HomeMy WebLinkAbout06.b.02.a CA SA No. 6 TankRehab RFP 21.22-A05 EXECUTIVE SUMMARY
AGENDA ITEM:
Proposed Supplemental Agreement No. 6 to Master Contract RFP No.2021/2022-A05 for TankRehab.com
LLC to provide Ground Storage Tank Repairs at the Orange Park South Water Treatment Plant (WTP),
ITB No. 2021/2022-A28
Project No.: 6021-004
Date: August 14,2025
BACKGROUND:
On May 17,2022,the Board of Supervisors approved the selection of general contractors that specialize in
tank inspection, cleaning, and repairs.
With this project, TankRehab.com LLC will provide interior repair to the ground storage tank at Orange
Park South WTP as stated in the attached proposal. These repairs will extend the tank's lifespan, ensuring
reliable service for the facility and community, all while minimal disruption during the process.
Staff requested quotes from the two(2)qualified contractors under the continuing contract on July 23,2025.
EVALUATION:
Staff received responses to the requests, and the overall pricing is listed below. Staff requests authorization
to engage TankRehab.com LLC, the lowest bidder,to complete the necessary repairs.
Bidders Bid Value Received
TankRehab.com LLC $75,000
Razorback LLC $165,511
BUDGET:
Staff budgeted$225,000 for subcontractors in the operations renewal&replacement for FY2024/2025.
RECOMMENDATION:
Staff respectfully recommends the Board of Supervisors approval of Supplemental Agreement No. 6 to
Master Contract RFP No. 2021/2022-A05 for TankRehab.com LLC to provide Ground Storage Tank
Repairs at the Orange Park South Water Treatment Plant, ITB No. 2021/2022-A28.
ATTACHMENTS:
Supplemental Agreement No. 6
Scope of Work and Fee
//DP (Author)
//AE,LB, JM(Review)
//AE(Final)
Supplemental Agreement No. 6 to Master Contract RFP No. 2021/2022-A05 for
TankRehab.com LLC to provide Ground Storage Tank Repairs at the
Orange Park South Water Treatment Plant
ITB No. 2021/2022-A28
Contractor: Tom Donovan, Manager Owner: Clay County Utility Authority
TankRehab.com, LLC
20230 E. Adams Street
Jacksonville, FL 32202
Date: August 19, 2025
Description of Services: Fee
Provide interior services as requested and identified in the attached
scope of services and fee proposal.
Surface Preparation and Coating System $75,000
Total (Price Not to Exceed Without Prior Authorization) $75,000
The Contract time shall commence on August 19,2025.This document,along with the Scope and Fee Proposal
dated July 23, 2025, shall become an amendment to ITB No. 2021/2022-A28 and all provisions of the
Agreement will apply hereto.
Accepted by: Date:
Contractor:
Tom Donovan, Manager
TankRehab.com LLC
Accepted by: Date:
Owner:
Jeremy D. Johnston, P.E.,MBA,
Executive Director
Clay County Utility Authority
TANKREHABP
Professional Tank
Services
July 23, 2025
PROPOSAL 24-310 rev2
Preparation and Painting of the Interior 2810-1 Baily Way GST 24'x44' Tank
TankRehab.com, LLC (TankRehab) proposes to provide labor and material for
the rehab of the water tank as specified below in accordance with all applicable
codes and standards including OSHA and AWWA.
1. DRAWINGS, SPECIFICATIONS, AND OTHER REQUIRED DATA
Prior to starting work, TankRehab will gather all data required for submittal
purposes for the repair to the afore mentioned storage tank including any
available computations, detailed drawings, and specifications.
2. COMMENCEMENT AND COMPLETION
Upon your execution of this proposal, we will be prepared to start work 5 days
after approval of our submittal information; and will undertake to furnish sufficient
labor, materials, and equipment to complete the work in approximately 30 days
working time thereafter.
In the event that we cannot start the job by December 1, 2025 because of delays
of any nature which are caused by the owner or other contractor employed by
him or other circumstances over which we have no control, then the contract
price may be renegotiated to reflect any increased costs.
3. INSURANCE
We hereby certify that we have complete Workers' Compensation Insurance, and
that we carry adequate Liability and Property Damage Insurance. A certificate will
be furnished by our insurance agency upon request.
904.551.9293
contact@tankrehab.com
2030 E.ADAMS ST.
JACKSONVILLE FL.32202
2810-1 Bally Way GST 24'x44' Item 20 July 23, 2025
CCUA
4. SERVICES TO BE FURNISHED BY TANKREHAB.
We propose to furnish all supervision, labor, material, and equipment required to
complete the work, except as noted in Paragraph 5. The services to be
furnished by TankRehab are specifically:
• Surface Preparation
Pressure Clean with a minimum 3,500 psi to remove all surface
contaminants.
