Loading...
HomeMy WebLinkAbout05.e.02 DA CU23.24-8 - Clay Town Center Lot 9 Return to: Clay County Utility Authority 3176 Old Jennings Road CU23/24-8 Middleburg, Florida 32068-3907 Parcel No.: 32-04-25-008102-013-00 CLAY TOWN CENTER—LOT 9 Clay County 1660 JEREMIAH STREET (Clay Utility System) Name of Project DEVELOPER AGREEMENT THIS DEVELOPER AGREEMENT ("Agreement"), made and entered into this day of 3-at .1a , 2024, by and between CLAY TOWN CENTER VILLAGE, LLC a Delaware limited liability company, hereinafter referred to as "Developer", and CLAY COUNTY UTILITY AUTHORITY,an independent special district established under Chapter 94-491,Laws of Florida,Special Acts of 1994, hereinafter referred to as "Utility". WHEREAS, Developer owns or controls lands located in Clay County, Florida, and described in Exhibit "A", attached hereto and incorporated herein by reference (hereinafter "Property"); WHEREAS, Developer desires that the Utility provide central water, pumping, treatment and distribution service and/or central wastewater collection,treatment and disposal,and central reclaimed water service for the Property; WHEREAS,the Utility is willing to provide,in accordance with the provisions of this Agreement, central water, wastewater, and reclaimed water service to the Property and thereafter operate applicable facilities so that the occupants of the improvements on the Property will receive adequate water,wastewater, and reclaimed water service from the Utility; WHEREAS, it is the intent of the parties that the Developer shall perform certain obligations hereunder; and WHEREAS,the parties wish to enter into this Agreement setting forth their mutual understandings and undertakings regarding the furnishing of potable water,wastewater,and reclaimed water service by the Utility to the Developer's Property. NOW, THEREFORE, for and in consideration of the premises, the mutual undertakings and agreements herein contained and assumed,Developer and Utility hereby covenant and agree as follows: 1. The foregoing statements are true and correct. 2. The following definitions and references are given for the purpose of interpreting the terms as used in this Agreement and apply unless the context indicates a different meaning: (a) "Consumer Installation" -All facilities ordinarily on the consumer's side of the point of delivery. (b) "Contribution-in-Aid-of-Construction(CIAC)" -The sum of money and/or the value of property represented by the cost of the wastewater collection system,potable water distribution system, and reclaimed water distribution system constructed or to be constructed which Developer or owner transfers,or agrees to transfer,to Utility,if so designated by the Utility,at no cost to Utility to provide utility service to specified property. -2 - (c) "Equivalent Residential Connection(ERC)" -A factor expressed in gallons per day (GPD)which is used to convert a given average daily flow(ADF)to the equivalent number of residential connections. For this purpose the average daily flow of one potable water ERC is (450) GPD, one wastewater ERC is (311) GPD, and one reclaimed water ERC is (275) GPD. (d) "Point of Delivery"-The point where the pipes or meter of Utility are connected with the pipes of the consumer. Point of delivery for potable water and reclaimed water service shall be at the consumer's side of the meter and for wastewater service at the lot or property line. Utility shall,according to the terms and conditions hereof, own'all pipes and appurtenances to the point of delivery unless otherwise agreed. The pipes and appurtenances inside the point of delivery shall belong to others. (e) "Service" - The readiness and ability on the part of Utility to furnish and maintain water,wastewater,and reclaimed water service to the point of delivery for each lot or tract pursuant to rules and regulations of applicable regulatory agencies. 3. Assurance of Title-Developer represents and warrants that he is the owner of the Property and has the legal right to grant the exclusive rights of service contained in this Agreement. Upon request, Developer agrees to deliver to Utility evidence of such ownership including any outstanding mortgages, taxes, liens and covenants. • 4. Connection Charges-In addition to the contribution of any wastewater collection systems, water distribution systems, and reclaimed water systems where applicable,and further to induce Utility to provide potable water,wastewater service,and reclaimed water service,Developer hereby agrees to pay to Utility the following fees and charges, as defined in the Rate Resolution (including Service Availability Policy), upon execution of this Agreement in order to reserve capacity in the System: (a) Potable Water Capacity Charge: ($450.00 x 3.00 ERCs) $ 1,350.00 * Alternative Water Supply Surcharge: ($388.01 x 3.00 ERCs) $ 1,164.03 * SJRWMD Black Creek Water Resource Charge: ($105.19 x 3.00 ERCs) $ 315.57 * Wastewater Capacity Charge ($4,100.00 x 3.00 ERCs) $ 12,300.00 * Reclaimed Water Capacity Charge: ($300.00 x 1.00 ERCs) $ 300.00 * Debt Service Charge: ($191.00 x 3.00 ERCs) $ 573.00 * (b) Main Extension Charge - Water $ N/A Main Extension Charge- Wastewater $ 1,710.15 ** (c) Fire Protection Charge $ N/A (d) Meter Installation Charge $ 2,840.38 *** (e) Plan Review Fee $ 1,001.00 (f) Inspection Fee $ 885.36 (g) Recording Fee $ 150.75 Total $ 22,590.24e * - Includes 3.00 ERCs for water,3.00 ERCs for wastewater,based on a 7,200 square feet multi- purpose lease space commercial building, and 1.00 ERC for reclaimed irrigation water service,based on 258.72 AGPD, all in accordance with Utility's current Rate Resolution. ** - See paragraph 42 for an explanation of charges. *** - Includes (2)two 1 1/2-inch potable water meters for the building and one 1-inch reclaimed water meter for irrigation (does not include meter boxes). Note: Items (e) and(f) are estimates and are subject to adjustment based on actual cost incurred. - 3 - Payment of the above charges does not and will not result in Utility waiving any of its rates or rules and regulations and their enforcement shall not be affected in any manner whatsoever by Developer making payment of same. Except as specifically stated, Utility shall not be obligated to refund to Developer any portion of the value of the above charges for any reason whatsoever nor shall Utility pay any interest upon the above charges paid. Except as otherwise stated in this Agreement, neither Developer nor any person or other entity holding any of the Property by,through or under Developer, or otherwise, shall have any present or future right,title, claim or interest in and to the charges paid or to any of the potable water, reclaimed water, or wastewater facilities and properties of Utility,and all prohibitions applicable to Developer with respect to no refund of such charges,no interest payment on said charges and otherwise,are applicable to all persons or entities. Paid capacity or connection charges may not be applied to offset any service bill or other claims of Utility. 