HomeMy WebLinkAbout09.c EDB CO No. 5. KBT Contracting. New Admin Bldg EXECUTIVE SUMMARY AGENDA ITEM: Proposed Change Order (CO) No. 5 with KBT Contracting Corp. to the New Administration Building Site Improvements project. CCUA Project No.: 4020-004 CCUA Bid No.: 21/22-A1 1 CCUA Financial Job No.: 21013AD Date: March 18, 2026 BACKGROUND: CCUA staff requests authorization from the Board of Supervisors to execute Change Order No. 5 to the construction contract with KBT Contracting Corp. for the project identified above, which reflects a contract deduction associated with the assessment of liquidated damages. The project exceeded the contractual completion time, resulting in the assessment of liquidated damages in accordance with the terms and conditions of the construction contract. Liquidated damages are calculated at a rate of $500.00 per day for a total of 435 calendar days beyond the allowed contract time. Accordingly, Change Order No. 5 provides a deductive adjustment for $217,500.00 to reconcile the contract value with the assessed liquidated damages. This adjustment is administrative in nature and reflects the enforcement of contract provisions related to project schedule performance. The change does not modify the project scope and represents the final reconciliation of contract time and associated costs. In conjunction with this Change Order, Pay Application No. 29 (Final) reflects the Engineer's certified amount based on the adjusted contract value, inclusive of liquidated damages. BUDGET: OH."nal Contract Amount $4,600,705.00 Total Net Change by CO (prior to this CO) $ 112,204.99 Net Change (CO No. 5-Deduction) _ $ (217,500.00) Revised Contract Amount $ 4,495,409.99 Total Paid to Date $ 4,468,825.49 Remaining Contract Balance(Pay App No.29-Final) _ $ 26,584.50 RECOMMENDATION: Staff respectfully requests the Board of Supervisors' authorization to execute Change Order No. 5 to the construction contract with KBT Contracting Corp. for the New Administration Building Site Improvement project, which reduces the contract value by $217,500.00, and to process Pay Application No. 29 (Final) consistent with the Engineer's certified amount. ATTACHMENTS: Change Order No. 5 Pay Application No. 29 (Final) Bhide & Hall Architects, PA Letter dated 02/06/26 Outlining Liquidated Damages //MB(Author). //DM(Review)L. //DM(Final) 'crtr Clay County Utility Authority Working together to protect 3176 Old Jennings Road public health.conserve our Middleburg,Florida 32068-3907 natural resources.and Telephone(904)213-5999 ovate long-term value for Facsimile (904)213-2498 our ratepayers. Change Order No.: 5 Date: March 13.2026 Project: New Administration Building Site Improvements CCUA Bid No.: 21'22-Al 1 CCUA Project No.: 4020-004 Vendor: KBT Contracting Corp. Owner. Clay County Utility Authority 5105 Blanding Boulevard Jacksonville,FL 32210 (904)647-9200 Engineer of Record: Bhide&Hall Architects.PA I329-C Kingsley Avenue Orange Park,Fl 32073 (904)264-1919 ORIGINAL CONTRACT TIMES ORIGINAL PREVIOUS CO CURRENT CO NTP 1:27/2023 DAYS ADD 139 31 SUB.COMP. 350 1/12r2024 5/30/2024 6.'30/2024 FINAL COMP. 365 1 27'2024 6/14 2024 7;1512024 INCREASE.OR DECREASE IN ITEM DESCRIPTION OF CHANGE(S) QTY. UNIT PRICE CONTRACT PRICE Contract Decrease (>_I7.5ln.ul),, Liquirdated Damages(435 Days(a,•5500iday) TOTAL INCREASE $0.00 TOTAL DECREASE ti2I-.5nt)lust NET CHANGE RESULTING FROM THIS CHANGE ORDER '21-sun,nnl ORIGINAL CONTRACT PRICE $4.600.705.00 Net Increases by Change Orden(prior to this change order) $l 12.204.99 Net Decreases by Change Orders(prior to this change order) S0.00 Total Net Change by Change Orders(prior to this change order) $112.2_0-1.99 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $4.712.909.99 NET CHANGE RESULTING FROM THIS CHANGE RDLlt ! .