Loading...
HomeMy WebLinkAbout05.b.02.a CA SA No 16 Ardurra LS 88 SubContractors EXECUTIVE SUMMARY AGENDA ITEM: Proposed Supplemental Agreement (SA) No. 16 with Ardurra Group, Inc. (Ardurra) to the Professional Services Agreement 2018/2019 RFQ No. 3 to provide Professional Engineering Services for the Lift Station#88 Relocation and Upgrade Project. Project Number: 2023-114 Finance Number: 24010RR Date: March 28, 2024 BACKGROUND: CCUA staff requests approval of SA No. 16 with Ardurra to provide Professional Engineering Services for the Clay County Utility Authority Lift Station#88 Relocation and Upgrade Project. The existing Lift Station#88 is in the Ravines Development adjacent to Black Creek. Because the golf course is abandoned and not maintained, Lift Station#88 and the gravity main serving it are at risk of being destabilized due to excessive erosion of the surrounding embankment. A schematic showing the current location and future relocation for LS 88 is attached. This project will relocate the station outside of the deteriorating golf course area. Most of the design will be performed in- house by CCUA engineering staff. Due to the sloping terrain of the new lift station site, both structural and geotechnical services are needed to design a retaining wall system to provide a flat surface for the LS design. Ardurra will manage sub-consultants for the needed geotechnical and structural services. Staff selected Ardurra from the continuing engineering services firms to perform this work based on similar recent project experience, their intimate knowledge of our facilities, and their ability to efficiently meet the project timeframes. BUDGET Staff negotiated the scope of work and the fee of $9,022.16 with Ardurra. Staff budgeted $1,200,000 in the current FY 24 Capital Improvement Plan (CIP) for this project and have sufficient funds to complete this authorization. CCNA: CCNA,F.S. s. 287.055, does apply to the use of a consultant under a continuing services contract. Staff negotiated this Supplemental Agreement in compliance with F.S. s. 287.055. Staff and the consultant negotiated this study scope and fee, based on established contract rates, for the professional services at a compensation that CCUA determines is fair,competitive,and reasonable. The contract fee for this work is below the CCNA contracting threshold of$500,000 for individual studies. RECOMMENDATION: Staff respectfully recommends board approval of SA No. 16 with Ardurra for a lump sum fee of $9,022.16 to provide Professional Engineering Services for the Lift Station #88 Relocation and Upgrade Project. ATTACHMENTS: Supplemental Agreement No. 16 Ardurra Group, Inc. Scope, and Fee Proposal //HC(Author) //JP,AA(Review) //PS(Final) Supplemental Agreement No. 16 to the Professional Engineering Services Agreement 18/19 No. 3, to provide Professional Engineering Services for the Lift Station No. 88 Relocation and Upgrade CCUA Project No. 2023-114 Engineer: Dave Rasmussen, P.E. Owner: Clay County The Ardurra Group, Inc. Utility Authority 405 Golfway West Dr, #201A St. Augustine, Florida 32095 Date: April 2, 2024 Item: Description of Services: Provide professional engineering services as requested and identified in the attached scope of services and fee proposal. Task 1 Project Management and Coordination $1,222.16 Task 2 Design Services $7,800.00 Total Price Not to Exceed Without Prior Authorization $9,022.16 The Contract time shall commence on April 2, 2024. This document, along with the Scope and Fee Proposal, shall become an amendment to the Professional Engineering Services Agreement and all provisions of the Agreement will apply hereto. Accepted by: Date: Engineer: David Rasmussen, P.E. Ardurra Group, Inc. Accepted by: Date: Owner: Jeremy D. Johnston, P.E., MBA, Executive Director Clay County Utility Authority /\\/ ARDURRA GROUP,INC. 405 GOLFWAY W DR.,SUITE 201A RDURR/ \ ST.AUGPH: , 3285 904-562-2185Px: W WWW.ARDURRA.COM TASK ORDER 16 March 19,2024 THIS TASK ORDER IS PURSUANT TO THE AGREEMENT FOR CONSULTING ENGINEERING SERVICES BETWEEN CLAY COUNTY UTILITY AUTHORITY AND ARDURRA GROUP,INC.WHICH IS INCORPORATED HEREIN BY THIS REFERENCE,WITH RESPECT TO Scope of Services to provide Professional Engineering Services for the Lift Station #88 Rehabilitation Project Article A. Purpose: The purpose of this Task Order is to authorize CONSULTANT (The Ardurra Group,Inc.) to proceed with professional engineering services for the Lift Station #88 (PROJECT) for Clay County Utility Authority (CLIENT). The PROJECT generally includes the professional engineering activities associated with the preparation of documents suitable to rehabilitate Lift Station #88. The