Loading...
HomeMy WebLinkAbout06.e.03 DA GC25.26-18 - Infrastructure for CR 15A Industrial Park Return to: - Clay County Utility Authority GC25/26-18 3176 Old Jennings Road Middleburg,Florida 32068-3907 WATER AND WASTEWATER INFRASTRUCTURE FOR COUNTY ROAD 15A INDUSTRIAL PARK (Green Cove System) Parcel No.: 38-06-26-016571-001-01 Name of Project Clay County DEVELOPER AGREEMENT This DEVELOPER AGREEMENT("Agreement"), made and entered into this Al..."" day of Sepk,brig- , 2026 by and between BUCKSHOT DEVELOPMENT,LLC, a Florida limited liability company, hereinafter referred to as "Developer," and CLAY COUNTY UTILITY AUTHORITY, an independent special district established under Chapter 94-491, Laws of Florida, Special Acts of 1994, hereinafter referred to as "Utility." WHEREAS,Developer owns or controls lands located in Clay County,Florida,and described in Exhibit "A," attached hereto and incorporated herein by reference (hereinafter"Property"); WHEREAS, Developer desires that the Utility provide central potable water, pumping,treatment, and distribution service; central wastewater collection, treatment, and disposal service for the Property; WHEREAS,the Utility is willing to provide, in accordance with the provisions of this Agreement, central water and wastewater service to the Property and thereafter operate applicable facilities so that the occupants of the improvements on the Property will receive adequate potable water and wastewater water service from the Utility; and WHEREAS,the parties wish to enter into this Agreement setting forth their mutual understandings and undertakings regarding the furnishing of potable water and wastewater service by the Utility to the Property. NOW, THEREFORE, for and in consideration of the premises, the mutual undertakings and agreements herein contained and assumed, Developer and Utility hereby covenant and agree as follows: 1. The foregoing statements are true and correct. 2. The following definitions and references are given for the purpose of interpreting the terms as used in this Agreement and apply unless the context indicates a different meaning: (a) "Consumer Installation"-All facilities ordinarily on the consumer's side of the point of delivery. (b) "Contribution-in-Aid-of-Construction(CIAC)"-The sum of money and/or the value of property represented by the cost of the wastewater collection system, potable water distribution system, and reclaimed water distribution system constructed or to be constructed which Developer or owner transfers,or agrees to transfer,to Utility,if so designated by the Utility,at no cost to Utility to provide utility service to the Property. -2- (c) "Equivalent Residential Connection(ERC)" -A factor expressed in gallons per day (GPD)which is used to convert a given average daily flow(ADF)to the equivalent number of residential connections. For this purpose the average daily flow of one potable water ERC is (450) GPD, one wastewater ERC is (311) GPD, and one reclaimed water ERC is (275) GPD. (d) "Point of Delivery"-The point where the pipes or meter of Utility are connected with the pipes of the consumer. Point of delivery for potable water service and reclaimed water service shall be at the consumer's side of the meter and for wastewater service at the lot or property line. Utility shall, according to the terms and conditions hereof,own all pipes and appurtenances to the point of delivery unless otherwise agreed. The pipes and appurtenances inside the point of delivery shall belong to others. (e) "Service" - The readiness and ability on the part of Utility to furnish and maintain potable water,reclaimed water,and wastewater service to the point of delivery for each lot or tract pursuant to rules and regulations of applicable regulatory agencies. 3. Assurance of Title- Developer represents and warrants that Developer is the owner of the Property and has the legal right to grant the exclusive rights of service contained in this Agreement. Upon request, Developer agrees to deliver to Utility evidence of such ownership including any outstanding mortgages,taxes, liens, and covenants. 4. Connection Charges-In addition to the contribution of any wastewater collection systems, potable water distribution systems, and reclaimed water systems where applicable, and further to induce Utility to provide potable water,reclaimed water,and wastewater service,Developer hereby agrees to pay to Utility the following fees and charges, as defined in the Rate Resolution (including Service Availability Policy),upon execution of this Agreement in order to reserve capacity in the System: (a) Potable Water Capacity Charge: ($476.93 x 0.00 ERCs) $ N/A * Alternative Water Supply Surcharge: ($411.64 x 0.00 ERCs) $ N/A * SJWMD Black Creek Water Resource Charge: ($102.40 x 0.00 ERCs) $ N/A * Wastewater Capacity Charge: ($4,345.34 x 0.00 ERCs) $ N/A * Environmental Impact Charge: ($317.95 x 0.00 ERCs) $ N/A * (b) Debt Service Charge: ($191.00 x 0.00 ERCs) $ N/A * (c) Main Extension Charge- Potable Water $ N/A Main Extension Charge-Wastewater $ N/A (d) Meter Installation Charge $ N/A (e) Plan Review Fee $ 885.50 ** (f) Inspection Fee $ 925.51 ** (g) Recording Fee $ 137.36 Total $ 1,948.37 * - The Property is being developed as an industrial park and usage/demands of each industrial parcel is not known