HomeMy WebLinkAboutCA 4. Jacobs N. Middleburg WM SA Amend 1 AGENDA ITEM: EXECUTIVE Summary Amendment No. 1 to Supplemental Agreement No. 6 with Jacobs Engineering Group, Inc. for Civil and Environmental Engineering Professional Services Agreement 2018/2019 RFQ No. 3 to provide Professional Services for the North Middleburg 12-inch Water Main Extension. CCUA Project No.: 2017-039 CCUA Financial Job No.: 02419WL Date: August 11,2023 BACKGROUND: CCUA Staff is seeking approval to execute Amendment No. 1 to Supplemental Agreement No. 6 with Jacobs Engineering Group for professional services. The fee for these services is $10,357.00 and is described in the attached Scope and Fee proposal. Under the existing supplemental agreement, Jacobs Engineering staff and their sub-consultants have and will provide services resulting in the installation of approximately 4,500 feet of new water main interconnecting two service areas and includes a horizontal directional drill beneath Black Creek at Blanding Boulevard and a jack and bore subsurface crossing of Blanding Boulevard at Long Bay Road. CCUA Staff worked diligently but unsuccessfully to secure easements with landowners along the most efficient alignment. Staff and its consultant have identified a cu new alignment which does not require new easements and to which the FDOT has given preliminary aa) approval. This alignment is unlikely to encounter additional hurdles. To complete the project design along ci this alignment, additional survey and design services are necessary. Funds included in the original , supplemental agreement related to easement acquisition will be used to pay for the added survey work. c L iii CCUA serves the Ravines and Middleburg areas from the Ravines Water Treatment Facility. This facility ce operates independently without supporting or redundant connections. CCUA has experienced water main breaks and extreme weather events that have impacted service to these customers. A 2020 Risk and Resiliency Assessment of CCUA's potable water system by Reiss Engineering identified interconnection of the Ravines facility with CCUA's other plants as a high value countermeasure to mitigate the possibility of widespread disruptions to the homes and businesses within the service area. This is one of two potential interconnection opportunities identified - the extension of a new water main from the north end of the Ravines service area in Middleburg to connect the system to CCUA's North Clay Grid which is comprised of eleven(11) interconnected water plants. BUDGET: The current project budget is $260,554.67. Jacobs expects to invoice $324,442.91 through the end of the fiscal year. Including the $10,357.00 being requested today, $63,888.24 will be transferred to the project budget from contingency to fund the project through the current fiscal year.The proposed 2023/2024 capital budget includes an increase in the project budget to$2,752,049.51.This will fully fund the project including the estimated$1.96 million construction costs. RECOMMENDATION: Staff respectfully recommends the Board of Supervisors' approval of the attached Amendment No. 1 to Supplemental Agreement No. 6 with Jacobs Engineering Group, Inc. in the amount of $10,357.00 for engineering design services for the North Middleburg 12-inch Water Main Extension. //DD (Author) //PS(Review) //PS(Final) ATTACHMENTS: Amendment No. 1 to Supplemental Agreement No. 6 Scope&Fee Proposal //DD (Author) //PS(Review) //PS(Final) Amendment No. 1 to Supplemental Agreement No. 6 to the Civil and Environmental Engineering Professional Services RFQ 18/19 with Jacobs Engineering Group, Inc. to provide Professional Services for the North Middleburg 12-inch Water Main Extension CCUA Project No. 2017-039 Engineer: Michael Dykes, P.E. Owner: Clay County Jacobs Engineering Group, Inc. Utility Authority 245 Riverside Ave., Suite 300 Jacksonville, FL, 32202 Date: August 15, 2023 Item: Description of Services: Provide professional engineering services as requested and identified in the attached scope of services and fee proposal. Task 8 Additional Engineering Services 8.1 Additional Engineering $10,157.00 Direct Cost $200.00 0 Total Lump Sum Price Not to Exceed Without Prior Authorization $10,357.00 The Contract time shall commence on August 15, 2023. This document, along with the Scope and Fee Proposal, shall become an amendment to the Professional Engineering Services Agreement and all provisions of the Agreement will apply hereto. Accepted by: Date: Consultant: Michael Dykes P.E. Jacobs Engineering Group, Inc. Accepted by: Date: Owner: Jeremy D. Johnston, P.E., MBA, Executive Director Clay County Utility Authority I #;% 7 G'e,TY AUT„00. Jacobs.. Supplemental Agreement No. 6 - North Middleburg 12-inch Water Main Extension Amendment No. 1 —Additional Survey and Engineering Services for Blanding Blvd. Crossing The Supplemental Agreement No. 6 scope of work presented herein will be performed in accordance with the terms and conditions set forth in the Civil and Environmental Engineering Services RFQ 18/19 No. 3 Agreement executed on May 28, 2019.This scope gives no rights or benefits to anyone other than Clay County Utility Authority (CCUA) and