5. On-Site Installations - On-site facilities are those located within the Property for which Developer is requesting service. Developer shall convey to Utility, if so designated by Utility, all on-site water and wastewater lines, laterals, mains, lift stations, pump stations and appurtenant facilities (collectively referred to as "Components" or "On-Site System") on the Property with all contractual guarantees relating thereto. Conveyance shall take place within a reasonable time after installation of the On-Site System but prior to Utility's obligation to provide service. Until such time as the On-Site System is conveyed, the same shall be operated and maintained by Developer. In its sole discretion, Utility may decline to accept the On-Site System,may lease the On-Site System from Developer,or agree to such other arrangement as it deems appropriate. Utility shall have the right and obligation,at the Developer's expense,to construct and/or approve the construction of the on-site installations which shall be owned and maintained by Utility,if so designated by Utility. The Utility shall also have the right to review all plans and specifications,connections to its system and the Developer shall pay a fee equal to the Utility's actual cost to review such plans and specifications. The Utility shall have the right to inspect all phases of construction undertaken by outside contractors for facilities which are to be owned by the Utility,if so designated by Utility. The Developer will reimburse the Utility for its costs for such inspection, including all overhead associated with same. Where on-site temporary pump stations or backflow prevention devices are required,they shall be paid for one hundred percent (100%) by the Developer without any provision for refund. Utility reserves the right to require backflow prevention devices on all water service connections. The On-Site System shall be constructed in compliance with all regulatory requirements and the specifications and requirements of Utility. No construction shall commence until Utility has reviewed and approved Developer's contractor and the plans and specifications for construction of the potable water, wastewater,and reclaimed water systems for the project. The proposed electrical transformer layout of the electric utility providing service must be provided to the Utility prior to commencement of construction. -4 - Developer shall guarantee Utility against defects in material and workmanship for the portion of the On-Site System to be owned by the Utility or County, if so designated by Utility. Developer shall secure from its contractor a written and fully assignable warranty that the system installed will be and remain free from all defects,latent or otherwise,with respect to workmanship,materials and installation in accordance with Utility-approved plans and specifications, for a period of two (2) years from the date of the system acceptance by the Utility,and immediately assign the same and the right to enforce the same to the Utility on or before such date. The Developer shall also provide to the Utility, at Developer's sole expense, such maintenance bond and other form of security acceptable to Utility in such amounts approved by Utility, which by its or their express terms protect and indemnify Utility against any loss, damage, costs, claims, debts or demands by reason of defects,latent or otherwise, in the system to be and remain in effect for two (2)years from the date of the system acceptance by Utility. In addition to any other promises,guarantees or warranties to be provided by Developer to the Utility hereunder,Developer agrees to protect and indemnify Utility against any loss,damage,costs,claims,debts or demands by reason of defects, latent or otherwise, in the system which could not have been reasonably discovered upon normal engineering inspection,to be and remain in effect for a period of two(2)years from the date of the system's acceptance by Utility. Developer agrees to transfer to Utility,if so designated by Utility,title to all water distribution and wastewater collection systems installed by Developer or Developer's contractor,which the Utility has agreed shall be owned and maintained by it pursuant to the provisions of this Agreement and shall: (a) Deliver a Bill of Sale and No Lien Affidavit in a form acceptable to Utility for such potable water distribution,reclaimed water distribution, and wastewater collection systems. (b) Provide copies of invoices and Release of Liens from contractor for installation of the utility systems as well as for any repairs to the Systems which may have been caused by other subcontractors during construction. (c) Assign any and all warranties and/or maintenance bonds as set forth herein. (d) Provide all operations, maintenance and parts manuals, as-built plans complying with Utility's specifications, and other documents required for operation of the utility system. (e) Convey to Utility, if so designated by Utility, easements and/or rights-of-way covering all areas in which potable water,reclaimed water, and wastewater systems are installed,with adequate legal access to same,byrecordable document satisfactoryto Utility. tY (f) Convey to Utility,if so designated by Utility,by recordable document in form satisfactory to Utility,fee simple title to lift station and pump station sites,along with recordable ingress/egress easement documents. (g) Provide a copy of the Project Engineer's final certification of completion to the Florida Department of Environmental Protection certifying installation of all potable water and wastewater facilities in accordance with approved plans. -5 - 6. Off-Site Installations - Developer shall further construct all transmission mains, pump stations and appurtenant facilities necessary to connect the On-Site System to the nearest appropriate point in Utility's transmission system,as determined by Utility. Utility may require Developer to oversize off-site transmission mains and appurtenant facilities in a manner consistent with Utility's Wastewater System Master Plan. The costs associated with construction of over-sized facilities which provide Utility with excess capacity for the benefit of other properties may be subject to refundable advance treatment pursuant to Utility's Service Availability Policy. The same construction standards, warranty requirements, maintenance bond requirements, transfer of title by Bill of Sale, and indemnification requirements, as provided under paragraph 5 of this Agreement, shall also apply to the Off-Site installations. 