at this time.A separate Developer Agreement will be prepared to assess the appropriate capacity charges as each commercial development is constructed in the future. ** - The "Plan Review Fee" and "Inspection Fee" are assessed specifically for the utility infrastructure for the project, in accordance with the plans shown on Exhibit "B," attached hereto. Note: Items(e) and(f) are estimates and are subject to adjustment based on actual cost incurred. -3- Payment of the above charges does not and will not result in Utility waiving any of its rates or rules and regulations,and their enforcement shall not be affected in any manner whatsoever by Developer making payment of same. Except as specifically stated,Utility shall not be obligated to refund to Developer any portion of the value of the above charges for any reason whatsoever nor shall Utility pay any interest upon the above charges paid. Except as otherwise stated in this Agreement, neither Developer nor any person or other entity holding any of the Property by,through or under Developer,or otherwise,shall have any present or future right,title, claim or interest in and to the charges paid or to any of the potable water, reclaimed water,`or wastewater facilities and properties of Utility,and all prohibitions applicable to Developer with respect to no refund of such charges,no interest payment on said charges and otherwise, are applicable to all persons or entities. Paid capacity or connection charges may not be applied to offset any service bill or other claims of Utility. 5. On-Site Installations - On-site facilities are those located within the Property for which Developer is requesting service. Developer shall convey to Utility, if so designated by Utility, all on-site water and wastewater lines, laterals, mains, lift stations, pump stations and appurtenant facilities (collectively referred to as "Components" or "On-Site System") on the Property with all contractual guarantees relating thereto. Conveyance shall take place within a reasonable time after installation of the On-Site System but prior to Utility's obligation to provide service. Until such time as the On-Site System is conveyed, the same shall be operated and maintained by Developer. In its sole discretion, Utility may decline to accept the On-Site System,may lease the On-Site System from Developer,or agree to such other arrangement as it deems appropriate. Utility shall have the right and obligation,at the Developer's expense,to construct and/or approve the construction of the on-site installations which shall be owned and maintained by Utility,if so designated by Utility. The Utility shall also have the right to review all plans and specifications,connections to its system and the Developer shall pay a fee equal to the Utility's actual cost to review such plans and specifications. The Utility shall have the right to inspect all phases of construction undertaken by outside contractors for facilities which are to be owned by the Utility,if so designated by Utility. The Developer will reimburse the Utility for its costs for such inspection, including all overhead associated with same. Where on-site temporary pump stations or backflow prevention devices are required,they shall be paid for one hundred percent (100%) by the Developer without any provision for refund. Utility reserves the right to require backflow prevention devices on all potable water service connections. Developer shall guarantee Utility against defects in material and workmanship for the portion of the On-Site System to be owned by the Utility or County, if so designated by Utility. Developer shall secure from its contractor a written and fully assignable warranty that the system installed will be and remain free from all defects,latent or otherwise,with respect to workmanship,materials and installation in accordance with Utility-approved plans and specifications, for a period of two (2) years from the date of the system acceptance by the Utility,and immediately assign the same and the right to enforce the same to the Utility on or before such date. The Developer shall provide the Utility, at the Developer's sole expense, a maintenance bond or other form of security acceptable to the Utility in an amount equal to ten percent (10%) of the project's schedule of values detailing the infrastructure being dedicated to the Utility.Such bond or security shall,by its express terms, protect and indemnify the Utility against any loss, damage, costs, claims, debts, or demands arising from defects,whether latent or otherwise, in the dedicated system. -4- This security shall remain in effect for a period of two(2)years from the date of the Utility's formal acceptance of the system.The Utility reserves the right to require security in excess of ten percent(10%)if deemed necessary to adequately protect the Utility from potential liabilities associated with warranty defects. In addition to any other promises,guarantees or warranties to be provided by Developer to the Utility hereunder,Developer agrees to protect and indemnify Utility against any loss,damage,costs,claims,debts or demands by reason of defects,latent or otherwise, in the system which could not have been reasonably discovered upon normal engineering inspection,to be and remain in effect for a period of