Scope of Services for this project are included in Article B. Article B. Scope of Services: The scope of services for this project includes the design and permitting services for the following improvements: • Task 1 -Project Management and Coordination • Task 2 -Design Services (Subconsultant) The design work effort will generally include preparation of construction documents, preparation and submittal of the necessary permit applications, and related activities to allow improvements outlined above to be constructed by a qualified General Contractor. The engineering and technical tasks that are proposed for this project are as follows: TASK 1. Project Management and Coordination Task 1.1:Project Kickoff Meeting and Site Visit A kickoff meeting will be held between OWNER and key members of the CONSULTANT's project team. The kickoff meeting will include a discussion of the project goals and objectives, scope of the project, challenges or issues, permitting approach,schedule,and communication protocols. CONSULTANT will prepare minutes of the kickoff meeting and distribute to the team via email. TASK 2. Design Services Design tasks associated with this task order will be performed by the Subconsultant and are included in Attachment B. 1 TASK ORDER-CLAY COUNTY UTILITY AUTHORITY LIFT STATION#88 REHABILITATION PROJECT Article C. Compensation Provisions: As compensation for providing the services described within this Task Order, CLIENT shall pay CONSULTANT in accordance with the current Agreement, based on the estimated completion of the Project. The total lump-sum fee proposed for Tasks 1 through 2 is $9022.16,which shall not be exceeded without a revision to this Agreement. A breakdown of the proposed fee is provided as Attachment A. Article D. Period of Service: This project will be complete within four (4) months from Notice to Proceed. Note that it is assumed that all deliverables will be reviewed by the CCUA within 2 weeks of submission. Article E. Authorized Representatives: The Authorized Representatives designated below are authorized to act with respect to this Task Order. Communications between the parties shall be through the Authorized Representatives: For CLIENT For CONSULTANT Name:Joe Paterniti,P.E. Name: Dave Rasmussen,P.E. CCUA Sr. Project Manager Sr. Project Manager Address: 3176 Old Jennings Road Address: 405 Golfway West Dr. Suite 201A Middleburg,FL 32068 Saint Augustine,FL,32095 Telephone: Office: 904-213-2408 Telephone: 904-593-5607 Mobile: 904-219-4127 2 Attachment A Clay County Utility Authority Lift Station#88 Fee Estimate Sr.Project Task Manager Administrative Total Hours Total Cost Rates $245.52 $60.02 Task 1 Project Management and Coordination 1.1 -Project Kickoff Meeting and Site Visit 4 4 8 $ 1,222.16 Subtotal Task 1 4 4 8 $ 1,222.16 LABOR SUBTOTAL 4.00 8.00 $ 1,222.16 %Labor per Category 0% 50% 100% OUTSIDE PROFESSIONALS Wekiva Engineering(Structural Design) I $ 4,300.00 UES(Geotechnical) $ 3,500.00 LUMP SUM TOTAL $ 9,022.16 Attachment B E 711 N Orange Ave, Suite A Winter Park, FL 32789 Phone: (321) 972-4989 WEKIVA ENGINEERING Wekiva Project Number: 24-145 February 14, 2024 Mr. David Rasmussen, PE Ardurra, Inc. 405 Golfway West Dr., Suite 201A St. Augustine, FL 32095 Re: Proposal for Structural Engineering Services Lift Station #88 Clay County, Florida Mr. Rasmussen, Wekiva Engineering, LLC (Wekiva) is pleased to submit this proposal to provide structural engineering services to Ardurra, Inc. (Ardurra) for the above referenced project which is owned and operated by Clay County Utility Authority (CCUA). It is our understanding that CCUA will be designing a new lift station to be located near the Ravines residential area. This lift station will be designed by CCUA but will require the design of retaining walls given the existing site grading. SCOPE OF SERVICES Wekiva will perform the following scope: Task 1: Engineering Design (60% 700%) Wekiva staff will assist Ardurra and CCUA in the preparation of the design submittals which will include drawings and specifications for the design of retaining walls around the pump station site. The walls are anticipated to be constructed of masonry or cast-in-place concrete and will be less than 5ft tall. The submittals will include one (1) structural drawing and several standard specifications. Wekiva will also prepare signed and sealed permit drawings as needed. Task 2:Bidding Services:Wekiva staff will assist Ardurra and CCUA staff with the answering of Contractor questions and issuing of addenda. Task 3. Construction Services: Wekiva staff will assist Ardurra and CCUA staff with the following: • Answer RFI's (Assumed to be 2 RFIs) • Review Shop