7. Agreement to Serve - Upon the completion of construction of the On-Site and Off-Site Facilities by Developer, or an appropriate phase thereof, and compliance with the terms and conditions of this Agreement and Utility's Service Availability Policy, Utility will allow connection or oversee the connection of the wastewater collection facility,potable water distribution facility,and/or reclaimed water facility installed by Developer to the central facilities of Utility in accordance with all rules,regulations and orders of the applicable governmental authorities. Utility agrees that once it provides potable water, reclaimed water, and/or wastewater service to the customers within the Property that it will continuously provide such service,at its cost and expense,but in accordance with the other provisions of this Agreement, the then current Rate Resolution in effect for Utility,and the requirements of the governmental authorities having jurisdiction over the operations of Utility. Utility shall not be liable for any temporary interruptions in service as a result of equipment failure, emergencies or Act of God. The covenants and agreements of Developer contained in paragraphs 5,6,and 7 hereof shall survive Utility's acceptance of any On-site and Off-site Facilities and Utility's commencement of service to the Property. Should any such covenant or agreement of Developer in fact be outstanding following either or both of such dates,then,notwithstanding any contrary provision contained herein,Utility may,upon thirty (30)days advance written notice and demand for cure mailed to Developer,temporarily interrupt service to the Property until such outstanding covenant or agreement of Developer is satisfied in full. Utility shall not be liable for any temporary interruptions in service as a result of any action authorized or permitted by this paragraph. 8. Application for Service - Developer, or any owner of any parcel of the Property, or any occupant of any residence,building or unit located thereon shall not have the right to and shall not connect any consumer installation to the facilities of Utility until formal written application has been made to Utility by the prospective user of service, or either of them, in accordance with the then effective rules and regulations of Utility and approval for such connection has been granted. 9. Easements - Developer hereby grants and gives to Utility, its successors and assigns, but subject to the terms of this Agreement, the exclusive right or privilege to construct, own, maintain and operate the potable water,wastewater,and reclaimed water facilities to serve the Property in,under,upon, over and across the present and future streets, roads, alleys, utility easements, reserved utility strips and utility sites. Mortgagees, if any,holding prior liens on the Property shall be required to release such liens, subordinate their position or join in the grant or dedication of the easements or rights-of-way, or give to Utility assurance by way of a "non-disturbance agreement", that in the event of foreclosure, mortgagee would continue to recognize the easement rights of Utility. All potable water, reclaimed water, and wastewater collection facilities, save and except installations owned by Developer, or its successors or assigns, shall be covered by easements or rights-of-way if not located within platted or dedicated roads or rights-of-way for utility purposes and there shall be adequate legal access to same. -6 - The use of easements granted by Developer to Utility shall not preclude the use by other utilities of these easements,such as for cable television,telephone,electric,or gas utilities. However,the use of such non-exclusive easements by third parties shall not interfere with Utility's utilization of same. Utility hereby agrees that all easement grants will be utilized in accordance with the established and generally accepted practices of the potable water,reclaimed water,and wastewater industry with respect to the installation of all its facilities in any of the easement areas. 10. Utility's Exclusive Right to Utility Facilities-Developer agrees with Utility that all potable water,reclaimed water,and wastewater facilities accepted by Utility in connection with providing potable water, reclaimed water and wastewater services to the Property, shall at all times remain in the sole, complete and exclusive ownership of Utility, and any person or entity owning any part of the Property or any residence,building or unit constructed or located thereon,shall not have any right,title,claim or interest in and to such facilities or any part of them, for any purpose, including the furnishing of potable water, reclaimed water,and wastewater services to other persons or entities located within or beyond the limits of the Property. 11. Exclusive Right to Provide Service-Developer shall not engage in the business of providing potable water services or sanitary wastewater services to the Property during the period of time Utility provides water and wastewater services to the Property. Utility shall have the sole and exclusive right and privilege to provide water and wastewater services to the Property and to the occupants of such residence, building or unit constructed thereon. 