HomeMy WebLinkAbout07.e EDB PC WRF Expansion Project Entrance Road Pipelines and Parkway Coordination EXECUTIVE SUMMARY AGENDA ITEM: Proposed Amendment No. 4 to RFQ 2020/2021-A14 Ardurra Group, Inc. (Ardurra) to provide Professional Services for the Peters Creek Water Reclamation Facility Expansion Project(Peters Creek WRF Project): Entrance Road Pipelines and Parkway Coordination. CCUA Project No.: 2211-0042 CCUA Financial Job No.: 22003SP Date: March 1, 2024 BACKGROUND: CCUA staff requests approval of Amendment No. 4 to RFQ 2020/2021-A14 for Ardurra to provide revised pipeline design services for the Peters Creek Entrance Road consistent with Reinhold Corporation's proposed future Parkway in the area designated the EW4 Parkway. The Clay County Utility Authority (CCUA) engaged Ardurra to provide professional engineering services for design, bid and construction administration services for the Peters Creek WRF project. CCUA awarded this work to Ardurra through a competitive RFQ process. The work on the three (3) project component packages itemized below continues to progress. • Peters Creek WRF & Pipelines • Site Civil work at the Governor's Park site • Governor's Park Lift Station and Reclaimed Water Storage and Pump Station. The Peters Creek WRF project construction contract includes pipelines from the Governor's Park site to the Peters Creek WRF site. This proposed amendment focuses on the section of the pipelines from Rosemary Hill Road to the Peters Creek WRF Plant site, shown in Attachment A of the Scope of Services. The existing design drawings and contractor's bid were based on an exclusive easement and roadway for CCUA along this corridor. The Reinhold Corporation approached CCUA in mid-2023 with a concept to modify the design to align with and incorporate a potential future parkway corridor over this area. Staff were amendable to the concept, but roadway plan and vertical concepts were not produced by the landowner that would be needed to facilitate that redesign until recently. As CCUA was moving to land acquisition, Reinhold produced draft plan and cross sections for the EW4 Parkway,which were subsequently reviewed by the County and revised to include the County's minor comments. The final typical cross section agreed to by CCUA, Clay County, and Reinhold Corporation is shown in Attachment A of the Scope of Services and will be formalized with a Centerline Agreement between the parties. The parties agree this is an efficient cross section to serve ratepayers and residents of the County. We consider time of the essence on the Peters Creek and Governors Park projects.We expect substantial completion by December 31, 2024. The pipeline contractor continues to progress from the Governor's Park site and working to the north. This redesign focuses on the final 1.1 mile of pipeline corridor. This Amendment authorizes Ardurra Group, Inc. (CONSULTANT) to perform additional design services for the Peters Creek Water Reclamation Facility (PC WRF) project to modify the pipeline section to conform to a future parkway as described above. The additional services could not have reasonably been anticipated at the time of the initial Agreement and are in response to the changed pipeline routing requested by the landowner. We do not know when the parkway will be built. We intend to leave the existing access road and adjacent easement lands as close to their current land surface elevations as practicable. The 20-foot- wide temporary road will be constructed as originally planned and bid in this project. We will master plan new and future pipelines according to the Reinhold Corporation roadway alignment. We show locations in the typical section described earlier. Ardurra met with CCUA staff and workshopped the draft elevations of the pipelines to work in the existing topography as well as the future parkway elevation sections. A summary of these services include: • Revision of the conformed