Drawings (Assumed to be 4 submittals with one resubmittal) • Preparation of record drawings COST AND SCHEDULE Wekiva proposes to undertake the work described above on a lump sum fixed fee basis for a total fee of $4,300, where the price for each task is as follows: • Task 1 $2,750 • Task 2 $450 • Task 3 $1,100 • Total $4,300 E 711 N Orange Ave, Suite A Winter Park, FL 32789 Phone: (321) 972-4989 WEKIVA ENGINEERING TERMS AND CONDITIONS Wekiva will begin work immediately upon your notice to proceed. We will issue monthly invoices for the work accomplished during the calendar month. We appreciate the opportunity to submit this proposal to Ardurra and we look forward to a successful collaboration on this project. If you have any questions or need further information, please call. Sincerely, John Sobczak, P.E. Member Attachment C ,fJ Materials Testing L1J E S TM Geotechnical Engineering Environmental Building Sciences& Safety Inspections&Code Compliance Virtual Design Consulting March 19, 2024 Ardurra 100 Center Creek Road- Suite 100 St. Augustine,Florida 32080 Attention—Mr. David Rasmussen Subject: PROPOSAL FOR A GEOTECHNICAL EXPLORATION Lift Station 88 Relocation Middleburg, Florida UES Proposal No. 2077224 UES Opportunity No. 0930.0324.00016 Dear Mr. Rasmussen: Universal Engineering Sciences (UES) is pleased to submit this proposal for providing geotechnical services for your project. Included in this proposal is an outline of the project information,proposed exploration, and schedule. PROJECT INFORMATION Project information was provided to us through recent correspondence with Mr. John Sobczak of Wekiva Engineering, LLC. We were provided with a Topographic Survey prepared by Clay County Utility Authority dated October 10, 2023 and with an aerial photograph. These plans show the boundary limits for the property, the roadways located adjacent to the site, the layout of the proposed lift station and the requested boring locations. We understand the project consists of construction of a lift station and retaining wall. PROPOSED GEOTECHNICAL EXPLORATION Based on our understanding of the project, as requested, as requested we propose to perform two (2) SPT borings at the requested locations to depths of 35 feet each. We assume the site will be accessible to our truck-mounted drilling equipment. Due to the nature of the equipment required to perform the test borings, some property disturbance should be expected. Our proposal does include limited site clean-up including backfilling the boreholes with soil-cuttings for safety considerations. No other restoration services (i.e. pressure washing, landscaping, repairing wheel ruts, etc.) are included in this 5561 Florida Mining Blvd S.I Jacksonville,Florida 322571 ph 904-296-0757 TeamUES.com UES Proposal No.2077224 March 19,2024 proposal. We understand that the rights of entry and access to the property will be provided to us prior to and at commencement of field activities. Our fee estimate does not include an allowance for horizontal and vertical survey control for the test boring locations. Our field crew will locate the test locations based upon estimated distances and relationships to obvious landmarks. Therefore, the test locations and depths should be considered accurate to the degree of the methodologies used. UES will contact Sunshine State One Call (1-800-432-4770) for public utility clearance prior to the start of drilling activities. It is our experience that this service does not mark the locations of privately owned utilities. Our proposal requires that private utility lines and other subsurface appurtenances be located in the field by others prior to our mobilization. UES shall not be held responsible for service interruptions or damage to private utility lines or other buried structures. We will conduct all drilling and sampling in general accordance with applicable ASTM standards. At the completion of drilling, we will transport all samples to our laboratory where they will be examined by a geotechnical engineer and visually classified according to the Unified Soil Classification System. A professional engineer, registered in the State of Florida, who has specialized in geotechnical engineering will direct and supervise our work. A report which describes our exploration and documents the subsurface conditions encountered will be provided for you. This report will include the following: 1. A brief discussion of our understanding of the planned construction. 2. A presentation of the field and laboratory test procedures used and the data obtained. 3. A presentation of the subsurface conditions including subsurface profiles, estimated seasonal high groundwater, and estimated geotechnical engineering properties (as necessary). 