HomeMy WebLinkAbout09.c EDB Ratify Ridgecrest GST 1 EXECUTIVE SUMMARY AGENDA ITEM: Ratification of Executive Director actions for the Emergency Repair on Ridgecrest Water Treatment Plant (WTP) Ground Storage Tank(GST)Number 1 Date: July 11,2024 BACKGROUND: Staff performs regular inspections and maintenance on our WTP GSTs. We complete these inspections on 5-years intervals as required by the Florida Depailment of Environmental Protection (FDEP). The contractors identify material and equipment needing repair or maintenance. Based upon this information, staff schedules the recommended repair and maintenance work. Staff and our contractors recently inspected GSTs at the Ridgecrest WTP. From a recent tank cleaning and inspection, staff and the contractor recommended immediate repair of the GST due to deteriorating conditions. The Ridgecrest WTP drives the water system for the Orange Park grid. Having a GST down for the time to procure contractor services presents a risk to public health and safety. CCUA finds itself with a risk to public health and safety with a Ridgecrest GST out of service for repair and maintenance. Under the emergency declaration, staff engaged TankRehab to repair the tank immediately. The attached inspection report, letter, and scope/fee outline the work to be done under this emergency repair. RECOMMENDATION: Staff respectfully requests the Board of Supervisors ratify the Executive Director's actions under the Declaration of Emergency Repair on Ridgecrest WTP GST Number 1, including the engagement of TankRehab for the emergency repair. ATTACHMENTS: Declaration of Emergency Repair on Ridgecrest WTP GST Number 1 //DM,DR(Author) //AB (Review) //JDJ(Final) /4/101 • Gr���T►'AutH°q`:‹� CLAY COUNTY UTILITY AUTHORITY DECLARATION OF EMERGENCY ACTION Certificate of Executive Director I,Jeremy D. Johnston,Executive Director of the Clay County Utility Authority,hereby certify that the action taken or approved as described below with supporting documentation is necessary to be taken forthwith by the Clay County Utility Authority, an Independent Special District of the State of Florida, to protect the public health, safety, or welfare. e. m I. Jol on, + A, PE cutiv- Bir Emergency Repair on Ridgecrest Water Treatment Plant (WTP) Ground Storage Tank (GST) Number 1 CCUA performs regular inspections and maintenance on our WTP GSTs. We execute Supplemental Agreements with our Professional Engineering consultants under continuing services contracts to perform these inspections. We complete these inspections on 5-years intervals required by the Florida Department of Environmental Protection(FDEP). The consultants identify material and equipment needing repair or maintenance. Based upon this information, CCUA schedules the recommended repair and maintenance work. The consultant identified items for repair and maintenance in that report. CCUA staff and the consultant recommended immediate repair of the GST due to deteriorating conditions. The Ridgecrest WTP drives the water system for the Orange Park grid. Having a Ridgecrest GST down for the time to procure contractor services presents a risk to public health and safety. CCUA finds itself with a risk to public health and safety with a Ridgecrest GST out of service for repair and maintenance. I am issuing this Declaration of Emergency Action to complete repairs on Ridgecrest GST number 1 to mitigate the public health and safety risk. I will engage the company TankRehab to repair the tank immediately. The attached inspection report, letter, and scope/fee outline the work to be done under