` oo CONTRACT PRICE INCLUDING THIS CHANGE DER $4.495.409.99 This document shall become an amendmet th• ontract and all provisions of the contract will apply hereto. Accepted by: j��_ /fr Date: 03/13/2026 E .ineerol 'ecord Accepted by: - —ADate: _ 3)18!&02�e Vendor Accepted by: Date: Owner Project: New Administration Building Site Improvements CCUA Bid No.: 21/22-All CCUA Project No.: 4020-004 Summary of Change Orders Date Description Contract Net Increase Net Decrease Revised Contract 1/27/2023 Original Contract Price: $4,600,705.00 Change Order No. 1: Additional 48 2/3/2023 LF of 24" RCP, Type C inlet, and $36,657.70 $0.00 $4,637,362.70 additional demo of existing sidewalk Change Order No. 2: (1) Equitable delay cost due to building permit delay (2) Gravel 9/18/2023 (Crushcrete/stabilized)fire $75,547.29 $0.00 $4,712,909.99 department access extension (3) Increse in landscape & Irrigation Labor and Material Change Order No. 3: Additional 1/5/2024 time of 23 calendar days without $0.00 $0.00 $0.00 cost to account for weather days Change Order No. 4: Additional 7/9/2024 time of 31 calendar days without $0.00 $0.00 $0.00 cost to account for weather days Change Order No. 5: Liquidated 3/13/2026 Damages (435 days @ $500/per $0.00 ($217,500.00) $4,495,409.99 day) Summary of Totals: $4,600,705.00 $112,204.99 ($217,500.00) $4,495,409.99 CLAY COUNTY UTILITY AUTHORITY APPLICATION AND CERTIFICATION FOR PAYMENT TO OWNER:CLAY COUNTY UTILITY AUTHORITY APPLICATION NO 29-FINAL 3-11-2026 Distribution lo: 3176 Old Jennings Road PERIOD TO: 12/31/2025 Middleburg,FL 32068 PROJECT NO.: 4020-004 X OWNER PO NO: SC-0000043 X ENGINEER FROM CONTRACTOR: KBT Contracting Corp X CONTRACTOR 5105 Blanding Blvd. Jacksonville.FL 32210 CONTRACT FOR:New Administration Building Expansion and Site Improvements (Bid No.21/22-A l I) CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, Application is made for payment,as shown below,in connection with the Contract. information and belief the Work covered by this Application for Payment has been Continuation Sheet is attached, completed in accordance with the Contract Documents,that all amounts have been paid by the Contractor for Work for which previous Certificates For Payment were issued and 1, ORIGINAL CONTRACT SUM $ 4,600,705.00 payments received from the Owner,and that current payment shown herein is now due. 2. Net change by Change Orders $ (105,295.01) 3. CONTRACT SUM TO DA'l'E(I.ine l±2) $ 4,495,409.99 TRAC FOR �_ , } f, J c L 4 TOTAL COMPLETED TO DATE(Column L on SOY) $ 4,495,409.99 � •1 o Dale: /f I// TOTAL STORED TO DATE(From Stored Material Log) Stale of:Florida _ . 5. RETAINAGE: County of:P_uva: a, 0%of Completed Work $ - Subscribed and sworn to before b. 5 %of Stored Material 5 - me this ,)I day of Total Retainage(Lines 5a+5b or S - - .e..-4 6. TOTAL EARNED LESS RETAINAGE $ 4,495,409.99 Notary Public State o(Florida (Lute 4 Less Line 5 Total) Notary Publ Kimberly Cisco My Commission NN 415962 It„ Expires 81312027 7. LESS PREVIOUS CERTIFICATES FOR �s cs�o• PAYMENT(Line 6 from prior Certificate) $ 4,468,825 49 My Commission expires. 