4. A geotechnical engineering evaluation of the site and subsurface conditions with respect to the planned construction. 5. Recommendation for lift station and retaining wall design. 6. Recommendations for site preparation procedures. 5561 Florida Mining Blvd S.I Jacksonville,Florida 32257 I ph 904-296-0757 Tea mUES.com UES Proposal No.2077224 March 19,2024 COMPENSATION FOR SERVICES Based on the scope of the geotechnical exploration, the proposed laboratory testing, and the preliminary engineering services outlined above, we propose to complete the geotechnical exploration and engineering services for a lump sum fee of $3,500.00. We will contact you immediately if we encounter subsurface conditions which could require (1) the borings to be performed to deeper depths, (2) additional borings or other field testing, and/or (3) additional engineering analysis/evaluation and studies outside the scope of this proposal. SCHEDULING AND AUTHORIZATION We can initiate the field services within one to two weeks after receipt of written authorization to proceed with the field exploration complete in one day. We can provide preliminary verbal results as soon as the drilling has been completed in order to expedite the design process, upon request. The final report should be available within four weeks after notice to proceed. We have included a short form authorization agreement. In order to expedite our internal project tracking requirements,please execute this document and return one copy to our office. We appreciate your consideration of Universal Engineering Sciences for these services and are looking forward to serving as your geotechnical consultant on this and other future projects. Respectfully Submitted, UNIVERSAL ENGINEERING SCIENCES, LLC Stephen R. Weaver, P.E. Jake D. Cochran, P.E. Geotechnical Services Manager Senor Geotechnical Engineer 5561 Florida Mining Blvd S.I Jacksonville,Florida 32257 I ph 904-296-0757 Tea mUES.com UNIVERSAL ENGINEERING SCIENCES WORK AUTHORIZATION/PROPOSAL ACCEPTANCE FORM Universal Engineering Science,LLC(UES)is pleased to provide the services described below. The purpose of this document is to describe the terms under which the services will be provided and to obtain authorization. PROJECT NAME: Lift Station 88 Relocation PROJECT LOCATION: Middleburg, Florida Ardurra CLIENT NAME: Mr. David Rasmussen DATE: March 19, 2024 CLIENT ADDRESS: 100 Center Creek Road- Suite 100 PHONE NO.: 904-593-5607 St. Augustine,Florida 32080 email: drasmussen@ardurra.com I. Scope of Services and Understanding of Project As Shown in UES Proposal No.2077224(Attached) UES Opportunity No.0930.0324.00016 Lump Sum Fee-$3,500.00 II. Contract Documents. The following documents form part of this Agreement and are incorporated herein by referral: A. UES General Conditions B. UES Proposal Dated: March 19,2024 C. Plans,reports,specifications and other documents provided by the Client prior to this Agreement date. D. Other exhibits marked and described as follows: In the event of any inconsistency or conflict among the Contract Documents,the provision in the Contract Document first listed above shall govern. III. Authority to proceed and for payment. (To be completed by Client) If the above invoice is to be mailed for approval to someone other than the account charged,please indicate where below: Social Security No.or Firm: Federal Identification No.: Address: Attention: Title: IN WITNESS WHEREOF,the parties have caused this agreement to be executed by their duly authorized representatives CLIENT UNIVERSAL ENGINEERING SCIENCES,LLC BY(Signature) BY(Signature) PRINTED NAME PRINTED NAME Stephen R.Weaver,P.E. TITLE TITLE Geotechnical Services Manager DATE DATE March 19,2024 RETURN EXECUTED COPIES TO UNIVERSAL ENGINEERING SCIENCES,LLC 5561 FLORIDA MINING BOULEVARD SOUTH,JACKSONVILLE,FLORIDA 32257-3648 TELEPHONE:904.296.0757 Universal Engineering Sciences,LLC GENERAL CONDITIONS SECTION 1: RESPONSIBILITIES 1.1 Universal Engineering Sciences, LLC, and its subsidiaries and affiliated companies ("UES"), is responsible for providing the services described under the Scope of Services.The term "UES"as used herein includes all of UES's agents, employees, professional staff, and subcontractors. 1.2 The Client or a duly authorized representative is responsible for providing UES with a clear understanding of the project nature and scope. The Client shall supply UES with sufficient and adequate information, including, but not limited to, maps, site plans, reports, surveys, plans and specifications,and designs,to allow UES to properly complete the specified services.The Client shall also communicate changes in the nature and scope of the project as soon as possible during performance of the work so that the changes can be incorporated into the work product. 