Loading...
HomeMy WebLinkAbout15.h FYI CAUA to Peters Creek WRF with WSI EXECUTIVE SUMMARY AGENDA ITEM: FYI regarding Contract Allowance Usage Authorization (CAUA) to Peters Creek WRF Expansion and Pipeline Project Agreement with Wharton-Smith, Inc. (WSI). CCUA Bid No. 22/23-A05 CCUA Project No.: 2211-0042/2022-106 CCUA Financial Job No.: 22003SP Date: May 15, 2025 Staff is providing this FYI to the Board regarding CAUA to cover several recommended design clarifications for the Peters Creek WRF Expansion and Pipeline Project. These items have been identified as beneficial to project completion and long-term operational functionality. BACKGROUND: WSI is providing construction services for the Peters Creek WRF Expansion and Pipeline Project, designed by Ardurra Group, Inc., the engineer of record. Staff requests that WSI utilize a portion of the remaining Original Contract Allowance (OCA) to fund several modifications to the Peters Creek WRF Expansion and Pipeline projects. This CAUA will: • Improve air release and scum removal at the Headworks • Improve the reliability of supplemental reclaimed water at the reclaimed water ground storage tank • Resolve final drainage requirements identified as a result of the entrance road modifications included in CAUA No. 1. • Fund removal of the temporary digester tanks from Peters Creek WRF and relocation to Keystone Heights WRF to be utilized in the expansion of Keystone Heights WRF The requested contract allowance usage totals $248,647.27. BUDGET: The total WSI project contract budget is $55,088,600. This CAUA will utilize $248,647.27 of the remaining $338,738 in the original contract allowance. This authorization leaves a remaining allowance in the OCA of$90,088.60. Peters Creek WRF &Pipeline Project Budget Summary Total Project Budget $55,088,600 Original Contract Allowances $1,825,000 Construction Budget $53,263,600 Total Project Budget $55,088,600 Original Contract Allowance (OCA) less previous CAUA $338,738 Current Contract Authorization Usage Authorization(CAUA) -$248,647.27 Remaining Allowance Balance $90,088.60 BOARD ACTION: No board action is needed. This CAUA will enable WSI to proceed with the installation and implementation of the necessary improvements outlined above. ATTACHMENTS: Contractor's Request and Backup Documentation /44 > Wharton-Smith, Inc. CONSTRUCTION GROUP April 11, 2025 Mr. Paul Steinbrecher, PE Clay County Utility Authority Chief Engineer RE: CCUA Peters Creek WRF CAUA#07 Mr.Steinbrecher, REQUEST The following describes the Contract Allowance Usage Authorization (CAUA)for the Peters Creek Water Reclamation Facility(WRF) Expansion and Peters Creek WRF Expansion Pipeline Projects.This CAUA proposal is in response to a request from CCUA and Ardurra Group, Inc.for Design Clarification DC-07, Design Clarification DC-08,and moving the(3) Digester Tanks from Peters Creek WRF to Keystone WRF. SUMMARY The total contract allowance for the Project is$1,825,000.The project's allowance used previously is $1,486,262.13. WSI is requesting an additional$248,649.27 for DC-07 and DC-08 and to move the(3) Digesters'Tanks to CCUA's Keystone Facility,Sludge Pump Down, Ladders,Stop Log,and Back Pressure Control Valve Station. There will be a remaining Allowance balance of$90,088.60. CLARIFICATIONS Below are clarifications for the CCUA-07. • WSI did not include the walkway shown in the DC-08 from the Filters to the Chlorine Contact Chambers due to the lead time to receive the catwalk from the fabricator. • WSI assumes that CCUA can close the Influent valve to the Headworks for at least(4) hours during a low flow period to allow WSI to install the stop log frame and wooden stop logs. A few days after flow is reintroduced to the Headworks, if CCUA believes the stop logs are helping with FOG build-up,WSI can have the fabricator provide the cost for the manufactured logs and lead times. TIME WSI requests 60 calendar days to be added to the contract. If you have any questions or concerns about the above information,don't hesitate to contact me at 904-302-3118. WHARTON-SMITH,INC. Russell Kovar Sr. Project Manager 750 Monroe Road • Sanford, Florida 32771 • (407)321-8410 • Fax: (407)829-4453 CG C032669 PC 0048385 CU 0056506 Allowance Allocated for Peters Creek $ 1,825,000.00 Description Amount Running Balance CCUA-01-Acess Rd Clearing $ 97,807.50 $ 1,727,192.50 CCUA-02-Storm Water DC-04 $ 70,443.43 $ 1,656,749.07 CCUA-03-Permits $ 40,000.00 $ 1,616,749.07 CCUA-04-Testing Services $ 100,000.00 $ 