two(2)years from the date of the system's acceptance by Utility. Developer agrees to transfer to Utility,if so designated by Utility,title to all water distribution and wastewater collection systems installed by Developer or Developer's contractor,which the Utility has agreed shall be owned and maintained by it pursuant to the provisions of this Agreement and shall: (a) Deliver a Bill of Sale and No Lien Affidavit in a form acceptable to Utility for such potable water distribution,reclaimed water distribution, and wastewater collection systems. (b) Provide copies'of invoices and Release of Liens from contractor for installation of the utility systems as well as for any repairs to the Systems which may have been caused by other subcontractors during construction. (c) Assign any and all warranties and/or maintenance bonds as set forth herein. (d) Provide all operations, maintenance, and parts manuals, as-built plans complying with Utility's specifications, and other documents required for operation of the utility system. (e) Convey to Utility, if so designated by Utility, easements and/or rights-of-way covering all areas in which potable water,reclaimed water, and wastewater systems are installed,with adequate legal access to same,by recordable document satisfactory to Utility. (f) Convey to Utility,if so designated by Utility,by recordable document in form satisfactory to Utility,fee simple title to lift station and pump station sites,along with recordable ingress/egress easement documents. (g) Provide a copy of the Project Engineer's final certification of completion to the Florida Department of Environmental Protection certifying installation of all potable water and wastewater facilities in accordance with approved plans. 6. Off-Site Installations - Developer shall further construct all transmission mains, pump stations,and appurtenant facilities necessary to connect the On-Site System to the nearest appropriate point in Utility's transmission system,as determined by Utility. Utility may require Developer to oversize off-site transmission mains and appurtenant facilities in a manner consistent with Utility's Wastewater System Master Plan. The costs associated with the construction'of over-sized facilities which provide Utility with excess capacity for the benefit of other properties may be subject to refundable advance treatment pursuant to Utility's Service Availability Policy. The same construction standards,warranty requirements,maintenance bond requirements, transfer of title by Bill of Sale, and indemnification requirements, as provided under paragraph 5 of this Agreement, shall also apply to the Off-Site installations. -5- 7. Agreement to Serve - Upon the completion of construction of the On-Site and Off-Site Facilities by Developer, or an appropriate phase thereof, and compliance with the terms and conditions of this Agreement and Utility's Service Availability Policy, Utility will allow connection or oversee the connection of the wastewater collection facility,potable water distribution facility installed by Developer to the central facilities of Utility in accordance with all rules, regulations, and orders of the applicable governmental authorities. Utility agrees that once it provides potable water and/or wastewater service to the customers within the Property it will continuously provide such service, at its cost and expense, but in accordance with the other provisions of this Agreement, the then current Rate Resolution in effect for Utility, and the requirements of the governmental authorities having jurisdiction over the operations of Utility. Utility shall not be liable for any temporary interruptions in service as a result of equipment failure, emergencies, or Acts of God. The covenants and agreements of Developer contained in Paragraphs 5,6,and 7 hereof shall survive Utility's acceptance of any On-site and Off-site Facilities and Utility's commencement of service to the Property. Should any such covenant or agreement of Developer in fact be outstanding following either or both of such dates,then,notwithstanding any contrary provision contained herein,Utility may,upon thirty (30)days advance written notice and demand for cure mailed to Developer,temporarily interrupt service to the Property until such outstanding covenant or agreement of Developer is satisfied in full. Utility shall not be liable for any temporary interruptions in service as a result of any action authorized or permitted by this paragraph. 8. Application for Service - Developer, or any owner of any parcel of the Property, or any occupant of any residence,building,or unit located thereon shall not have the right to and shall not connect any consumer installation to the facilities of Utility until formal written application has been made to Utility by the prospective user of service, or either of them, in accordance with the then effective rules and regulations of Utility and approval for such connection has been granted. 