1.3 The Client acknowledges that UES's responsibilities in providing the services described under the Scope of Services section is limited to those services described therein, and the Client hereby assumes any collateral or affiliated duties necessitated by or for those services. Such duties may include, but are not limited to, reporting requirements imposed by any third party such as federal, state, or local entities, the provision of any required notices to any third party, or the securing of necessary permits or permissions from any third parties required for UES's provision of the services so described, unless otherwise agreed upon by both parties in writing. SECTION 2: STANDARD OF CARE 2.1 Services performed by UES under this Agreement will be conducted in a manner consistent with the level of care and skill ordinarily exercised by members of UES's profession practicing contemporaneously under similar conditions in the locality of the project. No other warranty,express or implied, is made.2.2 Execution of this document by UES is not a representation that UES has visited the site, become generally familiar with local conditions under which the work is to be performed, or correlated personal observations with the requirements of the Scope of Services. It is the Client's responsibility to provide UES with all information necessary for UES to provide the services described under the Scope of Services, and the Client assumes all liability for information not provided to UES that may affect the quality or sufficiency of the services so described. SECTION 3: SITE ACCESS AND SITE CONDITIONS 3.1 Client will grant or obtain free access to the site for all equipment and personnel necessary for UES to perform the work set forth in this Agreement. The Client will notify any possessors of the project site that Client has granted UES free access to the site. UES will take reasonable precautions to minimize damage to the site, but it is understood by Client that, in the normal course of work, some damage may occur,and the correction of such damage is not part of this Agreement unless so specified in the Scope of Services. 3.2 The Client is responsible for the accuracy of locations for all subterranean structures and utilities. UES will take reasonable precautions to avoid known subterranean structures, and the Client waives any claim against UES,and agrees to defend, indemnify,and hold UES harmless from any claim or liability for injury or loss, including costs of defense,arising from damage done to subterranean structures and utilities not identified or accurately located. In addition, Client agrees to compensate UES for any time spent or expenses incurred by UES in defense of any such claim with compensation to be based upon UES's prevailing fee schedule and expense reimbursement policy. SECTION 4: BILLING AND PAYMENT 4.1 UES will submit invoices to Client monthly or upon completion of services. Invoices will show charges for different personnel and expense classifications. 4.2 Payment is due 30 days after presentation of invoice and is past due 31 days from invoice date. Client agrees to pay a finance charge of one and one-half percent(1 '/2%)per month,or the maximum rate allowed by law,on past due accounts.4.3 If UES incurs any expenses to collect overdue billings on invoices, the sums paid by UES for reasonable attorneys'fees, court costs, UES's time, UES's expenses, and interest will be due and owing by the Client. SECTION 5: OWNERSHIP AND USE OF DOCUMENTS 5.1 All reports,boring logs,field data,field notes,laboratory test data,calculations,estimates,and other documents prepared by UES, as instruments of service, shall remain the property of UES. Neither Client nor any other entity shall change or modify UES's instruments of service. 5.2 Client agrees that all reports and other work furnished to the Client or his agents, which are not paid for,will be returned upon demand and will not be used by the Client for any purpose. 5.3 UES will retain all pertinent records relating to the services performed for a period of five years following submission of the report or completion of the Scope of Services, during which period the records will be made available to the Client in a reasonable time and manner. 