pipeline drawings for the two (2) 16-inch Reclaimed Water Mains, 16-inch Force main, and 12-inch Water Main from the Peters Creek Plant site to the vicinity of Rosemary Hill Road along the future parkway corridor. • Design of the relocation of several existing power poles that run along the access road for the purpose of accommodating the temporary road and new pipelines. • Revisions to the wetland's maps and updates to the FDEP permit application. • Two (2) site visits to resurvey the gopher tortoises along the parkway route. • Provide revised survey and legal descriptions based on the centerline, easements and right- of-way limits shown in the section in Attachment A. • Review subsequent change order for consistency with existing contract approved amounts. We provide a summary of the Amendment components in the Cost Summary Table below. Amendment #4 with Ardurra: Task 1 - Project Management $9,654.40 Task 2 - Pipeline Design $41,305.60 Task 3 - Ecological Services $14,300 Task 4 - Survey Services $13,000 Total Amendment #4 $78,260 BUDGET: This project will be performed using construction contingency funds already approved within the Peters Creek budget. The CIP budget and Current and Proposed Contracts are itemized below. The project remains within the revised budget established in April 2023. Ca s ital Im I rovement Pro'ram (CIP) Bud:ets: Peters Creek WRF Phase II: $43,819,540 Peters Creek WRF Land Acquisition: $3,000,000 Project Transfers from Delayed Projects: $41,524,718.08 Total CIP Project Budget: $88,344,258.08 Current and Pro s osed Contracts: Original Design and Bidding Services with Ardurra: $3,564,608 Previous Change Orders for Interim Modifications: $76,960.80 Design and Bidding Amendment #3 with Ardurra: S690,013 Amendment #4 with Ardurra: $78,260 Peters Creek Pre-purchase of Equipment: $15,492,603.20 Peters Creek WRF Expansion with Wharton Smith: $55,088,600 Governor's Park Site Civil with PSCC: $1,905,000 Governor's Park LS and RWPS with Sawcross, Inc.: $7,683,000 Governor's Park Pre-Purchase Equipment: $609,643.08 Sub-Total Design and Construction Services Contracts: $85,188,688 Total Construction Contingency: $3,155,570.00 Total Design and Construction Services Contracts: $88,344,258.08 RECOMMENDATION: Staff respectfully requests the Board of Supervisors approve Amendment 4 to RFQ 2020/2021-A14 Ardurra Group, Inc. (Ardurra) Professional Services for the Peters Creek Water Reclamation Facility Expansion Project: Entrance Road Pipelines and Parkway Coordination (Peters Creek WRF Project). ATTACHMENTS: Amendment No. 4 to RFQ 2020/2021-A 1 4 Scope of Services //PS (Author) //AA(Review) //PS (Final) Amendment No. 4 to RFQ 2020/2021-A14 Ardurra Group,Inc to provide Professional Engineering Services for Peters Creek Water Reclamation Facility Expansion Project Entrance Road Pipelines and Parkway Coordination. CCUA Project No. 2211-0042 Engineer: David Rasmussen, P.E. Owner: Clay County The Ardurra Group, Inc Utility Authority 100 Center Creek Road, S-108 St. Augustine, Florida 32084 Date: February 20, 2024 Item: Description of Services: Provide professional engineering services as requested and identified in the attached scope of services and fee proposal. Task 1 Project Management $9,654.40 Task 2 Pipeline Design $41,305.60 Task 3 Ecological Services $14,300.00 Task 4 Surveying $13,000.00 Total Lump Sum Price Not to Exceed Without Prior Authorization $78,260.00 The Contract time shall commence on March 5, 2024. This document, along with the Scope and Fee Proposal, shall become an amendment to the Professional Engineering Services Agreement and all provisions of the Agreement will apply hereto. Accepted by: Date: Engineer: David Rasmussen, P.E. The Ardurra Group, Inc. Accepted by: Date: Owner: Jeremy D. Johnston, P.E., MBA, Executive Director Clay County Utility Authority \\ THE ARDURRA GROUP,INC. 100 CENTER CREEK ROAD,S-108 ST.AUGUSTINE,FL 32084 R D U R R A