1,516,749.07 CCUA-05-8 Additional Drills C-05 $ 1,016,442.48 $ 500,306.59 CCUA-06a- Influent Line DC-06 $ 118,918.65 $ 381,387.94 CCUA-06b-Ditch Blocks DC-06 $ 42,650.07 $ 338,737.87 CCUA-07- DC-07,DC-08 and Tanks $ 248,649.27 $ 90,088.60 Total Allowance Request $ 1,734,911.40 Remaining Allowance $ 90,088.60 Summary 441.0 yyhartcon-Smi1N.Inc. Estimate DESCRIPTION 1 WSI received Design Clarification#07 and#08,which revised the ditch and wet weather access road grading,revised 2 the plant entrance road and swale grading(Rosemary to the Plant),revised the pump out at aerobic digester,bollard along the entrance, Install ARV on 45 bend at influent,Install stop logs, Install piping and hose wash station at filter, modify weir plate,and 3 ladders at the Reject, The cost to install the Back Pressure control Valve and Piping mods, 3 including Electrical and MC work. 4 Following is the cost to install the drain line from the Aerobic Digest to the Pump Out Pumps,Lower the 18"Influent 5 due to grade changes,install the bollards along the entrance road,and General Conditions cost due to the extended 6 time to complete the entrance road,the work to complete DC-08 and the relocation of the(3)tanks to Keystone. Attached is a worksheet for GCs that is the backup for the material cost sheet.WSI's sitework subcontractor will 11 advise of discrepancies as they install the road. WSI reserves the right to reevaluate if there are additional conflicts/changes along the access road for additional allowance usage.Due to the lead time for the catwalk fabrication long lead time,we can not provide a cost to furnish and install. 13 14 MATERIALS TOTAL 15 $ 92,461.90 16 Tax 6.00% $ 5,547.71 Surtax 1.50% $ 75.00 18 I $ 98,084.61 19 20 LABOR HRS TOTAL 21 1354 $ 60,930.00 23 $ 60,930.00 24 25 TOOLS&EQUIPMENT TOTAL 26 $ 23,752.05 16 Tax 6.00% $ 1,425.12 Surtax 1.50% $ 75.00 29 I $ 25,252.18 30 31 SUBCONTRACTS TOTAL 32 $ 41,778.00 34 $ 41,778.00 35 44 FINAL QUOTE TOTAL TOTAL 45 $ 226.044.79 I Markup 10.00% $ 22,604.48 $ 248,649.27 46 47 TOTAL I $248,649.27 CAUA-07 Allowance Usage- DC7-DC8 and Various Items Page 1 PG 2 Materials MATERIAL ESTIMATE Wharton-Srrtith,Inc. CON9TRUCT]OrN GROUP # MATERIALS INV QTY UNIT UNIT RATE TOTAL 1 DC-07 Pump Out Materials(Header to below grade) 2133922 1 EA $ 1,500.39 $ 1,500.39 2 DC-07 Pump Out Materials(Underground realignment) 2139810 1 LS $ 2,832.85 $ 2,832.85 3 DC-07 Bollards/and Concrete 1 LS $ 3,500.00 $ 3,500.00 4 DC-07 General Conditions(see spreadsheet following) 1 LS $ 30,797.82 $ 30,797.82 5 DC-08 ARV and 45 Bend w/Tap and ARV CCUA PO 1 LS CCUA PO NA 6 DC-08 12"Potable Water Pressure Sustaining Valve 1 LS CCUA PO NA 7 DC-08 Hose Wash Station at Filter 1 EA $ 750.00 $ 750.00 8 DC-08 Weir Plate at CCC 1 EA $ 2,533.49 $ 2,533.49 9 DC-08 Safety Ladders 3 EA $ 514.13 $ 1,542.39 10 DC-08 Stop Log Frame 1 EA $ 3,166.30 $ 3,166.30 11 DC-08 Stop Logs-Wood Only 1 LS $ 515.00 $ 515.00 12 DC-08(2)Ladders at Clarifiers 2 EA $ 3,819.90 $ 7,639.80 13 Crane for(3)Tanks to Keystone 1 Day $ 12,754.90 $ 12,754.90 14 Haul/Trucking for(3)Tanks 3 EA $ 4,600.00 $ 13,800.00 15 Sludge Haul Off-Package Plant 1 EA $ 7,378.96 $ 7,378.96 16 Concrete for BPC Valve Pad and Walk 3 CY $ 1,250.00 $ 3,750.00 17 18 19 20 21 22 23 24 25 MATERIAL SUBTOTAL TOTAL 26 $ 92,461.90 27 I $ 92,461.90 CAUA-07 Allowance Usage- DC7-DC8 and Various Ite 2 PG 3 Labor 11.040w LABOR Wharton-Srrth, In . YTHlICTIOItiV 80CTP # I LABOR HRS RATE COST I ST 1OT ST OT ST OT TOTAL 1 DC-07 Pump Out-Installation 72 $ 45.00 $ 67.50 $ 3,240.00 $ - $ 3,240.00 2 DC-07 Lower 100 LF 18 Influent due to grade changes 160 $ 45.00 $ 67.50 $ 7,200.00 $ - $ 7,200.00 3 DC-07 Install Bollards 160 $ 45.00 $ 67.50 $ 7,200.00 $ - $ 7,200.00 4 DC-08 Install ARV and 45 Bend w/Tap and ARV 64 $ 45.00 $ 67.50 $ 2,880.00 $ - $ 2,880.00 5 DC-08 Install Piping and Hose Wash Station at Filter 64 $ 45.00 $ 67.50 $ 2,880.00 $ - $ 2,880.00 6 DC-08 Install Weir Plate at CCC 18 $ 45.00 $ 67.50 $ 810.00 $ - $ 810.00 _ 7 DC-08 Install Safety Ladders 16 $ 45.00 $ 67.50 $ 720.00 $ - $ 720.00 8 DC-08 Install Stop Log Frame and Logs(clean and drain HV 200 $ 45.00 $ 67.50 $ 9,000.00 $ - $ 9,000.00 9 DC-Back Pressure Control Valve Piping,Valves&Appurts 400 $ 45.00 $ 67.50 $ 18,000.00 $ - $ 18,000.00 10 DC-Back Pressure Control Valve Concrete Grading 200 $ 45.00 $ 67.50 $ 9,000.00 $ - $ 9,000.00 11 $ - $ - $ - $ - 12 $ - $ - $ - $ - 13 $ - $ - $ - $ - 14 $ - $ - $ - $ - 15 $ - $ - $ - $ - 16 $ - $ - $ - $ - 17 $ - $ - $ - $ - 18 $ - $ - $ - $ - 19 $ - $ - $ - $ - 20 $ - 1 $ - $ - $ - 21 1354.0 0.0 I $ 60,930.00 $ - 22 1354.0 I I $ 60,930.00 23 24 ADJUSTMENTS % HRS RATE/HR TOTAL 25 0 $ - 26 0 $ - 27 0 $ - 28 0 $ - 29 30 PROJECT MANAGEMENT HRS RATE/HR _ TOTAL 31 0 $ - 32 0 $ - 0 $ - 33 0 $ - 34 0.0 $ - 35 36 LABOR SUBTOTAL HRS TOTAL 37 Manhours 1,354.0 0.0 0.0 1,354.0 $ 60,930.00 38 1,354.0 39 $ 60,930.00 40 Labor rates include burden CAUA-07 Allowance Usage- DC7-DC8 and Various ItemPage 3 PG 4 Equipment EQUIPMENT ESTIMATE Wharton-Smith,Inc. bN9TRUCT]ON GR6UP # TOOLS DESCRIPTION REF RATE TOTAL 1 Small tools and consumables 4% $ 60,930.00 $ 2,437.20 2 $ - 3 $ - 4 $ 2,437.20 5 6 EQUIPMENT DESCRIPTION QTY UNIT RATE TOTAL 7 DC-07 Lower 18"Excavator at 18"(2 weeks) 2.0 Weeks $ 1,838.36 $ 3,676.73 8 Back Pressure Control Valve (2 weeks) 2.0 Weeks $ 1,838.36 $ 3,676.73 9 $ - 10 $ - 11 $ - 12 $ - 13 $ 7,353.45 14 15 RENTALS DESCRIPTION UNIT RATE TOTAL 16 130 TON Crane at Keystone 1.00 Day $ 12,754.90 $ 12,754.90 17 $ - 18 $ - 19 $ - 20 $ - 21 $ - 22 $ - 23 $ - 24 $ - 25 $ 12,754.90 26 27 FUEL DESCRIPTION Rate REF TOTAL 28 Equipment Fuel 6.00% $ 20,108.35 $ 1,206.50 29 $ 1,206.50 30 31 32 EQUIPMENT SUBTOTAL TOTAL 33 $ 23,752.05 34 35 $ 23,752.05 CAUA-07 Allowance Usage- DC7-DC8 and Various ItertBage 4 PG 5 Subcontracts 1114%.:0 r,,, Subcontracts COWSTBU4j 01;,GxoiCvr # SUBCONTRACTOR SCOPE INV TOTAL NOTES Paint New Piping at Back Pressure Control Valve 1 Excel Tech and new 45 Bend at HW $ 1,493.00 2 GCS BPC Valve Panel and Programing $ 17,075.00 3 Cogburn BPC Valve Electrical Scope $ 23,210.00 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 SUBCONTRACT SUBTOTAL TOTAL 24 $ 41,778.00 25 I $ 41,778.00 CAUA-07 Allowance Usage - DC7-DC8 and Various Itde 5 0 FERGUSON® INVOICE NUMBER TOTAL DUE CUSTOMER PAGE 2133922 $1,500.39 44606 1 of 1 • WATERWORKS 8008 E. SLIGH AVE. PLEASE REFER TO INVOICE NUMBER WHEN TAMPA, FL 33610-0000 MAKING PAYMENT AND REMIT TO: FEL-TAMPA, FL WATERWORKS#044 REMIT TO NEW ADDRESS: Please contact with Questions: 813-627-1240 PO BOX 100286 ATLANTA, GA 30384-0286 MASTER ACCOUNT NUMBER:143312 SHIP TO: PETERS CREEK 3616 ROSEMARY HILL RD WHARTON-SMITH INC GREEN COVE SPRINGS, FL 32043 750 MONROE ROAD SANFORD, FL 32771 Header to below grade at the Pumps SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME INVOICE DATE BATCH WHSE. WHSE. ID 44 44 FL2CLA QUOTE MAS PETERS CREEK 02/10/25 120194 ORDERED SHIPPED ITEM NUMBER DESCRIPTION UNIT PRICE UM AMOUNT Source Order#:2133772 1 1 SP-6"X7'FLGXPEP401 6"X7'FLGXPE P401 LINED PRIME COAT 1395.710 EA 1395.71 WON'T BE ABLE TO SHIP BY NEXT THURSDAY INVOICE SUB-TOTAL 1395.71 TAX Clay 104.68 LEAD LAW WARNING:IT IS ILLEGAL TO INSTALL PRODLCTS THAT ARE NOT"LEAD FREE"IN ACCORDANCE WITH US FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION, PRODUCTS W TH*NP IN THE DESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS.BUYER IS SOLELY RESFONSIBLE FOR PRODUCT SELECTION. Looking for a more convenient way to pay your bill? 0 Log in to Ferguson.com and request access to Online Bill Pay. I I I I TERMS: NET 10TH PROX ORIGINAL INVOICE TOTAL DUE $1,500.39 All past due amounts are subject to a service charge of 1.5%per month,or the maximum allowed by law,if lower. If Buyer fails to pay within terms,then in addition to other remedies,Buyer agrees to pay Seller all costs of collection,including reasonable attorney fees.Complete terms and conditions are available upon request or at https://www.ferguson.com/content/website-info/terms-of-sale,incorporated by reference.Seller may convert checks to ACH. 0 FERGUSON INVOICE NUMBER TOTAL DUE CUSTOMER PAGE WATERWORKS 2139810 $2,835.85 67177 1 of 1 9692 FLORIDA MINING BLVD W PLEASE REFER TO INVOICE NUMBER WHEN BUILDING#100 MAKING PAYMENT AND REMIT TO: JACKSONVILLE, FL 32257 FEL-JACKSONVILLE WW-#149 PO BOX 100286 Please contact with Questions: 904-268-2551 ATLANTA, GA 30384-0286 MASTER ACCOUNT NUMBER:143312 SHIP TO: COUNTER PICK UP 9692 FLORIDA MINING BLVD W WHARTON-SMITH INC BUILDING#100 750 MONROE ROAD JACKSONVILLE, FL 32257 PETERS CREEK WRF SANFORD, FL 32771 Pump Out - Underground re-alignment SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME INVOICE DATE BATCH WHSE. WHSE. 10 149 149 FL2DUV QUOTE MAS PETERS CREEK WRF 02/06/25 115358 ORDERED SHIPPED ITEM NUMBER DESCRIPTION UNIT PRICE UM AMOUNT 1 1 AFC2608DLAFMM 8 DI MJ RW OL SS STEM VLV L/A 1630.000 EA 1630.00 6 6 SSLCE8AP 8 PVC WDG REST*ONELOK W/A 155.000 EA 930.00 1 1 CFU 6 DI C110 125#THRD COMP FLG F/STL 78.000 EA 78.00 1 0 