Jacobs Engineering Group Inc. (Jacobs) and has no third-party beneficiaries. Purpose and Scope of Work The purpose of this amendment is to add Task 8 to Supplemental Agreement No. 6. Specifically,this task will include additional survey and engineering services for the proposed 12" water transmission main crossing of Blanding Blvd at Long Bay Road.The initial alignment from the scoping phase through the 30% deliverable was to be on the northeast side of Long Bay Rd and perpendicular to Blanding Blvd. After the 30%deliverable,this crossing alignment was determined to not be feasible. The intersection at Long Bay Rd and Blanding Blvd was recently updated as part of an FDOT Blanding Blvd widening project.This work included changes to the alignment of Long Bay Rd, a new stormwater to pond, changes to the alignment of Lazy Acres Rd, and new traffic signaling features. Jacobs will develop an alternate crossing alignment south of Long Bay Rd, along Lazy Acres Rd and going around the newly installed stormwater pond.This revised alignment will aim to use existing CCUA easements and FDOT right-of-way(ROW)to avoid any ROW acquisition. Task 8— Project Management and Project Meetings Task 8.1 Additional Engineering Services (Lump Sum) 1. Revised Blanding Blvd crossing alignment utilizing existing right-of-way and easements for auger bore installation. Including development of 2 new alignment sheets up to 60%design. 2. Coordination with FDOT on revised alignment, including one additional pre-application meeting. 3. Coordination with CCUA on revised alignment. Assumptions This scope of services includes the following Assumptions.The Assumptions are not intended to alter, change, conflict with, or modify in any way whatsoever, the terms of the Agreement dated May 28, 2019. In the event of a conflict between the Assumptions and the Agreement,the Agreement shall take precedence over these Assumptions: • All established assumptions included in the original Supplemental Agreement No. 6. • Previous authorized Surveyor fee for potential easement descriptions and boundary survey will be utilized to fund additional survey for this Amendment's scope of work for$7,340. 1 Supplemental Agreement No.6—Amendment No.1 North Middleburg 12-inch Water Main Extension Payment for Services Task 8.1—Lump Sum Services Compensation for the amendment scope of services described above will be paid for under a lump sum basis with progress payments payable in proportion to the percentage of work completed. Estimated budget of services for this amendment is $10,357. Table A Amendment No. 1: Engineering Services for the North Middleburg 12-inch Water Main Extension Cost of Services Engineering Services & Expense Cost Proposal Task 8.1 —Additional Engineering Services for Blanding Blvd Crossing $10,357 to 2 Supplemental Agreement No.6—Amendment No.1 North Middleburg 12-inch Water Main Extension ATTACHMENT A tO BLANDING BLVD PROJECT AREA MAP 3 r v i Al .vN 0 .:... iif—flf• cr ii O +- E �a C-1.07 a�Cr •! r7��� W proposedOriginal 0 C— 3,,Y 1 09 :. ti crossing no longer .`F ______ - - • E� o a viable due to ♦ Mirie - C-1..i;,.. qp-' E ,,- to , s.. • easements not being - ��05 able to be obtained / ,0 _ s '� QpJ • b Op0 w. • 1. 4 tJ�eP�R ,O Revs, d Revised proposed "" "' i „ C— ' - - crossing(two options) o W Q LONG BAY ROAD vAga -" �!-weak C-1.1 O A z • 2 C— S ,I C— .02 C-1.03 • w Lazy Acres Rd crossing f $_ R27/g�gND NG o d o a S E 'ik �,. .a+. y, �R a o,m, LOCATION PLAN - NORTH MIDDLEBURG 12-INCH WATER MAIN EXTENSION 200' 0 o 0 0 2 SCALE:1"=200' SCALE. 1" = 200' F `,3 a b Y,x55 FF < H zo/ INDEX OF DRAWINGS o6�� 4 " o � SHEET NUMBER DRAWING NUMBER SHEET TITLE a E 7ao GENERAL Ene I 1 G-1 COVER SHEET Ur-s C, 2 G-2 SIGNATURE SHEET* OW+3,, 0 3 G-3 GENERAL NOTES AND LEGEND C 4 G-4 LOCATION MAP AND SHEET INDEX I'i1 2 WATER MAIN ` 5 C-1.01 121N WM PLAN&PROFILE STA BEGIN TO 6+00 6 C-1.02 121N WM PLAN&PROFILE STA 6+00 TO 12+00 7 C-1.03 121N WM PLAN&PROFILE STA 12+00 TO 18+00 8 C-1.04 121N WM PLAN&PROFILE STA 18+00 TO 24+00 9 C-1.05 12IN WM PLAN&PROFILE STA 24+00 TO 29+00 LI 10 C-1.06 12IN WM PLAN&PROFILE STA 29+00 TO 34+00 X W i 11 C-1.07 12IN WM PLAN&PROFILE STA 34+00 TO 39+00 I o N z 12 C-1.08 12IN WM PLAN&PROFILE STA 39+00 TO 44+00 0 Z Z a 13 C-1.09 12IN WM PLAN&PROFILE STA 44+00 TO 48+00 — 0 I T to W 14 C-1.10 121N WM PLAN&PROFILE STA 48+00 TO END Z W zo 15 C-1.11 HDD-OVERALL PLAN AND PROFILE (5 W I I `NOT INCLUDED IN 30%SUBMITTAL D W 0 COZ II W Z Q Q Q 0_ o 2 a LU Z O °C a O U z O T J 2 N �I U y N "� a (1., a¢0 ul -43 WL Q 0 7 ,1 / T.ili �1 ¢ 6 a o y vzgg o $$ u i=yW 7 F O Z O „66 - W z 0 Vas a uT1'z p x ¢¢ $ . o2r iixa 6 "s r555 Supplemental Agreement No.6—Amendment No.1 North Middleburg 12-inch Water Main Extension ATTACHMENT B to PROJECT DETAILED DESIGN FEE 4 CCUA North Middleburg 12-inch WM Extension Hour Summary Senior Client Project Engineer of Project Pipeline Role Manager Manager Record Engineer QC Hours Total Hourly Bill Rate $ 185.17 $ 117.45 $ 243.05 $ 99.82 $ 278.57 Staff Member Gunn O'Farrell Ellenberger Hill Jenkins Task 8-Additional Engineering Services 8.1 -Additional Engineering 2 10 20 32 2 66 $ 10,157 Direct Cost $ 200 Totals 2 10 20 32 2 66 $ 10,357 to