8/3/2027 8. CURRENT PAYMENT DUE $ 26,584.50 ENGINEER'S CERTIFICATE FOR PAYMENT 9. BALANCE TO FINISH,INCLUDING RETAINAGE 0 (Line 3 less Line 6) In accordance with the Contract Documents,based on on-site observations and the data CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS comprising the application,the Engineer certifies to the Owner that to the best of the Total changes approved Engineer's knowledge,information and belief the Work has progressed as indicated, in previous months by Owner $112,204.99 the quality of the Work is in accordance with the Contract Documents,and the Contractor Total approved this Month $217,300.00 is entitled to payment of the AMOUNT CERTIFIED. TOTALS $112,204 99 S217,500.00 AMOUNT CERTIFIED S $26,584.50 NET CHANGES by Change Order ($105,295,0I) (Attach explanation if amount certified differs from the amount applied.Initial all figures on this Application and onthe Continuation Sheet that are changed to conform with the amount certified.) Attach a Schedule of Values which includes a description of work completed along with any ENGINEER: supporting documentation. By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein.Issuance,payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. A B I C D E F G H II ITEM DESCRIPTION OF WORK I SCHEOULED UNIT UNIT TOTAL COMPLETED PREVIOUS COMPLETED THIS PERIOD MATERIALS rOTAL % BALANCE RETAINAGE NO VALUE PRICE SCHEDULED PERIOD 1213 VALUE PRESENTLY COMPLETED COMPLETE TO FINISH 5% VALUE C1IY VALUE 12/31!2025 STORED ANOSIOREO (G-C) IC•G) (NOT IN 0 OR E) (O+F•F) CCUA BUILDING ADDITION 1 GENERAL CONDITIONS 1 LS S 529,200 00 $ 529.200 00 t0091 $ 52520000 0% $ • $ 529.200 00 100% $ • $ 76,440 00 e PAYMENT AND PERFORMANCE BOND! I LS S 39,095 00 $ 39,09500 100% S 39,09500 O% $ • $ 39,095 00 100% $ • $ 195475 INSURANCE 3 MOBILIZATION 1 LS $ 46,007 00 5 46,007 00 100% $ 46 007 00 0% $ • $ 46,007 00 100% $ • 5 2,300 35 4 SITEWORK I LS $ 831,376 OD S 831,37600 100% S 831,37600 0% 5 $ 831,37600 100% $ • $ 41,56880 5 FOUNDA rIONS I CONCRETE!SLAB 1 LS $ 191,224 95 5 191.224 95 100% S 191,224 95 0% $ • $ 191,224 95 100% $ • $ 9,561 25 6 MASONRY I LS 5 185,838 05 5 185,838 05 100% 5 185,838 05 0% 5 • $ 185,838 05 100% $ $ 9,291 90 7 TIE BEAMS 1 LS $ 142600 00 5 142,000 00 100' 5 142,000 00 0% $ • 5 142,000 00 100% $ - $ 7,100 00 8 STRUCTURAL STEEL 1 LS 5 393.230 00 5 393.230 00 100Y_ $ 393,230 00 0% 5 • $ 393,230 0G 100% $ • $ 19,661 50 5 MANSURD TRUSS AND DECKING 1 LS 5 242.0000C 5 242.00000 100% $ 242,00000 0% S $ 242,000 OC 100% $ • $ 12.100 DO 10 MANSURD METAL ROOr'NG I LS $ 174,011 DO S 174,011 00 100% $ 174,011 00 0% $ • $ 174,011 OC 100% $ $ 8,700 55 11 FLAT DECK ROOFING I LS 5 180 000 DO $ 160,000 00 100% S 180,000 00 0% $'. $ 180,000 00 100% 5 • 5 9,000 00 12 SOFFITS/S/AIRS I LS $ 43,200 UU $ 43 200 00 100:0 $ 43,20000 0% 5 • S 43,20000 100% $ • $ 2,16000 13 EXTERIOR DOORS AND STOREFRONTS 1 LS 5 279,763 00 5 279 753 00 100% S 279,763 00 0% $ • 5 279,763 00 100% $ • $ 13.988 15 14 STUCCO SYSTEMS I LS $ 103.440 00 $ 103 440 00 100% 5 103,440 00 0% S. • $ 103,440 00 100% $ $ 5,172 00 15 MFTAI FRAMING 1 I S $ 52,000 00 5 52 000 00 100% S 52,000 00 0% $ • $ 52,000 CO 100% $ • $ 2.600 00 16 DRYWALL 1 LS $ 43,35000 $ 4335000 100% S. 43.35000 0b. $ $ 43,35000 100% 5 $ 2,16750 1/ ACOUSTICAL CEIL NOS/HARD CEILINGS 1 LS $ 41 700 00 $ 41 700 00 100•% $ 41,700 00 0% $ • $ 41,700 60 100% $ • -$ 2,085 00 18 NI ERIOR 00045/GLAZING I LS $ 183 600 00 5 18360000 100% S 183,60000 0% S • 5 183,60000 100% $ • S 9,18000 19 PLUMBING I LS $ 142,266 00 $ 142,266 00 100% $ 142,266 00 0% $ - $ 142,286 00 100% $ • B 7,113 30 20 ELECTRICAL 1 LS $ 251,53700 $ 251,53700 100% $ 751,53700 