Abrasive Blast Clean in accordance with SSPC-SP10/NACE No.2 Near-
White Blast Cleaning.
Prime coat shall be applied the same day as surface preparation to avoid
flash rusting.
• Coating System
Prime Coat: Apply (1) coat of Tnemec Series 94-H20 Hydro-Zinc @ a
rate of 2.5 — 3.5 mils DFT.
Stripe Coat: By brush, apply Tnemec Series 22 Epoxoline to all welds,
edges, corners, nuts, bolts, etc...
Finish Coat: Apply (1) coat of Tnemec Series 22 Epoxoline @ a rate of
25.0 — 35.0 mils DFT.
TOTAL: $75,000.00
Page 2 of 5
2810-1 Bally Way GST 24'x44' Item 20 July 23, 2025
CCUA
5. MATERIALS AND SERVICES FURNISHED BY OTHERS
It is understood that the following services shall be provided by others without
expense to TankRehab.
a. Adequate access to the tank site including open storage space for our
vehicles, equipment and materials, conveniently located near the tank to be
repaired.
b. Any permit or other governmental fees as may be required for the work.
c. Removing and placing tank back in service.
6. BACK CHARGES AND CLAIMS FOR EXTRAS
No claim for extra services rendered or materials furnished will be valid by either
party unless written notice by owner change order within ten business days of
when claim originated. TankRehab claims for extras shall carry 30% for overhead
and 10% for profit.
7. DELAYS
It is agreed that we shall be permitted to prosecute our work without interruption.
If delayed at any time for a period of 24 hours or more by an act or neglect of the
owner, his representative, or other contractor employed by him, or by reason of
any changes ordered in the work, we shall be reimbursed for our actual
additional expense caused by such delay, including loss of use of our equipment,
plus 30% for overhead.
8. LABOR
This proposal is predicated on open-shop labor conditions, using our own
personnel. If we are required to employ persons of an affiliation desirable
to the owner or other contractor employed by him or the general contractor
thereby resulting in increased costs to us, the contract price shall be
adjusted accordingly. Such requirement shall not provide that TankRehab sign a
contract with any labor organization.
In the event of a labor stoppage, we shall not be in default or be deemed
responsible for delay of the progress of this contract or damage to the owner or
Page 3 of 5
2810-1 Bally Way GST 24'x44' Item 20 July 23, 2025
CCUA
the contractor so long as TankRehab has sufficient qualified employees available
to perform the work.
9. QUOTATION
We are prepared to carry out this work in accordance with the following lump
sum pricing:
PER THE SCHEDULE ON PAGE 2.
Final payment, including any retention, shall be made within 30 days from the
time work is completed or the billing is received, and is to be received by us in
our accounting office at 2030 E. ADAMS ST. JACKSONVILLE, FLORIDA 32202.
Final payment shall not be held up because of delays in testing. Owner shall pay
TankRehab interest at 12% per annum on any overdue amounts.
10. CONSULTATION AND LIMITATIONS
If the Owner wishes to have TankRehab to perform any additional repairs or
remediation of the tank or accessories, it shall authorize such work in writing and
pay TankRehab its standard charges for such work.
It is agreed that TankRehab shall not be responsible for any consequential,
special or delay damages.
It is agreed that the venue for any litigation under this Agreement shall be in
county where the project takes place.
If TankRehab engages an attorney for the collection of the amounts due from the
Owner, the prevailing party can recoup reasonable attorney's fees and costs
through any appeal.
11. GUARANTEE
TankRehab will guarantee its workmanship and materials on its work covered in
this Proposal for a period of one year after completion of its work. Prior to leaving
the location, TankRehab personnel will perform a walk through with the
responsible party overseeing our work for the Owner or Contractor. In case any
defects in TankRehab's workmanship or materials appear within the one-year
period after completion of TankRehab's work, TankRehab shall promptly make
repairs at its own expense upon written notice by the Owner or Contractor that
such defects have been found. TankRehab's guaranty is limited to defects in
TankRehab's workmanship and materials and TankRehab is not responsible for
ordinary wear and tear or for damage resulting from negligent or inappropriate
use.
Page 4 of 5
2810-1 Bally Way GST 24'x44' Item 20 July 23, 2025
CCUA
12. ACCEPTANCE
This proposal is offered for your acceptance within 45 days from the proposal
date.
We reserve the right after that period to amend our bid to reflect our changing
construction schedules and materials and labor rate changes. The return to this
company of a copy of this proposal with your acceptance endorsed thereon
within the time aforesaid will constitute a contract between us. This proposal shall
be made a part of any subcontract agreement or purchase order.
Sincerely,
TANKREHAB.COM, LLC.
/AA (7)j'
Tom Donovan
Managing Member/Owner
ACCEPTED:
BY:
TITLE:
DATE:
Page 5 of 5