HomeMy WebLinkAbout09.b EDB Amend No. 1 to SA No. 1 TetraTech NClayRWPipelines EXECUTIVE SUMMARY AGENDA ITEM: Change Order No. 1 to Supplemental Agreement No. 1 with Tetra Tech, Inc., for the Civil and Environmental Engineering Professional Services Agreement RFQ 2023/2024-A01 to provide Professional Engineering Services to construct new Reclaimed Main Extensions in the Northern Clay County area. CCUA Project No.: 2025-094 CCUA Financial Job No.: 25022WL Date: September 28,2026 CCUA staff requests Board of Supervisors approval to execute Change Order No. 1 to Supplemental Agreement No. 1(SA 1)with Tetra Tech,Inc.to provide additional professional services for the design,bid,and construction administration for the"North Clay Reclaimed Transmission Mains"project. BACKGROUND: The Board of Supervisors approved SA1 with Tetra Tech,Inc.at the December 2,2025,meeting.Under Change Order No. 1 to SA1,Tetra Tech,Inc.and their subconsultants will provide professional engineering services for an alternate pipeline route to avoid impacts to the Natures Hammock neighborhood. Change Order No. 1 will allow Tetra Tech, Inc. to provide additional design, survey, and environmental services along the alternate pipeline route and design modifications to the Spencer Water Reclamation Facility reclaimed pump facility to isolate an existing reclaimed distribution pump as a dedicated pump for reclaimed water transmission, as described in detail in the attached Change Order No. 1 Scope and Fee Proposal. The alternate pipeline route is expected to save on construction costs because it is shorter and requires less restoration than construction through the neighborhood. BUDGET: Staff budgeted$8.3M for this project within CCUA's Capital Improvements Program.The amended professional services fee of$726,442.00 proposed here is within this budget. Staff believes these fees are reasonable given the scope of services under this supplemental agreement. CCNA: CCNA, F.S. 287.055, does apply to the use of a consultant under a continuing contract. The anticipated construction cost of the project, including contingency, is $6,084,877.00. This does not exceed the statutory limit, $7,702,500.00, which includes the 2025 CPI adjustment. Staff negotiated Change Order No.1 to the Supplemental Agreement,which complies with F.S. 287.055. Staff and the consultant negotiated the scope and fee for the professional services at a compensation that CCUA determines is fair,competitive,and reasonable. RECOMMENDATION: Staff respectfully recommend that the Board of Supervisors approve the attached Change Order No. 1 for an additional $27,598.00 to Supplemental Agreement No. 1 with Tetra Tech, Inc. to provide Professional Engineering Services for the construction of new Reclaimed Main Extensions in the Northern Clay County area project for an amended contract amount in the amount of$726,442.00. ATTACHMENTS: Change Order No. 1 to Supplemental Agreement No. 1 with Tetra Tech,Inc. Scope&Fee Proposal Change Order No. 1 to Supplemental Agreement No. 1 to Professional Engineering Services Agreement 23/24-A01 with Tetra Tech, Inc. to provide Professional Services for the design, bid, and construction administration services for the installation of the "North Clay Reclaimed Transmission Mains" Project CCUA Project No. 2025-094 Engineer: James J. Wallace, P.E. Owner: Clay County Utility Tetra Tech, Inc. Authority 8880 Freedom Crossing Trail, Suite#101, Jacksonville, FL 32256 Date: October 6, 2026 Item: Description of Services: Provide professional engineering services as identified in the attached scope of services and fee proposal. Total SA No. 1 Price with Contingency $698,844.00 Change Order 1 to SA No. 1 Additional Coordination Services $4,028.00 Additional Survey Services $33,188.00 Additional Ecological Services $810.00 Additional Design Services $34,975.00 Permitting allowance $18,128.00 Total Additional Services $91,129.00 Minus SA No.1 Project Contingency -$63,531.00 Net Increase with Change Order No.1 $27,598.00 Total Amended Price $726,442.00 Total Price Not to Exceed Without Prior Authorization The Amended Contract time shall commence on October 6, 2026, and the scope of services is estimated to be completed on September 6, 2028, according to the amended schedule in the Change Order No. 1 Scope and Fee Proposal. This document, along with the Scope and Fee Proposal, becomes an amendment to the Professional Engineering Services Agreement, and all provisions of the Agreement apply hereto. Accepted by: Date: Engineer: James J. Wallace, P.E. Vice President Tetra Tech, Inc. Accepted by: Date: Owner: Jeremy D. Johnston, P.E., MBA, Executive Director Clay County Utility Authority TETRATECH September 28, 2026 Joe Paterniti, PE Assistant Chief Engineer Clay County Utility Authority 3176 Old Jennings Road Middleburg, FL 32068 Subject: Professional Engineering