D600DAL 6 ALUM QUICK COUP D EA 0.00 IN STOCK WITH DIXON INVOICE SUB-TOTAL 2638.00 TAX Duval 197.85 LEAD LAW WARNING:IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT"LEAD FREE"IN ACCORDANCE WITH US FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION PRODUCTS W TH*NP IN THE DESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS.BUYER IS SOLELY RESFONSIBLE FOR PRODUCT SELECTION. If paid on or before 03/10/25 you may deduct 52.76 Looking for a more convenient way to pay your bill? 0 Log in to Ferguson.com and request access to Online Bill Pay. - I I TERMS: 2%10TH NET 30TH ORIGINAL INVOICE TOTAL DUE $2,835.85 All past due amounts are subject to a service charge of 1.5%per month,or the maximum allowed by law,if lower. If Buyer fails to pay within terms,then in addition to other remedies,Buyer agrees to pay Seller all costs of collection,including reasonable attorney fees.Complete terms and conditions are available upon request or at https://www.ferguson.com/content/website-info/terms-of-sale,incorporated by reference.Seller may convert checks to ACH. FERGUSON' INVOICE NUMBER TOTAL DUE CUSTOMER PAGE WATERWORKS 2143891 $1,682.40 67062 1 of 1 9692 FLORIDA MINING BLVD W PLEASE REFER TO INVOICE NUMBER WHEN BUILDING#100 MAKING PAYMENT AND REMIT TO: JACKSONVILLE, FL 32257 FEL-JACKSONVILLE WW-#149 PO BOX 100286 Please contact with Questions: 904-268-2551 ATLANTA,GA 30384-0286 MASTER ACCOUNT NUMBER:129807 SHIP TO: WHARTON SMMITH 3630 ROSEMARY HILL RD CLAY COUNTY UTILITY AUTH INC PETERS CREEK WRF 3176 OLD JENNINGS ROAD GREEN COVE SPRINGS, FL 32043 PETERS CREEK WRF MIDDLEBURG, FL 32068 SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN JOB NAME INVOICE DATE BATCH WHSE. WHSE. ID 149 149 FLE 0000113 6"GALV PIPE BGM 6"GALVANIZED PIPE 03/18/25 115723 ORDERED SHIPPED ITEM NUMBER DESCRIPTION UNIT PRICE UM AMOUNT 42 42 GGPPEA53ULU 6 GALV BE A53A ULFM S40 PIPE 4005 710 C 1682.40 INVOICE SUB-TOTAL 1682.40 LEAD LAW WARNING:IT IS ILLEGAL TO INSTALL PRODUCTS THAT ARE NOT"LEAD FREE"IN ACCORDANCE WITH US FEDERAL OR OTHER APPLICABLE LAW IN POTABLE WATER SYSTEMS ANTICIPATED FOR HUMAN CONSUMPTION PRODUCTS WITH*NP IN THE DESCRIPTION ARE NOT LEAD FREE AND CAN ONLY BE INSTALLED IN NON-POTABLE APPLICATIONS.BUYER IS SOLELY RESPONSIBLE FOR PRODUCT SELECTION. Looking for a more convenient way to pay your bill? Log in to Ferguson.com and request access to Online Bill Pay. C13 I I I I TERMS: NET 10TH PROX ORIGINAL INVOICE TOTAL DUE $1,682.40 All past due amounts are subject to a service charge of 1.5%per month,or the maximum allowed by law,if lower. If Buyer fails to pay within terms,then in addition to other remedies,Buyer agrees to pay Seller all costs of collection,including reasonable attorney fees.Complete terms and conditions are available upon request or at https://www.ferguson.com/content/website-info/terms-of-sale,incorporated by reference.Seller may convert checks to ACH. EXTENDED GENERAL CONDITIONS Description Qnty Monthly Total Builders Risk 2 $ 1,121.68 $ 2,243.36 Cell Phone Monthly 2 $ 173.05 $ 346.09 Computer Equipment 2 $ 50.71 $ 101.43 Internet 2 $ 150.00 $ 300.00 Tool Trailer 2 $ 123.78 $ 247.56 Construction Trailer 1 $ 3,500.00 $ 3,500.00 Vehicles 2 $ 771.69 $ 1,543.39 Labor Description Qnty Monthly Total Superintendent 2 $ 11,258.00 $ 22,516.00 Total $ 30,797.82 GRAINGER. HI" Order Confirmation Order Summary Subtotal $2,181.71 Estimated Tax $163.63 Estimated Shipping $208.15 Estimated Total $2,553.49 Date Ordered 3/19/2025 IO Order#WEB2598865305 has successfully been submitted. Shipping Address Wharton Smith-Peters Creek WRF 3630 Rosemary Hill Rd Green Cove Springs,Florida,32043 Shipping Method Ground-Standard $208.15 Order arrives on Tue.Apr 29. Carrier Options Preferred Carrier Use Best Carrier Payment Method MasterCard***7363 I Exp 12/2027 M My Products lbw FIBERGRATE Qty Your Price Fiberglass Sheet:Fiberplate®,4 ft Overall Wd,8 ft Overall Lg,0.375 in Thick,Smooth 1 $2,181.71/each Item#804AW0 Availability 9 Ships from supplier.Expected to arrive by end of Apr,2025. This item requires special shipping,additional charges may apply. 