9. Easements -Developer hereby grants and gives to Utility, its successors, and assigns, but subject to the terms of this Agreement, the exclusive right or privilege to construct, own, maintain, and operate the potable water and wastewater facilities to serve the Property in,under,upon,over and across the present and future streets, roads, alleys, utility easements, reserved utility strips and utility sites. Mortgagees, if any,holding prior liens on the Property shall be required to release such liens, subordinate their position or join in the grant or dedication of the easements or rights-of-way,or give to Utility assurance by way of a"non-disturbance agreement,"that in the event of foreclosure,the mortgagee would continue to recognize the easement rights of Utility. All potable water and wastewater collection facilities, save and except installations owned by Developer or its successors or assigns, shall be covered by easements or rights-of-way if not located within platted or dedicated roads or rights-of-way for utility purposes,and there shall be adequate legal access to same. The use of easements granted by Developer to Utility shall not preclude the use by other utilities of these easements,such as for cable television,telephone,electric,or gas utilities. However,the use of such non-exclusive easements by third parties shall not interfere with Utility's utilization of same. Utility hereby agrees that all easement grants will be utilized in accordance with the established and generally accepted practices of the potable water and wastewater industry with respect to the installation of all its facilities in any of the easement areas. -6- 10. Utility's Exclusive Right to Utility Facilities-Developer agrees with Utility that all potable water and wastewater facilities accepted by Utility in connection with providing potable water and wastewater services to the Property shall at all times remain in the sole,complete and exclusive ownership of Utility, and any person or entity owning any part of the Property or any residence, building or unit constructed or located thereon,shall not have any right,title,claim or interest in and to such facilities or any part of them, for any purpose, including the furnishing of potable water and wastewater services to other persons or entities located within or beyond the limits of the Property. 11. Exclusive Right to Provide Service-Developer shall not engage in the business of providing potable water services or sanitary wastewater services to the Property during the period of time Utility provides water and wastewater services to the Property. Utility shall have the sole and exclusive right and privilege to provide water and wastewater services to the Property and to the occupants of such residence, building, or unit constructed thereon. 12. Rates-Utility agrees that the rates to be charged to Developer and individual consumers of water and wastewater services shall be those set forth in the then-current Rate Resolution most recently adopted by the Board Supervisors of the Clay County Utility Authority as may be amended from time to time.However,notwithstanding any provision in this Agreement,Utility,its successors, and assigns may establish,amend,or revise,from time to time in the future,and enforce in a reasonable manner the rates or rate schedule so established. Notwithstanding any provision in this Agreement,Utility may establish,amend,or revise,from time to time, in the future and enforce rules and regulations covering water and wastewater services to the Property.However, all such rules and regulations so established by Utility shall at all times be'reasonable and subject to such regulations as may be provided by law or contract. 13. Quality of Wastewater-All commercial facilities which discharge non-domestic type wastes into the Utility's collection system are required to meet the requirements of Resolution 2025/2026-05 (Pretreatment Resolution) with regard to waste quality. In addition, facilities with photographic development operations may be required to install and maintain a silver recovery unit in order to meet the requirements of this resolution. Discharge of floor finish stripper products and waste to the collection system requires an Industrial Pretreatment Permit issued by Utility. Developer, tenant or the Property/project owner or Lessor must inform Utility of its intent to discharge any floor finish stripper product and waste. Upon notification, a permit application will be sent to Developers, tenant or the Property/project owner or Lessor to be completed and submitted to Utility for processing. A permit fee is not required by Utility for an Industrial Pretreatment Permit. Failure to follow these procedures may result in termination of water and wastewater service. 14. Binding Effect of Agreement-This Agreement shall be binding upon and shall inure to the benefit of Developer, Utility and their respective assigns and successors by merger, consolidation, conveyance or otherwise. Prior to Developer's acquisition of title to the Property, any assignment or transfer by Developer shall be subject to Utility approval which shall not be unreasonably withheld provided the assignee or transferee shall acknowledge in writing that it assumes the duties and responsibilities of Developer as set forth in this Agreement. 15. Notice - Until further written notice by either party to the other, all notices provided for herein shall be in writing and transmitted by messenger,by mail,or by electronic mail,and if to Developer, shall be mailed or delivered to Developer at: Buckshot Development,LLC Attn.: Mr. George Petty 4410 Industrial Park Road • Green Cove Springs,Florida 32043 -l- and if to the Utility at: Clay County Utility Authority 3176 Old Jennings Road Middleburg, Florida 32068-3907 or such other address as specified in writing by either party to the other. 