Services for the North Clay Reclaimed Transmission Pipelines—Change Order#1 Dear Mr. Paterniti, Tetra Tech is pleased to furnish this proposal for professional engineering services to assist the Clay County Utility Authority(CCUA) with the North Clay Reclaimed Transmission Pipelines project. A detailed scope of services and compensation summary are attached hereto. We look forward to providing these services to the CCUA. If you should have any questions, please do not hesitate to contact me at 478-954-5219. Respectfully, Tetra Tech, Inc. Daniel D. Hill, P.E. Civil Engineer Daniel.Hill1 tetratech.com Attachments: Tetra Tech, Inc. 8880 Freedom Crossing Trail,Suite#101,Jacksonville,FL 32256 Tel 904.636.6125 Fax 904.636.6165 www.tetratech.com ATTACHMENT A CLAY COUNTY UTILITY AUTHORITY NORTH CLAY RECLAIMED WATER TRANSMISSION PIPELINES SCOPE OF SERVICES—CHANGE ORDER#1 I. PROJECT DESCRIPTION Clay County Utility Authority (CCUA) intends to make reclaimed water transmission pipeline improvements as part of the North Clay Reclaimed Transmission Pipelines Project. To meet the growing demand for reclaimed water in the southern service area, CCUA must transfer an excess of reclaimed water from the northern service area. To do so, three pipeline segments are planned to parallel the existing transmission pipeline system where it is interconnected into the distribution system. This will create an uninterrupted transmission system that can maintain the pressures and needs of the system. • Segment 1 consists of 6,500 LF 20" reclaimed water main from the Spencer's Crossing Water Reclamation Facility (WRF)to a connection along Oakleaf Village Parkway. • Segment 2 consists of 2,800 LF 12" reclaimed water main paralleling Challenger Drive from Kindlewood Drive to the First Coast Expressway(SR 23)to connect to the Oakleaf system. • Segment 3 consists of 4,300 LF 12" reclaimed water main from White Bark Plantation Drive and Brannon Mill Blvd.,traversing the unimproved right of way(R/W)of Brannon Mill Blvd to Whisper Creek Blvd, continuing West to a CCUA held property East of Challenger Drive. CCUA reviewed and approved the reclaimed water main alignments through the 30% design level on April 8, 2026, and authorized Tetra Tech to proceed with the 75% design for the North Clay Reclaimed Water Transmission Mains.Tetra Tech then completed and submitted the 75%design documents on July 15, 2026, and participated in a 75% design review meeting with CCUA on August 3, 2026. During that review,the project team discussed the potential for an alternative route for Segment 1 that would move the reclaimed water main away from the neighborhood and the significant impacts to the residents that could not be mitigated. CCUA and Tetra Tech subsequently evaluated the feasibility of an alternative to this alignment, and on August 21, 2026, CCUA elected to pursue this route revision and requested a proposal from the Tetra Tech for the associated additional services. The scope of services provided herein is for additional design services pertaining to design of segment 1 of the reclaimed water mains, realigning the proposed reclaimed water main to an existing 35' utility easement outside of the Canopy Oaks neighborhood, for approximately 4,500 LF. In addition, this scope of services includes a requested modification to the plant end connection of the reclaimed water main at Spencer's WRF, to include connecting the reclaimed water main to the pump station header within the pump station building rather than the distribution main. The proposed pipeline routes are planned within existing R/W, CCUA property, and easements. No additional easements are anticipated for the project and therefore no land acquisition assistance has been included. JJW/North Clay Reclaimed Transmission Pipelines ICI TETRA TECH Tt#200-409170-26001 -1- 09/23/2026 � �"� In order to provide logical,orderly completion of this assignment,the change order has been broken down into three (3) tasks. Tasks to be completed are further described herein. This proposal is for additional scope for professional engineering services associated with project coordination, field services, and final design services. II. SCOPE OF SERVICES 001. Project Coordination Services: Tetra Tech will provide project coordination and administration activities such as staffing, budget management, schedule management, and coordination with CCUA as required. This is based upon an assumed project schedule as identified in Section V. Tetra Tech will provide the following Project Coordination services: A. Tetra Tech will make one additional field visit during the final engineering and design phase to observe specific field conditions. 