HomeMy WebLinkAbout06.e.04 DA MU25.26-11 - Kelli Grove Multi-Family Return to: MU25/26-11
Clay County Utility Authority
3176 Old Jennings Road
Middleburg,Florida 32068-3907
KELLI GROVE MULTI-FAMILY
90 UNITS-2542 SANDRIDGE ROAD
(Mid-Clay System)
Parcel Number: 23-05-25-010099-004-00 Name of Project
Clay County
DEVELOPER AGREEMENT
THIS DEVELOPER AGREEMENT("Agreement"),made and entered into this 34 day of
1'�►n[. ,2026, by and between KELLI GROVE,LTD.,a Florida limited partnership,hereinafter
referred to as "Developer", and CLAY COUNTY UTILITY AUTHORITY, an independent special
district established under Chapter 94-491,Laws of Florida,Special Acts of 1994,hereinafter referred to as
"Utility".
WHEREAS, Developer owns or controls lands located in Clay County, Florida, and described in
Exhibit"A", attached hereto and incorporated herein by reference (hereinafter"Property");
WHEREAS, Developer desires that the Utility provide central water, pumping, treatment and
distribution service and/or central wastewater collection,treatment and disposal,and central reclaimed water
service for the Property;
WHEREAS,the Utility is willing to provide, in accordance with the provisions of this Agreement,
central water, wastewater, and reclaimed water service to the Property and thereafter operate applicable
facilities so that the occupants of the improvements on the Property will receive adequate water,wastewater,
and reclaimed water service from the Utility; and
WHEREAS,the parties wish to enter into this Agreement setting forth their mutual understandings
and undertakings regarding the furnishing of potable water,wastewater,and reclaimed water service by the
Utility to the Developer's Property.
NOW, THEREFORE, for and in consideration of the premises, the mutual undertakings and
agreements herein contained and assumed, Developer and Utility hereby covenant and agree as follows:
1. The foregoing statements are true and correct.
2. The following definitions and references are given for the purpose of interpreting the terms as
used in this Agreement and apply unless the context indicates a different meaning:
(a) "Consumer Installation"-All facilities ordinarily on the consumer's side of the point
of delivery.
(b) "Contribution-in-Aid-of-Construction(CIAC)"-The sum of money and/or the value
of Property represented by the cost of the wastewater collection system,potable water distribution system,
and reclaimed water distribution system constructed or to be constructed which Developer or owner
transfers,or agrees to transfer,to Utility,if so designated by the Utility,at no cost to Utility to provide utility
service to specified Property.
- 2 -
(c) "Equivalent Residential Connection(ERC)"-A factor expressed in gallons per day
(GPD)which is used to convert a given average daily flow(ADF)to the equivalent number of residential
connections. For this purpose the average daily flow of one potable water ERC is (450) GPD, one
wastewater ERC is (311) GPD, and one reclaimed water ERC is (275) GPD.
(d) "Point of Delivery"-The point where the pipes or meter of Utility are connected with
the pipes of the consumer. Point of Delivery for water service shall be at the consumer's side of the meter
and for wastewater service at the lot or Property line. Utility shall, according to the terms and conditions
hereof, own all pipes and appurtenances to the point of delivery unless otherwise agreed. The pipes and
appurtenances inside the Point of Delivery shall belong to others.
(e) "Service" - The readiness and ability on the part of Utility to furnish and maintain
water and wastewater service to the point of delivery for each lot or tract pursuant to rules and regulations of
applicable regulatory agencies.
3. Assurance of Title-Developer represents and warrants that he is the owner of the Property
and has the legal right to grant the exclusive rights of service contained in this Agreement. Upon request,
Developer agrees to deliver to Utility evidence of such ownership including any outstanding mortgages,
taxes, hens and covenants.
4. Connection Charges-In addition to the contribution of any wastewater collection systems,
water distribution systems,and reclaimed water systems where applicable, and further to induce Utility to
provide potable water,wastewater service,and reclaimed water service.Developer hereby agrees to pay to
Utility the following fees and charges, as defined in the Rate Resolution (including Service Availability
Policy),upon execution of this Agreement in order to reserve capacity in the System:
(a) Potable Water Capacity Charge:
($476.93 x 31.50 ERCs) $ 15,023.30 *
Alternative Water Supply Surcharge:
($411.64 x 31.50 ERCs) $ 12,966.66 *
SJWMD Black Creek Water Resource Charge:
($102.40 x 31.50 ERCs) $ 3,225.60 *
Wastewater Capacity Charge:
($4,345.34 x 31.50 ERCs) $ 136,878.21 *
Reclaimed Water Capacity Charge:
($317.95 x 5.00 ERCs) $ 1,589.75 *
Debt Service Charge:
($167.00 x 31.50 ERCs) $ 7,773.89
(b) Main Extension Charge-Water $ 4,504.50 **
Main Extension Charge- Wastewater $ 9,560.57 **
Main Extension Charge-Reclaimed $ 4,261.95 **
(c) Fire Protection Charge $ 15,810.00 ***
(d) Potable Meter Charge $ 1,527.29 ****
Reclaimed Meter Charge $ 1,454.59 ****
(e) Plan Review Fee $ 577.50
(f) Inspection Fee 1 142.68
(g) Recording Fee 153.92
Total 216 450.41 .,
* - Includes 31.50 ERCs for water and wastewater for the building(s) and 5.00 ERCs for
reclaimed irrigation water service for the Property based on 1,264.57 AGPD in accordance
with Utility's current rate resolution.
** - See paragraph 48 for explanation of charge.
*** - Based on 1,000 GPM of internal fire flow @$15.81 per gallon.
**** - Includes one 3-inch potable water meter for the building(s)and one 2-inch reclaimed water
meter for irrigation oes not include meter boxes).The 3-inch potable water meter will be
provided by Utility and installed by Developer's State of Florida Licensed Underground
Utility Contractor.The meter installation,including the meter pit,shall be in accordance with
Utility's standard details and specifications.
