONS. 4 FILE SEE LEFT E MASTER MANHOLE VERIFY E d6 DETAIL O GS NONE 3aDOZE, MAREH2@3 .300935.07 .. CONFORMED FOR CONSTRUCTION DwG. CD-5