HomeMy WebLinkAbout09.c EDB AWS 2025 Update EXECUTIVE SUMMARY AGENDA ITEM: Alternative Water Supply 2025 Annual Update Date: June 11,2025 BACKGROUND: Clay County Utility Authority (CCUA) Rate Resolution No. 2015-2016-01, Section 4. (7) authorized and implemented an Alternative Water Supply(AWS) Surcharge and Connection Charge. The resolution requires staff to report the adequacy of the AWS Surcharge and Connection Charge to the Board of Supervisors by July 1st each year.Any recommended AWS Surcharge or Connection Charge changes are placed in CCUA's annual budget and presented at the yearly public rate hearing. 2024-2025 PROGRESS: Staff and our consultant, Carollo Engineers (Carollo), have significantly progressed with CCUA's Project Quench Potable Reuse Demonstration AWS initiative (Project Quench). CCUA Staff envision Project Quench as one potential alternative water supply of the future. Shallow groundwater augmentation, surface water, and expanded demand management techniques are also leading potential alternatives as detailed in CCUA's Integrated Water Resources Plan. The Florida Department of Environmental Protection(FDEP)requires this demonstration work as a prerequisite to a potential future Basis of Design Report for this water portfolio technique. CCUA has previously conceptually evaluated stormwater augmentation and lower Floridan Aquifer production(and storage) as other potential AWS techniques. POTABLE RECLAIMED WATER DEMONSTRATION PROJECT(PROJECT QUENCH): CCUA's contractor for construction, Wharton Smith, Inc., completed the construction of the facility in the week of June 10,2024. CCUA staff began use of the facility for demonstration testing,operator training, and public engagement in July 2024. Carollo, remains engaged with the project effort as detailed in a Pilot Operations Supplemental Agreement approved by the Board of Supervisors in March of 2024. We discuss below the on-going efforts in three elements. Demonstration Testing. Carollo directly assists with the 12-month demonstration testing intended to document through extensive laboratory analysis the facility exceeds FDEP standards. CCUA,Carollo,and FDEP worked collaboratively to develop a detailed test plan for this purpose. At the time of this writing, CCUA staff and Carollo completed 11 of 12 planned extensive sampling events and reviewed detailed data through the first six-month operating period. CCUA staff considers the FDEP reviews and commentary to date favorable regarding the work completed so far. We scheduled the final testing event for July 8, 2025. Operator Training. Carollo fully operated the facility for the first quarter with shadowing by CCUA operations staff. Thereafter, Carollo operations intensity reduced quarterly to 75% / 50% / 25% in the second, third, and fourth operational quarters, while CCUA operations staffing responsibility increased similarly(0/25%/50%/75%). CCUA operations staff intends to begin 100%operations responsibility in July. Staff are well prepared and have made a number of enhancements to the system during the first year of operation. JP PS/ JDJ JP Public Engagement. Staff have hosted a wide variety of visitors for the purpose of public engagement. A full suite of "collateral" presentation material was previously developed on the project to educate community stakeholders on the need for future alternative supplies, what supply options exist, and the background on why potable reuse may be a good selection for a portion of the water portfolio in the future. Visitors have ranged from neighboring utilities,vendors and other water professionals, and school groups and community leaders such as the Clay County Economic Development Corporation (EDC). The collateral messaging is easily customized to the specific groups attending and has been received very positively. Staff are working to significantly expand school visits in the following fiscal year. NEXT STEPS: The Project Quench demonstration project,and the completed Integrated Water Resource Planning evaluation laid the long-term planning groundwork for future large production-scale infrastructure programs to meet the demands of a growing Clay County population. Staff anticipate a finalized Project Quench Demonstration report in the fall of 2025, approximately 2-3 months after receipt of final laboratory results. We expect the report to document the ability of the facility,as designed,to produce water exceeding state and federal drinking water standards. Staff budgeted appropriate funds and will continue to operate the facility next year in a reduced sampling mode for the purpose of continuing public engagement. In 2025/2026, Staff will begin focused feasibility studies of shallow groundwater augmentation of the reclaimed system, and more detailed evaluation of large surface or stormwater storage. Both were identified as leading alternatives in the Integrated Water Resource Plan. Alternative Water Supply Expenditures and Revenues: Expenditures(as of 4/30/2025) Potable Reclaimed Water Pilot Project $329,332.08 Total $329,332.08 2023/2024 Revenue(as of 4/30/2025) Surcharge Fund(Existing Customers) $463,942.92 Connection Charge Fund(New Customers) $248,532.91 Total $712,475.83 Total Annual Expenditures and Revenues(as of 4/30/2025) Beginning AWS Cash Balance 10/01/2024 $1,238,871.35 Total Expenditures $329,332.08 Total Revenues $712,475.83 Ending AWS Cash Balance 4/30/2025 $1,622,015.10 JP PS/ JDJ JP Changes In AWS Surcharge And Connection Charges: In 2018, CCUA identified the need to systematically increase the AWS Surcharge and Connection Charge over 25 years to generate sufficient revenue to fund the AWS Initiative as the program matures from feasibility evaluations and pilot projects to full-scale capital project implementations in years to come. CCUA has no new information available that would fundamentally or materially change the path set into motion. Staff recommends following the AWS Initiative funding plan presented in 2018. The recommendation results in a 3%increase in, the AWS Surcharge increase from$1.18 to $1.22, and the AWS Connection Charge increase from$388.01 to $399.65. RECOMMENDATION: Staff respectfully recommends a 3% increase to the AWS Surcharge and Connection Charge per the 2018 Analysis. JP PS/ JDJ JP