12. Rates-Utility agrees that the rates to be charged to Developer and individual consumers of water and wastewater services shall be those set forth in the then current Rate Resolution most recently adopted by the Board of Supervisors of the Clay County Utility Authority as may be amended from time to time.However,notwithstanding any provision in this Agreement, Utility, its successors and assigns,may establish,amend or revise,from time to time in the future,and enforce in a reasonable manner,rates or rate schedules so established. Notwithstanding any provision in this Agreement,Utility may establish,amend or revise,from time to time, in the future, and enforce rules and regulations covering water and wastewater services to the Property. However,all such rules and regulations so established by Utility shall at all times be reasonable and subject to such regulations as may be provided by law or contract. 13. Quality of Wastewater-All commercial facilities which discharge non-domestic type wastes into the Utility's collection system are required to meet the requirements of Resolution 21/22-05 (Pretreatment Resolution) with regard to waste quality. In addition, facilities with photographic development operations may be required to install and maintain a silver recovery unit in order to meet the requirements of this resolution. Discharge of floor finish stripper products and waste to the collection system requires an Industrial Pretreatment Permit issued by Utility. Developer, tenant or the Property/project owner must inform Utility of its intent to discharge any floor finish stripper product and waste. Upon notification, a permit application will be sent to Developer, tenant or the Property/project owner to be completed and submitted to Utility for processing. A permit fee is not required by Utility for an Industrial Pretreatment Permit. Failure to follow these procedures may result in termination of water and wastewater service. - 7 - 14. Binding Effect of Agreement-This Agreement shall be binding upon and shall inure to the benefit of Developer, Utility and their respective assigns and successors by merger, consolidation, conveyance or otherwise. Any assignment or transfer by Developer shall be subject to Utility approval which shall not be unreasonably withheld provided the assignee or transferee shall acknowledge in writing that it assumes the duties and responsibilities of Developer as set forth in this Agreement. 15. Notice - Until further written notice by either party to the other, all notices provided for herein shall be in writing and transmitted by messenger,by mail or by electronic mail,and if to Developer, shall be mailed or delivered to Developer at: Clay Town Center Village,LLC Attn.: David Kight 2300 Marshpoint Road, Suite 202 Neptune Beach,FL 32266 and if to the Utility at: Clay County Utility Authority 3176 Old Jennings Road Middleburg, Florida 32068-3907 or such other address as specified in writing by either party to the other. 16. Laws of Florida-This Agreement shall be governed by the laws of the State of Florida and it shall be and become effective immediately upon execution by both parties hereto,subject to any approvals which must be obtained from governmental authority, if applicable. 17. Costs and Attorney's Fees -In the event the Utility or Developer is required to enforce this Agreement by court proceedings, by instituting suit or otherwise, then venue shall lie in Clay County, Florida,and the prevailing party shall be entitled to recover from the other party all cost incurred,including reasonable attorney's fees. 18. Force Majeure - In the event that the performance of this Agreement by either party is prevented or interrupted in consequence of any cause beyond the control of either party, including,but not limited to Act of God or of the public enemy,war,national emergency,allocation or of other governmental restrictions upon the use or availability of labor or materials,civil disorder,strike,embargo,natural disaster or catastrophe, unforeseeable failure or breakdown of transmission, treatment or other facilities, governmental rule, act, order, restriction, regulation, statute, ordinance, or order, decree, judgment, restraining order or injunction of any court, said party shall not be liable for such non-performance. 19. Indemnification - Developer agrees to indemnify and hold the Utility harmless from and against any and all liabilities,claims,damages,costs and expenses(including reasonable attorney's fees)to which it may become subject by reason of or arising out of Developer's performance of this Agreement. This indemnification provision shall survive the actual connection to Utility's potable water,wastewater and reclaimed water systems. - 8 - MISCELLANEOUS PROVISIONS 20. The rights,privileges,obligations and covenants of Developer and Utility shall survive the completion of the work of Developer with respect to completing the facilities and services to any development phase and to the Property as a whole. 21. This Agreement supersedes all previous agreements or representations, either verbal or written, heretofore in effect between Developer and Utility, made with respect to the matters herein contained,and when duly executed,constitutes the agreement between Developer and Utility. No additions, alterations or variations of the terms of this Agreement shall be valid,nor can provisions of this Agreement be waived by either party,unless such additions,alterations,variations or waivers are expressed in writing and duly signed. 22. Whenever the singular number is used in this Agreement and when required by the context, the same shall include the plural, and the masculine, feminine and neuter genders shall each include the others. 23. Whenever approvals of any nature are required by either party to this Agreement,it is agreed that same shall not be unreasonably withheld or delayed. 24. The submission of this Agreement for examination by Developer does not constitute an offer but becomes effective only upon execution thereof by Utility. 25. Failure to insist upon strict compliance of any of the terms,covenants,or conditions herein shall not be deemed a waiver of such terms,covenants,or conditions,nor shall any waiver or relinquishment of any right or power hereunder at any one time or times be deemed a waiver or relinquishment of such right or power at any other time or times. 26. It is because of inducements offered by Developer to Utility that Utility has agreed to provide potable water, reclaimed water, and wastewater services to Developer's project. Capacity reserved hereunder cannot and shall not be assigned by Developer to Third Parties without the written consent of Utility, except in the case of a bona-fide sale of Developer's property. 