16. Laws of Florida-This Agreement shall be governed by the laws of the State of Florida and it shall be and become effective immediately upon execution by both parties hereto,subject to any approvals which must be obtained from governmental authority, if applicable. 17. Costs and Attorney's Fees-In the event the Utility or Developer is required to enforce this Agreement by court proceedings, by instituting suit or otherwise, then venue shall lie in Clay County, Florida,and the prevailing party shall be entitled to recover from the other party all cost incurred,including reasonable attorney's fees. 18. Force Majeure - In the event that the performance of this Agreement by either party is prevented or interrupted in consequence of any cause beyond the control of either party,including,but not limited to acts of God or of the public enemy,war,national emergency,allocation or of other governmental restrictions upon the use or availability of labor or materials,civil disorder,strike,embargo,natural disaster or catastrophe, unforeseeable failure or breakdown of transmission, treatment or other facilities, governmental rule, act, order, restriction, regulation, statute, ordinance, or order, decree, judgment, restraining order or injunction of any court, said party shall not be liable for such non-performance. 19. Indemnification - Developer agrees to indemnify and hold the Utility harmless from and against any and all liabilities,claims,damages,costs and expenses(including reasonable attorney's fees)to which it may become subject by reason of or arising out of Developer's performance of this Agreement. This indemnification provision shall survive the actual connection to Utility's potable water, reclaimed water, and wastewater systems. MISCELLANEOUS PROVISIONS 20. The rights,privileges,obligations and covenants of Developer and Utility shall survive the completion of the work of Developer with respect to completing the facilities and services to any development phase and to the Property as a whole. 21. This Agreement supersedes all previous agreements or representations, either verbal or written, heretofore in effect between Developer and Utility, made with respect to the matters herein contained,and when duly executed,constitutes the agreement between Developer and Utility. No additions, alterations or variations of the terms of this Agreement shall be valid,nor can provisions of this Agreement be waived by either party,unless such additions,alterations,variations or waivers are expressed in writing and duly signed by both parties. 22. Whenever the singular number is used in this Agreement and when required by the context, the same shall include the plural, and the masculine, feminine and neuter genders shall each include the others. 23. Whenever approvals of any nature are required by either party to this Agreement,it is agreed that same shall not be unreasonably withheld or delayed. -8- 24. The submission of this Developer Agreement for examination by Developer does not constitute an offer but becomes effective only upon execution thereof by Utility and Developer. 25. Failure to insist upon strict compliance of any of the terms,covenants,or conditions herein shall not be deemed a waiver of such terms,covenants,or conditions,nor shall any waiver or relinquishment of any right or power hereunder at any one time or times be deemed a waiver or relinquishment of such right or power at any other time or times. 26. It is because of inducements offered by Developer to Utility that Utility has agreed to provide potable water and wastewater services to Developer's project.Capacity reserved hereunder cannot and shall not be assigned by Developer to Third Parties without the written consent of Utility,except in the case of a bona-fide sale of Developer's Property. 27. Utility shall, as aforesaid, at all reasonable times and hours,have the right of inspection of Developer's internal lines and facilities. This provision shall be binding on the successors and assigns of the Developer. 28. The parties hereto recognize that prior to the time Utility may actually commence upon a program to carry out the terms and conditions of this Agreement,Utility may be required to obtain approval from various state and local governmental authorities having jurisdiction and regulatory power over the construction,maintenance,and operation of Utility. The Utility agrees that it will diligently and earnestly make the necessary proper applications to all governmental authorities and will pursue the same to the end that it will use its best efforts to obtain such approval. Developer agrees to provide necessary assistance to Utility in obtaining the approvals provided for herein. Upon execution of this Agreement, Utility may require the payment of a reasonable fee to defray Utility's legal,engineering,accounting,administrative,and contingent expense. 