1-1111VIIly 1 1Q1 LJ LVLJ 1 I01 L/ LVLJ 3M DBI-SALA 8516294 Rollgliss 8' Synthetic Web Rescue Ladder with Reinforced Rigid Staggered Steps, Yellow $285.26 ,/prime & FREE Returns v Ships from and sold by Amazon.com Quantity: 3 Change Add gift options Item often ships in manufacturer's container to reduce packaging and reveals what's inside. To change, click below. Reduce packaging, ship in manufacturer's container Arriving Mar 28, 2025 - Mar 31 , 2025 3MTM DBI-SALA''' RollglissTM Rescue Ladder Rescue Ladder Anchor 8516316, 1 EA $193.00 Ships from SIM Supply, Inc. Sold by SIM Supply, Inc. Quantity: 3 Change Gift options not available Tomorrow, Mar 25 - Thursday, Mar 27 FREE Delivery Monday, Mar 31 - Tuesday, Apr 1 By placing you FREE No-Rush Delivery privacy notice Get a $1 reward for select digital purchases. One reward per purchase. Terms Items (6): Shipping & ha Estimated tax Order tot Friday, Mar 28 - Monday, Mar 31 FREE Delivery Place your order lr order, you agree to Amazon's and conditions of use. S 1,434.78 ndling: S0.00 to be collected:* $107.61 :al: $1 ,542.39 PO Box 11089 PBM QUOTE 2025-54 Jacksonville, FL 32239 CONSTRUCTORS Phone: (904) 714-6353 INC. Fax: (904) 714-6354 Wharton-Smith, Inc TO 750 Monroe Rd. Sanford, FL 32771 I QUOTE DATE I VALID THRU FOR PAGE 3/5/2025 3/5/2025 Log Stop Frame 1 ITEM NO QTY DESCRIPTION UNIT PRICE EXTENDED SHOP FAB JOB 1 Log Stop frame 3166.30 3,166.30 * * means item is non-taxable TOTAL AMOUNT 3,166.30 **Quotes are based on estimated labor times and current material prices at time of quote. These items are subject to change which will affect final costs. Gray's Welding and Fabrication, Inc. Invoice 15007 NW Highway Cross City, FL 32066 USA 3525146142 graysweldingandfabrication@gmail.com grays-welding.com ' BILL TO ' SHIP TO wharton-smith wharton-smith INVOICE# DATE TOTAL DUE DUE DA. TERMS ENCLOSED 5815 03/19/2025 $7,639.80 04/18/2025 Net 30 1 ' SERVICE DESCRIPTION QTY RATE AMOUNT' Metal alum flat bar 3x3/8 4 250.00 1,000.00T Metal alum angle 3x3x1/4 2 350.00 700.00T Metal 3/4" solid round 2 150.00 300.00T Materials safety gate 2 500.00 1,000.00T Taxable Labor build ladders x2 32 120.00 3,840.00T Delivery deliver ladders to site 1 300.00 300.00T SUBTOTAL 7,140.00 TAX 499.80 TOTAL 7,639.80 BALANCE DUE $7,639.80 Page 1 of 2 gift Invoice 254324 51MSCRANE& Invoice Date: Thursday, March 13, 2025 EQUIPMENT Customer: 4196 PO Box 11825 Job No: JAOR-201649 Tampa, FL 33680-1825 Salesperson: Malloy Baker Ph. (813)626-8102 Fax(813)626-6255 Ordered By: David Beard Job Site : WHARTON SMITH INC CLAY COUNTY WWTP 750 MONROE ROAD 7399 SUNRISE BLVD SANFORD, FL 32771 KEYSTONE HEIGHTS, FL 32656 Terms: Net 30 Customer P.O. No: 23029 Customer Phone: (407)321-8410 Work Performed: SETTING(3)TANKS. (2)50'TANKS 17K @ 65' (1)TANK 12K @85' Date Description Unit No Qty Unit Meas Rate Extension 3/12/2025 130 Ton All Terrain TC543 13.50 Hour $525.00 $7,087.50 Crane Operated Rental Hourly Operator&Oiler(Crew) 5.50 Hour $105.00 $577.50 Overtime Counter Wgt In-Trk 2.00 Each $700.00 $1,400.00 Chg Counter Wgt Out-Trk 2.00 Each $700.00 $1,400.00 Chg Rigger Labor Charge 8.50 Hour $105.00 $892.50 Rigger Labor Overtime 0.50 Hour $50.00 $25.00 Spreader Beams and 1.00 Day $100.00 $100.00 Bars(10 Ton and under) Rental Daily Permit Charge 1.00 Each $130.00 $130.00 Regulatory Compliance 10.50% $1,142.40 Fee Total Invoice: $12,754.90 PLEASE REMIT PAYMENTS ONLY TO: Dept#9890 Sims Crane & Equipment Co. Page 2 of 2 i Invoice 254324 5� � CRANE & Invoice Date: Thursday, March 13, 2025 1111 EQUIPMENT Customer: 4196 PO Box 11825 Job No: JAOR-201649 Tampa, FL 33680-1825 Salesperson: Malloy Baker Ph. (813)626-8102 Fax (813)626-6255 Ordered By: David Beard Job Site : WHARTON SMITH INC CLAY COUNTY WWTP 750 MONROE ROAD 7399 SUNRISE BLVD SANFORD, FL 32771 KEYSTONE HEIGHTS, FL 32656 Terms: Net 30 PO Box 850001 Orlando, FL 32885-9890 If you currently pay via ACH,no changes are required. (Please contact us if you would like to set up ACH payments) AccountsReceivable@SimsCrane.com Efectve 8/1/2022,a 3%Convenience Fee will be assessed for all payments made by credit card Due to escalating costs it has become necessary for Sims Crane to attach a Regulatory compliance Surcharge on all Rentals. WE SEND NOTICE TO OWNER ON ALL INVOICES. TAMPA-ORLANDO-MULBERRY-VERO BEACH-MIAMI-FT.MYERS-JACKSONVILLE-OCALA-PINELLAS- WEST PALM BEACH-SPACECOAST-TALLAHASSEE-BROWARD-LAKE CITY-ATLANTA-PANAMA CITY so N MY HAUL Good morning David, Thank you for the opportunity to partner with you on this project,please see the rates below. **Shipment Details** *Origin:Green Cove Springs,FL *Destination:Keystone Heights,FL *Commodity:3 Tanks *Dimensions: *12'6"X12'X55' *12'6"X12'X48' *12'6"X12'X42' **Equipment** *1 Stretch RGN with 55'in well *1 Stretch RGN with 50'in well *2 Pilot Trucks/high pole/Chase **Timeline** *Transit Time:1 Day/12 hour day *Permit Lead Time:1 Day **Detention Policy** *2 