PH:904-593-5607 W W W.ARDURRA.COM Amendment No. 4 to RFQ 2020/2021-A14 February 13, 2024 Scope of Services for Professional Engineering Services for the Peters Creek Water Reclamation Facility Expansion and Effluent Management Project Purpose: The purpose of this Amendment is to authorize and direct Ardurra Group, Inc. (CONSULTANT) to perform additional design services for the Peters Creek Water Reclamation Facility (PC WRF) Expansion and Effluent Management project. The additional services could not have reasonably been anticipated at the time of the initial Agreement and are in response to changed pipeline routing along the PC WRF access road that runs from Rosemary Hill Road to the Peters Creek WRF. These revisions accommodate a future parkway planned by the Reinhold Corporation that will run east/west from Rosemary Hill Road to the First Coast Expressway and being acknowledged by the County in a Centerline Agreement. New and future pipeline locations relative to the Parkway have been master planned with the Reinhold Corporation who is the adjoining landowner. Figures showing the plan and section view of the future parkway are included in Attachment A. CCUA has an existing 20-foot-wide trail road that will be constructed as originally planned as part of this project,with some alignment changes as part of this design modification. The modified design will retain most of the existing ground surface elevations,with minimal cut and fill relative to the previous design, and balancing the design depth of new pipelines so they have adequate cover now and minimize excessive depth after construction of the future parkway which will have fill in some areas. A summary of these services include: • Revision of the conformed pipeline drawings for the two (2) 16-inch Reclaimed Water Mains,16-inch Force main, and 12-inch Water Main from Station 250+00 to Station 307+00 • Relocation of several of the existing power poles that run along the access road for the purpose of accommodating the trail road and new pipelines shown in Attachment A • Revisions to the wetlands maps and update of the FDEP permit application • Perform two (2) site visits to resurvey the gopher tortoises along the parkway route • Provide revised survey and legal descriptions based on the revised easements and right-of-way limits shown in the section in Attachment A to facilitate detailed design and land rights acquisition with the landowner. AMENDMENT NO.4 TO RFQ 2020/2021-A14 • The redesign will be utilized to finalize a change order with Wharton-Smith,Inc (Contractor). Ardurra will review the change order and provide comments. Costs such as materials and labor associated with the trail road are generally included in the original bid price and this is not anticipated to result in a significant change order. Additional Scope of Services: CONSULTANT will perform necessary tasks to complete the additional services as described herein. The work associated with these additional services is separated into the following tasks: • Task 1 -Additional Project Management • Task 2-Additional Pipeline Design • Task 3-Additional Ecological Services • Task 4-Additional Survey Services Task 1 Additional Project Management CONSULTANT shall provide project management services for the duration of the work described herein. The work under this task includes: Task 1.1-Additional Project Management CONSULTANT will manage and monitor the progress of subconsultants. CONSULTANT will perform miscellaneous project management and coordination duties scope and fee development, tracking budget, maintaining the project schedule, preparing monthly invoices and monthly status reports. This task includes quality control of the deliverables within this scope of services. Task 2 - Additional Pipeline Design Task 2.1-Additional Pipeline Design CONSULTANT shall perform additional pipeline design work for the the two (2) 16-inch Reclaimed Water Mains, 16-inch Force