29. It shall be Developer's responsibility or Developer's customers'responsibility,utilizing the project's potable water and wastewater service within Developer's project, to apply to Utility for service after the installation of the potable water and wastewater utilities have been completed and accepted by Utility. Upon completion of application for potable water, wastewater and reclaimed water services and payment of the appropriate charges set forth in Utility's then current applicable Rate Resolution,including any security deposits required, service will be initiated to customers within Developer's Property. 30. It shall be Developer's responsibility to provide acceptable as-built drawings of the potable water and wastewater systems installed by Developer,in accordance with Utility's standard specifications, details, and notes, which are to be accepted by Utility for ownership and maintenance, as set forth in paragraph 5(d)herein;and it is understood and agreed that Utility's charges associated with the review and quality assurance of the CAD as-built survey drawings will be paid directly by Developer's licensed underground utility contractor and shall be provided in accordance with CCUA's"As-built Specifications Standards Manual," which can be obtained from the Utility's website (www.clayutility.org). It shall be Developer's responsibility to properly instruct his contractor to contact Utility for an estimate of such charges and clarification of the required as-built drawing procedures. 31. Developer shall not place any conservation easements over any of the easement lands that contain Utility's water or wastewater facilities for the project covered by this Agreement. -9- 32. Developer shall grant an easement to Utility covering any portion of the potable water and wastewater facilities that Utility agrees to own and maintain, and Developer shall be responsible for providing the legal description for such easement to Utility.In addition,this Agreement is contingent upon the execution of the Grant of Easement document. 33. It shall be Developer's specific responsibility to provide all close-out documents,easements, etc.,that are necessary to legally convey title or property rights to the water and wastewater utilities installed within the parcel described in Exhibit "A", for which Utility agrees to assume ownership or requires that Utility assumes ownership. This includes any documents required to be signed by the owner of this portion of the Property. 34. The landscaping(new or existing)for this project shall not include the planting of any trees within seven and one-half feet(7 ft.6 in.)of any of the water and wastewater mains. In the alternative,it is understood and agreed by Developer and Utility that Developer shall provide a root barrier,satisfactory to Utility,around the roots of all landscaping,trees,shrubs,etc.,that are planted within the road right-of-ways that will potentially impact any of the utilities covered by this Agreement. 35. The road cross-section,utility placement,and sidewalk placement used within the street and right-of-ways shall be consistent with those layouts established by Utility in cooperation with other utilities and the Clay County Engineering Department. Any variance from these standard layouts shall be communicated by Developer to all utilities requiring facilities in the right-of-way and the Clay County Engineering Department and shall be approved by all such utilities and agencies prior to commencement of construction. 36. The charges shown in paragraph 4 (a) through (g) of this Agreement cover only the infrastructure for water and wastewater service to County Road 15A Industrial Park, in accordance with the plans shown on Exhibit"B,"attached hereto and by reference made a part hereof and does not include any of the commercial developments (future buildings, additions, etc.) that are planned for this Property. A separate agreement will be prepared for the additional requirements of each future development on the Property when such development is initiated. 37. Developer shall connect to Utility's existing 12-inch water main at the location shown on the final approved plans prepared by Brian Kent Bush,PE,of IME Civil and Surveying,as described in Exhibit "B",which are acceptable to Utility. All facilities shall be installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all of the requirements of Utility in accordance with Utility's standards and specifications and shall,prior to Utility's acceptance for ownership and maintenance. Utility shall own and maintain the potable water infrastructure constructed under this Agreement, beginning at the connection point to Utility existing water system and extending through the distribution system to the downstream side of each future service meter location, as described on the Utility approved construction plans, entitled County Road 15A Industrial Park, prepared by Brian Kent Bush, PE, of IME Civil and Surveying, as described in Exhibit `B", Project No. 070623.4. dated July 29, 2026, as may be revised and approved by Utility.All service lines, customer plumbing,irrigation systems,and appurtenant facilities located beyond the downstream side of each meter shall remain privately owned and maintained by the applicable property owner. 