AGENDA ITEM:
Amendment No. 1 to Agreement No.9 with Four Waters Engineering Inc.(Four Waters)to the Professional
Services Agreement 2018/2019 RFQ No. 3 for Lift Station No. 4(LS4)Upgrades.
Project Number: 2022-049
Finance Number: 22008RR
Date:November 4,2026
CCUA staff requests approval of Amendment No. 1 to Agreement No. 9 with Four Waters Engineering
Inc.to the Professional Services Agreement 2018/2019 RFQ No. 3 for LS4 upgrades.
BACKGROUND:
In April 2022,the Board approved Supplemental Agreement No. 9 with Four Waters Engineering,Inc. for
$106,310 to provide design, construction document preparation, permitting, bidding, and engineering
services during construction for LS4 upgrades.
Four Waters completed the final design for LS4 in September 2025. Staff determined it was in the Utility's
and its customers' best interest to have in-house staff construct the upgrades and provide construction
engineering and inspection services for the lift station. With this scope deduction, staff used Four Waters'
electrical consultant under this authorization to help develop the CCUA Lift Station Electrical Standards
for a fee of$6,500. Staff completed the Lift Station Electrical Standards in May 2026. This request reduces
the Four Waters authorization by$43,740 for bidding and engineering services for construction tasks while
adding the electrical consulting fee.
BUDGET:
Staff budgeted $1,000,000 for Lift Station No. 4 upgrades in the approved FY 27 CIP. The table below
shows the Four Waters Authorization summary.
Four Waters Authorization Summary Table
SA No. 9 Amount $106,310.00
Amendment No. 1 Deduction -$43,740.00
Final Authorization $62,570.00
CCNA:
CCNA, F.S. s. 287.055, applies to the use of a consultant under a continuing contract. The estimated
construction cost for the project does not exceed $7.5 million. Staff negotiated this Amendment No. 1 to
the Supplemental Agreement in compliance with F.S. s. 287.055. Staff and the consultant negotiated the
scope and fee for the professional services based on established contract rates, with compensation that
CCUA determines is fair, competitive, and reasonable.
//JP(Author)
//JL(Review)
//DD(Final)
RECOMMENDATION:
Staff respectfully recommends that the Board of Supervisors approve the attached Amendment No. 1 to
Supplemental Agreement No.9 with Four Waters to deduct$43,740 from its professional services tasks for
the upgrades to Lift Station No. 4.
ATTACHMENTS:
Amendment No.1 to Supplemental Agreement No. 9
//JP(Author)
//JL(Review)
//DD(Final)
Amendment No. 1 to Supplemental Agreement No. 9 with Four Waters Engineering,Inc. to
their Professional Services Agreement 2018/2019 RFQ No.3 for Lift Station #4 Upgrades.
Angela Bryan, P.E.
Four Waters Engineering, Inc. Owner: Clay County
Engineer: 324 6th Avenue North Utility Authority
Jacksonville, FL 32250
Date: November 3, 2026
Item: Description of Services:
Provide professional engineering services as
requested and identified in the attached scope of
services and fee proposal.
Task 1 Project Management and Survey $16,980.00
Task 2 30% Design $15,785.00
Task 3 Construction Documents Preparation $21,720.00
Task 4 Permitting Allowance $1,585.00
Task 5 Bidding Assistance $3,920.00
Task 6 Services During Construction $46,320.00
Supplemental Agreement 9 Total $106,310.00
Delete Task 5 -$3,920.00
Delete Task 6 -$46,320.00
New Task 5 Electrical Plan Upgrades $6,500.00
New Total Lump Sum Price Not to Exceed Without Prior Authorization $62,570.00
The Contract time shall commence on April 20, 2022. This document, along with the Scope and
Fee Proposal, shall become an amendment to the Professional Engineering Services Agreement
and all provisions of the Agreement will apply hereto.
Accepted by: Date: 10 ' 1 (p / 24,0 P
gineer:
ngela Bry , P.E., LEED AP
President
Four Waters Engineering, Inc.
Accepted by: Date:
Owner:
Jeremy D. Johnston, P.E., MBA,
Executive Director
Clay County Utility Authority