27. Utility shall, as aforesaid, at all reasonable times and hours,have the right of inspection of Developer's internal lines and facilities. This provision shall be binding on the successors and assigns of the Developer. 28. The parties hereto recognize that prior to the time Utility may actually commence upon a program to carry out the terms and conditions of this Agreement,Utility may be required to obtain approval from various state and local governmental authorities having jurisdiction and regulatory power over the construction,maintenance,and operation of Utility. The Utility agrees that it will diligently and earnestly, make the necessary proper applications to all governmental authorities and will pursue the same to the end that it will use its best efforts to obtain such approval. Developer,agrees to provide necessary assistance to Utility in obtaining the approvals provided for herein. Upon execution of this Agreement, Utility may require the payment of a reasonable fee to defray Utility's legal,engineering,accounting and administrative and contingent expense. 29. It shall be Developer's responsibility or Developer's customers'responsibility,utilizing the project's potable water, reclaimed water, and wastewater service within Developer's project, to apply to Utility for service after the installation of the potable water,reclaimed water,and wastewater utilities,have been completed and accepted by Utility. Upon completion of application for potable water,reclaimed water, and wastewater service and payment of the appropriate charges set forth in Utility's then current applicable Rate Resolution, including any security deposits required, service will be initiated to customers within Developer's Property. - 9 - 30. Developer shall not place any conservation easements over any of the easement lands that contain Utility's water,wastewater or reclaimed facilities for the project covered by this Agreement. 31. Developer shall grant an easement to Utility covering any portion of the potable water, reclaimed water,and wastewater facilities that Utility agrees to own and maintain,and Developer shall be responsible for providing the legal description for such easement to Utility. 32. The landscaping for this project(new or existing)shall not include the planting of any trees within seven and one-half feet(7 ft. 6 in.)of any of the water,wastewater and/or reclaimed water mains to be owned by Utility. 33. The tap of the existing 10-inch water main, connection to Utility's system, and the construction of the water services from the main to the meter locations, shall be installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all of the requirements of Utility prior to Utility's acceptance for ownership and maintenance.Utility shall own and maintain the tap through the meters and all facilities downstream of the meters shall be owned and maintained by Developer. 34. The developer shall install or have installed reduced pressure type backflow prevention devices,which shall be located immediately downstream of the Utility's proposed(2)two 1 1/2-inch potable water meters; such installations shall be in compliance with the requirements of the Florida Department of Health and Rehabilitative Services and Utility. Upon the completion of the installation of said devices,the Developer shall provide to the Utility for its permanent records the Make,Model,Size,and Serial Number of said devices. Furthermore,these devices must be tested and recertified by a certified backflow prevention technician,annually or such other period as may be required by Utility. Proof of the annual testing and re- certifications must be submitted to Utility for its records. The installation and annual re-certifications shall be the responsibility of the Developer or its successors and assigns. Utility shall have access to the water meters during normal business hours for meter reading and maintenance purposes. 35. The Developer shall connect to Utility's existing sanitary sewer manhole and the connection to Utility's system shall be installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all of the requirements of Utility prior to Utility's acceptance for ownership and maintenance. All mains and service lateral lines servicing Developer's Property,which are located upstream of the connection to the existing sanitary sewer manhole,shall be Developer's responsibility for ownership and maintenance and Utility shall own and maintain all facilities downstream of Developer's connection to the existing sanitary sewer manhole. 36. Developer shall install or have installed grit/sand trap interceptors (stainless steel sand screens) for each floor drain, in accordance with Utility's requirements for same. Developer shall also be responsible for the continued maintenance and cleaning of said grit/sand interceptors,and such interceptors shall be subject to periodic unannounced inspections by Utility.Developer's maintenance staff shall assist Utility personnel by removing the floor drain grates for this inspection of the grit/sand collectors.Developer shall maintain records of maintenance and cleaning. Those records shall be made available to the Utility upon request. 37. Where food preparation facilities or other facilities that are subject to discharge greases into the wastewater collection system are part of the development of the property or where floor drains are connected to the wastewater collection system,the Developer shall install or have installed a grease/sand interceptors for each building, meeting the requirements of the Clay County Department of Health & Rehabilitative Services and the Florida Building Code, which shall be designed and constructed in accordance with Utility's specifications for same. Such installation shall be provided by a Florida Licensed Plumbing Contractor. The grease/sand interceptor shall be designed for the facilities connected to the same; however, in no event shall the capacity be less than standard per the current billing code. -10- The developer shall also be responsible for the continued maintenance and cleaning of said grease/sand interceptor facility and such facility shall be subject to periodic unannounced inspections by Utility. In addition, all floor drains shall be connected to the grease/sand interceptor. 38. Air conditioning condensation discharge lines and any other piping that may intentionally or unintentionally drain storm water shall not connect to Utility's wastewater system. 