Note: Items (e) and(f) are estimates and are subject to adjustment based on actual cost incurred.
-3-
Payment of the above charges does not and will not result in Utility waiving any of its rates or rules
and regulations and their enforcement shall not be affected in any manner whatsoever by Developer making
payment of same. Except as specifically stated, Utility shall not be obligated to refund to Developer any
portion of the value of the above charges for any reason whatsoever nor shall Utility pay any interest upon
the above charges paid.
Except as otherwise stated in this Agreement, neither Developer nor any person or other entity
holding any of the Property by,through or under Developer,or otherwise, shall have any present or future
right,title, claim or interest in and to the charges paid or to any of the potable water, reclaimed water, or
wastewater facilities and properties of Utility,and all prohibitions applicable to Developer with respect to no
refund of such charges,no interest payment on said charges and otherwise,are applicable to all persons or
entities.
Paid capacity or connection charges may not be applied to offset any service bill or other claims of
Utility.
5. On-Site Installations - On-site facilities are those located within the Property for which
Developer is requesting service. Developer shall convey to Utility, if so designated by Utility, all on-site
water and wastewater lines, laterals, mains, lift stations, pump stations and appurtenant facilities
(collectively referred to as "Components" or "On-Site System") on the Property with all contractual
guarantees relating thereto. Conveyance shall take place within a reasonable time after installation of the
On-Site System but prior to Utility's obligation to provide service. Until such time as the On-Site System is
conveyed, the same shall be operated and maintained by Developer. In its sole discretion, Utility may
decline to accept the On-Site System,may lease the On-Site System from Developer,or agree to such other
arrangement as it deems appropriate.
Utility shall have the right and obligation,at the Developer's expense,to construct and/or approve the
construction of the on-site installations which shall be owned and maintained by Utility,if so designated by
Utility. The Utility shall also have the right to review all plans and specifications,connections to its system
and the Developer shall pay a fee equal to the Utility's actual cost to review such plans and specifications.
The Utility shall have the right to inspect all phases of construction undertaken by outside contractors for
facilities which are to be owned by the Utility,if so designated by Utility. The Developer will reimburse the
Utility for its costs for such inspection, including all overhead associated with same. Where on-site
temporary pump stations or backflow prevention devices are required,they shall be paid for one hundred
percent (100%) by the Developer without any provision for refund. Utility reserves the right to require
backflow prevention devices on all water service connections.
The On-Site System shall be constructed in compliance with all regulatory requirements and the
specifications and requirements of Utility. No construction shall commence until Utility has reviewed and
approved Developer's contractor and the plans and specifications for construction of the potable water,
wastewater,and reclaimed water systems for the project. The proposed electrical transformer layout of the
electric utility providing service must be provided to the Utility prior to commencement of construction.
Developer shall guarantee Utility against defects in material and workmanship for the portion of the
On-Site System to be owned by the Utility or County, if so designated by Utility. Developer shall secure
from its contractor a written and fully assignable warranty that the system installed will be and remain free
from all defects, latent or otherwise,with respect to workmanship,materials and installation in accordance
with Utility-approved plans and specifications, for a period of two (2) years from the date of the system
acceptance by the Utility,and immediately assign the same and the right to enforce the same to the Utility
on or before such date.
-4-
The Developer shall provide the Utility, at the Developer's sole expense, a maintenance bond or
other form of security acceptable to the Utility in an amount equal to ten percent (10%) of the project's
schedule of values detailing the infrastructure being dedicated to the Utility.Such bond or security shall,by
its express terms, protect and indemnify the Utility against any loss, damage, costs, claims, debts, or
demands arising from defects, whether latent or otherwise, in the dedicated system. This security shall
remain in effect for a period of two(2)years from the date of the Utility's formal acceptance of the system.
The Utility reserves the right to require security in excess of ten percent (10%) if deemed necessary to
adequately protect the Utility from potential liabilities associated with warranty defects.
In addition to any other promises,guarantees or warranties to be provided by Developer to the Utility
hereunder,Developer agrees to protect and indemnify Utility against any loss,damage,costs,claims,debts
or demands by reason of defects, latent or otherwise, in the system which could not have been reasonably
discovered upon normal engineering inspection,to be and remain in effect for a period of two(2)years from
the date of the system's acceptance by Utility.
Developer agrees to transfer to Utility, if so designated by Utility,title to all water distribution and
wastewater collection systems installed by Developer or Developer's contractor,which the Utility has agreed
shall be owned and maintained by it pursuant to the provisions of this Agreement and shall:
(a) Deliver a Bill of Sale and No Lien Affidavit in a form acceptable to Utility for such potable
water distribution,reclaimed water distribution, and wastewater collection systems.
(b) Provide copies of invoices and Release of Liens from contractor for installation of the utility
systems as well as for any repairs to the Systems which may have been caused by other subcontractors
during construction.
(c) Assign any and all warranties and/or maintenance bonds as set forth herein.
(d) Provide all operations, maintenance and parts manuals, as-built plans complying with
Utility's specifications, and other documents required for operation of the utility system.
(e) Convey to Utility, if so designated by Utility, easements and/or rights-of-way covering all
areas in which potable water, reclaimed water, and wastewater systems are installed,with adequate legal
access to same, by recordable document satisfactory to Utility.
(f) Convey to Utility,if so designated by Utility,by recordable document in form satisfactory to
Utility,fee simple title to lift station and pump station sites,along with recordable ingress/egress easement
documents.
(g) Provide a copy of the Project Engineer's final certification of completion to the Florida
Department of Environmental Protection certifying installation of all potable water and wastewater facilities
in accordance with approved plans.