002. Field Services: All field services will be coordinated with CCUA, and will consist of the following: A. Topographic Surveying Services: Topographic surveying services are proposed to be performed by Degrove Surveying, LLC, and will consist of the following: • Topographic surveying will consist of(1) foot topography, surface utilities, stormwater culverts, R/W and easement boundaries, and above ground features within the route limits,with cross sections every 200'. In addition,topographic survey will include 5 feet outside, but contiguous to, the R/W on each side of the R/W. Will include picking up existing fence locations and fence types (field fence, barbed wire, etc.). • Subsurface Utility Engineering(SUE)in accordance with ASCE 38-02 Quality level B along the project route. • Once the proposed routing is confirmed by CCUA,SUE will be performed in accordance with ASCE 38-02 Quality level A. Up to 5 test holes will be included. • A tree survey will be included where applicable. Trees larger than 6-inch diameter at breast height(DBH) will be collected,with species identified. • Coordinate with the Ecological and Geotechnical Engineering services as identified in Tasks 002.E and 002.0 to collect the wetland flags, endangered species flags, and geotechnical boring locations. JJW/North Clay Reclaimed Transmission Pipelines ICI TETRA TECH Tt#200-409170-26001 -2- 09/23/2026 � �"� • Vertical control data shall be based on the North American Vertical Datum 1988. Benchmarks will be provided in the project site as needed for the various areas provided above. • Horizontal control data shall be relative to the Florida State Plane Coordinate System, North American Datum of 1983/1990 adjustment. • All work will be completed under the direct supervision of a professional surveyor and mapper licensed to practice in the State of Florida and work will be in accordance with the Standards of Practice set forth by the Florida Administrative Code 5J-17.051 for Surveyors & Mappers, pursuant to Section 472.027 Florida Statutes. B. Ecological Services: Ecological services will consist of the following: • Tetra Tech will delineate the extent of Florida Department of Environmental Protection (FDEP) state wetlands and USACE federal wetlands, including Waters of the U.S. (WOTUS), and other surface waters according to the current regulations, interpretations, and guidelines where the project limits encroach upon said waters/wetlands. • During the wetland delineation, Tetra Tech will conduct a preliminary assessment of protected species and their habitats within the project limits and bordering areas. • Tetra Tech will prepare a Wetlands and Listed Wildlife and Habitat Assessment Report with shapefiles to support the engineering drawings for planning, design, and local, state, and federal permitting purposes. • An allowance for FDEP ERP General permit and associated FDEP Wetland Determination Review are included for the necessary permitting process', if the qualifications for an exemption (less than 0.1-acre impact) cannot be met. Deliverables: • Topographic Survey and SUE • Wetlands and Listed Wildlife and Habitat Assessment Report 004. Final Design Services: Tetra Tech will prepare and submit construction documents, including engineering drawings, technical specifications, and an engineer's opinion of probable construction cost(EOPCC) at the 75% design completion levels for CCUA review, for the design of approximately 4,500 LF of reclaimed water main realigning the proposed reclaimed water main to an existing 35' utility easement outside of the Canopy Oaks neighborhood, as well as a modification to the plant connection at Spencer's WRF to include connecting the reclaimed water main to the pump station header within the pump station building. Tetra Tech will then incorporate the 75% design into the previously scoped 100%design deliverable moving forward. (� JJW/North Clay Reclaimed Transmission Pipelines ICI TETRA TECH Tt#200-409170-26001 -3- 09/23/2026 � �"� The final design services will consist of the following: A. Engineering Drawings will be provided at the 75% design completion level and prepared utilizing AutoCAD Civil 3D and provided to CCUA as a PDF document. A preliminary list of engineering drawings is presented below: Civil—16 sheets Reclaimed Water Main Plan and Profile Sheets (Scale: 1" =40' H, 1" = 5' V) (5 sheets) Pump Station Plan and Demolition Sheets Civil Details (2 sheets) Pavement Repair and Sediment and Erosion Control Sheets (3 sheets) B. Engineer's Opinion of Probable Construction Cost (EOPCC): The EOPCC will be provided at the 75% (A.A.C.E. Class 2) design completion level and provided to CCUA as a PDF document.Tetra Tech will prepare an EOPCC based on previous bid tabulations,vendor quotes, and estimates provided by Contractors. C. Quality Assurance/Quality Control: Tetra Tech will implement a quality assurance and quality control (QA/QC) program as an integral part of the delivery of the project at the 75% design completion level. Quality reviews