5.4 All reports, boring logs,field data,field notes, laboratory test data, calculations, estimates,and other documents prepared by UES, are prepared for the sole and exclusive use of Client,and may not be given to any other entity, or used or relied upon by any other entity,without the express written consent of UES.Client is the only entity to which UES owes any duty or duties,in contract or tort, pursuant to or under this Agreement. SECTION 6: DISCOVERY OF UNANTICIPATED HAZARDOUS MATERIALS 6.1 Client represents that a reasonable effort has been made to inform UES of known or suspected hazardous materials on or near the project site. 6.2 Under this agreement,the term hazardous materials include hazardous materials, hazardous wastes, hazardous substances (40 CFR 261.31, 261.32, 261.33), petroleum products, polychlorinated biphenyls, asbestos, and any other material defined by the U.S. EPA as a hazardous material. 6.3 Hazardous materials may exist at a site where there is no reason to believe they are present. The discovery of unanticipated hazardous materials constitutes a changed condition mandating a renegotiation of the scope of work. The discovery of unanticipated hazardous materials may make it necessary for UES to take immediate measures to protect health and safety. Client agrees to compensate UES for any equipment decontamination or other costs incident to the discovery of unanticipated hazardous materials. 6.4 UES will notify Client when unanticipated hazardous materials or suspected hazardous materials are encountered. Client will make any disclosures required by law to the appropriate governing agencies. Client will hold UES harmless for all consequences of disclosures made by UES which are required by governing law. In the event the project site is not owned by Client, Client it is the Client's responsibility to inform the property owner of the discovery of unanticipated hazardous materials or suspected hazardous materials.6.5 Notwithstanding any other provision of the Agreement,Client waives any claim against UES,and to the maximum extent permitted by law, agrees to defend, indemnify, and save UES harmless from any claim, liability, and/or defense costs for injury or loss arising from UES's discovery of unanticipated hazardous materials or suspected hazardous materials including any costs created by delay of the project and any cost associated with possible reduction of the property's value.Client will be responsible for ultimate disposal of any samples secured by UES which are found to be contaminated. SECTION 7: RISK ALLOCATION 7.1 Client agrees that UES's liability for any damage on account of any breach of contract,error,omission,or professional negligence will be limited to a sum not to exceed $50,000 or UES's fee, whichever is greater. If Client prefers to have higher limits on contractual or professional liability, UES agrees to increase the limits up to a maximum of$1,000,000.00 upon Client's written request at the time of accepting UES's proposal provided that Client agrees to pay an additional consideration of four percent of the total fee, or$400.00, whichever is greater. If Client prefers a $2,000,000.00 limit on contractual or professional liability, UES agrees to increase the limits up to a maximum of$2,000,000.00 upon Client's written request at the time of accepting UES's proposal provided that Client agrees to pay an additional consideration of four percent of the total fee,or$800.00,whichever is greater. The additional charge for the higher liability limits is because of the greater risk assumed and is not strictly a charge for additional professional liability insurance. 7.2 Client shall not be liable to UES and UES shall not be liable to Client for any incidental, special, or consequential damages (including lost profits, loss of use, and lost savings) incurred by either party due to the fault of the other, regardless of the nature of the fault, or whether it was committed by Client or UES,their employees,agents,or subcontractors;or whether such liability arises in breach of contract or warranty,tort(including negligence),statutory,or any other cause of action.7.3 As used in this Agreement, the terms "claim" or"claims" mean any claim in contract, tort, or statute alleging negligence, errors, omissions, strict liability, statutory liability, breach of contract, breach of warranty, negligent misrepresentation, or any other act giving rise to liability. SECTION 8: INSURANCE 8.1 UES represents it and its agents, staff and consultants employed by UES, is and are protected by worker's compensation insurance and that UES has such coverage under public liability and property damage insurance policies which UES deems to be adequate. Certificates for all such policies of insurance shall be provided to Client upon request in writing.Within the limits and conditions of such insurance, UES agrees to indemnify and save Client harmless from and against loss, damage, or liability arising from negligent acts by UES, its agents, staff, and consultants employed by it. UES shall not be responsible for any loss,damage or liability beyond the amounts, limits, and conditions of such insurance or the limits described in Section 7,whichever is less.The Client agrees to defend,indemnify,and save UES harmless for loss,damage or liability arising from acts by Client, Client's agents, staff, and others employed by Client. 