-5-
6. Off-Site Installations - Developer shall further construct all transmission mains, pump
stations and appurtenant facilities necessary to connect the On-Site System to the nearest appropriate point
in Utility's transmission system,as determined by Utility. Utility may require Developer to oversize off-site
transmission mains and appurtenant facilities in a manner consistent with Utility's Wastewater System
Master Plan. The costs associated with construction of over-sized facilities which provide Utility with
excess capacity for the benefit of other properties may be subject to refundable advance treatment pursuant
to Utility's Service Availability Policy, as then in effect. The same construction standards, warranty
requirements, maintenance bond requirements, transfer of title by Bill of Sale, and indemnification
requirements,as provided under paragraph 5 of this Agreement,shall also apply to the Off-Site installations.
7. Agreement to Serve - Upon the completion of construction of the On-Site and Off-Site
Facilities by Developer, or an appropriate phase thereof, and compliance with the terms and conditions of
this Agreement and Utility's Service Availability Policy, Utility will allow connection or oversee the
connection of the wastewater collection facility,potable water distribution facility,and/or reclaimed water
facility installed by Developer to the central facilities of Utility in accordance with all rules,regulations and
orders of the applicable governmental authorities. Utility agrees that once it provides potable water,
reclaimed water, and/or wastewater service to the customers within the Property that it will continuously
provide such service,at its cost and expense,but in accordance with the other provisions of this Agreement,
the then current Rate Resolution in effect for Utility,and the requirements of the governmental authorities
having jurisdiction over the operations of Utility. Utility shall not be liable for any temporary interruptions
in service as a result of equipment failure, emergencies or Act of God.
The covenants and agreements of Developer contained in paragraphs 5,6,and 7 hereof shall survive
Utility's acceptance of any On-site and Off-site Facilities and Utility's commencement of service to the
Property. Should any such covenant or agreement of Developer in fact be outstanding following either or
both of such dates,then,notwithstanding any contrary provision contained herein,Utility may,upon thirty
(30)days advance written notice and demand for cure mailed to Developer,temporarily interrupt service to
the Property until such outstanding covenant or agreement of Developer is satisfied in full. Utility shall not
be liable for any temporary interruptions in service as a result of any action authorized or permitted by this
paragraph.
8. Application for Service - Developer, or any owner of any parcel of the Property, or any
occupant of any residence,building or unit located thereon shall not have the right to and shall not connect
any consumer installation to the facilities of Utility until formal written application has been made to Utility
by the prospective user of service, or either of them, in accordance with the then effective rules and
regulations of Utility and approval for such connection has been granted.
9. Easements - Developer hereby grants and gives to Utility, its successors and assigns, but
subject to the terms of this Agreement, the exclusive right or privilege to construct, own, maintain and
operate the potable water,wastewater,and reclaimed water facilities to serve the Property in,under,upon,
over and across the present and future streets, roads, alleys, utility easements, reserved utility strips and
utility sites. Mortgagees, if any,holding prior liens on the Property shall be required to release such liens,
subordinate their position or join in the grant or dedication of the easements or rights-of-way, or give to
Utility assurance by way of a "non-disturbance agreement", that in the event of foreclosure, mortgagee
would continue to recognize the easement rights of Utility. All potable water, reclaimed water, and
wastewater collection facilities, save and except installations owned by Developer, or its successors or
assigns, shall be covered by easements or rights-of-way if not located within platted or dedicated roads or
rights-of-way for utility purposes and there shall be adequate legal access to same.
-6-
The use of easements granted by Developer to Utility shall not preclude the use by other utilities of
these easements,such as for cable television,telephone,electric,or gas utilities. However,the use of such
non-exclusive easements by third parties shall not interfere with Utility's utilization of same. Utility hereby
agrees that all easement grants will be utilized in accordance with the established and generally accepted
practices of the potable water,reclaimed water,and wastewater industry with respect to the installation of all
its facilities in any of the easement areas.
10. Utility's Exclusive Right to Utility Facilities-Developer agrees with Utility that all potable
water,reclaimed water, and wastewater facilities accepted by Utility in connection with providing potable
water, reclaimed water and wastewater services to the Property, shall at all times remain in the sole,
complete and exclusive ownership of Utility, and any person or entity owning any part of the Property or
any residence,building or unit constructed or located thereon,shall not have any right,title,claim or interest
in and to such facilities or any part of them, for any purpose, including the furnishing of potable water,
reclaimed water,and wastewater services to other persons or entities located within or beyond the limits of
the Property.
11. Exclusive Right to Provide Service-Developer shall not engage in the business of providing
potable water services or sanitary wastewater services to the Property during the period of time Utility
provides water and wastewater services to the Property. Utility shall have the sole and exclusive right and
privilege to provide water and wastewater services to the Property and to the occupants of such residence,
building or unit constructed thereon.
12. Rates-Utility agrees that the rates to be charged to Developer and individual consumers of
water and wastewater services shall be those set forth in the then current Rate Resolution most recently
adopted by the Board of Supervisors of the Clay County Utility Authority as may be amended from time to
time. However, notwithstanding any provision in this Agreement, Utility, its successors and assigns,may
establish,amend or revise,from time to time in the future,and enforce in a reasonable manner,rates or rate
schedules so established.
Notwithstanding any provision in this Agreement,Utility may establish,amend or revise,from time
to time, in the future, and enforce rules and regulations covering water and wastewater services to the
Property.However, all such rules and regulations so established by Utility shall at all times be reasonable
and subject to such regulations as may be provided by law or contract.