this emergency repair. TANIKREHABO Professional Tank Services 2030 E. Adams St. Jacksonville,Florida 32202 (904)551-9293 contact@tankrehab.com 550,000 Gallons Ground Storage Tank Inspection Report Ridgecrest GST #1 WTP Prepared For: Clay County Utility Authority Clay County, Florida . • tY y Prepared By: 054.1.5/?024'0B 55__ Tom Donovan May 2024 General Information INTRODUCTION: On May 15, 2024,Tom Donovan of TankRehab.com, LLC, performed a condition assessment inspection on Ridgecrest#1 Ground Storage Tank,located at 1082 Camp Francis Johnson Road, Orange Park,FL 32065. The inspection was completed to determine the condition of the coatings and structure and compliance with current sanitation guidelines, safety and security regulations and guidelines published by AWWA,OSHA, Florida Department of Environmental Protection Department,US EPA and the US Department of Homeland Security. TANK DETAILS CAPACITY: 550,000 Gallons DESIGN: Ground Storage INSPECTION May 15,2024 INSPECTOR: Tom Donovan DATE: CONSTRUCTION Welded CONSTRUCTION Unknown STYLE: DATE: BUILDER: Unknown HEIGHT/ 'Diam. DIMENSION: "H _ l EXTERIOR Unknown COATING: INTERIOR Epoxy MANWAY: 32"square roof COATING: 24"round shell Page 2 of 25 Ridgecrest WTP GST#1 CCUA Exterior Coating Conditions SIDEWALLS Minor active corrosion occurring. Protective coating system thickness range: 6.5 to 31.2 mils;Average: 19.22 mils. ROOF N/A RECOMMENDATIONS • Monitor and repair exterior protective coating as required. Page 3 of 25 Ridgecrest VVTP GST#1 CCUA Interior Coating Conditions ROOF Active corrosion occurring on the top edge of shell wall. Metal loss occurring. SIDEWALLS Active corrosion occurring. Metal loss occurring. Protective coating system thickness range: 10.1 to 23.8 mils;Average: 16.45 mils. FLOOR Active corrosion occurring. Major metal loss occurring. RECOMMENDATIONS • Remove all existing protective lining and corrosion and install thick mill protective lining system and sealant to preserve substrate. • Budgetary Consideration: $100,000.00 Page 4 of 25 Ridgecrest WTP GST#1 CCUA Safety/Sanitation/Structure/Security Conditions SAFETY Ladders Exterior ladder equipped with a safety climbing cage. Recommend a cable type safety climb for the interior and exterior ladders. Roof Recommend a cable type safety climb for the roof. Shell Access Hatch The tank is equipped with a sidewall hatch in good and workable condition. SANITATION Roof Hatch This tank is equipped with a roof access hatch which is lockable and in good condition. The hatch does seal and is of a style that meets FL DEP standards. Center Roof Vent The roof vent screen needs to be replaced to keep contaminants out. Roof Fan Vent The roof fan vent screen needs replaced to keep contaminants out. Overflow There is internal overflow that runs to grade. The screen was found to be in good condition. Page 5 of 25 Ridgecrest WTP GST#1 CCUA STRUCTURE Foundation Visible areas of the foundation appeared to be in good condition. Bolts Bolts appear to be tight. SECURITY Site The tank is located within a fenced area and is secure. SUMMARY AND RECOMMENDATIONS SUMMARY Overall,this water storage tank is in poor condition and can be put back into service after screens are replaced. The exterior coating system should be monitored for corrosion. The interior coating system should be replaced to remove corrosion and install protective coating system and sealant as soon as feasible. Metal loss is occurring and substantial cost due to substrate repair/replacement will be required if not corrected in a timely manner. RECOMMENDATIONS • Add safety climb equipment. • Replace screen on vents. • Renovate interior to stop corrosion and metal loss. BUDGETARY CONSIDERATIONS • $125,000.00 Page 6 of 25 Ridgecrest WTP GST#1 CCUA 1111.1111111111Mmummt \, ri 4 ` r Photo #1 View of tank and access to roof. A !. • 4 AWOL. • - ---___ lip., • ' .4111111111111114 vidoill i di° 05/ )5I?0?4 I'f) I Photo #2 View of center roof with no safety cable. Page 7 of 25 Ridgecrest VVTP GST#1 CCUA .. I j- f - _ / '4811114444i • f.