Loading...
HomeMy WebLinkAbout14.a FYI Meadowbroork WTP Improvements Approved CO No. 1 C,%'i COU^,),, CLAY COUNTY UTILITY AUTHORITY MEMORANDUM TO: Jeremy D. Johnston, MBA, PE FROM: Joe Paterniti, P.E. DATE: January 23,2026 RE: Change Order No. 1 an Additional Valve required to maintain operation During Construction. The Contractor submitted the attached Change Order No. 1 for $21,665.77 to replace an additional non-functioning valve necessary to maintain plant operations during the replacement of existing pumps, as outlined in the construction contract. Staff included an $ 80,000.00 - allowance for the replacement of nonfunctioning valves in the existing construction contract. The contractor previously utilized a portion of the allowance to install 3 replacement valves at a cost of$75,796.49. This left $4,203.51 in the allowance. A fourth valve is now required at a cost of$21,665.77. Staff is requesting your signature on Change Order No. 1 to increase the construction contract by $17,462.26 ($21,665.77—4,203.51). An additional 20 days will be added to the contract duration with CO. No. 1. Please review the attached, and feel free to let me know if you have any questions or concerns. Joseph Paterniti Assistant C Engineer Clay County Utility Authority 3176 Old Jennings Road Middleburg, FL 32068 (904)213-2412 (Direct) (904)424-1280 (Cell) jpaterniti@clayutility.org .I CO(J Clay County Utility Authority Working together to protect 3176 Old Jennings Road public health,conserve our Middleburg,Florida 32068-3907 natural resources,and Gj Telephone(904)2l3 5999 create long-term value for♦ �� /�/ �\ our ratepayers. TYAUlNi Facsimile (904)213-2498 Change Order No.: 1 Date: 2/20/2026 Project: Meadowbrook WTP Improvements CCUA Bid No.: 2024/2025-A 10 CCUA Project No.: 1101-0062 Vendor: Petticoat-Schmitt Civil Contractors,Inc. Owner: Clay County Utility Authority 6380 Phillips Hwy Jacksonville,Fl (904)693-2190 Engineer of Record: Carollo Engineering Inc. 200 East Robinson St.,Suite 1400 Orlando,FL 32801 (407)487-4642 ORIGINAL CONTRACT TIMES ORIGINAL PREVIOUS CO CURRENT CO NTP 11/15/2025 DAYS ADD 20 SUB.COMP. 540 5/9/2027 5/29/2027 FINAL COMP. 570 6/8/2027 6/28/2027 INCREASE OR DECREASE IN ITEM DESCRIPTION OF CHANGE(S) OTY. UNIT PRICE CONTRACT PRICE Contract Increase 1 Replacement of Non Functioning Valve 1 $1 7,465 77 $17,462.26 Contract Decrease TOTAL INCREASE $17.462.26 TOTAL DECREASE $0.00 NET CHANGE RESULTING FROM THIS CHANGE ORDER $17.462.26 ORIGINAL CONTRACT PRICE $5.197,000.00 Net Increases by Change Orders(prior to this change order) $0.00 Net Decreases by Change Orders(prior to this change order) $0.00 Total Net Change by Change Orders(prior to this change order) $0.00 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $5.197.000.00 NET CHANGE RESULTING FROM THIS CHANGE ORDER $17,462.26 CONTRACT PRICE INCLUDING THIS CHANGE ORDER $5.214,462.26 This document shall become an amendment to the contract and all provisions of the contract will apply hcrc:n 2026.02.23 Accepted by: 09:53:1 0-05'00' Date: Engince S >f Recor . /Accepted by: ?F Date: 212 V' 4mimmi.