main, and 12-inch Water Main from Station 250+00 to Station 307+00. The pipe alignments were provided by another Consultant as part of the negotiations with Reinhold Corporation. The pipeline redesign is necessary to accommodate future roadway and stormwater utilities that has been closely coordinated with the Developers Engineer. The redesign will also accommodate future transmission mains that will convey raw wastewater to the PC WRF and reclaimed water from the PC WRF. Power poles that run parallel to the future parkway that are in conflict with the pipeline alignment or trail road will be relocated as part of the redesign. The stormwater system that conveys water from the southern basin to the northern basin across the trail road will be evaluated and redesigned. The design will not include the future 24-inch transmission mains shown in Attachment A. Task 3 - Additional Ecological Services CONSULTANT shall perform additional ecological services work. This work includes revisions to the Florida Department of Environmental Protection (FDEP) Environmental Resource Permit (ERP) that includes wetland mitigation and coordination with the Florida Wildlife Commission (FWC) and resurvey of gopher tortoises to determine gopher tortoise populations within the proposed pipeline limit boundary and implementing necessary mitigation procedures ahead of 2 AMENDMENT NO.4 TO RFQ 2020/2021-A14 construction. The revisions will include updated maps, figures and permit applications for submission to the regulatory agencies. The Subconsultants proposal is included in Attachment B. Task 4 - Additional Survey Services Additional Survey Services to be performed are as follows: 1. Perform additional survey and develop the legal descriptions for the future parkway within the limits shown in the section in Attachment A. The additional survey is needed to encompass the new pipeline routing along the trail road. The Subconsultants proposal is included in Attachment C. Compensation Provisions: As compensation for providing the services described within Amendment#4, CCUA shall pay CONSULTANT a not to exceed amount of$78,260.00,this amount shall not be exceeded without a revision to this Agreement.A breakdown of the proposed fee is provided as Attachment D. Period of Service: No change to the overall project schedule. Authorized Representatives: The Authorized Representatives designated below are authorized to act with respect to this Task Order. Communications between the parties shall be through the Authorized Representatives. For the CLIENT For the CONSULTANT Name: Paul Steinbrecher,PE Name: David Rasmussen,PE Chief Engineer Client Service Manager Address:3176 Old Jennings Road Address: 405 Golfway West Drive,Suite 201A Middleburg,FL 32068 St. Augustine,FL 32095 Telephone: 904-272-5999 Telephone: 904-593-5607 3 AMENDMENT NO.4 TO RFQ 2020/2021-A14 ATTACHMENT A: FUTURE PARKWAY PLAN AND SECTION 4 i , , - • i �..,7 .. .4 r I -'.:7116... :: .4'. 6' NP.::::. . • 0.4. •' ,'1,, ......., . „. • . ,„,,„.0, ID .._ _ _ ...---7-1k \rk 711111. , •.,- , Or 1 i4141: .:';i it ...4'f'..".....7.- tie 1 , ..‘" i ..r, 141 - 1 if • I I ( Ne •a . V�. ,r _ le- .tt,,,,, r -, •�r,'r I . Ii i . . * • • . 4.- '1 • ^i' - •f - •'.' - j PET4 ' kit _.., .. ♦ • . tyres CREEK J , WASTEWATER w / j J I� • TREATMJT PROPOSED FUTURE ROAD RIGHT OF WAY „,,A, • '. ` * 6 PLANT - ••� �-�— r J`%" •. 1 dI TEMPORARY EASEMENT CONVERTING TO PERMANENT ♦ ~ (±2.00 AC) ( 4 el 4 .. - r•• � ® TEMPORARY EASEMENT WILL CONVERT TO PROPOSED FUTURE ROAD RIGHT OF . y t .+ A . V /� •' '� WAY(±4.673 AC) / ' .•` 4r •. NEW PERMANENT CCUA EASEMENT ADJACENT TO PROPOSED FUTURE ROAD RIGHT . I-4), OF WAY(±1.26 AC) • �:�r • k// ///////A ADDITIONAL FEE SIMPLE LAND PURCHASE FOR CCUA BOUNDARY r i' �r AL FEE SIMPLE LAND (±0.54 AC) J " OR CCUA BOUNDARY11 ` �; } :ETWEEN PROPOSED 1~ ` • N.