38. Developer shall install or have installed a reduced pressure zone (RPZ) type backflow prevention device which shall be located immediately downstream of each potable water meter,which are proposed to service Developer's facilities and such installation shall be in compliance with the requirements of the Florida Department of Health and Rehabilitative Services and Utility. -10- Upon the completion of the installation of said devices, Developer shall provide to Utility for its permanent records the Make,Model,Size and Serial Number of said devices. Furthermore,these devices must be tested and recertified by a certified backflow preventer technician,annually or such other period as may be required by Utility. Proof of the annual testing and recertifications must be submitted to Utility for its records. These installations and annual recertifications shall be the responsibility of the Developer or its successors and assigns. Utility shall have access to the water meters, during normal business hours, for meter reading and maintenance purposes. 39. Connection to Utility's existing 4-inch wastewater force main and the construction of the force main extension shall be installed by Developer's State of Florida Licensed Underground Utility Contractor and shall meet all of the requirements of Utility prior to Utility's acceptance for ownership and maintenance.Utility shall own and maintain the tap through the Developer's point of connection,as shown on the approved plans titled'County Road 15A Industrial Park,prepared by Brian Kent Bush,PE, of IME Civil and Surveying, as described in Exhibit`B", Project No. 070623.4, as described in Exhibit"B."All wastewater mains,service lateral lines,and the private lift stations servicing Developer's property,which are located upstream of Developer's connection point, shall'be Developer's responsibility for ownership and maintenance. 40. The wastewater connection point being constructed is a pressure force main connection point and will require the Developer's installation and maintenance of a duplex grinder pump station and piping capable of pumping Developer's flow at each development parcel at the required pressure condition, and connection of said piping to Utility's system at the valve box within Utility's proposed easement,in order for Developer's flow to be pumped into Utility's system for treatment and disposal. In addition, Developer hereby agrees to install and maintain a Flowmatic ball check valve, Model 508 (epoxy coated cast iron body), at each development parcel on the discharge side of the Developer's duplex grinder pump station. The Flowmatic ball check valve shall be placed in a protective valve box with a lid. The check valve and valve box shall be positioned on a horizontal segment of pipe at least two linear feet outside of the grinder pump station. Prior to the start-up of the duplex grinder pump station,Developer will be required to pull the grinder pumps for Utility's inspection to ensure the proper grinder pumps and check valves have been provided. If the proper grinder pumps and check valves have been provided, the system start-up will be allowed to proceed. If not, Developer shall correct the pump station and check valve and call for a follow-up inspection. An additional service charge will be assessed for the follow-up inspection. 41. Developer will own and maintain the private pumping stations and check valves on each parcel, and in the event of an electrical power outage, it shall be Developer's responsibility to provide backup power,if continuous service is desired. Utility is in no way responsible for damages or injury,either directly or indirectly,related to sanitary sewage overflows, spills or stoppages related to loss of electrical power or any malfunction of the privately owned facilities. 42. This Agreement does not include any other phases or developments planned for this Property. A separate agreement will be entered into when these developments are initiated. 43. All water and wastewater installations/connections shall be in accordance with the plans prepared by IME Civil & Surveying, Project No. 070623.4, titled County Road 15A Industrial Park, as described in Exhibit`B,"or as modified in a manner acceptable to Utility. -11- 44. The construction of this project will not commence until receipt by Utility of all necessary permits and easements, and this Agreement is executed, and the charges stated herein are paid. 45. This Agreement will need to be executed by Developer,the charges paid(shown on page 2 of Agreement), prior to October 1, 2026, and the construction of the utilities for this total project shall be commenced by October 1, 2026, or this Agreement will be subject to any Service Availability charge increases currently approved, which may be applicable or which may be approved by Utility's Board of Supervisors for the next fiscal year beginning October 1,2026;and this Agreement is subject to any material cost increases which Utility may experience after October 1, 2026. [Signatures Begin Next Page] -12- IN WITNESS WHEREOF, Developer and Utility have executed or have caused this Agreement, with the named Exhibits attached, to be duly executed in several counterparts, each of which counterpart shall be considered an original executed copy of this Agreement. WITNESSES: DEVELOPER: BUCKSHOT DEVELOPMENT LLC., a Florida limited liability company `Witness: By: 6- � ' Print Name: i(- (2e) George R. Petty,Manager Witness. � Print ame: €'.0 r.\,..6.p.— STATE OF 1.