13. Quality of Wastewater-All commercial facilities which discharge non-domestic type wastes
into the Utility's collection system are required to meet the requirements of Resolution 2021/2022-05
(Pretreatment Resolution) with regard to waste quality. In addition, facilities with photographic
development operations may be required to install and maintain a silver recovery unit in order to meet the
requirements of this resolution. Discharge of floor finish stripper products and waste to the collection
system requires an Industrial Pretreatment Permit issued by Utility. Developer, tenant or the
Property/project owner must inform Utility of its intent to discharge any floor finish stripper product and
waste. Upon notification, a permit application will be sent to Developer, tenant or the Property/project
owner to be completed and submitted to Utility for processing. A permit fee is not required by Utility for an
Industrial Pretreatment Permit. Failure to follow these procedures may result in termination of water and
wastewater service.
-7-
14. Binding Effect of Agreement-This Agreement shall be binding upon and shall inure to the
benefit of Developer, Utility and their respective assigns and successors by merger, consolidation,
conveyance or otherwise. Any assignment or transfer by Developer shall be subject to Utility approval
which shall not be unreasonably withheld provided the assignee or transferee shall acknowledge in writing
that it assumes the duties and responsibilities of Developer as set forth in this Agreement.
15. Notice - Until further written notice by either party to the other, all notices provided for
herein shall be in writing and transmitted by messenger, by mail or by electronic mail (email) and if to
Developer, shall be mailed or delivered to Developer at:
Kelli Grove LTD.
Attn: James Hoover
1649 Atlantic Boulevard
Jacksonville, Florida 32207
and if to the Utility at:
Clay County Utility Authority
3176 Old Jennings Road
Middleburg, Florida 32068-3907
or such other address as specified in writing by either party to the other.
16. Laws of Florida-This Agreement shall be governed by the laws of the State of Florida and it
shall be and become effective immediately upon execution by both parties hereto,subject to any approvals
which must be obtained from governmental authority, if applicable.
17. Costs and Attorney's Fees-In the event the Utility or Developer is required to enforce this
Agreement by court proceedings, by instituting suit or otherwise, then venue shall lie in Clay County,
Florida,and the prevailing party shall be entitled to recover from the other party all cost incurred,including
reasonable attorney's fees.
18. Force Majeure - In the event that the performance of this Agreement by either party is
prevented or interrupted in consequence of any cause beyond the control of either party,including,but not
limited to Act of God or of the public enemy,war,national emergency,allocation or of other governmental
restrictions upon the use or availability of labor or materials,civil disorder,strike,embargo,natural disaster
or catastrophe, unforeseeable failure or breakdown of transmission, treatment or other facilities,
governmental rule, act, order, restriction, regulation, statute, ordinance, or order, decree, judgment,
restraining order or injunction of any court, said party shall not be liable for such non-performance.
19. Indemnification - Developer agrees to indemnify and hold the Utility harmless from and
against any and all liabilities,claims,damages,costs and expenses(including reasonable attorney's fees)to
which it may become subject by reason of or arising out of Developer's performance of this Agreement.
This indemnification provision shall survive the actual connection to Utility's potable water,wastewater and
reclaimed water systems.
-8-
MISCELLANEOUS PROVISIONS
20. The rights,privileges,obligations and covenants of Developer and Utility shall survive the
completion of the work of Developer with respect to completing the facilities and services to any
development phase and to the Property as a whole.
21. This Agreement supersedes all previous agreements or representations, either verbal or
written, heretofore in effect between Developer and Utility, made with respect to the matters herein
contained,and when duly executed,constitutes the agreement between Developer and Utility. No additions,
alterations or variations of the terms of this Agreement shall be valid,nor can provisions of this Agreement
be waived by either party,unless such additions,alterations,variations or waivers are expressed in writing
and duly signed.
22. Whenever the singular number is used in this Agreement and when required by the context,
the same shall include the plural, and the masculine, feminine and neuter genders shall each include the
others.
23. Whenever approvals of any nature are required by either party to this Agreement,it is agreed
that same shall not be unreasonably withheld or delayed.
24. The submission of this Agreement for examination by Developer does not constitute an offer
but becomes effective only upon execution thereof by Utility.
25. Failure to insist upon strict compliance of any of the terms,covenants,or conditions herein
shall not be deemed a waiver of such terms,covenants,or conditions,nor shall any waiver or relinquishment
of any right or power hereunder at any one time or times be deemed a waiver or relinquishment of such right
or power at any other time or times.
26. It is because of inducements offered by Developer to Utility that Utility has agreed to provide
potable water, reclaimed water, and wastewater services to Developer's project. Capacity reserved
hereunder cannot and shall not be assigned by Developer to Third Parties without the written consent of
Utility, except in the case of a bona-fide sale of Developer's Property.
27. Utility shall, as aforesaid, at all reasonable times and hours, have the right of inspection of
Developer's internal lines and facilities. This provision shall be binding on the successors and assigns of the
Developer.
28. The parties hereto recognize that prior to the time Utility may actually commence upon a
program to carry out the terms and conditions of this Agreement,Utility may be required to obtain approval
from various state and local governmental authorities having jurisdiction and regulatory power over the
construction,maintenance,and operation of Utility. The Utility agrees that it will diligently and earnestly
make the necessary proper applications to all governmental authorities and will pursue the same to the end
that it will use its best efforts to obtain such approval. Developer agrees to provide necessary assistance to
Utility in obtaining the approvals provided for herein. Upon execution of this Agreement, Utility may
require the payment of a reasonable fee to defray Utility's legal,engineering,accounting and administrative
and contingent expense.
-9-
29. It shall be Developer's responsibility to provide acceptable as-built drawings of the potable water,
reclaimed water and wastewater systems installed by Developer or Utility,in accordance with Utility's standard
specifications,details and notes,which are to be accepted by Utility for ownership and maintenance,as set forth
in paragraph 5(d)herein;and the Utility's charges associated with the review and quality assurance of the CAD
as-built survey drawings will be paid directly by Developer's licensed underground utility contractor and shall be
provided in accordance with CCUA's"As-built Specifications Standards Manual",which can be obtained from
the Utility's website (www.clayutility.org). It shall be Developer's responsibility to properly instruct his
contractor to contact Utility for an estimate of such charges and clarification of the required as-built drawing
procedures.