CII, $I • $ 251,53700 100% $ • $ 12,57685 71 FIRE SLIPPRFSSION I LA $ 115,59700 $ 115,59700 10094,, 3 115.59700 0% O. • 5 115,59700 100% $ • $ 5,779 B5 22 MECHANICAL HVAC 1 I S $ 212,000 00 $ 212.000 00 100% $ 212,000 00 0% 5 • $ 212,000 00 100% 5 • $ 10,d00 00 23 MILLWORK 1 LS $ 65,048 00 $ 65,048 00 100% S 85,048 00 0% $ 65,048 00 100% $ S 3,252 40 24 FLOORING/TILE 1 LS 5 48,800 00 S 48,800 00 10U% $ 48,8C0 UO 0% $ • $ 48,860 00 100% $ $ 2,44D DO 25 PAINTING INTERIOR/EXTERIOR 1 LS 5 52,42200 5 52,422 00 10O-. $• 52,42200 0% $ • $ 52,42200 1013% $ • S 282110 26 SPECIALTIES I SIGNAGE 1 IS $ 17,000 OD S 12,00000 1004 $ 12,00000 0%% 5 • $ 12,00000 100% $ • 5 600 DO Tolal Orginal Contract Amount _ _ _ _ __54,600,705.00 54.600,705.00. 1. _$L6Q,105,001{' - 1 $0.00 $0.00 84.600.705.00 100% ^50.001 S230.036.26 Change Order81 1 LS $� 36,657,70 $36,657.70 100% $ 36,657,70 0% _ $ 36,657.70 100% $0.00I 51,832.89 Change Order#2 1 LS $ 75,547.29 575,547.29 88% $ 66,664.13 12% $ 8,863.16 $ 75,547.29 100% $0.00 $3,777.36 Change Order N3-Luquidated Damages 1 LS $ (217,500.00) 00-$217,500.00 04A $ - 1 % $ (217,500.001 $ (217,500.00) 100% $0.00 -$10,675.00I 36658 $4,495,409.99 $4,495,409.99 54,704,026.63 -5208,616.84 50.00 $4,495,409.99 $0.00 $224,770 50 Previous Payments Previous Payments Previous Payments 1 $62,277.25 11 $216,842.88 21 5213,249.02 1. Contract Amount $ 4,600,705.00 2 $312,750.77 12 $40,023.50 22 $285,153.56 2. Executed Change Orders $ (105,295.01) 3 $60,762 00 13 $196,106.11 23 $97,097.27 3. Total Contract(1)+(2) $ 4,495,409.99 4 $244,344 75 14 $125,400.00 24 5182,726.53 4. Work Performed on Contract Amount(1) $4,600,705.00 5 $226,506 96 15 $397,975.80 25 $235,210.94 5. Work Performed on Change Orders(2) -$105,295.01 6 8113,532.54 16 $134,230.88 26 $95,550.49 6. Materials stored $0.00 7 $150,193.56 17 5172,294.03 27 $111,940.91 7. Total Completed&Stored(4)+(5)+(6) $4,495,409.99 8 $165,881.77 18 $79,203.97 28 $125,444.51 8. Retainage"5%of Item(7) $0.00 9 $1D4,517.73 19 5101,865.27 9. Less Previous Payments Made(or)Invoiced $4,468,825.49 10 $74,265.93 20 5143,456.56 10.Payment Amount Due this Application(7}-(8)-(9) $26,584.50 TOTAL $4,468,825.49 <AP Invoice i';$ r Date Invoice# CONTRACTING CORP. 3/11/2026 707 5105 BIanding Blvd Jacksonville,FL 32210 904-647-9200 Bill To Project Clay Co Utility Authority 3176 Old Jennings Rd Adrnin Bldg Expansion Middleburg.FL 32068 Estimate Previously Invoiced Description Amount 4,600,705.00 4,370,669.75 CONTRACT#Bid 21/22-All 230,035.25 36,657.70 34,824.81 CO#1 -Addtl RCP and Demo of Existing Sidewalks(approved 2-3-2023) 1,832.89 75,547.29 63,330.93 CO#2- 12,216.36 -217,500.00 CO#3 Liquidated Damages G 5 c o� .9 p d -217,500.00 / a m072. V I°- Total $26,584.50 J . ram`' ` PSG C 6Xhi'ci'iip �0Gl e Project Title: Clay County Utility Authority New Administration Bldg. Owner: Clay County Utility Authority Location: 3176 Old Jennings Rd, Middleburg, FL 32068 Substantial Completion Date: September 8, 2025 KBT Contracting Corp (KBT) hereby warrants all labor, materials, and workmanship for a period of 24 months from the Substantial Completion Date for all scopes as described and defined in the contract specifications for the above referenced project. If repairs due to defective workmanship are required at any time while the project is under this warranty, KBT shall make such repairs within 72 hours of notification, unless additional time is permitted by the Owner. Failure to perform repairs within the time specified shall be grounds for having the