• I it . AND CCUA WWTP) • • .... . - 4: • — EXISTING 40'CCUA __ E EMENT TERMINATES• PERMANENT 20'CCUA EASEMENT • _-- _ AS TRANSITIONS TO VARIABLE WIDTH `�• ---- VARIABLE WIDTH CCUA • f • PROPOSED FUTURE -\ \� PERMANENT EASEMENT EXISTING 40'CCUA EASEMENTIOC FUTURE 87' EXISTING 40'CCUA EASEMENT ROAD CENTERLINE / PROPOSED CCUA EASEMENT-) 5,520LF± RIGHT OF WAY 1 PERMANENT 20' u. • 10'CCUA EASEMENT "- _ ------ --- PERMANCCUA ENT • �' 10'CEC EASEMENT - -- - TYPICAL ,( .• FUTURE 87 CROSS SECTION FUTURE 87' \ ' � OS i ♦ ` �♦it • ` RIGHT OF WAY RIGHT OF WAY \ � 'by��' y . • ini,J% • • 4. 10'CCUA EASEMENT - - • 9 r ' . / �<! - •♦ • % • 10'CCUA EASEMENT \- �O • A • ` Vi i . - .• M .r`-► 10'CEC EASEMENT- o•° - • -j . • / iii • r 7 V.„. , _- ll!ete 04 . .F, til ° ' .•• y ' 1d r �. Niiiihik - . I < < 4 +.'f •••� , �i I •• • ..• sip • • '0 l • vie . t • •44 . W a • • • . • , •. sir .... t.,r "••. '7 O 2024 Microsoft Corporation CO 2024 Maxar©CNES (2024) Distribution Airbus DS • c • • 1_ .i _• ? it• w * ES _ • 1 IF_ _ 52'TEMPORARY 20' PERMANENT 10' PERMANENT CCUA EASEMENT CCUA EASEMENT CCUA EASEMENT (4.043 NEW ACRES) (1.26 ACRES) 5'TEMPORARY (2.0 ACRES) CCUA EASEMENT (0.63 ACRES) EXISTING 40' CCUA EASEMENT / 10'CEC �(y EASEMENT C • 46' 41' F E 7' RI i 7 Q a0i (V czt Q, \\ _ 12' TRAVEL LANE _ 20'MEDIAN OF TURN LANE 12' TRAVEL LANE 5'CONC 12'MULTI-USE PATH 5.5' I 1 1 55' _ 6' _ SIDEWALK h.. ——�/�///////////////////////////// ///////////////////////// / O ROOT BARRIER—�__ --- ROOT BARRIER ROOT BARRIER �� --- —��\�_— -- ------- EXISTING 5' 7.5' 5' 6' MAXIMUM 7' OGRADE O C (VARIES 7'-5') FUTURE 24"' FUTURE 24"1 NEW 12"WM)) 1 NEW 16"RW NEW 16"FM TRANSMISSION TRANSMISSION NEW i6"RW EXISTING 12"FM MAX OR FILL AT 4, NEW TYPICAL SECTION MAXIMUM SLOPE TO EXISTING GRADE (SEED AND MULCH SIDE SLOPES FILL AND ALL DISTURBED AREAS) MAXIMUM SLOPE TO EXISTING GRADE (TYPICAL BOTH SIDES) N.T.S. (SEED AND MULCH SIDE SLOPES — AND ALL DISTURBED AREAS) (TYPICAL BOTH SIDES) AMENDMENT NO.4 TO RFQ 2020/2021-A14 ATTACHMENT B: SWCA ENVIRONMENTAL SERVICES 5 swc © SERVICES AGREEMENT CHANGE ORDER Jacksonville Office 2008 Riverside Avenue,Suite 100 ENVIRONMENTAL CONSULTANTS Jacksonville,Florida 32204 Tel 904.384.7020 Tax I.D.Number 860483317 Project Name: Ardurra Peters Creek WWTF Project Number: 71361 Client: Ardurra Date : February 9, 2024 SWCA Project Manager: Matt Canepa The purpose of this Change Order is to reflect certain modifications to the contract for services ("Agreement") entered into between SWCA, Incorporated("SWCA")and the client identified above("Client")pursuant to which SWCA agreed to provide certain services to Client. SWCA and Client agree to the following modifications: Changes in Scope of SWCA Services: The following describes any changes in the scope of services to be provided by SWCA: [describe any additional services, reductions in scope or other modifications] Phase 01, Task 13: FDEP Permit Application - At the request of the Client, SWCA shall prepare one or two additional environmental components of a Florida Department of Environmental Protection (FDEP) Environmental Resource Permit (ERP) for the Project (Subject Area). SWCA shall develop environmental figures and textual information appropriate for submittal to FDEP. SWCA would need site plan in AutoCAD format from the Project Engineer in order to quantify impacts and to submit application to FDEP. The cost for this work includes up to one (1) request, per additional permit,for additional information (RAI)from FDEP. The cost for this work does not include any permit application fees. Client is responsible for payment of applicable filing fees. Any Regulatory Agency meetings required either in the field and/or the office will be an additional line item fee. Phase 1, Task 14: Additional Gopher Tortoise Surveys - SWCA will conduct up to 2 additional site visit to surveys of 100% of the subject area and locate gopher tortoise burrow according to Florida Fish and Wildlife Conservation Commission (FWC) guidelines. The number and location of gopher tortoise