are an internal QA/QC procedure that will be done by senior level technical peers who were not involved in the development of the documents. The senior level technical peers will review draft documents for proper application of the approved assumptions, calculation methods, design methods and technologies. D. Review Meetings: Tetra Tech will attend an in-person design review meeting with CCUA at the 75% design completion level. Tetra Tech will maintain a comment tracking log and provide responses to all comments received from each design completion level. Deliverables: • Engineering Drawings at the 75% Design Completion Level • EOPCC at the 75% Design Completion Level • Comment Tracking Log and Responses at the 75% Design Completion Level JJW/North Clay Reclaimed Transmission Pipelines ICI TETRA TECH Tt#200-409170-26001 -4- 09/23/2026 � �"� III. ASSUMPTIONS 1. Hydraulic modeling services to verify the pipe size and capacity have previously been completed by others, and therefore, are not included as part of this scope of services. 2. Hydraulic modeling services to verify that two (2) pumps identified to operate the proposed transmission main within the reclaimed pump station will be completed by CCUA, and therefore, are not included as part of this scope of services. 3. CCUA will provide all record drawings, as-builts, pertinent easement/property information, and GIS files related to the prospective routes(s). 4. CCUA will provide record drawings of the reclaimed water pump station at Spencer's WRF 5. It is anticipated that there is room for an additional wall penetration at the reclaimed water pump station at Spencer's WRF for the proposed connection, and no major building modifications are required (ie. Building expansion, wall removal, or door/window modification). 6. Easement drawings and real estate acquisition assistance are not included in this scope of services. 7. Groundwater sampling and analyses to comply with the FDEP Generic Permit for the Discharge of Produced Groundwater from Any Non-Contaminated Site Activity is not included in the cost proposal, as no contamination was found within 500 feet of the project per review of the FDEP contaminant locator map. 8. If hazardous materials or contaminated soils or groundwater are found during the geotechnical investigation,subsurface utility investigation, or construction, additional testing, investigation,or remediation are not included in this scope of services. 9. CCUA will be responsible for the Bidding and Contract Requirements (i.e., Divisions 0 and 1); however,Tetra Tech will support as needed. 10. Electronic submission of the Permitting applications with all application fees paid for by CCUA. 11. It is anticipated that permanent wetland impacts will be less than 0.5 acres. If permanent wetland impacts are greater than 0.5 acres, then an Individual State ERP will be required, and Tetra Tech will request additional funding. 12. Storm Water Pollution Prevention Plans (SWPPP) and National Pollutant Discharge Elimination System (NPDES) permits are not included in this scope of services and are assumed to be a part of the awarded Contractor's responsibilities. JJW/North Clay Reclaimed Transmission Pipelines ICI TETRA TECH Tt#200-409170-26001 -5- 09/23/2026 � �"� IV. COMPENSATION SUMMARY The total compensation for the above-described services is$91,129 for Tasks 001,002, and 004 to be provided on a Lump Sum basis. A fee breakdown is provided below, and a detailed breakdown is included as Attachment C. Services will be invoiced to CCUA on a monthly basis. Task Amount 001. Project Coordination Services $4,028 002. Field Services $52,126 004. Final Design Services $34,975 Total Price: $91,129 Notes: 1. Subconsultant proposals provided in Attachment C and D. 2. Environmental services include$11,686 for permitting services allowance. V. SCHEDULE This schedule is based off an assumed notice to proceed (NTP) date of October 1, 2026. Any modifications to the NTP date would affect the dates listed below. Milestone Duration Cumulative Date (Weeks) Duration (Weeks) Notice to Proceed - - 12/16/2025 Kickoff Meeting 3 1/6/2026 Surveying* 6 9 2/17/2026 Ecological Assessment* 6 44 3/3/2026 Geotechnical Investigation* 49 43 3/17/2026 Basis of Design § 1-4 3/24/2026 30% Design Review Meeting 2 4.6 4/7/2026 75% Design Submittal 1-4 38 7/14/2026 75% Design Review 2 32 7/28/2026 ' Change Order 1 Notice to Proceed - - 10/01/2026 Surveying 6 6 11/12/2026 Updated 75% Design Submittal (Alt Rt 1) 6 12 12/23/2026 Updated 75% Design Review 2 14 1/7/2027 Permit Application Submittals& RAI Responses 6 20 2/18/2027 100% Design Submittal (Bid Package) 6 26 3/31/2027 Bidding 8 34 05/27/2027 Construction NTP 2 36 06/10/2027 Materials Procurement& Mobilization 8 44 08/05/2027 Pipeline Installation &Testing 40 84 05/11/2028 Substantial Completion 8 92 7/06/2028 Final