-„asup Accepted by: r"�, Date: a3 O% n�� Project: Meadowbrook WTP Improvements CCUA Bid No.: 2024/2025-A10 CCUA Project No.: 1101-0062 Summary of Change Orders Date Description Contract Net Increase Net Decrease Revised Contract Original Contract Price: $5,197,000.00 12/17/2025 Change Order No. 1: Replacement $17,462.26 $0.00 of Non-Functioning Valve Summary of Totals: $5,197,000.00 $17,462.26 $0.00 $5,214,462.26 8014 Bayberry Rd 1.1ft® petticoat Jacksonville, FL 32256 Ir= (904) 751-0888 Phone Schmitt (904) 751-0988 Fax REQUEST FOR INFORMATION To: CCUA and Carollo Location: Jacksonville,FL From:Petticoat-Schmitt Civil Contractors, Inc. RFI No. 5 roject Meadowbrook WTP Improvements Date: 02/13/26 Area Involved 12"Inserta Valve Behind HSPS Building Drawing No. See drawing below Information Requested: Due to the discovery of additional nonfunctioning valves,PSCC proposes to install one 12-inch Inserta Valve on the discharge side of the HSPS.The proposed location is at the northeast corner of the HSPS building.Installation of this valve is necessary to isolate and stop flow, allowing for the installation of a 12-inch cap at the 45-degree bend in the line so that demolition activities may proceed. -1L. Valve Location 12'G.V.&V:B (BROKLN) (1)24"X.24-TEE a ,, 24"X12"RED. . o (1) N J1 (1) 12"TEE T (1) 12"PLUG 1TDIP : 1213 v 24 01P r • OI % t , j//J// 13-7' /: //// /, // ( / E PUMP HOUSE UM & 'CONTROL BLDG. No 2 . / ////////// //y Submitted By: Dean McCurdy Date Answer Requested By: 02/20/26 Reply: Reply By: Date: CHANGE ORDER REQUEST COR# 1 JOB# 25253 DATE 2116/2026 TO: Clay County Utility Authority 3176 Old Jennings Road Middleburg,Florida 32068 Project# 1101-062 Reference: RFI#5-12"Inserta Valve,NE Corner of HSPS RFP# Unless otherwise clarified,this proposal expires 30 calendar days after the date above. Description: Change Order No.1—12"Inserta Valve(NE Comer of HSPS Building) Due to the discovery of additional nonfunctioning valves,PSCC proposes to install one 12-inch Inserta Valve on the discharge side of the HSPS.The proposed location is at the northeast corner of the HSPS building. Installation of this valve is necessary to isolate and stop flow,allowing for the installation of a 12-inch cap at the 45-degree bend in the line so that demolition activities may proceed. We propose an ADD TO our contract of: $21,665.77 Upon acceptance of this proposal. Extension of cons ct time with this extra 20 working days(Based on a standard 5 day work week). This;moose'does nol include any X 1 S for extension or acceleration but Inc 1 j,t 2 nriht to ask for these costs al a later Petti o -S rr�(t Civil Contractors.Inc. to date is expressly reserved. N/A 2 Extension cost is included to this proposal. Acceleration cost to maintain N/A 3 project schedule is included in this proposal. Owner Approval Date 1. MATERIALS: ITEM QUAN TITY U/M PER UNIT TOTAL Valve Box Risers 1.00 EA $104.00 $104.00 Concrete Collar 1.00 EA $22.00 $22.00 $0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 Extension sheet attached Subtotal $126.00 Consumables 4% of Sub-total (1) $5.04 SUBTOTAL 1 $131.04 2.SUBCONTRACTS: ITEM QUANTITY U/M PER UNIT TOTAL $0.00 Colt- Inserta Valves 1.00 EA $13,875.00 $13,875.00 Colt-Mobilization 1.00 EA $250.00 $250.00 $0.00 $0.00 $0.00 SUBTOTAL 2 $14,125.00 3. CONSTRUCTION EQUIPMENT: ITEM HR/DAY/WK U/M RATE TOTAL $0.00 Loader 2.00 DY $129.00 $258.00 Truck-Super 2.00 DY $29.00 $58.00 Truck-Foreman 2.00 DY $36.00 $72.00 $0.00 $0.00 SUBTOTAL 3 $388.00 4. FIELD LABOR Description RATE HOURS TOTAL Super 128 16 $2,048.00 Foreman 89 16 $1,424.00 Operator 45 16 $720.00 $0.00 $0.00 $0.00 $0.00 Total labor $4,192.00 Hand Tools/Safety 5.00% $209.60 SUBTOTAL 4 $4,401.60 DIRECT COST SUBTOTAL $19,045.64 5. GENERAL CONDITIONS: 12.00% (1+4) $565.32 6. MISCELLANEOUS: Insurance: 1.00% of Direct Cost $190.46 Taxes. (State&Local Sales) 6.00% of 1 &3 $31.14 Total (6) $221.60 7. CONTRACT EXTENSION COST 20 Working Days Extended X Daily Rate Total (7) $0.00 8. MARKUP: 5.00% On Subcontractor $706.25 15.00% On Self-Perform $856.13 10. BOND: 1.25% Total (10) $270.82 TOTAL $21,665.77