hours of free time for the shipper and consignee.After that,a detention rate of$200.00 per hour will apply. **Charges** *Fuel Surcharge: ($950.00) *Specialized Service:Stretch RGN(50-55 Feet Deck)$3,550.00 X 3 *Escorts:2($1,350.00) *Route Survey:$850.00(Completed 2/14/2025) ***Grand Total:$13,800.00*** Please let me know if you have any questions. Respectfully Timmy Donohoe-Heavy Transport Manager- De Berardinis Heavy Haul 10500 Rocket Court. Orlando,FL 32824 813-440-7926 Phone 407-859-1926 Fax Timmy@floridasfirstcall.com www.floridasfirstcall.com https://youtu.be/5AUyOGPN4lU De NEM7 EMIL BADGER Invoice Number 2818876 Invoice Date 02-20-2025 Payment Terms 60 Net Amount Due $ 7,378.96 BILL TO REMIT TO WHARTON SMITH Badger Daylighting Corp 4912 W LA SALLE STREET PO Box 95000 Tampa, FL 33607 LB# 1627 Philadelphia, PA 19195-0001 Bank Routing#: 026013673 Account#: 03248177952 Customer Number PO/Work Order AFE/Job Badger Sales Area 22050 Peters Creek-23-029 Peters Creek-23-029 40071 Service Ticket# Unit# Item Description Qty Unit of Unit Price Amount Date Measure 01-15-2025 TKT-011425-1408885 2021 Consumable 1 Each 42.00 42.00 Materials 01-15-2025 TKT-011425-1408885 2021 Supply Water 1 Each 115.00 115.00 01-15-2025 TKT-011425-1408885 2021 Badger Hydrovac 8 Hour 275.00 2,200.00 With Operator 01-15-2025 TKT-011425-1408885 2021 Fluctuating Fuel 1 Each 266.67 266.67 Recovery 01-15-2025 TKT-011425-1408885 2021 Badger Hydrovac 3 Hour 301.00 903.00 With Operator Overtime 01-16-2025 TKT-011525-1409648 2021 Consumable 1 Each 42.00 42.00 Materials 01-16-2025 TKT-011525-1409648 2021 Supply Water 1 Each 115.00 115.00 01-16-2025 TKT-011525-1409648 2021 Badger Hydrovac 8 Hour 275.00 2,200.00 With Operator 01-16-2025 TKT-011525-1409648 2021 Fluctuating Fuel 1 Each 291.29 291.29 Recovery 01-16-2025 TKT-011525-1409648 2021 Badger Hydrovac 4 Hour 301.00 1,204.00 With Operator Overtime Total Due(USD) 7,378.96 USE AND SURTAX ADDED $442.74+$75.00=$517.74 For your convenience, Badger accepts payment in multiple forms including check,ACH, EFT,and certain credit cards.To w,:,• ,<<<, the extent permitted by applicable law, payments made by credit card are subject to a surcharge equal to 3% of the , ,,,,m dun&bradstreet transaction amount(or the highest percentage permitted by applicable law, if less than 3%). Please see attached tickets for additional detail. Please direct all invoicing inquiries to accountsreceivable@badgerinc.com or (877) 322-3437 and remittances to remittance@badgerinc.com Page 1 of 1 Page 1 of 1 DAv`oMNon Badger Contact Info: 265 Cahoon Road N BADGER Jacksonville, FL 32220 WHARTON SMITH Ticket Number: TKT-01 1 425-1 408885 4912 W LA SALLE STREET Ticket Date: 01-15-2025 Tampa, FL, 33607 Job Number: SR0000597506 Paper Ticket#: Title: Wharton Smith @ Peters Creek WTP 24 DB pO/WO#: 01-14-2025 03:58 PM Site Location: Rosemary Hill Rd & Co Hwy 315 Green AFE/JOB#: Peters Creek-23-029 Cove Springs, FL, 32043 Phone: +1 (352) 210-8192 Requesters Name: Cost Centre/GL: Major/Minor: Rig/Well Pad#: Job Name: User/Approver ID: Other Order#: This is not an invoice Total subject to change based on taxes,fees and other charges. Item Item Description Unit# Quantity Rate UOM Amount Badger Hydrovac With Operator 2021 8 $275.00 HR $2200.00 Badger Hydrovac With Operator 2021 3 $301.00 HR $903.00 Overtime Consumable Materials 2021 1 $42.00 EA $42.00 Supply Water 2021 1 $115.00 EA $115.00 Fluctuating Fuel Recovery 2021 EA $266.67 Notes: Ticket Total: $3526.67 Cleaning pit Approved By: Approver Name: Approver Phone#: Unless Buyer expressly advises otherwise,Buyer represents and warrants that the soil and groundwater in the area of the Hydrovac excavation operations is not contaminated with any non-naturally occurring substance,and buyer hereby indemnifies and holds Badger Daylighting Corp(or LP in Canada's case),and its directors,officers,employees,agents,and contractors harmless from all losses,costs,expenses,and penalties which it or they directly or indirectly suffer or incur in the event the soil and or groundwater is contaminated with any substance other than naturally occurring substances. Page 1 of 1 DAv`oMNon Badger Contact Info: 265 Cahoon Road N BADGER Jacksonville, FL 32220 WHARTON SMITH Ticket Number: TKT-01 1 525-1 409648 4912 W LA SALLE STREET Ticket Date: 01-16-2025 Tampa, FL, 33607 Job Number: SR0000597506 Paper Ticket#: Title: Wharton Smith @ Peters Creek WTP 24 DB pO/WO#: 01-14-2025 03:58 PM Site Location: Rosemary Hill Rd & Co Hwy 315 Green AFE/JOB#: Peters Creek-23-029 Cove Springs, FL, 32043 Phone: +1 (352) 210-8192 Requesters Name: Cost Centre/GL: Major/Minor: Rig/Well Pad#: Job Name: User/Approver ID: Other Order#: This is not an invoice Total subject to change based on taxes,fees and other charges. Item Item Description Unit# Quantity Rate UOM Amount Badger Hydrovac With Operator 2021 8 $275.00 HR $2200.00 Badger Hydrovac With Operator 2021 4 $301.00 HR $1204.00 Overtime Consumable Materials 2021 1 $42.00 EA $42.00 Supply Water 2021 1 $115.00 EA $115.00 Fluctuating Fuel Recovery 2021 EA $291.29 Notes: Ticket Total: $3852.29 Cleaning out slug from pit Approved By: Approver Name: Approver Phone#: Unless Buyer expressly advises otherwise,Buyer represents and warrants that the soil and groundwater in the area of the Hydrovac excavation operations is not contaminated with any non-naturally occurring substance,and buyer hereby indemnifies and holds Badger Daylighting Corp(or LP in Canada's case),and its directors,officers,employees,agents,and contractors harmless from all losses,costs,expenses,and penalties which it or they directly or indirectly suffer or incur in the event the soil and or groundwater is contaminated with any substance other than naturally occurring substances. Exceletech Coatings Applications, LLC Fax Bid Form To: Russell Kovar Company: Wharton & Smith Fax #: #N/A Phone #: 904-302-3118 From: Rick Scruggs Direct Phone: 407-466-4429 Email: rick@excelcoatings.com Bid Date Submitted Date 11-Apr-25 Project: Peters Creeks WRF -GST Fill Valve piping & (1) 24" -45 degree bend at Headworks Division Description of Work(Listed by Area) Amount 9900- Painting, GST Fill Valve piping&(1)24"-45 degree bend at Headworks $1,493 General Conditions, Submittals& Mobilization Bond Cost(If Needed) TOTAL PROPOSED AMOUNT $1,493 Alternates: Number Description of Work Add Deduct Yes No Yes No Bonds Included? XX Materials& Labor XX Sales Tax Included? XX Labor Only XX Per Plans&Specs? XX Terms 2%NET 10,NET 15 XX Certified MBE or WBE? XX Retainage Held @ 5% XX Visited Job-Site? XX Crew Days 0 221 N Hwy 27 Suite I Clermont, Florida 34711 Phone (352) 394-2155 Fax (352) 394-5422 C:\ hers\Quin r\Desktop\Peters Creek WRF-GST Fill Valve piping&(1)24 inch 45 degree bend at Headworks\Peters Creek WRF-GST Fill Valve Conident�al .xlsm Exceletech Coatings Applications, LLC Project Scope of Work Bid Date Estimator:Rick Scruggs Phone# 407-466-4429 Provided herein is the scope of work that Exceletech Coating.intends to perform on the Peters Creeks WRF-GST Fill Valve piping Project. Please review the items listed to ensure that our interpretation of the project documents will meet the needs of your proposal. This confidential information is not intended for distribution.Please acknowledge receipt and contact us if there is any conflicts. GST Fill Valve piping&(1)24"-45 degree bend at Headworks Yes No Notes 070-General Billable Unknown Contingency, Metal(P&E)Exterior,8"above ground DIP&(1)24"45-degree bend at Headworks Exclusions/Notes: Proposal is based on a 40-hour workweek, Electricity and Water shall be supplied by others, All Metals are to be prepared and shop primed by others, Exclude Aluminum in contact with concrete, Exclude all Manholes unless stated above, Exclude all labels other than stencils and self-adhesive pipe markers, Exclude all pipe interiors, Exclude all tank floors/bottom unless otherwise stated, All water retaining structures shall be clean and maintained dry by others, All crane lifts and assistance with unloading materials and equipment shall be provide by others, Exclude FRP Ducts,Piping&Scrubbers, Payments beyond 45 days is subject to a 1.5%Fee, This proposal and work scope shall become part of the contract and any unlisted work shall be done on a change order, Guarantee shall be 1 year from date of acceptance not to exceed 18 months from date of installation, Bid price based on Exceletech Coatings standard wages. If Davis Bacon required,please contact us prior to bid date., Exclude all below grade pipe, Exclude all lead and asbestos abatement, All damaged/abraded field welded and beyond maximun re-coat window items that were shop/factory pre-finished will, be repaired on a T&M basis, if factory/shop primed items are noncompatible with the specified paint system,the barrier coat or removal and reprime, shall be done on a T&M basis, No Enviroment Controls,weather has not been included.Ambient and Substate Temperature must be within manufacturers, products data sheets, Confidential