39. Developer shall be required to install an on-site irrigation system in full compliance with Utility's Reclaimed Water Policy(i.e., "Reuse Policy"),a true copy of which,in its current form,is attached hereto as Exhibit"C",and shall require that this system be operated and maintained in accordance with the rules and regulations of Utility,as well as all governmental agencies having jurisdiction over such reclaimed water system, and all parcels lying within the Property are hereby so restricted. 40. All elements of the Florida Department of Environmental Protection rules and regulations regarding the use of reclaimed water within the project will be adhered to at all times. This specifically g g p Y pertains to the Public Notice (posting of signs) provisions of the Florida Department of Environmental Protection rules and regulations,as well as all specific requirements pertaining to the use of reclaimed water in public areas and on roadways. 41. No wells shall be permitted within or upon the Property for any reason. 42. All irrigation contractors employed by Developer to install reclaimed water irrigation systems within the Property shall be registered with Utility.The criteria for registration is included in Utility's Cross- Connection Control Policy. Once registered, such irrigation contractor shall comply completely with Utility's Cross-Connection Control Policy and Reuse Policy. Cross-connection control inspections will not be conducted for irrigation contractors that are not registered with Utility. 43. The charge shown in paragraph 4(b) "Main Extension Charge - Wastewater", of this Agreement, is Developer's share of the cost of the gravity main and wastewater force main across Old Jennings Road,installed with the Summerbrook Subdivision development,as well as Developer's share of the cost to upgrade Lift Station#111,which is necessary to accommodate the additional wastewater from this project. 44. The charges shown in paragraphs 4(a)through(g)of this Agreement are to assess the charges for Clay Town Center—Lot 9,as shown on the plans prepared by Kimley-Horn and Associates,Inc.Project No.045655009(See Exhibit"B"),and do not include any other developments (future additions,buildings and/or out parcel projects,etc.)that are planned for this Property. A separate agreement will be prepared for the additional requirements of each future development on the Property when such development is initiated. 45. Since the usage of the lease space is undetermined at this time,the"Water Capacity Charge", "Alternative Water Supply Surcharge", "Wastewater Capacity Charge", "SJRWMD Black Creek Water Resource Charge","Debt Service Charge",and"Main Extension Charge—Wastewater"shown in Paragraph 4(a)through(b)of this Agreement will be determined at time of buildout and the charges will be based on Utility's then-current Rate Resolution. A supplemental agreement will be prepared to assess any additional charges to either the tenant or the Property/project owner or Lessor for the additional lease spaces,based on their mutual agreement on same,as the additional ERCs are determined.For each supplemental agreement prepared, a service charge of$100.00 will be assessed to prepare the agreement, in addition to the above stated connection charges.At a very minimum,Developer shall report to Utility fifteen (15) days prior to each space being occupied initially or in the future, so that the supplemental agreement for the water and wastewater connection charges can be prepared and executed before tenant occupancy. -11- In addition,if Developer has pre-planned and determined which meter will serve each lease space or unit of the flex rental space and provides that information to Utility,then Utility's staff will audit and verify which meter serves each individual unit of the buildings. This additional audit will be done in one trip for all meters at no additional charge.However,for each additional trip that,in Utility's opinion,is necessary to audit the meter/rental unit relationship, a service charge of$50.00 will be assessed for each extra trip required of staff to verify which meter serves each individual unit of the flex rental space. Should the audit take over three quarters of an hour,then each extra hour or portion thereof will be charged at$75.00 per hour. 46. This Agreement will need to be executed by Developer,the charges paid(shown on page 2 of Agreement), prior to October 1, 2024, and the construction of the utilities shall be commenced prior to October 1, 2024, or this Agreement will be subject to any Service Availability charge increases currently approved,which may be applicable or which may be approved by Utility's Board of Supervisors for the next fiscal year beginning October 1,2024; and this Agreement is subject to any material cost increases which Utility may experience after October 1,2024. [Signatures Begin on Next Page] -12- IN WITNESS WHEREOF,Developer and Utility have executed or have caused this Agreement,with the named Exhibits attached,to be duly executed in several counterparts, each of which counterpart shall be considered an original executed copy of this Agreement. WITNESSES: DEVELOPER: CL• TOWN CENTER VILLAG LLC a D: . are limited li. �ilitfirly/Api cs i'vvy By: At z � Seal rent Name: GB L4 1 - 40,57./14 s David Ki. anageil" Print Na e: s i e STATE OF COUNTY OF The foregoing instrument was acknowledged before me by means of 0 physical presence or ❑ online notarization this day of ,2023,by DAVIT)KIGHT,as MANAGER of CLAY TOWN CENTER VILLAGE, LLC a Delaware limited liability company, who is personally known to me or who has produced ,as identification. Print Name: My Notary Public in and for the County and State Aforesaid My Commission Expires: iffis CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. State of California ) County of San Diego ) On January 1 ' 2024 before me, Ash Nickle, Notary Public Date Here Insert Name and Title of the Officer personally appeared Dem,leJ b I Name(s)of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s)-whose name(s)-is/are- subscribed to the within instrument and acknowledged to me that he/sheithey executed the same in his/her,Ltleir authorized capacity(fes),'and that by his/herAheir signature(sjron the instrument the persop(s), or the entity upon behalf of which the persoe(s)-acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph ,SSW°`-f. ASH NICKLE is true and correct. �p �a Com#2339548 U) Yti !' =c NOTARY PUBLIC-CALIFORNIA l WITNESS my hand and official seal. $AN DIEGO COUNTY -• °trsoa�r MY C01,'!,I,EX?.d,4R.3,2025 " Signature Signature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Docu ent Title or Type of Document: Doafhf 0 ar ,4-9reeiv164 Document Date: / Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑Corporate Officer — Title(s): El Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑General ❑ Partner — ❑Limited ❑General ❑ Individual ❑Attorney in Fact ❑ Individual ❑Attorney in Fact ❑Trustee ❑Guardian or Conservator ❑Trustee ❑Guardian or Conservator El Other: ❑ Other: Signer Is Representing: Signer Is Representing: ©2015 National Notary Association •www.NationalNotary.org • 1-800-US NOTARY(1-800-876-6827) Item#5907 -13- WITNESSES: UTILITY: CLAY COUNTY UTILITY AUTHORITY Witn By: Print ame: r,Na M.