Loading...
HomeMy WebLinkAbout08.e ITB 23-24-A03 Swimming Pen WM EXECUTIVE SUMMARY AGENDA ITEM: Proposed award of contract to T B Landmark Construction,Inc.,for the Swimming Pen Creek Water Main Interconnection Project CCUA Bid No.: 2023/2024-A03 CCUA Project No.: 2021-097 CCUA Financial Job No.: 21020WL Date: January 12,2024 BACKGROUND: CCUA staff seeks approval from the Board of Supervisors to execute a contract with T B Landmark Construction,Inc. (TBL), for the construction of the Swimming Pen Creek Water Main Interconnection. CCUA serves the Fleming Island area from two (2) water treatment facilities, Pace Island and Fleming Oaks. A 2020 Risk and Resiliency Assessment of CCUA's potable water system by Reiss Engineering identified vulnerabilities of the Fleming Island water service area including flooding and other extreme weather events. The report identified the interconnection of the Fleming Island system with CCUA's mainland plants by interconnecting the systems across Swimming Pen Creek as a valuable countermeasure to mitigate the possibility of disruptions to the homes and businesses within the service area.. CCUA staff also applied for and received a grant from the Florida Depai anent of Environmental Protection for $500,000 to be used for construction expenses. On October 31, 2023, and November 2, 2023, staff publicly advertised the above-referenced project on CCUA's Bonfire Procurement Portal and in the Florida Times-Union,respectively. At the December 12, 2023,bid opening, CCUA received one(1)bid from TBL for the total amount of$5,319,419. During design,the consulting engineer,Jacobs Engineering,provided an Opinion of Probable Construction Cost (OPCC) of$2,886,000. Though the bid exceeds the OPCC by 1.84 times, considering the volatility of the current market and the critical nature of the project,proceeding with the project is in the best interest of CCUA. The Jacobs Engineering project manager, Samantha Hanzel, PE, and staff evaluated the submittal for conformance with the solicitation requirements and deemed the bid submittal both responsive and responsible. BUDGET: The 23/24 budget included a project budget of$4,060,000A summary of the CIP budget is as follows: Original CIP budget $4,060,000.00 Revised Budget and Detail Feasibility Study $ 111,853.00 Design Construction $ 687.354.00 Construction Costs $ 5,319,419.00 Construction Contingency(10%) $ 541,374.00 Total Revised Budget $ 6,660,000.00 Funds from Contingency $2,600,000.00 Grant Funds in CIP Revenue $ 500,000.00 Net Funds from CCUA $2,100,000.00 //DD(Author) //AW,DP,AB(Review) //PS(Final) RECOMMENDATION: Staff respectfully requests the Board of Supervisors approve and authorize the execution of the contract with T B Landmark Construction, Inc. for the construction of the Swimming Pen Creek Water Main Interconnection project for a total of$5,319,419. Staff also requests the Board of Supervisors approval of deductive change orders and owner-direct purchase orders for the express purpose of saving sales taxes on major materials and equipment, as authorized by the Executive Director, or his designee, and as recommended by the Chief Engineer. In addition, staff also requests approval of the attached Bid Documents. ATTACHMENTS: Florida Times-Union Advertisement Pre-Bid Meeting Sign-In Sheet Bid Opening Sign-In Sheet Engineer of Record Recommendation //DD(Author) //AW,DP,AB(Review) //PS(Final) LOCA LiQ FLORIDA PO Box 631244 Cincinnati, OH 45263-1244 PROOF OF PUBLICATION INVITATION TO BID NOTICE IS HEREBY GIVEN Darrin Parker THAT Clay County Utility Authority (CCUA), Clay County, Florida, will Accounts Payable be accepting sealed Bids for ITB# ClayCountyUtilityAuth 23/24-A03 Swimming Penn Creek Water Main Interconnect Proiect, 3176 Old Jennings RD which will be received until 2:00 MiddleburgFL 32068 3907 P.M. (EST), December 12, 2023, at the following location: The complete Solicitation package can be obtained by visiting: https://clayutility.bonfirehub.com/po STATE OF WISCONSIN, COUNTY OF BROWN rtal/?tab=openOpportunities. Submissions must be posted to the Clay County Utility Authority Bonfire Procurement Portal located ub.com. Before the undersigned authoritypersonallyappeared,who (Hardcopies h willllnot b nace accepted). g pp not be accepted). on oath says that he or she is the Legal Coordinator of The Swimming Penn Creek Water Main Interconnect Project Florida Times-Union, published in Duval and Clay Counties, A Mandatory Pre-Bid Meeting and Site Visit (herein so called) will