Completion 8 100 8/31/2028 Note: Schedule assumes a 2-week review of all deliverables by CCUA. Fi t)JJW/North Clay Reclaimed Transmission Pipelines ICI TETRA TECH Tt#200-409170-26001 -6- 09/23/2026 � �"� ATTACHMENT B CLAY COUNTY UTILITY AUTHORITY NORTH CLAY RECLAIMED WATER TRANSMISSION PIPELINES DETAILED FEE BREAKDOWN JJW/North Clay Reclaimed Transmission Pipelines 'fit TETRA TECH Tt#200-409170-26001 -7- 09/23/2026 f i Price Proposal Revision Date: Labor Plan I ATTACHMENT B Sep 25,2026 7 Resource North Clay Reclaimed Water Transmission Pipelines Bill Rate> 300.00 250.00 200.00 195.00 135.00 160.00 I 120.00 Proj Area> Submitted to:Clay County Utility Authority(CCUA)(Attn:Joe Paterniti,P.E.) - Pricing by Resource u 3 n m a w m o r E Total _ = a a Q " < r Task Pricing Schedule Labor Hrs ig v a u d o 674 .5 d 2 v a d R Labor Subs Travel Totals Project Phases/Tasks From Thru Months 220 15 6 69 24 38 64 4 40,330 50,128 671 91,129 t 001-Project Coordination Services 18 5 - 11 - - - 2 3,940 - 88 4,028 C.Additional Field Visits(1) 10/01/26 10/31/26 1.0 6 3 3 1,500 88 1,588 D.Project Coordination 12 2 - 8 - - - 2 2,440 - - 2,440 Project Schedule 10/01/26 03/31/28 17.6 - - Project Status Reports 10/01/26 03/31/28 17.6 - - General Project Coordination 10/01/26 03/31/28 17.6 12 2 8 2 2,440 2,440 002-Field Services 8 MI - 6 - - - 1,800 50,128 198 52,126 A.Topographic Surveying 5 1 - 4 - - - - 1,100 32,000 88 33,188 Topographic Surveying 10/01/26 10/31/26 1.0 - 32,000 32,000 Coordination 10/O1/26 10/31/26 1.0 5 1 4 1,100 88 1,188 B.Ecological Services 3 1 - 2 - - - - 700 18,128 110 18,938 Ecological Services 10/01/26 10/31/26 1.0 - - - - - - - - - 18,128 - 18,128 Wetland Deliniation and Species Assessment - 6,443 6,443 Allowance-ERP General Permit - 9,073 9,073 Allowance-FDEP Wetland Determination Review - 2,613 2,613 Coordination 09/10/26 10/31/26 1.6 3 1 2 700 110 810 004-Final Design 194 8 52 24 38 64 2 34,590 - 385 34,975 A.Engineering Drawings 160 4 - 40 20 32 64 - 27,660 - 275 27,935 75%Design Drawings 10/31/26 12/23/26 1.7 160 4 40 20 32 64 27,660 275 27,935 B.EOPCC 17 1 - 8 4 4 - - 3,220 - - 3,220 75%EOPCC 10/31/26 12/23/26 1.7 17 1 8 4 4 3,220 3,220 C.CIA/QC 7 1 6 - - - - - 1,800 - - 1,800 QA/QC 10/31/26 12/23/26 1.7 7 1 6 1,800 1,800 D.Review Meetings 10 2 - 4 - 2 - 2 1,930 - 110 2,020 75%Review Meeting 10/31/26 01/07/27 2.2 10 2 4 2 2 1,910 110 2,020 005-Permitting - - 1 Totals 09/10/26 03/31/28 18.3 220 15 6 69 24 38 64 4 40,330 50,128 671 91,129 Tetra Tech-Confidential and Proprietary Page 1 of 1 Printed 9/25/2026 ATTACHMENT C CLAY COUNTY UTILITY AUTHORITY NORTH CLAY RECLAIMED WATER TRANSMISSION PIPELINES SURVEY SUBCONSULTANTS SCOPE (DEGROVE) JJW/North Clay Reclaimed Transmission Pipelines 'fit TETRA TECH Tt#200-409170-26001 -8- 09/23/2026 DE R V E SURVEYORS, INC. September 22, 2026 Daniel D. Hill, P.E. Tetra Tech 8880 Freedom Crossing Trail, Suite 101 Jacksonville, Florida, 32256 Subject: Surveying and Mapping Services — Clay County Utility Authority - Reclaim Water System —Segment 1 Revised Alignment Dear Mr. Hill: The following is a proposal for surveying and subsurface utility designation services in support of the referenced Reclaimed Water Main project. Project Limits Segment 1 - Revised — From Oakleaf Village Parkway to Oakleaf RWF following existing 35-foot easement. The survey will extend 5 feet outside of the easement. F . ,, VI ` ` / Y j. , - 9 ,t'i,,,,v,.>;..14,-,.,CPT. Nirk 4• rl... .. y 41:4; ,: 1 bra. 1 t. • .- \ tti,t‘ - ' - 2131 CORPORATE SQUARE BLVD. JACKSONVILLE, FLORIDA 32216 (904)722 0400 • FAX(904)722 0402 DEGROVE@DEGROVE.COM Scope of Work 1. General: The survey will establish horizontal and vertical control and determine existing site conditions for design considerations in the construction of the reclaimed water main. The result of the survey shall be the completion of a topographic survey along the route of the proposed reclaimed water main. The survey will be completed under the supervision and direction of a Surveyor and Mapper licensed in the State of Florida. 2. Vertical and Horizontal Control: Degrove shall establish and depict on the survey multiple temporary benchmarks using a closed level loop from an established benchmark referenced to the NAVD 1988 Datum. Degrove shall establish horizontal control at the site based on Florida State Plane Coordinates NAD 83. Third Order accuracy shall be required for the horizontal control. All temporary benchmarks shall have horizontal control to define their location. 3. Survey Requirements: Degrove shall complete a topographic survey of the existing easement shown in the Figure above. In addition, we shall complete a topographic survey 5 feet outside of, but contiguous to each side of the easement. A. Features to be located include, but are not limited to, the following: 1. Apparent easement limits and widths. Specific easement rights with respect to underground water and sewer utilities. 