\\ '.1 Photo #3 View of roof vent,screen need replaced. R . R I. 4 n5/15 0n74 n �*I:. :.A: tea Photo #4 View of exterior. Page 8 of 25 Ridgecrest WTP GST#1 CCUA t1 _... 1 II Photo #5 View of exterior spot coating repair. ADANGER Confined I • space Net . I to...1 �++1 MMry . bilk .. .mow»: '.;_- . - Photo #6 View of shell access manway. Page 9 of 25 Ridgecrest WTP GST#1 CCUA T +th . ,i I -.i ' - .i r ' �•,, ice.' '', Photo #7 View of exterior shell wall. / 0: . If ' F 3} , 41111111111111.11 a ; 7 Photo #8 View of exterior shell wall. Page 10 of 25 Ridgecrest WTP GST#1 CCUA Photo #9 View of exterior shell wall. • r,lQ•� lt2f}3gfiza t at a ? ^S ,fu4. . .e1l4 l��w X4 a! A'• r y •• 11L�.\ }I t) ♦ iyyj •�� r try: � ':; T > � , KE• ; I+� ti: • • • Photo #10 View of tank above grade foundation. Page 11 of 25 Ridgecrest WTP GST#1 CCUA Photo #11 View of piping. tom` 1 z 1 . r'; . kfl • C'Y (Ogg gia I -.0P2,VAA,r- leflt • •.14 . sir Photo #12 View of overflow. Page 12 of 25 Ridgecrest WTP GST#1 CCUA • Photo #13 View of screen on overflow. • 5 , I • Photo #14 View of roof fan vent and screen in need of replacement. Page 13 of 25 Ridgecrest WTP GST#1 CCUA ` _n ♦ t? _- , .cGPI C 11 L Photo #15 View of roof access manway. . 5 d 4 41 1,1 pe illik Photo #16 View of active corrosion on interior ladder. Page 14 of 25 Ridgecrest WTP GST#1 CCUA • (I) 8151M 9§:El Photo #17 View of coating corrosion on interior sidewall and ceiling area. AM . {LI 100160 411E:El Photo #18 View of active corrosion on interior sidewall and ceiling area. Page 15 of 25 Ridgecrest WTP GST#1 CCUA 2024 05 15 CCUA TANKREITAB PAN : 17 TILT 86 ROLI.= (I I NCI.= - 3 • Photo #19 View inside tank before sediment removal. 2024 05 I5 CCUA ►'"', REHAB PAN: 358 TILT: I21 ROLL", " CL: 4 • _ _ __ p}h Photo #20 View of floor during sediment removal. Page 16 of 25 Ridgecrest WTP GST#1 CCUA 2024 05 IS CCUA TANKREHAB PAN: 352 TILT: 8 ROLI.: 0 INCI.: 3 I . Photo #21 Ceiling structure in good condition. 2024 -05-15 CCUA TANKREHAB PAN: 323 TILT: IU ROLL: 1 INCI.- 1 _ Photo #22 View inside shell wall corrosion occurring. Page 17 of 25 Ridgecrest WTP GST#1 CCUA 2024 -05-15 CCUA TANKREIIAB PAN : 2 TILT: 79 ROLL: -1 INCL: -4 � _ Photo #23 View inside floor/shell wall during sediment removal. 2024-05-15 CCUA TANKR ;;` ; ` ' ' 1 : 1 ' : -4 " .w " •. � r Sit: • 14 f' } Photo #24 View inside shell wall during sediment removal. Page 18 of 25 Ridgecrest WTP GST#1 CCUA 2024--05-1.5iCGN' T+AMPREMAB W �51 TILT: 81 ROLL: O I NCL : -3 r ra c Photo #25 View of nozzle. 202' 5- 15 CCUA TANKREHAB P10354 TILT: 70 ROLL : 0 1NCL : 3 Photo #26 View of fill pipe. Page 19 of 25 Ridgecrest WTP GST#1 CCUA • 2024-05-15 CCUA TANKREHAB PAN 229 TILT: 130 ,,-[ram , i L. . • Photo #27 View of floor. 2024 -05 - 15 CCUA TANKREHAB PAN: 201 TILT: 44 ROLL: 0 INCL: -5 Photo #28 View of ceiling. Page 20 of 25 Ridgecrest WTP GST#1 CCUA 2024-05-15 CCUA TA, . NAB PAN: 85 TILT: 13 ROLL: 0 INCL: -3 _ .4L `` Photo #29 View inside access ladder. 