be Florida;that the attached copy of advertisement, being a held on Thursday, November 9, 2023, at 9:30 A.M. (EST) at the Govt Bids& Proposals,was published on the publicly following location: accessible website of Duval and Clay Counties, Florida, or in Clay County Utility Authority a newspaper by print in the issues of, on: Board of Supervisors Room (Boardroom) 3176 Old Jennings Road 11/02/2023 Middleburg, Florida 32068-3907 All questions and concerns regard- ing this Solicitation must be submit- Affiant further says that the website or newspaper complies mentn the CCUA Bonfire Propertael with all legal requirements for publication in chapter 50, https://clayutllity.bonfirehub.com prior to 5:00 P.M. (EDT) on Florida Statutes. Friday, November 17, 2023. Late questions may be answered at the Subscribed and sworn to before me, by the legal clerk, who discretion of CCUA. All responses to questions will be uploaded to the is personally known to me, on 11/02/2023 Portal and issued in an Addendum on Tuesday, November 28, 2023, by 5:00 (EST). CCUA reserves the right to change the time and date of the Mandatory '37(::.------ -.. --7 Legal Clerkyvkk0/\ Pre-Bid Meeting, to change the Bid g due date and time,to waive formali- ties in any Bid, to reject any or all Bids with or without cause, and/or to Notary,State of WI,County of Brown accept the Bid or any portion 7 / , 7,6 thereof that, in the CCUA'S sole and CJU `Jl absolute judgment, will be in the best interest of CCUA. My commision expires 11/2/2023 Publication Cost: $102.66 Order No: 9463821 #of Copies: Customer No: 759750 1 PO#: THIS IS NOT AN INVOICE! Please do not use this form,for payment remittance. IMARIAH AGEN NotaryVERH Public State of Wisconsin C Page 1 of 1 „yY!,,, , PRE-BID MEETING SIGN-IN SHEET SWIMMING PEN CREEK WATER MAIN INTERCONNECTION PROJECT CCUA Bid No. 23/24-A03 Date: November 9, 2023, 9:30 A.M. (EST) Name Company E-Mail Address Darrin G. Parker W Clay County Utility Authority dgparker(a�clayutility.orq (1) Darrell Damrow ,c4 4 Clay County Utility Authority ddamrowCa�clavutility.orq Samantha Hanzel 5i4 Jacobs Engineering Group, Inc. samantha.hanzel c(Diacobs.com "rile{ P,nclet 8esciA and Srn:th Cv`‘ I Tlerr be ,cha, d sni; it,Co.-, 5164c. lairke.,A' 7.g, cv(weu. co&I-e n& - . .Awx)1 Bco u_.tO 5 ryuv.coq(e. () z . `(,_i/4.((ovikrad-va 19a^ \rq) `V) (0.u,,eII coy. i ✓ __, v NhAii.e Et lez beva,er Sae7)14s �. ri4iyke eklaA If tcciaro icteobc J - V Q-514-1•` vaL f5/A-t It -,k 6)05111,0461A J10i✓l JCo 'fbiGKIWYk.Go GAN- scot, etvey+bark Q .7-D i«ncdt ta�.Ce �"(j Lclr• 01 r1uYIL Con��-�acfi`��t S r� ve�bar� ct.,\A kr'0.)/ ) tM c Gkx,„„ ca�, (t�lt v.-Ai ^\t.O.,=.eUvM TSCc 'MeCA_Nrs ( ,^-3WO•d‘; ikcc,.,F�ls .C� 5�,,. �e i� �z�E� if kLCp 7 Coo l! i�h L �. lorry C V ?c,,,, . SUi.-1-,cfrit 1 ,k_ KcL D�J�I Wl�✓1 bluy 'rOyO46Vcgr lL ) ,,i a✓1 1 .61 f k_� d'eZYP / -6. BID OPENING SIGN-IN SHEET SWIMMING PEN CREEK WATER MAIN INTERCONNECTION PROJECT CCUA Bid No. 23/24-A03 Date: December 12, 2023, 2:00 P.M. (EST) Name Company E-Mail Address Darrin G. Parker Clay County Utility Authority dgparker@clayutility.org Darrell Damrow Clay County Utility Authority ddamrow@clayutility.org Ashton Thigpen T B Landmark Construction Inc. ashtont@tblandmark.com Jacobs 200 W. Forsyth St.,Suite 1520 Jacksonville,Florida 32202 United States T+1.904.636.5432 www.jacobs.com Mr. Darrell Damrow, P.E. Clay County Utility Authority 3176 Old Jennings Road Middleburg, Florida 32068 January 2, 2024 Subject: Engineer's Construction Recommendation of Award Swimming Pen Creek Water Main Interconnect CCUA Project No.2021-097/CCUA Bid Procurement No.23/24-A03 Dear Mr. Damrow and Governing Board Members: Jacobs has reviewed the bids opened by Clay County Utility Authority(CCUA)for the Swimming Pen Creek Water Main Interconnect project that were acknowledged and opened on December 12, 2023 at 2:00 PM local time. One (1) bid was received by CCUA. Bid result was as follows: • TB Landmark Construction, Inc. $5,319,419.00 The received bid was reviewed by Jacobs and the bidder met the solicitation requirements. The lowest responsive bidder for the project is TB Landmark Construction, Inc. In review of Florida Statue 225.20, and our ongoing experience with the firm on other projects, it is our recommendation that the Swimming Pen Creek Water Main Interconnect project be awarded to TB Landmark Construction, Inc. in the amount of$5,319,419.00. Regards JACOBS 3aottutikAA T1 0114L, Samantha L. Hanzel P.E. Jacobs Engineering Group Inc.