repairs performed by others and the cost of such repairs billed to KBT. Any issues should be addressed to our office. Our contact information is listed below. KBT Contracting Corp. 5105 Blanding Blvd. - Jacksonville, FL 32210 Rebecca E. Timmons, President Office: (904) 647-9200 -tiO Mobile: (904) 591-5326 Fax: (904) 771-2876 CONTRACTING CORP. Email: info@kbtcorp.com Lic: CGC1520730 CBC058625 CCC1330401 v r4 CONTRACTOR'S AFFIDAVIT OF PAYMENT The undersigned, being first sworn,states as follows: 1.The Affiant, Rebecca E.Timmons,is the President of KBT Contracting Corp.and is authorized to submit this Affidavit. 2. Under a contract with Clay County Utility Authority(the"Owner"),the Affiant provided labor, laborers, materials,services, machinery,tools,equipment,or fixtures ("Services")for improvements of the Owner's real property at 3176 OLD JENNINGS ROAD, MIDDLEBURG, FLORIDA 32068(the"Real Property"). 3.The Affiant hereby acknowledges$125,444.51 in payment for the Services provided to or for use on the Real Property before December 8,2025.This amount represents Progress Payment#28 under the contract. Z... ........„...._ Rebecca Timmons State of Florida County of Duval ` Signed and sworn to [or affirmed] before me on 1\ ZC\-- ,\j4_ , by Rebecca Timmons as President of KBT Contracting Corp. _f_.. \,,.\TIVILALV IN 410,_( :)._ ____ Signatur of notarial office My commission expires:08/03/2027 Notary public State of F of r da�1 Kimbarl Y Cisco ,_,, 111 n My Commission HH<15962 Expires 8/3/2027 'mil—`(. uo bhide & hall architects Jeremy D. Johnston, MBA, PE (Lic. FL) February 6, 2026 Executive Director Clay County Utility Authority RE: Final Payment—CCUA Contract No.: 4020-004 Dear Mr. Johnston, The intent of this letter is to outline the liquidated damages reflected in the current completion of the project Original Contract Execution Date: July 20, 2022 Notice To Proceed: January 27, 2023 Original Substantial Completion Date: January 12, 2024 *Revised Substantial Completion Date: June 30, 2024 Original Final Completion Date: January 27, 2024 *Revised Final Completion Date: July 15, 2024 *The revised dates above are reflected in the most recent change order No 4 issued on July 9,2024. Actual Substantial Completion: September 8, 2025 Days past Substantial Completion: 435 days *Liquidated Damages: 420 days, $500/day: $217,500.00 *Liquidated Damages:As illustrated in the Standard Form of Agreement(Section 0500, 4.03) of the contract documents, is$500/per day that expires after the time specified for Substantial Completion until the work is Substantially Complete. Following Substantial Completion, the contractor is provided 30 days to complete Final completion with a Liquidated Damage assessment of$250/day that expires until the project is deemed Finally Complete. Pay App#28 was presented showing a draw request of$133,883.51 and Retainage of$235,645.50. We advised rejecting the Pay App #28 as presented and paying a total of $125,444.51 Final Pay App received on February 6, 2026 requested payment for all Retainage, in the amount of $235,645.50 Total contract amount: $4,712,909.99 Liquidated Damages (see above): $217,500.00 Total Previous Payments: $4,468,825.49 Pay App#29 (recommended Payment) $26,584.50 Total Due: $4,495,409 99 Please let us know if you ha any questions or require additional discussion on the above. Thank you, David S Shively,AIA Architect— FL#0099028 Senior Vice President 1329 Kingsley Ave, Suite C, Orange Park, FL 32073 904.264.1919 Bhide-Hall.com AR91953 BHA#202135