202 15- 15 CCUA,TANKR. i"� ROLL: 0 I,'I,: -3 + . • 71, , • • Photo #30 View of shell manway. Page 21 of 25 Ridgecrest WTP GST#1 CCUA (v,q15tani Hi.51 Photo #31 View of floor after sediment removal. n 21 (H1 15 CCUA TANKREHAB PAN: 2 T1LT: 81 ROLL: 11NCL: -4 Photo #32 View of floor after sediment removal. Page 22 of 25 Ridgecrest WTP GST#1 CCUA 2024 -05- IS CCUA TANKREUAB_P.AN: I TILT: 100 ROI.l.: 0 'NCI, 5 r' Photo #33 View of floor after sediment removal. L , Photo #34 View of roof manway closed and locked. Page 23 of 25 Ridgecrest WTP GST#1 CCUA 1340.;;;43011:fteilt:+0:';';':)`:10$"'IFll}!!?ll!�!1!!1►1?�s }11}1111}!)I111 f�t?�!?1!I1}?1!11f11!11111i1►1}1!' +flttllf?!!,'!1?I�!1!1?1!11!i' IIOIfI!l111111?!?!!!!?1!!?ll!!? P111111!r1H1111i 111111111!11'/11!11N11f1111!1)� 111N11111tIII1")11111111f111111111P!1!1!IIFl1��I 11�11�1�11111i111111111191111!>I 1111!)!!y!)111 �0'���?frl�lftff�l�tl►fll>1`1►11'1 ' ?I I IPII►1/11IIIIIIIPf'►Il�f III}!1!11!)11 1 !11►1►PI11111111111t11ttfI11►Ill t)!!I 1))"y!I IIP1�1111It1f IIt1I11I11+1I111ttII!!!)?!?t!)!!!!??!I� I111/►P�1111I1'11P11'1't'I11+II!�!�'I�I+!�+'!}I��1 -- �_�IIPt� f'P1111t11111t�1I1'11>1�!>>!►1►1,?!! ylIIII'i'III 1� 11111lIItIP11Nf!!1!!!�!! ���l111il1fll?�l11!!!?} 1 �1 1!N!1llftl>�!�)1!1►)!!? � N11NN11I!!;!!f+!II��1,1�, /►i IIII1f1111t1+PI1111I11+IIlIt1!; , PI11111111111ItI!a!��1) 1 ► 111111111fIfilll��!1`11►��!}, 1 fit� 1lt �I!P►�1)1I11��!) tICISirtioittilitt;ittttilill}itilIcl;I4' Pt1I�1}t11??���ll!I�Ir�}1l�IAI. Photo #35 Locked access to roof. .. ,ADANGER ©.............. {A11 V sY.00. , .._. ._ hwry . ..,_ . ., . _ . . . .. _ ilk 1 0 O� OR a 08a0JQ Photo #36 Manway secured. Page 24 of 25 Ridgecrest WTP GST#1 CCUA • • ENVIR ONEERING INC. 109 AZALEA POINT DRIVE SOUTH • PONTE VEDRA BEACH • FLORIDA • 32082 May 29, 2024 Mr. Tom Donovan, President Tank Rehab,LLC 2030 East Adams Street Jacksonville, Florida 32202 Subject: Ground Storage Tank Inspection Report- (GSTIR) $50KG—Ridgecrest#1 GST#1 WTF— 1082 Camp Francis Johnson Road, Orange Park,FL 32065—Manufacturer (Unknown),S/N(Unknown), Model(Unknown), Year(Unknown), Clay County Utility Authority. 3176 Old Jennings Road,,.Middleburg, Florida 32068—JON 8262. Reference: TankRehab, LLC Report Dated May 2024,Tank Inspection(TI)Report Dear Mr. Donovan: The subject inspection.was conducted in accordance with accepted inspection protocols and was • coxppletOd by TankRehab,LLC on the Ground'Storap Tank. The tank was built by an unknown • company. The tank was found to be in the condition as documented in the TANKREHAB report dated May 2024. Details of the inspection are noted in the inspection report dated May 2024. The tank interior should be inspected every five(5)years for corrosion control maintenance activities. The tank exterior should be inspected every,year for corrosion control�maintenance • activities. ..The sludge and sedimer t build up should be removed from the•tank 4 minimum of once every two years. Recompnenda#iond in thereportshouud be followed'as:stated: • .It leas beena pleasure working with you and Ilookc forward to completn)g this work with yon in • - the:very..near••fuWure;•:l;can 1,e reached at (904) 665-01#0 C.t.inobiile(904)612-145.6 if you should • have 1y,'q iestions: • Respectfully submitted - • • Vki Timothy W. Rudolph;P.E., L.A.C. '. :���': Licensed Professional Engineer 39617 -Florida 5( ./4. 