2. Type and width of pavement, with street corner radius. 3. Apparent boundary lines. 4. Apparent property lines. 5. Fences, gates, hedges, center of trees over six inches and large bushes (type and sizes of all indicated). NOTE: IDENTIFY LIVE OAK TREES SEPARATE FROM OTHER OAK TREES. 6. Driveways and sidewalks, type and width indicated. 7. Houses and structures (if located within the scope of work) and slab elevation. 8. Street, road and railroad crossings, rail iron, and include street names or railroad owner's name. 9. Manholes, valves and valve boxes, catch basins, ditch bottom inlets and grates, junction boxes, and culvert end sections. Downstream and upstream manholes, catch basins, and inlet/rim and invert elevations shall be provided, for all pipelines crossing the area of interest. 10. Top of bank and toe of slope of ditches and swales and inverts of culverts. 11. Ponds to the edge of water 12. Type and width of existing curb and gutter, with flowline. 13. Existing water meters and water service lines. 14. All buildings, structures, trees, landscaping, and obstructions within this SCOPE OF WORK. 15. Include addresses for all houses, buildings, and properties. 16. Location of test hole (VVH) locations as performed by Degrove. 17. The location of soil borings performed by others (Tetra Tech's Geotechnical Subconsultant). Coordination with Tetra Tech's Geotechnical Subconsultant will be required. 18. The location of wetland flags along the project route (flags to be set by Tetra Tech's Environmental Subconsultant). Coordination will be required to locate the wetland flags within 1 to 2 days of the flagging. 19. The SURVEYOR shall locate Endangered species flags along the project route (flags to be set by Tetra Tech's Environmental Subconsultant), including but not limited to gopher tortoise. B. Elevations and Cross Sections: Degrove shall provide elevations for the following specific items required for vertical control: 1. Elevations shall be taken every 200 feet on station and shall include centerline, edges of pavement, gutter elevations, top of curb, front and back of sidewalks, top of bank and toe of slope of swales and ditches, right-of-way lines, all changes in grade between 200-foot stations, and throughout the intersections of roadways (especially at the intersection of the baselines, road centerline intersections, approaches, and curve radii). 2. All rim, invert, and bottom elevations of storm, gas, fiber optic, telephone, and sanitary sewer manholes; catch basins and storm grates; and the top of the operating nut of all utility valves. Also provide pipe materials and sizes for sanitary sewer, storm sewer lines, and water mains. If any structure cannot be accessed to obtain the information, the SURVEYOR shall notify CCUA, or the proper authority, well in advance of the scheduled completion date. CCUA, or the proper authority, will try to provide access to those structures. C. Subsurface Utility Designation and Verified Vertical and Horizontal (VVH) location: 1. Identify the horizontal location of subsurface utilities within the project boundaries. The location will be marked on the ground and identified as to type. The existence and location of the subsurface utilities will be determined through the use of electromagnetic and ground penetrating radar. Subsurface utility designation shall be in accordance with Standards for a Quality Level B Utility Investigation as defined by the American Society of Civil Engineers (ASCE) Publication 38-22. 2. Verify the existence and depth of specified subsurface utilities. Vacuum excavations or other methods will be employed to determine the location and depth of utilities up to 6 feet in depth or until groundwater is encountered. For costing purposes, the proposal includes 5 VVH's in grass/dirt (the locations will be determined during the design phase). Subsurface utility VVH's shall be in accordance with Standards for a Quality Level A Utility Investigation as defined by the ASCE Publication 38-22. 4. CAD Requirements: A. Degrove shall provide all digitized data in AutoDesk Civil 3D. The survey shall be plotted at a scale of 1" = 20'. A signed and sealed Surveyors Report will be provided at the conclusion of the survey. Produce a working 3D surface model within the project scope defined by the boundaries established from geographic references, point data, area of easements and ROW's. 5. Deliverables: A. A signed and sealed surveyors report will be provided. B. An electronic file containing all of the information required by this scope. 