&1114-h re D'` ohnst n, P.E., M.B.A. E ec r (Corporate Seal) Witness: �.►i- Print Name: Summer P. Berndt. STATE OF FLORIDA COUNTY OF CLAY The foregoing instrument was acknowledged before me by means of El physical presence or❑online notarization this 1144 day of 3 j asy , 2024, by JEREMY D. JOHNSTON, as EXECUTIVE DIRECTOR of the CLAY COUNTY UTILITY AUTHORITY,who is personally known to me. .a����u, . SUMMER P BERNDT &urivigt(P4no ;o c Notary Public-State of Florida Print Name: Summer P. Berndt °: *= Commission# HH 450194 ;,•ri.Ti�� My Commission Expires Notary Public '-n;;,0 January 26, 2028 State of Florida at Large My Commission Expires: o1/€Q6fGg CLAY TOWN CENTER—LOT 9 1660 JEREMIAH STREET Parcel No. 32-04-25-008102-013-00 EXHIBIT "A" (Parcels 7, 8, and 9) A PORTION OF SECTION 32, TOWNSHIP 4 SOUTH., RANGE 25 EAST, CLAY COUNTY, FLORIDA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCE AT TFIE NORTHWESTERLY CORNER OF SAID SECTION 32: THENCE SOUTH 00°21'12" EAST, ALONG THE WESTERLY LINE OF SAID SECTION 32. A DISTANCE OF 385.91 FEET; THENCE NORTH 89°38'48" EAST, 79.95 FEET, TO THE EASTERLY RIGHT OF WAY LINE OF BRANAN FIELD ROAD (A VARIABLE WIDTH RIGHT OF WAY, AS NOW ESTABLISHED), AND THE POINT" OF 13FCINNING; THENCE SOUTHERLY AND WESTERLY,ALONG SAID EASTERLY RIGI-IT OF WAY LINE, RUN THE FOLLOWING FOUR (4) COURSES AND DISTANCES: COURSE NO.. 1: SOUTH 00°40'10" WEST_21.64 FEET;COURSE NO. 2: SOUTH 00°20'48"EAST,42.91 FEET; COURSE NO. 3: SOUTH 89°38'48" WEST, 39.96 FEET; COURSE'. NO 4: SOUTH 00°21'12" EAST. 535.69 FEET; THENCE NORTH 89°39'43" EAST, 231.50 FEET; THENCE NORTH 00°21'12" WEST.456.91 FEET, TO THE POINT OF CURVATURE OF A CURVE LEADING NORTHEASTERLY;THENCE NORTHEASTERLY,ALONG AND AROUND THE ARC OF SAID CURVE. CONCAVE SOUTHEASTERLY, HAVING A RADIUS OF 233.50 FEET. AN ARC DISTANCE OF 153.83 FEET, SAID ARC BEING SUBTENDED BY A CIIORD BEARING AND DISTANCE OF NORTH 18°31'12" EAST, 151.07 FEET; THENCE SOUTH 89°45'06" WEST, 240.02 FEET, TO TI-IE POINT OF BEGINNING. t:lSmim.4rvlebilityDcvcleFcr AgccmmtAlva FJeVferel�er Agrtemrn Armm Ficld VJIagcNGRCWY Cnunty Tmm C.n4.Lat 9.lm.dec L 131213 r1IA/!g?d I0fl AAI EXHIBIT "B" DESCRIPTION OF APPROVED CONSTRUCTION PLANS (Less and except plans to be replaced due to;minor changes required) Project: Clay Town Center—Lot 9 Engineer: Sidney J.Reynolds P.E. Kimley-Horn and Associates,Inc. 12740 Gran Bay Parkway West, Suite 2350 Jacksonville,Florida 32258 Project No.: 045655009 Engineer Drawing Description Latest Engineer Number Approved Plan Date C-00 Cover Sheet 10/20/2023 C-02 General Notes 10/20/2023 C-02 Site Plan 10/20/2023 C-04 Clearing and Demolition Plan 10/20/2023 C-02 Paving and Geometry Plan 10/20/2023 C-04 Grading,and Drainage Plan 10/20/2023 C-08 Utility Plan 10/20/2023 C-09-C-10 Site Details 10/20/2023 C-11 Drainage Details 10/20/2023 C-12 Best Management Practice Details 10/20/2023 C-13 Stormwater Pollution Prevention Plan. 10/20/2023 C-14 Fire Truck Routing Plan 10/20/2023 S-SPD Utility Details 10/20/2023 WAT 01-WAT 04 Utility Details 10/20/2023 LW-STD Utility Details 10/20/2023 S-SEW Utility Details 10/20/2023 S-REI Utility Details 10/20/2023 S-UTC1 Utility Details 10/20/2023 �:VSmice A�ailebiliryV)nxloFcr AgmemmtALnmr FileDeeele9cr Agreanmm Hmnan Field Village AGRCIny Ceumy Tern Cents Lel9.jme.deo Lmt printed 1/3R@d 10:ST AM EXHIBIT "C" REUSE POLICY Page 1 of 2 Effective Date - Thirty(30)days after Board's approval of the policy,for all developments that have not met the filing requirements of the County's Zoning Department,which requires each new development to be reviewed by the Development Review Committee (DRC), or for those developments not requiring DRC approval,which have been quoted charges to connect to the Clay County Utility Authority's(CCUA)water and/or wastewater systems within twelve months prior to the effective date of the reuse policy. A filing for a DRC meeting,which is incomplete as of the effective date of this policy, shall not be considered as filed timely for the prior policy to apply. If the Developer has not commenced substantial construction on his project,which was filed with DRC prior to the effective date of this policy,within fifteen months after the effective date of the policy, then said development shall come under the provisions of this policy. Applicability - This policy will be applicable to all developments that file for a Development Review Committee review after the effective date of this policy. This shall include: A. Developments occurring under Development of Regional Impact(DRI)agreements which may not be technically required to install residential reuse,but who choose to do so in settlement of minor and/or major modifications to the structure and composition of developments within the DRI.These shall be regulated and charged under this proposed policy and effective date criteria the same as all other developments. B. Exceptions to the applicability of this policy and/or effective date are as follows: 1. Developments occurring under DRI agreements or Florida Quality Development (FQD) agreements, which are not required by said agreement to install residential reuse and who do not volunteer to provide residential reuse piping systems. 