2 • Licensed Asbestos Consultant EA 0000074 •r, I ' Asbestos Business License ZA0000243 • ; TANK REHAB INSPECTION-LETTER—8262-I> ai .1` - (904) 665-0100 (904) 61 2-1 456 • MOBILE (904) 665-01 01 • FAX �1I TANKREHABA Profaeeional Tank Services July 2,2024 PROPOSAL 24-204 Preparation and Painting of the Interior Ridgecrest GST#1 Tank TankRehab.com, LLC (TankRehab) proposes to provide labor and material for the rehab of the water tank as specified below in accordance with all applicable codes and standards including OSHA and AWWA. 1. DRAWINGS, SPECIFICATIONS, AND OTHER REQUIRED DATA Prior to starting work, TankRehab will gather all data required for submittal purposes for the repair to the afore mentioned storage tank including any available computations, detailed drawings, and specifications. 2. COMMENCEMENT AND COMPLETION Upon your execution of this proposal, we will be prepared to start work 5 days after approval of our submittal information; and will undertake to furnish sufficient labor, materials, and equipment to complete the work in approximately 30 days working time thereafter. In the event that we cannot start the job by December 1, 2024 because of delays of any nature which are caused by the owner or other contractor employed by him or other circumstances over which we have no control, then the contract price may be renegotiated to reflect any increased costs. 3. INSURANCE We hereby certify that we have complete Workers' Compensation Insurance, and that we carry adequate Liability and Property Damage Insurance. A certificate will be furnished by our insurance agency upon request. 904 551.9293 contact@tankrehab,corn 2030E ADAMS ST JACKSONVILLE FL 32202 Ridgecrest#1 GST Tank May 16, 2024 CCUA 4. SERVICES TO BE FURNISHED BY TANKREHAB. We propose to furnish all supervision, labor, material, and equipment required to complete the work, except as noted in Paragraph 5. The services to be furnished by TankRehab are specifically: • Surface Preparation Pressure Clean with a minimum 3,500 psi to remove all surface contaminants. Abrasive Blast Clean in accordance with SSPC-SP10/NACE No.2 Near- White Blast Cleaning. Prime coat shall be applied the same day as surface preparation to avoid flash rusting. • Coating System Prime Coat: Apply (1) coat of Tnemec Series 94-H20 Hydro-Zinc @ a rate of 2.5 —3.5 mils DFT. Stripe Coat: By brush, apply Tnemec Series 22 Epoxoline to all welds, edges, corners, nuts, bolts, etc... Finish Coat: Apply (1) coat of Tnemec Series 22 Epoxoline @ a rate of 25.0—35.0 mils DFT. • Seal Chime Seal chime with non-shrink grout. TOTAL: $108,500.00 • Patch Plate and Seam Welding (As ordered) Complete specified work to patch plate(75)corrosion pits on floor. Material to be used: A36 carbon steel to replace/repair existing water tank items. Welding shall conform to all applicable requirements of the current Rules for Field Welding of Steel Storage Tanks of the American Welding Society. • (75) Corrosion patch plates 3"diameter x .25"thick ASTM A36. (25 ft.) seam welding. (As ordered $11,500.00) TOTAL: $120,000.00 Page 2 of 5 Ridgecrest#1 GST Tank May 16, 2024 CCUA 5. MATERIALS AND SERVICES FURNISHED BY OTHERS It is understood that the following services shall be provided by others without expense to TankRehab. a. Adequate access to the tank site including open storage space for our vehicles, equipment and materials, conveniently located near the tank to be repaired. b. Any permit or other governmental fees as may be required for the work. c. Removing and placing tank back in service. 6. BACK CHARGES AND CLAIMS FOR EXTRAS No claim for extra services rendered or materials furnished will be valid by either party unless written notice by owner change order within ten business days of when claim originated. TankRehab claims for extras shall carry 30%for overhead and 10%for profit. 