6. Fee Breakdown: The fee proposal for the above scope of work shall is as follows: A. Topographic Survey: $14,250.00 B. Subsurface Utility Designation (ASCE 38-22 Levels B, C, D): $15,500.00 C. Subsurface Utility Test holes (VVH) locations (ASCE 38-22 Level A) for 5 VVH's in grass/dirt $2,250.00 ($450.00 each). Thank You for the opportunity to submit this proposal. We look forward to working with you on this project. Regards, Gordon R. Niles, PSM, CH President ATTACHMENT D CLAY COUNTY UTILITY AUTHORITY NORTH CLAY RECLAIMED WATER TRANSMISSION PIPELINES ECOLOGICAL SERVICES SUBCONSULTANTS SCOPE (TETRA TECH) JJW/North Clay Reclaimed Transmission Pipelines 'fit TETRA TECH Tt#200-409170-26001 -9- 09/23/2026 ln-t: TETRA TECH MEMO To: Jamey Wallace, Tetra Tech, Inc. (IEW) Date: August 26, 2026 Subject: Mod 1 Clay County Utility Authority Sewer Drain Project-Environmental Permitting Services SCOPE OF WORK Tetra Tech IEW (TT IEW) requested that Tetra Tech EGS (TT EGS) provide a modification to TT EGS project #1121C11394 to include the revised pipeline alignment, totaling approximately 4,203 linear feet(Proposed Project), in Clay County, FL (Figure 1). The following is assumed to be needed based on recent communications with Tetra Tech IEW. Task 1: Wetland Delineation and Listed Species Assessment: TT EGS will delineate the extent of on-site Florida Department of Environmental Protection (FDEP) state wetlands and U.S. Army Corps of Engineers (USACE) federal wetlands (i.e., Waters of the U.S. (WOTUS) and other surface waters according to the current regulations, interpretations, and guidelines for the site for the revised pipeline segment (see attached Figure). Based on a cursory review of online databases, wetlands and other surface waters were observed within the proposed pipeline route. All wetlands and surface waters within the ROW of the pipeline route will be delineated (Project Area). All Jurisdictional wetland limits will be GPS surveyed with a sub-meter GPS unit and marked in the field utilizing alpha-numeric labeled survey tape. During the wetland delineation field effort, TT EGS will conduct a site reconnaissance of state and federally listed species and their habitats within the limits of disturbance of the project area.Within two weeks of following the fieldwork, we will provide a Wetlands and Listed Wildlife and Habitat Assessment Report,along with shapefiles to support the engineering drawings for planning,design, and local,state, and federal permitting process. We anticipate the fieldwork effort will take two (2)Wetland Scientists one (1)day to complete the fieldwork effort. Task 3: FDEP General Permit: If the proposed project does not meet the de minimis-type activities that are required for an Environmental Resource Permit (ERP) Exemption, a General Permit may be required. The Project may qualify for a General Permit under 62-330.453 F.A.C., for Installation, Maintenance, Repair, and Removal of Utility Lines if the activity meets the permitting conditions, including the maximum width of the disturbed corridor in wetlands shall not exceed 30 feet and the total area of forested wetland disturbance shall not exceed 0.5 acre per ten miles. Additional conditions can be found at https://flrules.org/gateway/ruleNo.asp?id=62-330.453. TT EGS will collaborate with TT IEW engineering and use the information obtained during the wetland delineation fieldwork to complete the necessary sections of an ERP General Permit application for the project. TT EGS will prepare the environmental, wetlands, and mitigation portions of the application; compile engineering information, construction information,and drawings provided by TT IEW;and conduct impact assessments based on the wetland boundaries and engineering design specifications. Based on the acreage and type of unavoidable wetland impacts, TT EGS will determine the amount and type of mitigation credits required, if any. Tetra Tech will consult with representatives of the FDEP ERP staff to discuss the ERP application, project design, and avoidance/minimization efforts to reduce impacts on wetlands, listed species, and their habitats. This task includes one (1) conference Tetra Tech Document#26JAX0075 Tetra Tech, Inc. 8880 Freedom Crossing Trail, Suite 101,Jacksonville, Florida 32256 Tel 904.636.6125 Fax 904.636.6165 tetratech.com call/online meeting with FDEP ERP and a Uniform Mitigation Assessment Method (UMAM)assessment of wetland impacts, if applicable. TT EGS will respond to up to two (2) RAIs from FDEP ERP review staff with the assistance of the TT IEW project engineer. TT IEW will provide all support needed to complete the application. If wetland impacts are greater than 0.5 acres and/or the project doesn't meet the criteria for a general permit, an FDEP Individual Permit may be required. In this case, TT EGS will request additional funding, if necessary. Task 4: FDEP Wetland Determination Review: If the project submits a General Permit, FDEP Regulatory Staff may request an on-site wetland determination review of the wetland delineation. Any changes to the locations of on-site wetlands will be incorporated into the Wetland Delineation Map and the CAD/GIS and provided for incorporation into the engineering drawing. TT EGS will coordinate with state agencies to schedule a site visit. We anticipate one (1)TT EGS wetland scientist for(1) day. ASSUMPTIONS TT assumes the following as it relates to this project: 1. The project meets the FDEP criteria for a General Permit. 