HomeMy WebLinkAbout15.i FYI Swimming Pen WM Ext. CO #1 EXECUTIVE SUMMARY AGENDA ITEM: Proposed Change Order (CO) No. 1 with TB Landmark Construction to reconcile final construction contract price for changes to the Swimming Pen Water Main Extension project. CCUA Bid No.: 23/24-A03 CCUA Project No.: 2021-097 CCUA Financial Job No: 21020WL Date: May 15, 2025 BACKGROUND: CCUA staff requests approval of CO No. 1 to the contract with TB Landmark Construction, Inc. to reconcile the final contract price to reflect work completed prior to project closeout. CCUA serves the Fleming Island area from two (2) water treatment facilities, Pace Island and Fleming Oaks. A 2020 Risk and Resiliency Assessment of CCUA's potable water system by Reiss Engineering identified vulnerabilities of the Fleming Island water service area, including flooding and other extreme weather events. The report identified the interconnection of the Fleming Island system with CCUA's mainland plants by interconnecting the systems across Swimming Pen Creek on County Rd.220(CR220)as a valuable countermeasure to mitigate the possibility of disruptions to the homes and businesses within the service area. The Swimming Pen WM Extension project was designed to rectify this vulnerability. The project was competitively bid and awarded to TB Landmark Construction, Inc. (TBL). The final project design required that one lane of CR 220 be closed for multiple months. Due to the high traffic volume on CR220, CCUA elected to install a temporary driving lane to minimize disruption to local drivers and maximize the safety of the contractor and the public at large. Clay County's Engineering Director, Richard Smith, contacted staff during the project to inquire about the possibility of leaving the temporary asphalt in place following completion of the project to be used as an emergency pull-off area. Because hundreds of yards of asphalt did not require removal and the site restoration was greatly reduced, a net savings of$255,198.95 has been realized. CO No. 1 also includes the replacement of an existing defective 10-inch gate valve for $6,500.00 bringing the total contract reduction to $248,698.95. Construction of the Swimming Pen Creek WM Extension project is now complete. BUDGET: The project budget is $6,660,000. To date $5,495,516.43 has been spent on engineering services, construction, and construction inspection. There is a current balance of$646,922.81 on existing engineering and construction contracts as final invoices have not been received. CO No.1 will reduce the balance by $248,698.95 to $398,223.86 and the project will be completed within the allocated budget. BOARD ACTION: No Board action is required. The Board of Supervisors empowers the executive director to execute change orders increasing the value of a construction contract by $50,000 or 5% of the contract (whichever is lower) without Board action being required. CO No. 1 is deductive. ATTACHMENTS: Change Order No. 1 coati �,�' Tr Clay County Utility Authority Working together to 3176 Old Jennings Road protect public health, Middleburg, Florida 32068-3907 conserve our natural • resources,and create r AU7NOV`� Telephone (904) 272-5999 long-term value for our Facsimile (904)213-2498 ratepayers. Change Order No. 1 Date: May 1, 2025 Project: Swimming Pen Creek WM Extension Owner: Clay County Utility Authority CCUA Bid No.: 23/24-A03 3176 Old Jennings Road CCUA Project No.: 2021-097 Middleburg, FL 32068 (904)272-5999 Vendor: TB Landmark Construction, Inc. Engineer: Jacobs Engineering Group, Inc. 11220 New Berlin Rd. 200 W. Forsyth St. Jacksonville, FL 32226 Ste. 1520 (904)652-6093 Jacksonville, FL 32202 (863)636-5432 CONTRACT TIMES ORIGINAL PREVIOUS CO CURRENT CO NTP 2/22/2024 DAYS ADD 0 0 SUB. COMP 394 3/22/2025 3/22/2025 FINAL COMP 425 4/22/2025 4/22/2025 INCREASE OR DECREASE IN ITEM DESCRIPTION OF CHANGE(S) QTY. UNIT PRICE CONTRACT PRICE Contract Increase 1 Temporary Asphalt Striping & MOT 1 $15,437.00 $15,437.00 2 10"Gate Valve&Box 1 $6,500.00 $6,500.00 3 Guard Rail Removal 1 $10,000.00 $10,000.00 4 Landscaping 1 $1,264.05 $1,264.05 Contract Decrease 1 Crash Cushions 13 _ $4,500.00 $58,500.00 2 Remove Temp. Paving&Regrade 1 $202,150.00 $202,150.00 3 Handrails 1 $21,250.00 $21,250.00 TOTAL INCREASE $33,201.05 TOTAL DECREASE $281,900.00 NET CHANGE RESULTING FROM THIS CHANGE ORDER ($248,698.95) ORIGINAL CONTRACT PRICE $ 5,319,419.00 Net Increases by Change Orders(prior to this change order) $Net Decreases by Change Orders(prior to this change order) $ - Total Net Change by Change Orders(prior to this change order) $ - CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $ 5,319,419.00 NET CHANGE RESULTING FROM THIS CHANGE ORDER $ (248,698.95) CONTRACT PRICE INCLUDING THIS CHANGE ORDER $ 5,070,720.05 This document shall become an amendment to the contract and all provisions of the contract will apply hereto. Accepted by: Date: Engineer of Record Accepted by: Date: Vendor Accepted by: Date: Owner