burrows will be located by GPS and a map will be sent to the Client. Gopher tortoise burrows will be identified in the field with pink flagging tape or pink pin flags. The map will be suitable for submitting to the Client's surveyor to assist them in locating the gopher tortoise burrows. The results of this survey are valid for 90 days. Changes in Fees for SWCA Services: The following describes any changes in the amount of fees payable to SWCA: [describe any additional fees, reductions or other modifications; describe whether additional fees are to be billable as provided in original contract or on another basis (e.g., fixed fee or time and materials)] Ph. 01, Tsk 13: $7,400.00 Ph. 01, Tsk 14: $6,900.00 Changes in SWCA Cost Reimbursement: The following describes any changes in costs reimbursable to SWCA: [describe any changes in the nature or amount of reimbursable costs] Changes in Payment Terms: The following describes any changes in payment terms for fees and costs payable to SWCA: [indicate whether payment terms are same as original contract or whether payment terms are being modified] Other Changes: The following describes any other changes in the terms of the Agreement: [describe any other significant changes such as changes in estimated completion date] Except as modified by this Change Order, the terms of the Agreement shall remain in full force and effect. This Change Order is hereby incorporated into the Agreement. SW CA Client: Ardurra ENVIRONMENTAL CONSULT n WCA Incorporated,an Arizona corporation By: By: (signature) (signature) Name. anet Herrick Name: Title: Director-Jacksonville Office Title: Date: February 9, 2024 Date: Client Initials 2 AMENDMENT NO.4 TO RFQ 2020/2021-A14 ATTACHMENT C: DRMP SURVEYING SERVICES 6 R'* DRmp 8001 Belfort Parkway,Suite 200,Jacksonville, Florida 32256 try Phone:904.641.0123 I Fax:904.641.88.8858 1.833.811.3767 I www.DRMP.com February 14, 2024 David Rasmussen, P.E. Ard u rra 100 Center Creek Road, Suite 108 St. Augustine, FL 32084 RE: Professional Surveying Services for CCUA Peter's Creek WWTP Project, Peter's Creek Access Road Easements, Clay County, Florida Dear Mr. Rasmussen, DRMP is pleased to be working with you on this project. Below is our proposed Scope of Work and our Fees to complete the project. Scope of Work 1. New Sketch and Legal Descriptions to be Recorded for the East—West Access Road to Peter's Creek WWTP. 2. Additional Topographic Survey South of the existing 40' CCUA Easement Deliverables —The survey will be delivered in electronic AutoCAD Civil 3D and PDF for recording purposes. The Survey will conform to the Florida Standards of Practice for Surveying. Fees The fees to complete the effort are: Easements $ 8,500.00 Topographic Survey $ 4,500.00 Total This effort $ 13,000.00 We sincerely appreciate this opportunity to provide professional services for this project. Sincerely, DRMP, Inc. Randy Tompkins, SM Project Manager AMENDMENT NO.4 TO RFQ 2020/2021-A14 ATTACHMENT D: FEE BREAKDOWN Attachment A Clay County Utility Authority Amendment#4 to RFQ 2020/2021-A14 Fee Estimate Senior Project Sr.Professional Professional Engineering Senior CADD Field Reviewer Manager Engineer Engineer Intern I Designer Technician Task Administrative Total Hours Total Cost Rates $249.20 $196.00 $187.60 $140.00 $92.40 $98.00 $70.00 $64.40 - - Task 1 -Additional Project Management - - Task 1.1 -Additional Project Management 0 44 0 0 0 0 0 16 60 $ 9,654.40 Subtotal Task 1 0 44 0 0 0 0 0 16 60 $ 9,654.40 %Labor per Category 0% 73% 0% 0% 0% 0% 0% 27% 100% Task 2-Additional Pipeline Design - - Task 2.1 -Additional Pipeline Design 8 16 40 40 80 160 0 0 344 $ 41,305.60 Subtotal Task 2 8 16 40 40 80 160 0 0 344 $ 41,305.60 %Labor per Category 2% 5% 12% 12% 23% 47% 0% 0% 100% Subconsultant Task 3- SWCA Environmental Consultants(Additional Ecological Services) $ 14,300.00 Task 4-DRMP(Additonal Survey Services) $ 13,000.00 LUMP SUM TOTAL $ 78,260.00 1