30. It shall be Developer's responsibility or Developer's customers' responsibility, utilizing the
project's potable water,reclaimed water,and wastewater service within Developer's project,to apply to Utility
for service after the installation of the potable water, reclaimed water, and wastewater utilities, have been
completed and accepted by Utility. Upon completion of application for potable water, reclaimed water, and
wastewater service and payment of the appropriate charges set forth in Utility's then current applicable Rate
Resolution, including any security deposits required, service will be initiated to customers within Developer's
Property.
31. Developer shall not place any conservation easements over any of the easement lands that contain
Utility's water,wastewater or reclaimed facilities for the project covered by this Agreement.
32. Developer shall grant an easement to Utility covering any portion of the potable water,reclaimed
water,and wastewater facilities that Utility agrees to own and maintain,and Developer shall be responsible for
providing the legal description for such easement to Utility.
33. The landscaping for this project(new or existing)shall not include the planting of any trees within
seven and one-half feet(7 ft.6 in.)of any of the water,wastewater and/or reclaimed water mains to be owned by
Utility.
34. Connection to Utility's existing 12-inch water main,existing 12-inch reclaimed water main and
the construction of the water and reclaimed water services from the mains to the meter locations, shall be
installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all of the
requirements of Utility prior to Utility's acceptance for ownership and maintenance. Utility shall own and
maintain the tap through the meters and all facilities downstream of the meters shall be owned and maintained by
Developer. Utility shall have access to all of the water meters during normal business hours,for meter reading
purposes. All fire hydrants within the development are to be owned and maintained by Developer.
35. Developer shall install or have installed a reduced pressure type backflow prevention device,
which shall be located immediately downstream of Utility's proposed 3-inch potable water meter for the building,
and 3/4-inch bypass meter on the 8-inch double-detector check valve for the fire sprinkler system. Such
installations shall be in compliance with the requirements of the Florida Department of Health and Rehabilitative
Services and Utility. Upon the completion of each installation of said device(s), Developer shall provide to
Utility,for its permanent records,the Make,Model,Size and Serial Number of said device(s).Furthermore,
these devices must be tested and recertified by a certified backflow prevention technician annually or such other
period as may be required by Utility. Proof of the annual testing and re-certification must be submitted to Utility
for its records. These installations and annual re-certifications shall be the responsibility of the Developer,or its
successors and assigns.
-10-
36. Utility agrees to provide minimum fire flows of 1,000 GPM to the point of connection to Utility's
fire main stub, at 20 PSI, subject to acts of God and temporary emergency conditions.
37. Connection to Utility's existing 12-inch wastewater force main and the construction of the force
main extension shall be installed by Developer's State of Florida Licensed Underground Utility Contractor and
shall meet all of the requirements of Utility prior to Utility's acceptance for ownership and maintenance as shown
on the approved plans titled Kelli Grove by England-Thims & Miller, Inc., dated October 2025. All service
lateral lines and the private lift station servicing Developer's property, which are located upstream of
Developer's connection point, shall be Developer's responsibility for ownership and maintenance
38. The wastewater connection point being constructed is a pressure force main connection point.
Therefore,it will be the Developer's project Engineer's responsibility to design and permit the proposed pump
station directly with the Florida Department of Environmental Protection(FDEP)which is capable of pumping
Developer's flow at the required pressure condition and connect said piping to Utility's system at the valve box
within Utility's proposed easement on the front of the Property,in order for Developer's flow to be pumped into
Utility's system for treatment and disposal. In addition, Developer hereby agrees to install and maintain a
Flowmatic ball check valve,Model 508(epoxy coated cast iron body),on the discharge side of the Developer's
pump station. The Flowmatic ball check valve shall be placed in a protective valve box with a lid. The check
valve and valve box shall be positioned on a horizontal segment of pipe at least two linear feet outside of the
proposed pump station. The Utility will require a copy of the final permit, certification of construction
completion issued by FDEP and pump station material submittals for review and approval, prior to the Utility
providing service.
Prior to the start-up of the pump station, Developer will be required to pull the pumps for Utility's
inspection to ensure the proper pumps and check valve have been provided. If the proper pumps and check valve
have been provided, the system start-up will be allowed to proceed. If not, Developer shall correct the pump
station and check valve and call for a follow-up inspection. An additional service charge will be assessed for the
follow-up inspection.
39. The Developer will own and maintain the private pumping station and check valve on the
Property,and in the event of an electrical power outage,it shall be Developer's responsibility to provide backup
power, if continuous service is desired.Utility is in no way responsible for damages or injury,either directly or
indirectly, related to sanitary sewage overflows, spills or stoppages related to loss of electrical power or any
malfunction of the privately owned facilities.
40. Where food preparation facilities or other facilities that are subject to discharge greases into the
wastewater collection system are part of the development of the property or where floor drains are connected to
the wastewater collection system,the Developer shall install or have installed a grease/sand interceptors for each
building,meeting the requirements of the Clay County Department of Health&Rehabilitative Services and the
Florida Building Code,which shall be designed and constructed in accordance with Utility's specifications for
same. Such installation shall be provided by a Florida Licensed Plumbing Contractor. The grease/sand
interceptor shall be designed for the facilities connected to the same;however,in no event shall the capacity be
less than standard per the current billing code. The developer shall also be responsible for the continued
maintenance and cleaning of said grease/sand interceptor facility and such facility shall be subject to periodic
unannounced inspections by Utility. In addition, all floor drains shall be connected to the grease/sand
interceptor.