7. DELAYS It is agreed that we shall be permitted to prosecute our work without interruption. If delayed at any time for a period of 24 hours or more by an act or neglect of the owner, his representative, or other contractor employed by him, or by reason of any changes ordered in the work, we shall be reimbursed for our actual additional expense caused by such delay, including loss of use of our equipment, plus 30%for overhead. 8. LABOR This proposal is predicated on open-shop labor conditions, using our own personnel. If we are required to employ persons of an affiliation desirable to the owner or other contractor employed by him or the general contractor thereby resulting in increased costs to us, the contract price shall be adjusted accordingly. Such requirement shall not provide that TankRehab sign a contract with any labor organization. In the event of a labor stoppage, we shall not be in default or be deemed responsible for delay of the progress of this contract or damage to the owner or the contractor so long as TankRehab has sufficient qualified employees available to perform the work. Page 3 of 5 Ridgecrest#1 GST Tank May 16, 2024 CCUA 9. QUOTATION We are prepared to carry out this work in accordance with the following lump sum pricing: PER THE SCHEDULE ON PAGE 2. Final payment, including any retention, shall be made within 30 days from the time work is completed or the billing is received, and is to be received by us in our accounting office at 2030 E. ADAMS ST. JACKSONVILLE, FLORIDA 32202. Final payment shall not be held up because of delays in testing. Owner shall pay TankRehab interest at 12% per annum on any overdue amounts. 10. CONSULTATION AND LIMITATIONS If the Owner wishes to have TankRehab to perform any additional repairs or remediation of the tank or accessories, it shall authorize such work in writing and pay TankRehab its standard charges for such work. It is agreed that TankRehab shall not be responsible for any consequential, special or delay damages. It is agreed that the venue for any litigation under this Agreement shall be in county where the project takes place. If TankRehab engages an attorney for the collection of the amounts due from the Owner, the prevailing party can recoup reasonable attorney's fees and costs through any appeal. 11. GUARANTEE TankRehab will guarantee its workmanship and materials on its work covered in this Proposal for a period of one year after completion of its work. Prior to leaving the location, TankRehab personnel will perform a walk through with the responsible party overseeing our work for the Owner or Contractor. In case any defects in TankRehab's workmanship or materials appear within the one-year period after completion of TankRehab's work, TankRehab shall promptly make repairs at its own expense upon written notice by the Owner or Contractor that such defects have been found. TankRehab's guaranty is limited to defects in TankRehab's workmanship and materials and TankRehab is not responsible for ordinary wear and tear or for damage resulting from negligent or inappropriate use. Page 4 of 5 Ridgecrest#1 GST Tank May 16,2024 CCUA 12. ACCEPTANCE This proposal is offered for your acceptance within 45 days from the proposal date. We reserve the right after that period to amend our bid to reflect our changing construction schedules and materials and labor rate changes. The return to this company of a copy of this proposal with your acceptance endorsed thereon within the time aforesaid will constitute a contract between us. This proposal shall be made a part of any subcontract agreement or purchase order. Sincerely, TANKREHAB.COM, LLC. /AA ,d,`' Tom Donovan Managing Member/Owner ACCEPTED: BY: TITLE DATE: Page 5 of 5