-L COUNTY OF C,l Q&V\ The foregoinf hnstrumen as ack 2wledged before me by means of 0 physical presence or❑online notarization this? day of _ , 2026, by GEORGE R. PETTY, as MANAGER of BUCKSHOT DEVELOPMENT,LL ,a Florida limited liability company,who is personally known to me or has produced , as identification. rint tiie. h i i_C , KY?in i1i Notary Pu 'c State of L at Large My Commission Expires: OSppV P�j -N ,;, _ CHRISTINE MOORE r"-- " MY COMMISSION#HH 448156 „,,.. .f, EXPIRES:January 26,2028 r -13- WITNESSES: UTILITY: CLAY COUNTY UT •UTHORITY Witness: By: Print Name: An rew H Mitchell e y D. rsto r P.E.,M.B.A. ec _' - _I -ector Witness: Print Name: (,l f 5' c/ (Corporate Seal) STATE OF FLORIDA COUNTY OF CLAY • The foregoing instrument was acknowledged before me by means of❑x physical presence or❑online notarization this 29 " day of Si Pkv , 2026 by JEREMY D. JOHNSTON, as EXECUTIVE DIRECTOR of the CLAY COUNTY UTILITY AUTHORITY,who is personally known to me. 4 Notary Public State of Florida ► Print Name: Andrew H Mitchell o Andrew H Mitchell My Commission HH 730417 i Notary Public 1 Expires 10/25/202s I State of Florida at Large My Commission Expires:i p a 9 WATER AND WASTEWATER INFRASTRUCTURE FOR COUNTY ROAD 15A INDUSTRIAL PARK Parcel Number No.: 38-06-26-016571-001-01 EXHIBIT"A" PART OF LOTS 4 AND 6 OF BLOCK 40,SITUATE. LYING AND BEING EAST OF COUNTY ROAD NO.15-A (FORMALLY STATE ROAD NO.3, AND U.S. HIGHWAY NO. 17)AND BEING PART OF THE GEORGE I. F. CLARKE GRANT, ACCORDING TO THE GOULD T. BUTLER PLAT, AND BEING IN SECTION 38, TOWNSHIP 6 SOUTH, RANGE 26 EAST, CLAY COUNTY, FLORIDA; TOGETHER WITH A PART OF SECTION 17, BLOCK 35,GOULD T, BUTLER PLAT OF BAYARD TRACT,PLAT BOOK 1, PAGES 31,32,33 AND 34,ALSO DESCRIBED AS NORTH 1/2 OF LOT 17 AND ALL OF LOT 18,BLOCK 27 SMITHS PLAT OF BAYARD TRACT,RECORDED IN DEED BOOK"J",PAGES 273 AND 234;TOGETH ER WITH A PORTION OF BLOCK 35 CLINTCH ESTATE,ACCORDING TO PLAT BOOK 1, PAGES 31, 32,33, 34, OF THE PUBLIC RECORDS OF CLAY COUNTY, FLORIDA;ALL BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGIN AT THE INTERSECTION OF THE SOUTH LINE OF SECTION 17,WITH THE EAST LINE OF SAID LOT 4;THENCE ON SAID EAST LINE,N 16°18'01"W,67.14 FEET;THENCE S 71°51'14"W,521.85 FEET TO THE EAST LINE OF SAID COUNTY ROAD NO.15-A;THENCE ON SAID LINE, RUN THE FOLLOWING TO COURSES(1)N 21°40'20"W,319.09 FEET;(2)ON THE ARC OF CURVE CONCAVE EASTERLYAND HAVING A RADIUS OF 1859.86 FEET,AN ARC LENGTH OF 300.22,SAID ARC BEING SUBTENDED BY A CHORD BEARING AND DISTANCE OF N 17°02'52"W, 299.89 FEET; THENCE 64°03'08" E, 1913.08 FEET TO THE EAST LINE OF SAID SECTION 17;THEN ON SAID LINE,S 15°23'12"E, 1000.00 FEET TO THE SOUTHEAST CORNER OF SAID SECTION17,THENCE ON THE SOUTH LINE OF SAID SECTION 17, S 74°11'43"W, 1314.77 FEET TO THE POINT OF BEGINNING. SAID LANDS SITUATED, LYING AND BEING IN CLAY COUNTY, FLORIDA EXHIBIT "B" DESCRIPTION OF APPROVED CONSTRUCTION PLANS (Less and except plans to be replaced due to minor changes required) Project: County Road 15A Industrial Park Engineer: Brian Kent Bush, P.E. IME Civil& Surveying 1870 County Road 214 St.Augustine,FL 32084 Project No.: 070623.4 Project Date: January 21, 2026 Engineer Drawing Description Latest Number Engineer Approved Plan Date C-01 Cover Sheet 08/20/2026 C-02 General Notes 08/20/2026 Existing Conditions Survey , 08/20/2026 C-04.1 —C-04.2 Water Plan 08/20/2026 C-05.1 —C-05.2 Sewer Plan 08/20/2026 C-06.1 —C-06.4 Water Details 08/20/2026 C-07 Sewer Details 08/20/2026 �NN \ 7111W 4F. . II 073 S SSMc ROAD 23 IIlppo. s ,JN 1 NSTATF 10 s °aD KpVlk C1 STATER 10% ,11 :11101111111, 01. 11, Infrastructure only for ' CR 15A Industrial Park. , 1110 1 0 • o Z 5-------- �op�aERpA`Z \' M �RL1N PSG 229 // 4 -It-tot c S v s � � ev...;r \ 1 Ij� toot r2 ,00v P�Op.1RY p Now Ill► cv-sri J RPS3 '11 *714 N.'s liCe �,,,01.z�;�� . liI i Z• r'TTh. ; D Disclaimer:The information displayed on this drawing or sheet is for a general visual representation purposes only.The drawing is based upon numerous sources of public information which include but are not limited to Clay County Property Appraisers, FDOT, SJRWMD, and the Clay County Utility Authority's (CCUA)own records.All information included in the drawing is general in nature and not site specific.Any cimensions or other information is approximate and needs to be field verified.CCUA does not offer any guarantees,certifications,or warranties,either expressed or implied,in regards to the accuracy of the information represented on these drawings.The drawing is not a survey and should not be construed in any manner as such.By receiving this drawing,the recipient is agreeing to hold CCUA harmless for any errors or omissions which may be present in this&awing.All interested parties are strongly encouraged to engage a Professional Surveyor and Mapper licensed in the State of Florida to field verify all site,property,infrastructure,and utility information prior to any decisions or actions. I yr,<, // /I --•` I CCUA ("-C1C01);\ " Title: ___\` Clay County Utility Authority CCUA Web Map 3176 Old Jennings Road i Info: � Middleburg, Florida 32068-3907 prepared by CCUA GIS Portal water Features 'a Phone 904 272 5999 ill■ Gravity Sewer Features \t 9/24/2026,4:50:00 PM - Forced Sewer Features Conservation.Commitment.Community �TYAUTN� 1 inch = 1,000 feet - Reclaimed Features