Page 1 of 1 221 N Hwy 27 Suite I Clarimont,FL 34711 Phone(352)394-2155 Fax(352)394-5422 ■■■■ General Control Systems, Inc. 3520 Airport Road m•••• Lakeland, Florida, 33 811 GENERAL CONTROL SYSTEMS (863)250-8069 csi a V AS R ISO-9001:2015 American S Certified QMS CERTIFIED REGISTRtAR April 09, 2025 ATTEN: Russell Kovar SUBJECT: PCO 003 —Additional Instrument Enclosure and Programming PROJECT#: 80-23-0012 Peter's Creek We propose to furnish quality labor, materials and supervision to develop the control system as discussed. All work will be done in accordance with the following scope of work, and includes the quantities as listed below. SCOPE OF WORK: INSTRUMENT ENCLOSURE Qty(1) - Transmitter Wall Mount, 24"x 24"x 12"NEMA 12/3R aluminum enclosure w/four Citel surge protectors for each of the 24vdc power and the three analog signals, and terminal blocks for the pilot valve control conductors. SERVICES INCLUDED The following services are included in this proposal • Project Management • Drawing • ICP 300 PLC Programming, ICP 300 OIT, SCADA Integration • Start-up and Commissioning Support Total firm price $ 17, 075.00 Payment terms - net 30 Days from invoice date, 1.5% interest will be applied to payments in excess of our terms. CLARIFICATIONS: C-1 Proposal is based on GCS Standard Terms & Conditions. C-2 All wiring diagrams will be done using AutoCAD Electrical and submitted in written form or PDF format"dwg" files will remain in title to General Control Systems, Inc. C-3 Unless expressly noted above, all valving, tubing, fittings, or hardware required to connect instruments is provided by others. C-4 All device takeoffs are based on the current P&ID drawings at the time of bid. C-5 Shipping: FOB Lakeland, FL,pre-pay and add. C-6 VTScada programming will use existing license. C-7 The X141-PT pressure transmitter, the X117H Valve position transmitter, and Model X35 flow calculation module with mounting brackets is to be provided by others. EXCLUSIONS: E-1 Overtime or Premium time labor outside of scope. E-2 Material and Equipment other than mentioned above. E-3 Sales or Use Taxes. E-4 Cutting and Patching of existing structures. E-5 Temporary Facilities. E-6 Concrete Mounting Pads. E-7 Field wiring, terminations or conduit installation. E-8 Installation of any kind on site. E-9 Instrument stands, instrument brackets, tubing, brackets, or any custom items necessary for field mounting. E-10 Mechanical mounting of instruments, instrument stands, instrument brackets, control panels. E-11 Instrument and control panel receiving, storage, unpacking, and delivery to installation area at the site, GC is to provide a secure area for storage. Respectfully, GENERAL CONTROL SYSTEMS, INC. Cherish Decker Project Manager Rev 1.4—7/27/2021 F 130-SALES-06 csiaCASR, ISO-9001 2015 American S Certified QMS CERTIFIED R.EGISTR'AR J 7 7 , , Y741 4011 B R 0 Sii .r NC 3300 Faye Road Phone(904)358-7344 Jacksonville,Fl.32226 Fax(904)358-2805 Wharton-Smith April 3,2025 RE: CCUA Peters Creek GST Fill Valve Cogburn Bros.Electric is pleased to provide you with this quotation for the electrical portion of the above referenced project.Our scope of work is below- Clarifications: 1. Pricing is Based off of David L.Drawings Provided Our Price Includes: 1. Supply&Install Conduit&Wire per David L.Drawings 2. Supply and Install Light Fixture Per Drawings 3. Supply&Install Pull Box&Racks per Drawings Our Price Does Not Include: 1. Premium Time(All Work Scheduled,Mon-Fri,7-3:30) 2. Concrete Removal/Replacement 3. Instrumentation&Controls Lump Sum Total: $23,210.00 This proposal is predicated upon the scheduled construction time and overall duration as indicated in the bid documents.Delays not attributable to Cogburn Bros.,Inc.will result in extended completion dates and compensation for accelerated and/or extended schedule. If selected as the electrical contractor for this project,our sub-contract agreement must include as an attachment,this scope and proposal.By listing Cogburn Bros.,Inc.or using this proposal,the contractor acknowledges and agrees to the terms and conditions of this scope and proposal. This proposal will remain valid for 30 days and is subject to acceptance of a mutually agreeable contract. Thank you for the opportunity to work with you on this project.If you have any questions regarding our proposal,please contact me at your convenience. Sincerely, Tucker Littlepage Co dai,,,$tea ell& Office: (904) 358-7344 I Cell: (904) 616-0051 Email:tlittlepage@cogburnbros.com