41. Developer shall install or have installed grit/sand trap interceptors(stainless steel sand screens)for
each floor drain located in any of the common areas of development, in accordance with Utility's approved
Standard Sewer System Detail (Floor Drain with strainer Detail), as shown in the plans prepared by England-
Thims&Miller,Inc.(See Exhibit"B"). Developer shall also be responsible for the continued maintenance and
cleaning of said grit/sand interceptors,and such interceptors shall be subject to periodic unannounced inspections
by Utility. Developer's maintenance staff shall assist Utility personnel by removing the floor drain grates for this
inspection of the grit/sand collectors. Developer shall maintain records of maintenance and cleaning. Those
records shall be made available to the Utility upon request.
-11-
42. Air conditioning condensation discharge lines,swimming pool discharge lines,decorative water
fountain discharge lines and any other piping that may intentionally or unintentionally drain storm water, shall
not connect to Utility's wastewater system.
43. All water, reclaimed, and wastewater installations/connections shall be in accordance with the
plans prepared by England-Thims & Miller, Inc., as described in Exhibit `B", or as modified in a manner
acceptable to Utility.
44. Developer shall be required to install all on-site reclaimed systems,as utilized for irrigation in full
compliance with Utility's Reclaimed Water Policy (i.e., "Reuse Policy"), an excerpt, in its current form, is
attached hereto as Exhibit"C".Developer shall require that this system be operated and maintained in accordance
with the rules and regulations of Utility, as well as all governmental agencies having jurisdiction over such
reclaimed water system, and all parcels lying within the Property are hereby so restricted.
45. All elements of the Florida Department of Environmental Protection rules and regulations
regarding the use of reclaimed water within the project will be adhered to at all times. This specifically pertains
to the Public Notice(posting of signs)provisions of the Florida Department of Environmental Protection rules
and regulations,as well as all specific requirements pertaining to the use of reclaimed water in public areas and
on roadways.
46. No wells shall be permitted within or upon the Property for any reason.
47. All irrigation contractors employed by Developer to install reclaimed water irrigation systems
within the Property shall be registered with Utility. The criteria for registration is included in Utility's Cross-
Connection Control Policy. Once registered, such irrigation contractor shall comply completely with Utility's
Cross-Connection Control Policy and Reuse Policy. Cross-connection control inspections will not be conducted
for irrigation contractors that are not registered with Utility.
48. The charges shown in paragraph 4(b), "Main Extension Charge — Water," "Main Extension
Charge—Wastewater," and "Main Extension Charge—Reclaimed Water" in the amount of$18,327.02, of this
Agreement, are refundable to Utility who previously paid for upsizing the water, wastewater, and reclaimed
water main extensions along Sandridge Road.
49. The charges shown on page 2, paragraph 4 (a)through (g) of this Agreement, are to assess the
charges for Kelli Grove as shown on the plans prepared by England-Thims&Miller,Inc.,(See Exhibit`B"),and
do not include any other developments (future additions, buildings and/or out parcel projects, etc.) that are
planned for this Property.
50. The construction of this project will not commence until Utility is in receipt of an executed
Agreement, the charges due from Developer stated herein are paid.
51. This Agreement will need to be executed by Developer, the charges paid (shown on page 2 of
Agreement),prior to October 1,2026,and the construction of the utilities shall be commenced prior to October 1,
2026,or this Agreement will be subject to any Service Availability charge increases currently approved,which
may be applicable or which may be approved by Utility's Board of Supervisors for the next fiscal year beginning
October 1,2026;and this Agreement is subject to any material cost increases which Utility may experience after
October 1,2026.
-12-
IN WITNESS WHEREOF,Developer and Utility have executed or have caused this Agreement,with the
named Exhibits attached, to be duly executed in several counterparts, each of which counterpart shall be
considered an original executed copy of this Agreement.
WITNESSES: DEVELOPER:
KELLI GROVE, LTD.,
a Florida limited partnership,
By: KELLI GROVE GP, LLC,
a Florida limited liability company,
its General Partner
By: VESTCOR, INC.,
a Florida corporation, its Manager
Witness: By: t., (Seal)
Print Na pare ,,* . es R. oover,Vice l(ArPresident
Witness: ! II--
Print Name: '�.l e* L-1 eP ler
STATE OF c Lo p d,\
COUNTY OF N1.V iy L
The foregoing instrument was acknowledged before me by means of❑x physical presence or D online
notarization,this 2-tctday of -Tune_ ,2026,by JAMES R.HOOVER,VICE PRESIDENT of
VESTCOR,INC.,a Florida corporation,MANAGER of KELLI GROVE GP,LLC,a Florida limited liability
company, GENERAL PARTNER of KELLI GROVE,LTD., a Florida limited partnership, on behalf of the
company,who is personally known to me or has produced ,as identification.
(1 1..C.l 0ff". .(6 �
Print Name: __ e — « _
Notary Public Notary Public State of Florida I
State of Florida at Large Rebecca•
L. White I
Iflyfi My Commission HH 499145 0
My Commission Expire Expires 3/23/2028
-13-
WITNESSES: UTILITY:
CLAY COUNTY UTILITY AUTHORITY
Witness: By: 1.i ,- \ - --v--�
Print Name: Andrew H Mitchell
Je,- D.iiihnsto ,P.E.,M.B.A.
(Corporate Seal)
Wit ess: 1 ` �'`
Prin a • Jma . rill
STATE OF FLORIDA
COUNTY OF CLAY
The foregoing instrument was acknowledged before me by means of❑physical presence or❑online
notarization this 3,4 day of YK r."t• , 2026, by JEREMY D. JOHNSTON, as EXECUTIVE
DIRECTOR of the CLAY COUNTY UTILITY AUTHORITY,who is personally known to me.
