Loading...
HomeMy WebLinkAbout15.a FYI CO No. 3 Sawcross GP Reclaimed Water Pump Station GAY CO(J^,T), Clay County Utility Authority Working together to protect 3176 Old Jennings Road public health,conserve our Middleburg,Florida 32068-3907 natural resources,and Telephone(904)213-5999 create long-term value for ON' our ratepayers. Facsimile (904)213-2498 Change Order No.: 3 Date: 10/30/2024 Project: Governor's Park Wastewater Lift Station Project and Reclaimed Water Pump Station Project CCUA Bid No.: 2022/2023-A06 CCUA Project No.: 1127-004 Vendor: Sawcross Incorporated Owner: Clay County Utility Authority 10970 New Berlin Road 3176 Old Jennings Road Jacksonville,Florida 32226-2270 Middleburg,Florida 32068 904-751-7500 (904)272-5999 Engineer of Record: Ardurra 100 Center Creek Road,Suite 108 St.Augustine,Florida 32084 904-562-2185 ORIGINAL CONTRACT TIMES ORIGINAL PREVIOUS CO CURRENT CO NTP 8/25/2023 DAYS ADD 420/353 SUB.COMP. 474 12/14/2024 4/30/2025 FINAL COMP. 534 2/12/2025� 12/31/2025 INCREASE OR DECREASE IN ITEM DESCRIPTION OF CHANGE(S) QTY. UNIT PRICE CONTRACT PRICE Contract Increase Contract Decrease TOTAL INCREASE $0.00 TOTAL DECREASE $0.00 NET CHANGE RESULTING FROM THIS CHANGE ORDER $0.00 ORIGINAL CONTRACT PRICE $7,683,000.00 Net Increases by Change Orders(prior to this change order) $0.00 Net Decreases by Change Orders(prior to this change order) ($792,106.37) Total Net Change by Chance Orders(prior to this change order) ($792,106.37 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $6,890,893.63 NET CHANGE RESULTING FROM THIS CHANGE ORDER $0.00 CONTRACT PRICE INCLUDING THIS CHANGE ORDER $6,890,893.63 This document shall become an amendment to the contract and all provisions of the contract will apply hereto. Accepted by: Date: Engineer of Record t , Accepted by: /l/f�/ Date: 20,,�"L endor Accepted by: Date: _ Owner A I, SAWCROSS INCORPORATED 10970 NEW BERLIN ROAD JACKSONVILLE, FL 32226-2270 904-751-7500(VOICE)904-751-0600(FAX)WWW.SAWCROSS.COM (INTERNET) October 31, 2024 Paul Steinbrecher, P.E. Clay County Utility Authority (CCUA) 3176 Old Jennings Road Middleburg, FL 32068 Subject: CCUA Governors Park RWPS — Proposed Change Order #003 (Time Extension) Dear Paul, This letter is to request a laddered extension to the Substantial Completion date from 12/14/2024 to 12/31/2025. The extension is necessary since the developers reclaim water distribution system will not be in service by the original Substantial Completion date (12/14/2024) and as such, the reclaim water pump station cannot be adequately tested for final acceptance. All equipment is installed at this time and the plant will be functional for its intended purpose by December 31, 2024. This request is to ensure the ability to test the high service pumps under realistic conditions, which will not occur until the developer completes a phase or partial phase of development which is expected in 2025. Accordingly, Sawcross requests an initial substantial completion to demonstrate the plant is available for its intended purpose by 12/31/2024. A second partial substantial completion date is requested on 4/30/2025 for building components, sitework and punchlist items. Please see this letter as a request for an additional four hundred nineteen (419) day(s). Revised Substantial Completion date is Wednesday 4/30/2025 and Final Completion date is Wednesday 12/31/2025. Clay County Utility Authority (CCUA) can withhold 2.50% of retainage from this contract until final acceptance is complete. Warranties will not be impacted by this extension and Clay County Utility Authority (CCUA) accepts long term storage responsibilities as indicated by manufacturers. This will allow all associated and responsible parties to return on the first phase of a remote development and final test the high service pumps properly by mutual agreement. Total Costs $0.00 Total Additional Contract Time (Days) Four Hundred Nineteen (419) Day(s) Sincerely, CONTRACTORS&ENGINEERS CGC 36203 CMC 56728 CUC 56787 UC 300564 Ci te'z /7,crzi-iz Drew Hickinbotham Project Manager 904-751-7500 Ext. 113 drewh@sawcross.com SECTION 00660 Change Order Request Form Project: Governor's Park Wastewater Lift Station Project and Governor's Park Reclaimed Water Pump Station Project Bid No.: 2022/2023-A06 Project No.: 1127-004 Change Order No.: 003 Change in Contract Times (Days) (Days) Original Contract time: Substantial Completion: 474 Ready for Final Payment: 534 Increased from previous C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Decreased from previous C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Contract time prior to this C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Increase in time on this C.O.: Substantial Completion: 419 Ready for Final Payment: 353 Decrease in time on this C.O.: Substantial Completion: 0 Ready for Final Payment: 0 Contract time with all approved C.O.s: Substantial Completion: 893 Ready for Final Payment: 887 Change in Contract Price Original Contract Price: $7,683,000.00 Increased from previously approved C.O.: $0.00 Decreased from previously approved C.O.: $(792,106.37) Increase in Contract price this C.O.: $0.00 Decrease in Contract price this C.O.: $0.00 Contract price with all approved C.O.s: $6,890,893.63 The undersigned Contractor certifies to the best of my knowledge and belief: (1) all items and amounts shown above are correct; (2) all Work performed and Reimbursable Expenses fully comply with the terms and conditions of the Contract Documents; (3) all previous progress payments received from Clay County Utility Authority (CCUA) , on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of Contractor incurred in connection with Work covered by prior Applications for Payment; (4) title to all materials and deliverables incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to the CCUA at the time of payment clear of all liens, claims, security interests and encumbrances; (5) payment is due and has not been previously requested for these amounts; (6) no markup has been applied to reimbursable expenses. 00660-1 GOVERNOR'S PARK WASTEWATER LIFT STATION PROJECT CHANGE ORDER REQUEST FORM AND GOVERNOR'S PARK RECLAIMED WATER PUMP STATION PROJECT OCTOBER 2022 SECTION 00660 Change Order Request Form Drew Hickinbotham (Sawcross, Inca Project Manager) Contractor Name and Title Cost Break Down Form: (instructions:use a separate form for each individual work item) Description Unit Quantity Unit Cost Extended Cost Labor Materials Equipment — $ Maintenance of Traffic $ -- ----- — ----- --- Bonding $ General Conditions $ Overhead and Profit $ - ----- ------------- ------ $ Total firm fixed cost not to exceed amount: $ Note:attached supporting documentation RFI No. initiating the change: N/A Description: No costs associated with change order. Time extension requested due reclaim water not being available from the developers until late 2025. Reclaim water is required for startup and testing and complete checkout of operation. Sawcross and required vendors/manufacturers to be onsite for startup and testing services once water is available. Justification for the request:Reclaim water is required for startup and testing services. The developer will not be complete will the distrubution system until late 2025. Sawcross and required parties will complete startup and testing services once reclaim water is available. State the firm fixed cost not to exce otft in w ds: Contractor Signature: Date: J O) 31'Z02 G' 00660-2 GOVERNOR'S PARK WASTEWATER LIFT STATION PROJECT CHANGE ORDER REQUEST FORM AND GOVERNOR'S PARK RECLAIMED WATER PUMP STATION PROJECT OCTOBER 2022 SECTION 00660 Change Order Request Form Printed Name: Title: 00660-3 GOVERNOR'S PARK WASTEWATER LIFT STATION PROJECT CHANGE ORDER REQUEST FORM AND GOVERNOR'S PARK RECLAIMED WATER PUMP STATION PROJECT OCTOBER 2022