8.2 Under no circumstances will UES indemnify Client from or for Client's own actions, negligence, or breaches of contract. 8.3 To the extent damages are covered by property insurance, Client and UES waive all rights against each other and against the contractors, consultants,agents,and employees of the other for damages,except such rights as they may have to the proceeds of such insurance. SECTION 9: DISPUTE RESOLUTION 9.1 All claims,disputes,and other matters in controversy between UES and Client arising out of or in any way related to this Agreement will be submitted to mediation or non-binding arbitration, before and as a condition precedent to other remedies provided by law. 9.2 If a dispute arises and that dispute is not resolved by mediation or non-binding arbitration,then:(a)the claim will be brought in the state or federal courts having jurisdiction where the UES office which provided the service is located; and (b) the prevailing party will be entitled to recovery of all reasonable costs incurred,including staff time,court costs,attorneys'fees,expert witness fees,and other claim related expenses. SECTION 10: TERMINATION 10.1 This agreement may be terminated by either party upon seven (7)days written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof,or in the case of a force majeure event such as terrorism, act of war, public health or other emergency.Such termination shall not be effective if such substantial failure or force majeure has been remedied before expiration of the period specified in the written notice. In the event of termination,UES shall be paid for services performed to the termination notice date plus reasonable termination expenses. 10.2 In the event of termination, or suspension for more than three(3)months, prior to completion of all reports contemplated by the Agreement, UES may complete such analyses and records as are necessary to complete its files and may also complete a report on the services performed to the date of notice of termination or suspension.The expense of termination or suspension shall include all direct costs of UES in completing such analyses,records,and reports. SECTION 11: REVIEWS, INSPECTIONS,TESTING,AND OBSERVATIONS 11.1 Plan review, private provider inspections, and building inspections are performed for the purpose of observing compliance with applicable building codes. Threshold inspections are performed for the purpose of observing compliance with an approved threshold inspection plan. Construction materials testing("CMT")is performed to document compliance of certain materials or components with applicable testing standards. UES's performance of plan reviews, private provider inspections, building inspections, threshold inspections,or CMT,or UES's presence on the site of Client's project while performing any of the foregoing activities, is not a representation or warranty by UES that Client's project is free of errors in either design or construction. 11.2 If UES is retained to provide construction monitoring or observation, UES will report to Client any observed work which,in UES's opinion,does not conform to the plans and specifications provided to UES. UES shall have no authority to reject or terminate the work of any agent or contractor of Client. No action,statements,or communications of UES,or UES's site representative,can be construed as modifying any agreement between Client and others. UES's performance of construction monitoring or observation is not a representation or warranty by UES that Client's project is free of errors in either design or construction. 11.3 Neither the activities of UES pursuant to this Agreement,nor the presence of UES or its employees, representatives, or subcontractors on the project site, shall be construed to impose upon UES any responsibility for means or methods of work performance, superintendence, sequencing of construction, or safety conditions at the project site. Client acknowledges that Client or its contractor is solely responsible for project jobsite safety. 