2. Developments which, as of the date of enactment of this policy, own and maintain their own reuse pumping plant and purchase bulk service from the CCUA. 3. Developments which have prepaid connection fees prior to January 1, 1998, at a prior approved rate and still have an inventory of prepaid connections, shall be exempt until such prepaid connections are used up. 4. Developments and/or communities that own, operate and maintain their own reuse infrastructure as of January 1, 1998. Developments Required to Install Wastewater Effluent Reuse Piping Systems and Take Reuse Water When it is Available - All developments occurring after the effective date of this policy will be reviewed by the CCUA staff for feasibility of the installation of a reuse piping system for irrigation purposes.These shall include commercial,public facilities, industrial, as well as residential developments. Summary of Criteria to be Utilized by Staff to Evaluate and Determine if Reuse Piping Systems will be Required - (1) Financial feasibility of extending a trunk main to an area at that time,or some planned future date, to provide reuse water to the proposed reuse system. This item shall consider the size of the development, distance to nearest master planned reuse trunk main or planned reuse plant, remaining developable property in the area,complexity of existing development of area which trunk mains must pass through, natural geographical barriers(or obstacles), environmental damage, etc. Last ice Arailabiliy0%veleper Ag�eemmtOlmtcr FJetDncleper Agteemcnta Brant Field VJkec AGRCIey County Town Cenlur lw+t9.jm..dm L Lest printed 1/32014 10:37 001 EXHIBIT "C" REUSE POLICY Page 1 of 2 (2) Remaining developable land in the area(new area with very little existing development and much growth potential will be considered more feasible than an already built-out area). (3) Availability of adequate reuse water within a reasonable time to service the reuse system. (4) CCUA's budgetary restraints. (5) Length of time before a reuse plant or pump station is expected to be built in the area. Surcharge for Developments not required to Install Reuse Piping Systems - Due to the built-out condition of certain geographical areas and the other evaluation of feasibility considerations noted above,it will not be practical to require all areas to install reuse piping systems. All developments that are not required to install the reuse system shall pay a surcharge per ERC as its share of the burden of the reuse system installations at a rate set forth in the "proposed charges for service availability". Requirement for Installation of an Automatic Sprinkler System - All developments where reuse piping systems are required shall install or require the installation of an automatic sprinkler irrigation system acceptable to CCUA for the development of each separate parcel(lot)within the development. Such on-site systems shall utilize color-coded pipe for reuse water,functional rain sensors,and automatic controllers and timers. Approval of Sprinkler Irrigation Contractors - It is deemed by CCUA to be important that sprinkler irrigation contractors,who connect to the reuse system,be thoroughly educated with regard to reuse systems in an effort to eliminate any potential cross connection with the potable water system. In this regard, all irrigation contractors installing irrigation systems in conjunction with this reuse program must prequalify with CCUA by providing their credentials and passing a qualification interview with CCUA's staff for the purpose of demonstrating knowledge of the key issues regarding use of reuse water. A current certificate of insurance,acceptable to CCUA,naming the CCUA as an additional insured shall be on file at all times with the CCUA. Requirement for Payment of Reuse Base Facility Charge - All customer classes that have reuse piping systems available shall be required to pay the Base Facility Charge for reuse water whether they use the reuse water or not. Requirement for Reuse Meter - All customer classes that have reuse piping systems available shall pay for the installation of a reuse meter at the same time the domestic meter is requested. Wells - All developments where reuse piping systems are installed shall prohibit the installation of wells for irrigation purposes. Responsibility for Design and Installation of Reuse Piping Systems - Where reuse piping systems are required,the design engineer for the project shall design,at Developer's expense,the reuse piping system for the development and any reasonable trunk mains necessary to connect to the nearest source of reuse water, and Developer shall install said system at its expense. The CCUA's existing policy regarding cost sharing for oversized mains, refundable agreements, plan review and approval, and adherence to CCUA's specifications and details, shall apply to these reuse piping systems, the same as the potable water distribution systems and wastewater collection systems. VScrica ailability Dcrcloper.48reemmtMaster Filc13c5claper Agrcemw0 Ilr+nm Ficld VillagdAGRClay County Touu Ccoi rL t9.jmedao Lest prig Icd 13/202410:57 MI 1 I i N 1. 0I p\ il • W i�i•-E /1,4 — s • • 1 i iI ICI : • 1 i II II �! 4 Clay County Town ` Center Lot 9 i' I • 0 W �I z ,. ii co 1 II • �l ::,, �— ii .. ..., •ors ` 1 A 1 Disclaimer:The information displayed on this drawing or sheet is for a general visual representation purposes only.The drawing is based upon numerous sources of public information which include but are not limited to Clay County Property Appraisers, FDOT, SJRWMD, and the Clay County Utility Authority's (CCUA)own records.All information included in the drawing is general in nature and not site specific.Any cimensions or other information is approximate and needs to be field verified.CCUA does not offer any guarantees,certifications,or warranties,either expressed or implied,in regards to the accuracy of the information represented on these drawings.The drawing is not a survey and should not be construed in any manner as such.By receiving this drawing,the recipient is agreeing to hold CCUA harmless for any errors or omissions which may be present in this&awing.All interested parties are strongly encouraged to engage a Professional Surveyor and Mapper licensed in the State of Florida to field verify all site,property,infrastructure,and utility information prior to any decisions or actions. I r: 4' CCUA (IS—CO(fN Title: -_- Clay County Utility Authority CCUA Web Map 3176 Old Jennings Road i Info: C _� Middleburg, Florida 32068-3907prepared by CCUAGIS Portalwater Features 'a Phone 904 272 5999ill■ Gravity Sewer Features �t 1/17/2024,9:44:59 AM - Forced Sewer Features Conservation.Commitment.CommunO 1TYAUTN6 1 inch = 200 feet - Reclaimed Features