2. No USAGE permit is required because the project will not permanently impact more than 0.1 acre of Waters of the United States (WOTUS). 3. Electronic submission of permitting applications,wetland delineation files, and Wetlands and Listed Wildlife and Habitat Assessment Report will be provided; no paper copies. 4. Formal boundary and features survey work, requiring a registered professional surveyor, will be performed by others. 5. All application permitting and mitigation fees will be paid for by the Client (CCUA). 6. It is anticipated that there will be reasonable ease of access to the project site to perform the tasks detailed in this proposal. PROPOSED COSTS TT EGS will complete the services for a total of$18,127.50 on a Time and Materials task basis, not to exceed. The following is the proposed cost per task: Task 1 Wetland Delineation and Listed Species Assessment $6,442.50 Task 3 ERP General Permit $9,072.50 Task 4 FDEP Wetland Determination Review $2,612.50 Project Total $18,127.50 Tetra Tech Document#26JAX0075 Tetra Tech, Inc. 8880 Freedom Crossing Trail, Suite 101,Jacksonville, Florida 32256 Tel 904.636.6125 Fax 904.636.6165 tetratech.com SCHEDULE TT EGS can begin work on this project within five business days of receipt of an approved Inter-Services Agreement from TT IEW. TT EGS anticipates the fieldwork and documentation to be completed within 3 weeks of receiving authorization. To allow for potential delays outside of our control and to allow Tetra Tech time to perform miscellaneous closeout actions, we will set the end date of this project to June 30, 2026. Enclosures: Figure 1 —Segment 1 Alternate Alignment Map Table 1 —Project Pricing Tetra Tech Document#26JAX0075 Tetra Tech, Inc. 8880 Freedom Crossing Trail, Suite 101,Jacksonville, Florida 32256 Tel 904.636.6125 Fax 904.636.6165 tetratech.com JAX:\\tt.local\GIS\US\EGS\Jacksonville\GIS\Pro'ects\Natural Resources\Jame Wallace IEW-Cla Count Utilit Authorit\Jame Wallace-Cla Count Sewer Pi.eline.a.rx Aerial Source:Goggle Maps,2024 t, v 'A, I 7";Atil . '•rih vie 4', rt:,, i • . „ill. ' *1;9,4'.r.?IN • 0? . . • ' oar . �dho. "�.. '�_- y , It • w '�► . it ic I ' ,i4i- :' -- 4 (f 3 ,`ti t.v . 4' . 411. . 7kli. `' r i 7� , zu -14 All., . 1 ,T , :;, Al ' dir- .I'Ziff - f ``° , ik r,. rave If - i 'silt"~ iff . 7. _:....4 ie .0... allr • + � et - 1 Lift Station '^� lift 1/.l.�4 .4. '/.. �- L 1 r �` - - Cunningham Rd Cunningham - • , - • ,}- I . r I r . or f ' rr. sR ,'i ot' . _ .m1/116 .� �4nit 7 1- . Pa ,lib 7 All . ' . . Legend t ..A TT Segment 1 Project Area(19.92 acres) ill- 1 Segment 1 RWM Aligment Estimated Wetlands(8.80 acres) 700 0 700 I Feet DRAWN BY DATE CONTRACT NUMBER M.COLLINS 8/25/2026 n TETRA TECH __ CHECKED BY DATE APPROVED BY DATE Segment 1 Alternate Alignment Map H.CAROLAN 8/25/2026 REVISED BY DATE North Clay RWM Transmission Pipeline APPROVED BY DATE SCALE Clay County, FL FIGURE NO. REV AS NOTED 1 0 Task 1 Wetland T&E Task 3 General Permitting Task 4 Wetland Review Total LABOR I Contracted Category Employee Name Billable Labor Hours Total Hours Total Hours Total Hours Total Rate Sr.Consultant 1 Carolan,Heather $ 180.00 6.00 $ 1,080.00 6.00 $ 1,080.00 4.00 $ 720.00 16.00 $ 2,880.00 Scientist 2 _ Collins,Megan $ 110.00 14.00 $ 1,540.00 43.00 $ 4,730.00 14.00 $ 1,540.00 71.00 $ 7,810.00 Scientist 1 Shaw,Patrick $ 95.00 34.00 $ 3,230.00 30.00 $ 2,850.00 - $ - 64.00 $ 6,080.00 Project Analyst I Robbins,Diann $ 105.00 0.50 $ 52.50 0.50 $ 52.50 0.50 $ 52.50 1.50 $ 157.50 Project Adm Toner,Brenda $ 120.00 2.00 $ 240.00 3.00 $ 360.00 - $ - 5.00 $ 600.00 Labor Subtotal 56.50 $ 6,142.50 82.50 $ 9,072.50 18.50 $ 2,312.50 157.50 $ 17,527.50 OTHER DIRECT COSTS&TRAVEL Category Description Unit Cost Quantity Total Quantity Total Quantity Total Quantity Total Field supplies $ 100.00 0.50 $ 50.00 - $ - - $ - 0.50 $ 50.00 Hydration $ 100.00 0.50 $ 50.00 - $ - 0.50 $ 50.00 1.00 $ 100.00 Travel-Auto Rental $ 150.00 1.00 $ 150.00 - $ - 1.00 $ 150.00 2.00 $ 300.00 Travel-Gas and Tolls $ 100.00 0.50 $ 50.00 - $ - 1.00 $ 100.00 1.50 $ 150.00 ODCs and Travel Subtotal $ 300.00 $ - $ 300.00 $ 600.00 SUBCONTRACTORS Category Description Unit Cost Quantity Total Quantity Total Quantity Total Quantity Total Subcontractor Subtotal $ - $ - $ - $ - TOTALS Labor Subtotal $ 6,142.50 $ 9,072.50 $ 2,312.50 $ 17,527.50 ODCs and Travel Subtotal $ 300.00 $ - $ 300.00 $ 600.00 Subcontractor Subtotal $ - $ - $ - $ - GRAND TOTAL $ 6,442.50 $ 9,072.50 $ 2,612.50 $ 18,127.50