11.4 Client is responsible for scheduling all inspections and CMT activities of UES.All testing and inspection services will be performed on a will-call basis. UES will not be responsible for tests and inspections that are not performed due to Client's failure to schedule UES's services on the project, or for any claims or damages arising from tests and inspections that are not scheduled or performed. SECTION 12: ENVIRONMENTAL ASSESSMENTS Client acknowledges that an Environmental Site Assessment ("ESA") is conducted solely to permit UES to render a professional opinion about the likelihood or extent of regulated contaminants being present on, in, or beneath the site in question at the time services were conducted.No matter how thorough an ESA study may be,findings derived from the study are limited and UES cannot know or state for a fact that a site is unaffected by reportable quantities of regulated contaminants as a result of conducting the ESA study. Even if UES states that reportable quantities of regulated contaminants are not present, Client still bears the risk that such contaminants may be present or may migrate to the site after the ESA study is complete. SECTION 13: SUBSURFACE EXPLORATIONS 13.1 Client acknowledges that subsurface conditions may vary from those observed at locations where borings,surveys, samples, or other explorations are made, and that site conditions may change with time. Data, interpretations, and recommendations by UES will be based solely on information available to UES at the time of service. UES is responsible for those data, interpretations, and recommendations, but will not be responsible for other parties'interpretations or use of the information developed or provided by UES. 13.2 Subsurface explorations may result in unavoidable cross-contamination of certain subsurface areas, as when a probe or boring device moves through a contaminated zone and links it to an aquifer, underground stream, or other hydrous body not previously contaminated. UES is unable to eliminate totally cross-contamination risk despite use of due care.Since subsurface explorations may be an essential element of UES's services indicated herein, Client shall,to the fullest extent permitted by law, waive any claim against UES, and indemnify, defend, and hold UES harmless from any claim or liability for injury or loss arising from cross- contamination allegedly caused by UES's subsurface explorations. In addition,Client agrees to compensate UES for any time spent or expenses incurred by UES in defense of any such claim with compensation to be based upon UES's prevailing fee schedule and expense reimbursement policy. SECTION 14:SOLICITATION OF EMPLOYEES Client agrees not to hire UES's employees except through UES.In the event Client hires a UES employee within one year following any project through which Client had contact with said employee, Client shall pay UES an amount equal to one-half of the employee's annualized salary,as liquidated damages,without UES waiving other remedies it may have. SECTION 15: ASSIGNS Neither Client nor UES may delegate,assign,sublet,or transfer its duties or interest in this Agreement without the written consent of the other party. SECTION 16: GOVERNING LAW AND SURVIVAL 16.1 This Agreement shall be governed by and construed in accordance with the laws of the jurisdiction in which the UES office performing the services hereunder is located. 16.2 In any of the provisions of this Agreement are held illegal, invalid, or unenforceable, the enforceability of the remaining provisions will not be impaired and will survive. Limitations of liability and indemnities will survive termination of this agreement for any cause. SECTION 17: INTEGRATION CLAUSE 17.1 This Agreement represents and contains the entire and only agreement and understanding among the parties with respect to the subject matter of this Agreement, and supersedes any and all prior and contemporaneous oral and written agreements, understandings, representations, inducements, promises,warranties,and conditions among the parties. No agreement, understanding, representation, inducement, promise, warranty, or condition of any kind with respect to the subject matter of this Agreement shall be relied upon by the parties unless expressly incorporated herein. 17.2 This Agreement may not be amended or modified except by an agreement in writing signed by the party against whom the enforcement of any modification or amendment is sought. SECTION 18:WAIVER OF JURY TRIAL Both Client and UES waive trial by jury in any action arising out of or related to this Agreement. SECTION 19: INDIVIDUAL LIABILTY PURSUANT TO FLORIDA STAT. 558.0035, AN INDIVIDUAL EMPLOYEE OR AGENT OF UES MAY NOT BE HELD INDIVIDUALLY LIABLE FOR NEGLIGENCE. UES DOCS No. 1823094 Revised 12/04/2020