State of Florida , Print Name: Andrew H Mitchell
Notary Public
Andrew H Mitchell Notary Public
; , My Commission HH 730417 State of Florida at Large
UU" ExpirA51012512029
My Commission Expires: to/
Zs/zoa
9
•
KELLI GROVE MULTI-FAMILY—90 UNITS
2542 SANDRIDGE ROAD
Parcel Identification No. 23-05-25-010099-004-00
Official Records Book 5050,Page 1113, Clay County,Florida
EXHIBIT "A"
PARCEL 1:
Aparcel of land situated in the Southwest 1/4 of Section 23,Township 5 South,Range 25 East,Clay County,
Florida, said parcel being more particularly described as follows:
Commence at the Northwest corner of said Southwest 1/4; thence on the North line thereof, South 89
degrees 57 minutes 58 seconds East, 1325.14 feet to the East line of the West 1/2 of said Southwest 1/4;
thence on said East line,South 01 degree 45 minutes 42 seconds West,328.60 feet;thence North 89 degrees
58 minutes 50 seconds West, 396.29 feet to the point of beginning;thence South 01 degree 45 minutes 42
seconds West,593.55 feet to the North line of County Road No.739-B;thence on said North line,North 89
degrees 25 minutes 43 seconds West,546.93 feet to the East line'of State Road No.23;thence on said East
line,North 02 degrees 30 minutes 54 seconds East, 588.57 feet; thence South 89 degrees 58 minutes 50
seconds East, 539.32 feet to the point of beginning.
)(Mervice Availability\Developer Agreement Muter File\Developer Agreements\Old Jennings Road\Kelli Grove Multi Family 90 Units.jms.doc
Last printed 6/1/2026 4:47 FM
EXHIBIT "B"
DESCRIPTION OF APPROVED CONSTRUCTION PLANS
(Less and except plans to be replaced due to minor changes required)
Project: Kelli Grove
Engineer: Dallas D. Schrier,P.E.
England-Thims &Miller, Inc.
14775 Old St. Augustine Road
Jacksonville, Florida 32258
Date: October.2025
Engineer Description Latest
Drawing Engineer
Number Approved
Plan Date
1 Cover Sheet 10/08/2025
3 General Notes&Legends 10/08/2025
3 Demolition Plan 10/08/2025
4 Master Site Plan 10/08/2025
5A-5C Geometry Plan 10/08/2025
6 Pre-Development Drainage Plan 10/08/2025
7 Post Development Drainage Plan 10/08/2025
8A-8C Paving and Drainage Plan 10/08/2025
9A-9C Paving and Drainage Details 10/08/2025
10 Master Utility Plan 10/08/2025
11A-11C Water&Sewer Plan 10/08/2025
12A-12B Forcemain Directional Drill 10/08/2025
12C Watermain Directional Drill 10/08/2025
13 Private Lift Station Details 10/08/2025
S-SPA Standard Water and Sewer System Specifications 10/08/2025
WAT 01 Standard SCH80 PVC and Polyethylene Water Service Details 10/08/2025
WAT 02-
WAT 03 Standard Fire Hydrant and D.D.C.V Backflow Preventor Details 10/08/2025
WAT 04 CCUA Reclaimed Water RE-2 10/08/2025
S-SEW Standard Sewer System Details 10/08/2025
17-18 Sediment and Erosion Control Plan and Details 10/08/2025
19 Stormwater Prevention Plan 10/08/2025
20 Contractor's Certification 10/08/2025
21-22 Maintenance of Traffic Plan Details. 10/08/2025
L1-L3 Landscape Plan 10/08/2025
L4-L5 Landscape Details Plan 10/08/2025
I1-I3 Irrigation Plan 10/08/2025
I-4 Irrigation Details 10/08/2025
X:\Service Availability\1J vdoper Agreement Hasler File\Develuper Agrc m nts\Gld kmings Road\Kelli Grove MWti Family 90 Units j,m doe
Last printed 6/12026 4:47 PM
EXHIBIT "C"
REUSE POLICY
PAGE 1 OF 2
Effective Date- Thirty (30) days after Board's approval of the policy, for all developments that have not
met the filing requirements of the County's Zoning Department,which requires each new development to be
reviewed by the Development Review Committee (DRC), or for those developments not requiring DRC
approval,which have been quoted charges to connect to the Clay County Utility Authority's(CCUA)water
and/or wastewater systems within twelve months prior to the effective date of the reuse policy. A filing for
a DRC meeting,which is incomplete as of the effective date of this policy,shall not be considered as filed
timely for the prior policy to apply.
If the developer has not commenced substantial construction on his project, which was filed with
DRC prior to the effective date of this policy,within fifteen months after the effective date of the policy,
then said development shall come under the provisions of this policy.
Applicability - This policy will be applicable to all developments that file for a Development Review
Committee review after the effective date of this policy. This shall include:
A. Developments occurring under Development of Regional Impact(DRI)agreements which
may not be technically required to install residential reuse,but who choose to do so in settlement of minor
and/or major modifications to the structure and composition of developments within the DRI.These shall be
regulated and charged under this proposed policy and effective date criteria the same as all other
developments.
B. Exceptions to the applicability of this policy and/or effective date are as follows:
1. Developments occurring under DRI agreements or Florida Quality Development
(FQD) agreements, which are not required by said agreement to install residential
reuse and who do not volunteer to provide residential reuse piping systems.
2. Developments which, as of the date of enactment of this policy,own and maintain
their own reuse pumping plant and purchase bulk service from the CCUA.
3. Developments which have prepaid connection fees prior to January 1, 1998, at a
prior approved rate and still have an inventory of prepaid connections, shall be
exempt until such prepaid connections are used up.
4. Developments and/or communities that own, operate and maintain their own reuse
infrastructure as of January 1, 1998.
Developments Required to Install Wastewater Effluent Reuse Piping Systems and Take Reuse Water
When it is Available-All developments occurring after the effective date of this policy will be reviewed by
the CCUA staff for feasibility of the installation of a reuse piping system for irrigation purposes.These shall
include commercial,public facilities, industrial, as well as residential developments.
