Loading...
HomeMy WebLinkAbout06.b.02.b SA No. 2 Kimley Horn Corrosivity Water Sampling EXECUTIVE SUMMARY AGENDA ITEM: Proposed Supplemental Agreement No. 2 to the Hydrogeological and Environmental Professional Engineering Services RFQ Agreement 2022/2023-A02 with Kimley-Horn and Associates, Inc. (Kimley-Horn)for the Saratoga Springs Water Treatment Plant(WTP) Corrosivity Water Sampling Date: December 14, 2023 BACKGROUND: The Florida Department of Environmental Protection requires new Public Water Systems to conduct initial lead and copper tap sampling or complete a corrosivity study showing the new source (i.e., wells) will not increase the corrosivity of the current water supply. CCUA staff will be required to conduct this sampling or study at Saratoga Springs WTP once we begin providing water to customers. Kimley-Horn conducted a corrosivity study for CCUA when Peters Creek WTP was tied into the Lake Asbury Grid Public Water System. The completion of the study allowed CCUA to forgo multiple lead and copper tap sampling events, saving money in laboratory costs and Water Operator staff hours. CCUA has asked Kimley-Horn to conduct the corrosivity study for Saratoga Springs WTP to eliminate the need once again for the initial lead and copper tap monitoring that would otherwise be required. Staff considers the Kimley-Horn scope of services and fee to be reasonable. BUDGET: Operations did not budget for this item. Staff plans to use funding from the Environmental Compliance Department's Subcontractors budget for this project. RECOMMENDATION: Staff respectfully requests the Board of Supervisors approve Supplemental Agreement No. 2 with Kimley-Horn and Associates, Inc., in the amount of $1,000 for the Saratoga Springs Water Treatment Plant(WTP) Corrosivity Water Sampling ATTACHMENTS: Supplemental Agreement No. 2 with Kimley-Horn and Associates, Inc. Scope of Work and Fee Proposal //HW(Author) //DM,AB(Review) //HW(Final) Supplemental Agreement No. 2 to the Hydrogeological and Environmental Professional Engineering Services RFQ Agreement 2022/2023-A02 to Provide Professional Hydrogeological and Environmental Professional Engineering Services for the Saratoga Springs Water Treatment Plant Corrosivity Study and Report Engineer: Kimley-Horn and Associates, Inc. Owner: Clay County 12740 Gran Bay Parkway West, Suite#2350 Utility Authority Jacksonville, FL 32258 Date: December 19, 2023 Item Description of Services Provide Hydrogeological and Environmental Professional Services as requested and identified in the attached scope of services and fee proposal dated November 3, 2023 Phase 1 Water Quality Sampling $ 447.02 Phase 2 Letter Report $ 552.98 Total Cost Plus Expenses Not To Exceed Without Prior Authorization $ 1000.00 The Contract time shall commence on the needed date. This document, along with the attached scope and fee request and the November 3, 2023, Fee Proposal, shall become an amendment to the RFQ Agreement 2022/2023-A02 and all provisions of the Agreement will apply hereto. Accepted by: Date: Engineer: Joseph P. Mecca, PE Senior Vice President Kimley-Horn and Associates, Inc. Accepted by: Date: Owner: Jeremy D. Johnston, MBA, PE Executive Director Clay County Utility Authority CCUA Hydrogeological & Environmental Professional Engineering Services RFQ 22/23—A02 Contract Saratoga Springs Corrosivity Water Sampling Clay County Utility Authority (CCUA) is planning to connect the Saratoga Springs Treatment Plant (WTP) to its Lake Asbury Grid.As such,the Florida Department of Environmental Protection (FDEP) is requesting that CCUA conduct water quality sampling to demonstrate that the addition of the water from Saratoga Springs WTP will not affect the corrosivity of the water within the Lake Asbury Grid. Kimley-Horn and Associates, Inc. (Kimley-Horn) will conduct water quality sampling at three locations to evaluate corrosivity. Additionally, Kimley-Horn will prepare and submit a letter report to the FDEP documenting the corrosion analysis. Scope of Services The following scope of services is for Phase 1 and 2. Phase 1 Water Quality Sampling This task primarily consists of the collection of up to three water quality samples from the Saratoga Springs WTP, and the Lake Asbury Grid. Laboratory analysis will be performed by Advanced Environmental Laboratories, Inc. (AEL). AEL will direct bill CCUA for the analytical analyses. This task will consist of the following: A. Coordinate with CCUA staff to collect the three water quality samples. B. Coordinate with AEL to analyze the samples for lead, copper, pH, and corrosivity. C. The following field parameters will be measured and recorded during sampling:temperature, pH, specific conductance, dissolved oxygen, oxidation/reduction potential, and turbidity. D. The water quality samples will be collected in laboratory provided and preserved containers. E. Sampling will be performed in general accordance with FDEP Standard Operating Procedures. F. Deliver samples to AEL for analysis under chain-of-custody protocol. Phase 2 Letter Report Kimley-Horn will prepare a letter report upon receipt of the laboratory results. The letter report will include the following: A. Concise summary of the sampling methodology and results. B. Tabular summary of the laboratory data. C. Discussion and interpretation of the analytical data. D. Conclusions and recommendations based on the analytical results. E. Copies of the field sampling logs. F. Copies of the laboratory data sheets. Kimley-Horn will provide CCUA with a draft copy of the letter report to review prior to submittal to the FDEP. The final letter report will be signed and sealed by a Professional Geologist (P.G.) licensed in the State of Florida. The final report will be submitted in electronic (PDF) format, unless requested by CCUA or the FDEP to furnish hard copies. Fee The attached table provides our fee for the project. CCUA Price Proposal Form Project: CCUA Hydrogeological&Environmental Professional Engineering Services RFQ 22/23 A02 Contract- Saratoga Springs Water Sampling Project Job Title Sr.Professional Professional Professional Analyst Senior Support Support Totals Hourly Rate $ 268.76 $ 237.03 $ 172.09 $ 119.60 $ 175.35 $ 99.50 Sub-consultant Direct Costs Hours Hours Hours Hours Hours Hours ASRus $ $ $ $ $ $ $ Phase 1 Task 1 Water Sampling 4 $ 412.72 $ 34.30 $ 447.02 Task 2 Letter Report 0.5 3.5 $ 134.38 $ 418.60 $ - $ 552.98 $ - $ $ - $ $ $ $ 0.5 0 0 7.5 0 0 TOTAL $ 134.38 $ - $ - $ 831.32 $ - $ - $ - $ 34.30 $ 1,000.00 Total Lump Sum Fee: $ 1,000.00 Total Lump Sum Fee One thousand dollars and zero cents. 11/3/20233:23 PM