Summary of Criteria to be Utilized by Staff to Evaluate and Determine if Reuse Piping Systems will
be Required -
(1) Financial feasibility of extending a trunk main to an area at that time,or some planned future
date, to provide reuse water to the proposed reuse system. This item shall consider the size of the
development, distance to nearest master planned reuse trunk main or planned reuse plant, remaining
developable property in the area,complexity of existing development of area which trunk mains must pass
through, natural geographical barriers (or obstacles), environmental damage,etc.
X:\Service Availability1Descluper Agreement Master File\Devcloper Agreements\Old Jemtings RoadlKelli Grove Main Family 90 Units.jmsdoe
Last printed 6/12026 4:47 PM
EXHIBIT "C"
REUSE POLICY
PAGE 2 OF 2
(2) Remaining developable land in the area(new area with very little existing development and
much growth potential will be considered more feasible than an already built-out area).
(3) Availability of adequate reuse water within a reasonable time to service the reuse system.
(4) CCUA's budgetary restraints.
(5) Length of time before a reuse plant or pump station is expected to be built in the area.
Surcharge for Developments not required to Install Reuse Piping Systems - Due to the built-out
condition of certain geographical areas and the other evaluation of feasibility considerations noted above,it
will not be practical to require all areas to install reuse piping systems. All developments that are not
required to install the reuse system shall pay a surcharge per ERC as its share of the burden of the reuse
system installations at a rate set forth in the "proposed charges for service availability".
Requirement for Installation of an Automatic Sprinkler System-All developments where reuse piping
systems are required shall install or require the installation of an automatic sprinkler irrigation system
acceptable to CCUA for the development of each separate parcel(lot)within the development. Such on-site
systems shall utilize color-coded pipe for reuse water,functional rain sensors,and automatic controllers and
timers.
Approval of Sprinkler Irrigation Contractors - It is deemed by CCUA to be important that sprinkler
irrigation contractors,who connect to the reuse system,be thoroughly educated with regard to reuse systems
in an effort to eliminate any potential cross connection with the potable water system. In this regard, all
irrigation contractors installing irrigation systems in conjunction with this reuse program must prequalify
with CCUA by providing their credentials and passing a qualification interview with CCUA's staff for the
purpose of demonstrating knowledge of the key issues regarding use of reuse water. A current certificate of
insurance,acceptable to CCUA,naming the CCUA as an additional insured shall be on file at all times with
the CCUA.
Requirement for Payment of Reuse Base Facility Charge-All customer classes that have reuse piping
systems available shall be required to pay the Base Facility Charge for reuse water whether they use the
reuse water or not.
Requirement for Reuse Meter-All customer classes that have reuse piping systems available shall pay for
the installation of a reuse meter at the same time the domestic meter is requested.
Wells-All developments where reuse piping systems are installed shall prohibit the installation of wells for
irrigation purposes.
Responsibility for Design and Installation of Reuse Piping Systems -Where reuse piping systems are
required,the design engineer for the project shall design,at Developer's expense,the reuse piping system for
the development and any reasonable trunk mains necessary to connect to the nearest source of reuse water,
and developer shall install said system at its expense. The CCUA's existing policy regarding cost sharing for
oversized mains,refundable agreements,plan review and approval,and adherence to CCUA's specifications
and details,shall apply to these reuse piping systems,the same as the potable water distribution systems and
wastewater collection systems.
X:\Service Avuilubility\Dmveloper Agreement Muster FiletDeveloper Agreements\Old Jennings Road\Kclli Gruve Multi Fumily 90 Units.jms.doe
Last printed 6/12026 4:47 PM
'jot!JM
- BNB
W 7�V1�
c •�la 7QFERN CT1'
INC
lErz
MO J
le,,zL'.4...
1 it L
GOPHEF'1
.APPIF F.
Nam ii i`
I
III
AM
•
elli -Grove Multi-Family Nis I IREBRUSH I
90 Units at , j :,..
2542 Sandridge Road v l LN� .
—F . 1� �,
� I
III"
r
I=
il
1 /�
Q I1
1—
(n Is
cmi`•
t fmreYl.V'IIT ��-_
_--- --'i - -
lir`:'41.•1 L'�� Sj�0
�C•�.M.a1■1'H C N•
�` /141
WC :)BRIDGE
�. ioi J CINS;'C1
lir
1111/ \\ r .": :.C,
p' ".
LBELLA
Ile U
NA •
LL TRC •
I!, z ' — 11
I5 �� •♦ •
Disclaimer:The information displayed on this drawing or sheet is for a general visual representation purposes only.The drawing is based upon numerous sources of public
information which include but are not limited to Clay County Property Appraisers, FDOT, SJRWMD, and the Clay County Utility Authority's (CCUA)own records.All
information included in the drawing is general in nature and not site specific.Any cimensions or other information is approximate and needs to be field verified.CCUA does
not offer any guarantees,certifications,or warranties,either expressed or implied,in regards to the accuracy of the information represented on these drawings.The drawing
is not a survey and should not be construed in any manner as such.By receiving this drawing,the recipient is agreeing to hold CCUA harmless for any errors or omissions
which may be present in this&awing.All interested parties are strongly encouraged to engage a Professional Surveyor and Mapper licensed in the State of Florida to field
verify all site,property,infrastructure,and utility information-MT-1
to any decisions or actions.
r-1 - l - - I\ - / -
r-r-,,,:i
co If. Title:
.........
Clay County Utility Authority CCUA Web Map
3176 Old Jennings Road
i Info:
�IMiddleburg, Florida 32068-3907prepared by CCUAGIS Portalwater Features
'a Phone 904 272 5999ill■ Gravity Sewer Features
tti1312026,1:10:31 PM
1` Conservation.Commitment.Community Forced Sewer Features
/TYAUT 1 inch = 500 feet - Reclaimed Features